CN108879663A - Power train with abnormality processing unifies key sequence method and system - Google Patents
Power train with abnormality processing unifies key sequence method and system Download PDFInfo
- Publication number
- CN108879663A CN108879663A CN201810690929.XA CN201810690929A CN108879663A CN 108879663 A CN108879663 A CN 108879663A CN 201810690929 A CN201810690929 A CN 201810690929A CN 108879663 A CN108879663 A CN 108879663A
- Authority
- CN
- China
- Prior art keywords
- operation order
- abnormality processing
- ticket
- operating procedure
- power train
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000012545 processing Methods 0.000 title claims abstract description 53
- 230000005856 abnormality Effects 0.000 title claims abstract description 49
- 238000000034 method Methods 0.000 title claims abstract description 47
- 238000011017 operating method Methods 0.000 claims abstract description 36
- 230000002159 abnormal effect Effects 0.000 claims abstract description 13
- 238000004088 simulation Methods 0.000 claims description 7
- 238000012795 verification Methods 0.000 claims description 7
- 238000012546 transfer Methods 0.000 claims description 2
- 238000012360 testing method Methods 0.000 claims 1
- 230000009286 beneficial effect Effects 0.000 abstract description 2
- 238000012544 monitoring process Methods 0.000 description 7
- 238000012423 maintenance Methods 0.000 description 5
- 238000012790 confirmation Methods 0.000 description 3
- 238000003825 pressing Methods 0.000 description 3
- 230000001681 protective effect Effects 0.000 description 3
- 238000009825 accumulation Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 238000010586 diagram Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 238000004519 manufacturing process Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000013475 authorization Methods 0.000 description 1
- 238000006243 chemical reaction Methods 0.000 description 1
- 238000010276 construction Methods 0.000 description 1
- 230000007812 deficiency Effects 0.000 description 1
- 238000012217 deletion Methods 0.000 description 1
- 230000037430 deletion Effects 0.000 description 1
- 238000001514 detection method Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 235000013399 edible fruits Nutrition 0.000 description 1
- 238000009472 formulation Methods 0.000 description 1
- 238000007689 inspection Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 230000001737 promoting effect Effects 0.000 description 1
- 230000000284 resting effect Effects 0.000 description 1
- 238000003860 storage Methods 0.000 description 1
- 230000001360 synchronised effect Effects 0.000 description 1
Classifications
-
- H—ELECTRICITY
- H02—GENERATION; CONVERSION OR DISTRIBUTION OF ELECTRIC POWER
- H02J—CIRCUIT ARRANGEMENTS OR SYSTEMS FOR SUPPLYING OR DISTRIBUTING ELECTRIC POWER; SYSTEMS FOR STORING ELECTRIC ENERGY
- H02J3/00—Circuit arrangements for ac mains or ac distribution networks
Landscapes
- Engineering & Computer Science (AREA)
- Power Engineering (AREA)
- Supply And Distribution Of Alternating Current (AREA)
- Train Traffic Observation, Control, And Security (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810690929.XA CN108879663B (en) | 2018-06-28 | 2018-06-28 | One-key sequence control method and system for electric power system with exception handling |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810690929.XA CN108879663B (en) | 2018-06-28 | 2018-06-28 | One-key sequence control method and system for electric power system with exception handling |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108879663A true CN108879663A (en) | 2018-11-23 |
CN108879663B CN108879663B (en) | 2021-03-16 |
Family
ID=64296542
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810690929.XA Active CN108879663B (en) | 2018-06-28 | 2018-06-28 | One-key sequence control method and system for electric power system with exception handling |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108879663B (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111614913A (en) * | 2020-05-06 | 2020-09-01 | 许昌许继软件技术有限公司 | One-key sequence control double-confirmation system and method based on intelligent isolation switch position identification |
CN112186739A (en) * | 2020-09-07 | 2021-01-05 | 南京南瑞继保电气有限公司 | Sequential control operation order non-power-outage checking method and system |
CN112578695A (en) * | 2019-09-29 | 2021-03-30 | 国网重庆市电力公司 | Intelligent substation one-key sequence control checking method and system based on block chain |
Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10210655A (en) * | 1997-01-21 | 1998-08-07 | Meidensha Corp | Power system restoration support system |
CN102751785A (en) * | 2012-05-21 | 2012-10-24 | 中国电力科学研究院 | Modularization sequential control system and realization method thereof |
CN105302121A (en) * | 2015-11-24 | 2016-02-03 | 积成电子股份有限公司 | Sequential control operation order automatic anti-error check method based on simulation IED device |
CN107844838A (en) * | 2017-09-27 | 2018-03-27 | 国网四川省电力公司 | Power network schedule automation main website O&M operation ticket system and overall process anti-misoperation method |
-
2018
- 2018-06-28 CN CN201810690929.XA patent/CN108879663B/en active Active
Patent Citations (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH10210655A (en) * | 1997-01-21 | 1998-08-07 | Meidensha Corp | Power system restoration support system |
CN102751785A (en) * | 2012-05-21 | 2012-10-24 | 中国电力科学研究院 | Modularization sequential control system and realization method thereof |
CN105302121A (en) * | 2015-11-24 | 2016-02-03 | 积成电子股份有限公司 | Sequential control operation order automatic anti-error check method based on simulation IED device |
CN107844838A (en) * | 2017-09-27 | 2018-03-27 | 国网四川省电力公司 | Power network schedule automation main website O&M operation ticket system and overall process anti-misoperation method |
Non-Patent Citations (1)
Title |
---|
朱炳铨 等: "支持一键式顺控的智能操作票生成和管理系统", 《华东电力》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112578695A (en) * | 2019-09-29 | 2021-03-30 | 国网重庆市电力公司 | Intelligent substation one-key sequence control checking method and system based on block chain |
CN111614913A (en) * | 2020-05-06 | 2020-09-01 | 许昌许继软件技术有限公司 | One-key sequence control double-confirmation system and method based on intelligent isolation switch position identification |
CN111614913B (en) * | 2020-05-06 | 2022-09-09 | 许昌许继软件技术有限公司 | One-key sequential control double-confirmation system and method based on intelligent isolation switch position identification |
CN112186739A (en) * | 2020-09-07 | 2021-01-05 | 南京南瑞继保电气有限公司 | Sequential control operation order non-power-outage checking method and system |
Also Published As
Publication number | Publication date |
---|---|
CN108879663B (en) | 2021-03-16 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107846011B (en) | Power distribution network fault recovery method based on main and distribution network cooperative control | |
CN109617241B (en) | Intelligent sequential control system and method based on panoramic data in transformer substation | |
CN108879663A (en) | Power train with abnormality processing unifies key sequence method and system | |
CN110138092B (en) | Substation sequence control system and method with master station safety check regulation and control function | |
CN104753063A (en) | Transformer substation bus load transferring method and system | |
CN105302121A (en) | Sequential control operation order automatic anti-error check method based on simulation IED device | |
CN101673965A (en) | Automatic switching control method for wide-area emergency power source of electric power system | |
CN108233536A (en) | A kind of intelligent program remote handling system | |
CN110674282B (en) | Expert knowledge rule base-based one-key sequential control operation order intelligent simulation method | |
CN103474972A (en) | Online setting calculation method for relay protection | |
CN110428533A (en) | One kind realizing the anti-error integrated intelligent lock management system of lock control based on Internet of Things | |
CN101662168A (en) | System for preventing misoperation of relay-protection pressing plate and method for controlling same | |
CN109146253A (en) | A kind of intelligent automatic interactive operating system for making out an invoice and protecting locking | |
CN101661283B (en) | System for completing sequential control by intelligent one-key operation | |
CN107067081A (en) | Substation secondary maintenance safety measure generation method based on many object models | |
CN107887878B (en) | A kind of fool proof method and apparatus of relay protection soft pressing plate | |
CN202475014U (en) | Regional electrical network integrated five-preventing system | |
CN108448718A (en) | One key sequence method and system of intelligent substation protective device | |
CN108847655A (en) | Intelligent substation protective device sequence method and system based on operation task | |
CN107133883A (en) | Based on the intelligent substation safety measure automatic generation method and device that safety measure is semantic | |
CN107871176A (en) | The safety-optimized method and system of secondary device applied to IEC61850 information modelings | |
CN111917179B (en) | Real-time online misoperation prevention system of transformer substation based on multimode internet of things | |
CN104979900A (en) | Substation programmed operation anti-misoperation system and method | |
CN106774068B (en) | The anti-error implementation method of intelligent substation and realization system | |
CN108963841A (en) | It is associated with the secondary device sequence method and system of primary equipment operating status |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 274000 No. 199 Zhonghua Road, Shandong, Heze Applicant after: Heze Power Supply Company, State Grid Shandong Electric Power Co., Ltd. Applicant after: National Network Intelligent Technology Co., Ltd. Address before: 274000 No. 199 Zhonghua Road, Shandong, Heze Applicant before: Heze Power Supply Company, State Grid Shandong Electric Power Co., Ltd. Applicant before: Shandong Luneng Intelligent Technology Co., Ltd. |
|
CB02 | Change of applicant information | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20201028 Address after: 250101 Electric Power Intelligent Robot Production Project 101 in Jinan City, Shandong Province, South of Feiyue Avenue and East of No. 26 Road (ICT Industrial Park) Applicant after: National Network Intelligent Technology Co.,Ltd. Address before: 274000 No. 199 Zhonghua Road, Shandong, Heze Applicant before: State Grid Shandong Electric Power Company Heze Power Supply Co. Applicant before: National Network Intelligent Technology Co.,Ltd. |
|
TA01 | Transfer of patent application right |
Effective date of registration: 20201218 Address after: Room 902, 9 / F, block B, Yinhe building, 2008 Xinluo street, hi tech Zone, Jinan City, Shandong Province Applicant after: Shandong Luneng Software Technology Co.,Ltd. intelligent electrical branch Address before: 250101 power intelligent robot production project 101 south of Feiyue Avenue and east of No.26 Road (in ICT Industrial Park) in Suncun District of Gaoxin, Jinan City, Shandong Province Applicant before: National Network Intelligent Technology Co.,Ltd. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: Room 902, 9 / F, block B, Yinhe building, 2008 Xinluo street, hi tech Zone, Jinan City, Shandong Province Patentee after: Shandong luruan Digital Technology Co.,Ltd. smart energy branch Address before: Room 902, 9 / F, block B, Yinhe building, 2008 Xinluo street, hi tech Zone, Jinan City, Shandong Province Patentee before: Shandong Luneng Software Technology Co.,Ltd. intelligent electrical branch |
|
CP01 | Change in the name or title of a patent holder |