CN108879960A - A kind of harbour bank electricity monitoring system - Google Patents

A kind of harbour bank electricity monitoring system Download PDF

Info

Publication number
CN108879960A
CN108879960A CN201810825675.8A CN201810825675A CN108879960A CN 108879960 A CN108879960 A CN 108879960A CN 201810825675 A CN201810825675 A CN 201810825675A CN 108879960 A CN108879960 A CN 108879960A
Authority
CN
China
Prior art keywords
electrically connected
data
monitoring system
harbour bank
remote terminal
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810825675.8A
Other languages
Chinese (zh)
Inventor
胡长军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810825675.8A priority Critical patent/CN108879960A/en
Publication of CN108879960A publication Critical patent/CN108879960A/en
Pending legal-status Critical Current

Links

Classifications

    • H02J13/0013

Abstract

The invention discloses a kind of harbour bank electricity monitoring systems,Including monitoring system main body,Detection system and remote terminal,The bottom of monitoring system main body is electrically connected with long-range control zone,The bottom of long-range control zone is electrically connected with remote terminal,The bottom of remote terminal is electrically connected with user's login,The bottom that user logs in is electrically connected with remote validation,The bottom of remote terminal is electrically connected with client,Data transmit-receive area is electrically connected at the top of monitoring system main body,Background control terminal is electrically connected at the top of data transmit-receive area,When in use,After risk evaluating system assesses biggish data of floating,Risk analysis system again analyzes data listed by risk evaluating system,Risk analysis system is compared according to the record in this month in former years,Provide the larger reason of the floating of system judgement,Pass through the record in former years,It is possible to prevente effectively from there is the state judged by accident,Use suitable for harbour bank electricity monitoring system.

Description

A kind of harbour bank electricity monitoring system
Technical field
The present invention relates to monitoring system technical field, specially a kind of harbour bank electricity monitoring system.
Background technique
Electric power monitoring system is the real-time number of transformation and distribution system using computer, communication apparatus, measurement and control unit as basic tool The platform that provides the foundation is detected and remotely controlled according to acquisition, switch state, it can be arbitrarily complicated with detection, control equipment composition Monitoring system, become distribution monitor in played central role, can help enterprise eliminate isolated island, reduce operating cost, mention High efficiency accelerates to become reaction speed abnormal in process of distributing electricity.
But existing electricity consumption monitoring system is not suitable for the power monitoring at harbour, and existing monitoring can only carry out current data Record can not export situation to previous electric power and record and analyze its peak period and risk, and common monitoring system can not Internal system is adjusted by remotely monitoring, the efficiency of adjusting is lower.
So how to design a kind of harbour bank electricity monitoring system, becoming us will currently be solved the problems, such as.
Summary of the invention
The purpose of the present invention is to provide a kind of harbour bank electricity monitoring systems, to solve mentioned above in the background art ask Topic.
To achieve the above object, the present invention provides the following technical solutions:A kind of harbour bank electricity monitoring system, including monitoring system System main body, detection system and remote terminal, the bottom of the monitoring system main body is electrically connected with long-range control zone, described long-range The bottom of control zone is electrically connected with remote terminal, and the bottom of the remote terminal is electrically connected with user's login, the user The bottom of login is electrically connected with remote validation, and the bottom of the remote terminal is electrically connected with client, the monitoring system It is electrically connected with data transmit-receive area at the top of main body, Background control terminal, institute are electrically connected at the top of the data transmit-receive area The side for stating data transmit-receive area is electrically connected with monitoring camera, and the bottom of the monitoring camera is electrically connected with power supply, The other side in the data transmit-receive area is electrically connected with station control server, and the bottom of the station control server is electrically connected with electric power Database, the bottom in the electric power data library are electrically connected with data and extract area, and the bottom that the data extract area is electrically connected There is detection system, the side of the detection system is electrically connected with information storage area, and the other side of the detection system electrically connects It is connected to external storage area, the side of the external storage area is electrically connected with USB interface.
Further, the bottom of the remote validation is electrically connected with regulation terminal.
Further, the bottom of the detection system is electrically connected with data comparison system.
Further, the bottom of the data comparison system is electrically connected with risk evaluating system.
Further, the bottom of the risk evaluating system is electrically connected with risk analysis system.
Compared with prior art, the beneficial effects of the invention are as follows:This kind of harbour bank electricity monitoring system is provided with regulation eventually The risk at end, the use state for checking harbour electric power, current working condition and detection system that staff can be long-range is commented Estimate report, convenient for timely adjusting the power state of harbour bank, with remote control, extract data can, it is convenient to system It is checked, improves the practicability and functionality of system, be provided with data comparison system, transfer the history consumption of current harbour bank Electric data compare the electricity consumption situation in week, the moon, season and year, with week for comparison unit when, system just by the data of this week with The data of preceding surrounding compare, and facilitate staff to find the deviation wherein generated, help quickly to analyze current harbour The power operation state of bank is provided with risk evaluating system, and staff is reminded to reconnoitre it, to overall system power, bears The floating of lotus maximum value, power factor bound is assessed, and when floating larger, staff is reminded to carry out corresponding data It goes through, and makes remarks to floating is excessive, convenient for handle and regulate and control the working condition of harbour bank electricity power to data, It is provided with risk analysis system, when in use, after risk evaluating system assesses biggish data of floating, risk point Analysis system again analyzes data listed by risk evaluating system, and risk analysis system is carried out according to the record in this month in former years Comparison provides the larger reason of the floating of system judgement, by the record in former years, it is possible to prevente effectively from there is the state judged by accident.
Detailed description of the invention
Fig. 1 is agent structure schematic diagram of the invention;
Fig. 2 is detection system structure chart of the invention;
Fig. 3 is remote terminal structure figure of the invention.
In figure:1, monitoring system main body, 2, long-range control zone, 3, remote terminal, 301, user log in, 302, remotely test Card, 303, regulation terminal, 4, client, 5, data transmit-receive area, 6, Background control terminal, 7, monitoring camera, 8, power supply, 9, It stands and controls server, 10, electric power data library, 11, data extraction area, 12, detection system, 1201, data comparison system, 1202, wind Dangerous assessment system, 1203, risk analysis system, 13, USB interface, 14, information storage area, 15, external storage area.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", "top", The orientation or positional relationship of the instructions such as "bottom", "inner", "outside", " hollow out " is to be based on the orientation or positional relationship shown in the drawings, only It is that for the convenience of describing the present invention and simplifying the description, rather than the device or element of indication or suggestion meaning must have specifically Orientation is constructed and operated in a specific orientation, therefore is not considered as limiting the invention.
Fig. 1-3 is please referred to, the present invention provides a kind of technical solution:A kind of harbour bank electricity monitoring system, including monitoring system Main body 1, detection system 12 and remote terminal 3, the bottom of monitoring system main body 1 are electrically connected with long-range control zone 2, long-range to control The bottom in area 2 is electrically connected with remote terminal 3, and the bottom of remote terminal 3 is electrically connected with user and logs in 301, and user logs in 301 Bottom be electrically connected with remote validation 302, the bottom of remote terminal 3 is electrically connected with client 4, monitoring system main body 1 Top is electrically connected with data transmit-receive area 5, and the top in data transmit-receive area 5 is electrically connected with Background control terminal 6, is convenient for port An Kou Electric power background monitoring center is directly adjusted electric system, and the side in data transmit-receive area 5 is electrically connected with monitoring camera 7, it records a video to external electric power facility, prevents artificial destruction circuit, the bottom of monitoring camera 7 is electrically connected with power supply 8, distributed power supervision department, convenient for accurately controlling power state, the other side in data transmit-receive area 5 is electrically connected with station control The bottom of server 9, control server 9 of standing is electrically connected with electric power data library 10, and electric power data is accurately counted and remembered Record, the bottom in electric power data library 10 are electrically connected with data and extract area 11, and user is on network to electric power number in different time periods According to extracting, the bottom that data extract area 11 is electrically connected with detection system 12, and the side of detection system 12 is electrically connected with Information storage area 14 can store 1 year or more electricity usage record, simultaneously convenient for carrying out safety point to electric power by data Analysis, the other side of detection system 12 is electrically connected with external storage area 15, is conveniently replaceable the storage chip of information storage area 14, outside The side for setting storage area 15 is electrically connected with usb 13, can connect computer terminal downloading electric power data.
Further, the bottom of remote validation 302 is electrically connected with regulation terminal 303, is provided with regulation terminal 303, In use, staff can log in long-range control zone 2 by the APP of mobile terminal, then while logging in, needs to pass through Background control The confirmation message of terminal 6, so that it may log in long-range monitoring system main body 1, what staff can be long-range checks harbour electricity The Risk Assessment Report of the use state of power, current working condition and detection system 12, convenient for timely adjusting harbour bank Power state, with remote control, extract data can, it is convenient that system is checked, improve system practicability and It is functional.
Further, the bottom of detection system 12 is electrically connected with data comparison system 1201, is provided with data comparison system System 1201, staff when using data comparison system 1201, transfer from information storage area 14 by data comparison system 1201 The history power consumption data of current harbour bank, compares the electricity consumption situation in week, the moon, season and year, when with week to compare unit, is System just by the power consumption of the data of this week and preceding surrounding, change distribution speed, three-phase voltage, electric current, power, power factor, frequency, The data such as electric energy, temperature, overall system power, load maximum value, power factor bound compare, and staff is facilitated to find The deviation wherein generated facilitates the power operation state for quickly analyzing current harbour bank.
Further, the bottom of data comparison system 1201 is electrically connected with risk evaluating system 1202, is arranged risky Assessment system 1202, in data comparison of the use detection system 12 to current harbour bank, risk evaluating system 1202 is according to number The value that the data provided according to comparison system 1201 generate relatively large deviation to current harbour bank carries out comprehensive assessment, and reminds work people Member reconnoitres it, assesses the floating of overall system power, load maximum value, power factor bound, floats larger When, remind staff corresponding data are gone through, and to float it is excessive make remarks, convenient for data carry out processing and The working condition of harbour bank electricity power is regulated and controled.
Further, the bottom of risk evaluating system 1202 is electrically connected with risk analysis system 1203, is arranged risky Analysis system 1203, when in use, after biggish data of floating when 1202 Duis of risk evaluating system are assessed, risk analysis System 1203 again analyzes data listed by risk evaluating system 1202, and risk analysis system 1203 was according to this month in former years Record compare, the larger reason of floating of system judgement is provided, if of that month record occurs in former years record The higher float value of similarity, risk analysis system 1203 then judge that the floating belongs to normal floating, and risk is larger, works as appearance Float the numerical value not having in of that month record of larger and former years when, it is abnormal floating that risk analysis system 1203 then judges that the floating belongs to Dynamic, risk is higher, should preferentially be handled, and avoids the error of the assessment occurred when risk assessment again in this way, because The electricity consumption amount of increase in annual summer and winter is all relatively high, and undulating value is larger, by the record in former years, it is possible to prevente effectively from There is the state judged by accident.
Working principle:Firstly, installing and using monitoring system main body 1, then, staff is using data comparison system When 1201, data comparison system 1201 transfers the history power consumption data of current harbour bank from information storage area 14, to week, the moon, The electricity consumption situation in season and year compares, when with week for comparison unit, system just by the power consumption of the data of this week and preceding surrounding, Become distribution speed, three-phase voltage, electric current, power, power factor, frequency, electric energy, temperature, overall system power, load maximum value, The data such as power factor bound compare, and facilitate staff to find the deviation wherein generated, help quickly to analyze The power operation state of current harbour bank, then, in data comparison of the use detection system 12 to current harbour bank, risk is commented Estimate the value that the data that system 1202 is provided according to data comparison system 1201 generate relatively large deviation to current harbour bank to integrate Assessment, and staff is reminded to reconnoitre it, the floating to overall system power, load maximum value, power factor bound It is assessed, when floating larger, staff is reminded to go through corresponding data, and make remarks to floating is excessive, just In handle and regulate and control the working condition of harbour bank electricity power to data, and then, when risk evaluating system 1202 is right After biggish data of floating are assessed, risk analysis system 1203 again to data listed by risk evaluating system 1202 into Row analysis, risk analysis system 1203 are compared according to the record in this month in former years, provide the biggish original of floating of system judgement Cause, if the higher float value of similarity occurs in of that month record, and risk analysis system 1203 then judges in former years record The floating belongs to normal floating, and risk is larger, when the numerical value for occurring not having in floating of that month record of larger and former years, wind Dangerous analysis system 1203 then judges that the floating belongs to abnormal floating, and risk is higher, should preferentially be handled, in this way it is avoided that The error of the assessment occurred when risk assessment again, because the electricity consumption amount of increase in annual summer and winter is all relatively high, wave Dynamic value is larger, by the record in former years, it is possible to prevente effectively from there is the state judged by accident, finally, staff can pass through movement The APP of terminal logs in long-range control zone 2, then while logging in needs the confirmation message by Background control terminal 6, so that it may log in remote The monitoring system main body 1 of journey, the use state for checking harbour electric power that staff can be long-range, current working condition and The Risk Assessment Report of detection system 12 has remote control, extracts data convenient for timely adjusting the power state of harbour bank Can, it is convenient that system is checked, improve the practicability and functionality of system, here it is this kind of harbour bank electricity monitoring systems The working principle of system.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention are limited by the following claims and their equivalents.

Claims (5)

1. a kind of harbour bank electricity monitoring system, including monitoring system main body (1), detection system (12) and remote terminal (3), special Sign is:The bottom of the monitoring system main body (1) is electrically connected with long-range control zone (2), the bottom of the long-range control zone (2) Portion is electrically connected with remote terminal (3), and the bottom of the remote terminal (3) is electrically connected with user and logs in (301), the user The bottom for logging in (301) is electrically connected with remote validation (302), and the bottom of the remote terminal (3) is electrically connected with client (4), it is electrically connected with data transmit-receive area (5) at the top of the monitoring system main body (1), the top of the data transmit-receive area (5) It is electrically connected with Background control terminal (6), the side of the data transmit-receive area (5) is electrically connected with monitoring camera (7), described The bottom of monitoring camera (7) is electrically connected with power supply (8), and the other side of the data transmit-receive area (5) is electrically connected with station It controls server (9), the bottom of station control server (9) is electrically connected with electric power data library (10), the electric power data library (10) bottom is electrically connected with data and extracts area (11), and the bottom that the data extract area (11) is electrically connected with detection system (12), the side of the detection system (12) is electrically connected with information storage area (14), the other side of the detection system (12) It is electrically connected with external storage area (15), the side of the external storage area (15) is electrically connected with USB interface (13).
2. a kind of harbour bank electricity monitoring system according to claim 1, it is characterised in that:The remote validation (302) Bottom is electrically connected with regulation terminal (303).
3. a kind of harbour bank electricity monitoring system according to claim 1, it is characterised in that:The bottom of the detection system (12) Portion is electrically connected with data comparison system (1201).
4. a kind of harbour bank electricity monitoring system according to claim 3, it is characterised in that:The data comparison system (1201) bottom is electrically connected with risk evaluating system (1202).
5. a kind of harbour bank electricity monitoring system according to claim 4, it is characterised in that:The risk evaluating system (1202) bottom is electrically connected with risk analysis system (1203).
CN201810825675.8A 2018-07-25 2018-07-25 A kind of harbour bank electricity monitoring system Pending CN108879960A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810825675.8A CN108879960A (en) 2018-07-25 2018-07-25 A kind of harbour bank electricity monitoring system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810825675.8A CN108879960A (en) 2018-07-25 2018-07-25 A kind of harbour bank electricity monitoring system

Publications (1)

Publication Number Publication Date
CN108879960A true CN108879960A (en) 2018-11-23

Family

ID=64304806

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810825675.8A Pending CN108879960A (en) 2018-07-25 2018-07-25 A kind of harbour bank electricity monitoring system

Country Status (1)

Country Link
CN (1) CN108879960A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110443444A (en) * 2019-06-24 2019-11-12 武汉港湾工程质量检测有限公司 Terminal facilities check and evaluation system and its implementation based on digital Platform

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06311568A (en) * 1993-04-23 1994-11-04 Matsushita Electric Works Ltd Power control system
CN103905568A (en) * 2013-04-22 2014-07-02 南通大学 Remote monitoring device capable of guaranteeing system stability and based on embedded Web
CN204190487U (en) * 2014-09-02 2015-03-04 国家电网公司 For the load data collect and transmit analytical equipment in rural power dispensing table district
CN107769381A (en) * 2017-10-27 2018-03-06 中远海运科技股份有限公司 Ship shore-based power supply information monitoring system and method
CN108225439A (en) * 2018-02-08 2018-06-29 北海职业学院 A kind of electronic communication environment monitoring system

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH06311568A (en) * 1993-04-23 1994-11-04 Matsushita Electric Works Ltd Power control system
CN103905568A (en) * 2013-04-22 2014-07-02 南通大学 Remote monitoring device capable of guaranteeing system stability and based on embedded Web
CN204190487U (en) * 2014-09-02 2015-03-04 国家电网公司 For the load data collect and transmit analytical equipment in rural power dispensing table district
CN107769381A (en) * 2017-10-27 2018-03-06 中远海运科技股份有限公司 Ship shore-based power supply information monitoring system and method
CN108225439A (en) * 2018-02-08 2018-06-29 北海职业学院 A kind of electronic communication environment monitoring system

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110443444A (en) * 2019-06-24 2019-11-12 武汉港湾工程质量检测有限公司 Terminal facilities check and evaluation system and its implementation based on digital Platform

Similar Documents

Publication Publication Date Title
CN103064027B (en) A kind of 750KV intelligent wireless accumulator on-line monitoring and maintenance system
CN203534587U (en) Real-time monitoring system for tilting of power transmission line pole tower based on Beidou satellite communication
CN104579166A (en) Distributed photovoltaic power station monitoring system and fault diagnosis method thereof
CN105510779A (en) Arrester on-line monitoring system and application method thereof
CN102946144B (en) Based on the transforming plant DC power information management system of three-level network framework
CN101713818B (en) Working condition automatic interpreting system of satellite power source subsystem
CN202854237U (en) Storage battery on-line internal resistance detection device having adaptive test technology
CN202661536U (en) Wireless digital monitoring sensor for electrical equipment
CN209676004U (en) A kind of the wireless monitor detector and system of electric line safe operation
CN108922134B (en) Lightning protection insulator monitoring alarm device
CN108879960A (en) A kind of harbour bank electricity monitoring system
CN109980782A (en) A kind of the wireless monitor detector and system of electric line safe operation
CN109063850A (en) A kind of lightning strike positioning system and method
CN104237744A (en) Current calculating method for low power consumption of fault indicator
CN106208363A (en) Electrical network DC power-supply system
CN201072596Y (en) Centralized monitoring system for lightning protection facilities
CN111308217A (en) Method and device for intelligently monitoring grounding resistance, storage medium and computer equipment
CN110190811A (en) Solar panel on-line monitoring system and equipment
CN201876530U (en) Storage battery discharging detector
CN106771490A (en) A kind of OPGW terminal monitorings system
CN204595120U (en) A kind of automatic electricity getting distribution line records wave system system online
CN204373687U (en) A kind of plant's environmental monitoring handheld device based on Internet of Things
CN209820465U (en) Water regime collection system based on thing networking
CN203965034U (en) A kind of electrical transformer cores and winding failure on-line monitoring system
CN207601174U (en) A kind of taiwan area acquisition terminal and unit-area management system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181123

WD01 Invention patent application deemed withdrawn after publication