CN108877451A - Upper thoroughly lower resistance type cap rock is collapsed to because of experimental provision - Google Patents

Upper thoroughly lower resistance type cap rock is collapsed to because of experimental provision Download PDF

Info

Publication number
CN108877451A
CN108877451A CN201810948510.XA CN201810948510A CN108877451A CN 108877451 A CN108877451 A CN 108877451A CN 201810948510 A CN201810948510 A CN 201810948510A CN 108877451 A CN108877451 A CN 108877451A
Authority
CN
China
Prior art keywords
water
simulation box
resistance type
cap rock
lower resistance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810948510.XA
Other languages
Chinese (zh)
Inventor
肖先煊
许模
夏强
蔡国军
郭健
杜锋
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chengdu Univeristy of Technology
Original Assignee
Chengdu Univeristy of Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chengdu Univeristy of Technology filed Critical Chengdu Univeristy of Technology
Priority to CN201810948510.XA priority Critical patent/CN108877451A/en
Publication of CN108877451A publication Critical patent/CN108877451A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G09EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
    • G09BEDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
    • G09B23/00Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes
    • G09B23/40Models for scientific, medical, or mathematical purposes, e.g. full-sized devices for demonstration purposes for geology

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Geology (AREA)
  • Mathematical Optimization (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • Paleontology (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Algebra (AREA)
  • Computational Mathematics (AREA)
  • Environmental & Geological Engineering (AREA)
  • Mathematical Analysis (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Mathematical Physics (AREA)
  • Pure & Applied Mathematics (AREA)
  • Business, Economics & Management (AREA)
  • Educational Administration (AREA)
  • Educational Technology (AREA)
  • Theoretical Computer Science (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The present invention relates to a kind of lower resistance type cap rocks to collapse to because of experimental provision, belongs to Study of Karst Collapse technical field.The present invention can intuitively express the overall process of the upper thoroughly lower resistance type Formation Causes of Karst Collapse of Decline or rise of groundwater level triggering, when intuitively showing Decline or rise of groundwater level, pressure change rule and underground water in solution cavity cause soil cave to be formed and extended subsoil erosion, and carry out correlation test and parametric measurement.Utilize present invention experimental data obtained and experiment law, it is very beneficial for analysis and the constitutive relations between Study of The Underground water level and karst collapse geological disaster, the seepage deformation and the erosion of lower layer's soil body in particular generated in research ground water of karst caves position change procedure causes soil cave to generate, extension and then initiation karst collapse etc. provide completely new technological means, also the growth course of such karst collapse has been reappeared, the genesis mechanism of such karst collapse is disclosed, prevents the work such as mitigation, early-warning and forecast systems foundation for karst collapse and certain reference value is provided.

Description

Upper thoroughly lower resistance type cap rock is collapsed to because of experimental provision
Technical field
The present invention relates to a kind of lower resistance type cap rocks to collapse to because of experimental provision, belongs to Study of Karst Collapse technology neck Domain.
Background technique
Karst collapse refers to that karst band has the solution cavity upper caldding layer soil body of opening in interior static(al), outer dynamic condition The effects of under and generate slump breakoff phenomenon, it is one of the topic that people discuss warmly all the time.China karst region area 363 Ten thousand km2, 1/3 of territory total area or more is accounted for, medium cloud, Guizhou Province, river, osmanthus, Hunan, Chongqing, Hubei Province, Guangdong etc. save (city, area) karst area and reaches 105.5 ten thousand km2, it is one of the country that karst is most developed in the world.South China can lava mountain area river valley it is deep, it is with heavy rainfall, Ground water circulation is fast, and the row's of benefit period is short, causes karstification degree high, crack~pipeline type, pipeline type karst are more universal, hydrodynamic force Field is complicated and changeable, becomes karst collapse district occurred frequently, and karst (soil cave) collapses the transport hubs route selection such as Ze Dui highway, railway, city City's engineering construction has larger impact, causes important economic loss and endangers traffic safety, these will cause the fear of people, Regional Economic Development and the improvement of people's living standards are affected for a long time.
Karst water is a kind of underground water divided by preservation media type.Karst water is distributed in the gap of solvable rock mass In.Water carries out chemolysis to solvable rock, is solutional cavity, solution cavity, pipeline by void enlargement, and the rapidly water flow for carrying silt is continuous Erosion simultaneously extends karst, just forms the increasing ground water solution space of scale, so as to cause top covering rockmass face it is empty and Collapsing, avalanche occur under the effect of gravity, this avalanche sometimes gradually extension can extend to earth's surface, make showing for Surface falling etc. As referred to as karst, i.e. karst.
Southwestern China mountain area distributed large area can lava, influenced by tectogenetic, form that topography is strategically located and difficult of access, river valley Deep geomorphic feature, sufficient rainfall are infiltrated by channels such as hole, cracks into karst aquifer, ground water circulation Fastly, the features such as the period is short, and the aggressivity of water is strong cause karstification degree high, and the karst region band of intense development is often dispersed with largely Underground corrosion space (dissolution pore, solutional cavity, solution crack, solution cavity, pipeline, underground river etc.);On the one hand, this for underground water storage, migration and Enrichment provides place, becomes local valuable groundwater resources, utilizes convenient for exploitation;On the other hand, karstic ground water is strong Strong activity provides important condition for the development of the extensive karst underground space, and side forms fragmentary, linear under the cover Or the solution cavity of zonal distribution, then in solution cavity or near solution cavity, the variation of underground water will likely induce karst collapse.
Nature has a kind of double-deck cover rocks, and upper layer is the preferable sand of water penetration, and lower layer is the poor clay of water penetration Layer.Due to the barrier that lower part blocks water, it is easier to occur compared with the permeable cap rock of single layer so that collapsing.The general preservation in top is pore water, Water blocking layer only has the presence of capillary water in lower layer, and water blocking layer is the following are karst water, and there are pressure difference between two layers of underground water, pressure difference is big Small is about head difference of the karst water to argillic horizon floor elevation, as shown in Figure 1.
In its natural state, since the presence of pressure difference causes downward penetration, water blocking layer due to cannot allow bulk water from Make karst water pressure-bearing by passing in and out, its underpart, which is all contacted with underground water, just has certain thickness underwater zone of transformation of satisfying, top because The infiltration of pore water and unsaturated state is presented, form upper zone of transformation after a certain period of time, when direction of groundwater flow is advantageous, water of satisfying is soft Change band soil layer to not easily run off, as shown in Figure 2.But when declining Karst water table because of Human dried bloodstains, subsurface flow is downward When, the zone of transformation soil body may be gradually lost, and be emptied, and soil cave is formed.The rapid decrease of Karst water table on the one hand can generation office The latent erosion of the overcritical hydraulic gradient in portion can make lower layer sticky in addition, level of ground water rapid decrease can form negative pressuren zone in cap rock Soil blocks water damage layer, forms opening identical with upper layer pervious bed, upper layer pervious bed is since sand cohesive force is relatively small, huge Under big pressure difference and hydraulic gradient effect, soil cave is gradually to laterally and upwards developing, and formation collapses, as shown in Figure 2.
Due to karst collapse spatially have many characteristics, such as concealment, on the time it is sudden, it is prevented and treated and mitigation is current One of important scientific research problem.Currently, effectively to mitigate harm of the karst collapse to people's production, life, the hand taken first Section is general Field Geology Investigations, but field investigation is limited only to adjust existing, collapsing of having occurred in detail Research is looked into, there is apparent one-sidedness.Obtained result is only capable of carrying out the point collapsed improvement and mitigation.And essence On, potentially, still nonevent karst collapse geological disaster be only threaten engineering construction and people's security of the lives and property emphasis, Therefore the investigation for relying solely on field can not fundamentally prevent and treat the karst collapse in region.
And numerical simulation calculation becomes a kind of technological means of one kind of prevention and treatment geological disaster efficiently, inexpensive in recent years. But on the one hand, the parameter in numerical model is chosen, causes results of calculation to be difficult generalization of karst collapse geological conditions etc. It matches with the karst collapse at scene, accurately can not provide reliable and practical data for the geological disaster that collapses of karst area Support, causes calculated result confidence level not high.GIS platform disaster alarm is used as a kind of scientific and effective method of preventing and reducing natural disasters, but It is still necessary to want the accumulation of a large amount of basic data and sample, prediction and evaluation could be carried out to some regional karst collapse, it is clear that This also has certain deficiency.
Karst collapse is typically due to the understanding of karst collapse and grind with very strong concealment and sudden to people Study carefully personnel and very big difficulty brought to the analysis etc. of different types of Formation Causes of Karst Collapse mechanism, and has that time-consuming, it is at high cost, The disadvantages of not intuitive.
Summary of the invention
The technical problem to be solved by the present invention is to:A kind of lower resistance type cap rock is provided to collapse to because of experimental provision, it can Intuitively to understand the overall process of the upper thoroughly lower resistance type Formation Causes of Karst Collapse of Decline or rise of groundwater level triggering, intuitively show Decline or rise of groundwater level When, pressure change rule and underground water in solution cavity lead to the formation and extension of soil cave to the erosion of subsoil, and carry out phase Close test and parametric measurement.
To solve above-mentioned technical problem the technical scheme adopted by the invention is that:Upper thoroughly lower resistance type cap rock is collapsed to because of experiment Device, including geologic body simulation box, measuring system and water injection system.
Geologic body simulation box is provided with horizontal positioned partition in its cabinet, and partition, which divides geologic body simulation box one, is Two, upper half is the cap rock simulation box for simulating upper lower resistance type cap rock, and bottom half is can lava and can lava for simulation The solution cavity simulation box of middle development solution cavity;The hole for simulating solution cavity opening is offered in the middle part of partition;Cap rock simulation box is on partition top Face is provided with down resistance type cap rock, and the upper layer of upper lower resistance type cap rock is opposite pervious bed, lower layer is opposite water blocking layer, in phase To water injection well is provided in pervious bed, water injection well vertically protrudes into opposite pervious bed, and water filling bottom is provided with permeable hole.
Measuring system includes manograph and contactless deformation observation system, and manograph is set to the outside of geologic body simulation box Wall, the measurement end of manograph penetrates the sidewall paneling of solution cavity simulation box and solution cavity simulation box is connected;Contactless deformation observation system Set on geologic body simulation box over top.
Water injection system includes water tank, intermediate water tank and water pump, and the water inlet of water pump is connected to water tank, the water outlet of water pump Mouth is connected to the water inlet of intermediate water tank by first pipe, and the water outlet of intermediate water tank passes through second pipe and is connected to solution cavity simulation box Bottom, be provided with the first valve in first pipe, the second valve be provided on second pipe;Intermediate water tank is equipped for driving Move the jacking system of its vertical lifting.
It is further:Intermediate water tank is provided with the demarcation plate being vertically arranged, intermediate water tank surrounding side wall in its cabinet The top surface of plate is above the top surface of demarcation plate, and intermediate water tank is divided into two by demarcation plate, and side is water feeding tank, the other side is overflow Two connectors are arranged in case, the bottom plate of water feeding tank, and a connector is for connecting first pipe, another connector for connecting Second pipe;Overflow drainage mouth is arranged in the bottom of spill box.
It is further:Overflow drainage mouth is set on the bottom plate of spill box, and is connected to water tank by third pipeline.
It is further:Jacking system includes mutually matched sliding block and sliding rail, and sliding block is connected to a fixed with intermediate water tank, Sliding rail is fixed at the lateral wall of geologic body simulation box, and the lateral wall of geologic body simulation box is additionally provided with to be arranged in parallel with sliding rail Threaded rod, threaded rod is threadedly coupled with sliding block, by driving threaded rod rotation come so that sliding block makees elevating movement along sliding rail.
It is further:Second pipe is connected on the bottom plate of solution cavity simulation box, and on the bottom plate of solution cavity simulation box also It is connected with drainage pipeline, the water outlet of drainage pipeline is connected to water tank, is provided with drain valve on drainage pipeline.
It is further:Opposite pervious bed is made of sandy soil layer, and opposite water blocking layer is made of stickiness soil layer;Lower layer Stickiness soil layer infiltration coefficient is 10-6~10-3Cm/s, upper layer sandy soil layer infiltration coefficient are 8 × 10-3~2 × 10-2cm/s;Water filling Well uses lucite tube, vertically penetrates entire opposite pervious bed, up to the basal surface position of opposite pervious bed, permeable hole is filling the water Bottom is uniformly arranged.
It is further:Geologic body simulation box and partition are all made of poly (methyl methacrylate) plate production, and geologic body simulation box is set to On the top plate of water tank.
It is further:Position of opening is folded equipped with baffle in the middle for partition top surface, and baffle is set in the position of opening of partition It is equipped with the second aperture, and the diameter of the second aperture is less than the diameter of aperture in the middle part of partition.
It is further:Manograph is U-shaped pressure-measuring pipe, is arranged side by side multiple;Contactless deformation observation system is laser Multipoint displacement meter.
It is further:The side wall of geologic body simulation box is provided with the scale of measurement vertical height.
The beneficial effects of the invention are as follows:It is very beneficial for analyzing using present invention experimental data obtained and experiment law Constitutive relations between Study of The Underground water level and karst collapse geological disaster.Carry out upper thoroughly lower resistance type cap rock using the present invention to collapse After falling into origin cause of formation simulation test, the overall process that on the one hand can collapse for the upper thoroughly lower resistance type cap rock unstability cause of further investigation provides good base Plinth condition, the seepage deformation and the erosion of lower layer's soil body in particular generated in the change procedure of research ground water of karst caves position lead to soil cave It generates, extend and then initiation karst collapse etc. provides completely new technological means, also reappear and disclose such karst collapse mistake The genesis mechanism of journey provides certain reference value for the prevention prediction work of karst collapse.In addition, the present invention is also to disaster The development of matter and environmental geology subject has certain facilitation.
The present invention is using the upper lower resistance type cap rock karst collapse case of nature as research object, by can by the present invention Complete laboratory test, so as to it is clear, intuitively show water-level fluctuation or change cause lower layer's aquiclude bottom plate to weather, soil cave It is formed and the stability status of extension, coating deformation and different time, reproducible the type karst collapse develops overall process.By It can implement indoors in the present invention, with visual phenomenon, variation of groundwater dynamic is high-visible, the period is short, at low cost, movement side Just the advantages that.The present invention is also equipped with experimental phenomena is repeatable, the reliable true and practical goodness of fit of engineering of data is high etc. simultaneously Advantage.The exploration that the present invention can study complex area Formation Causes of Karst Collapse and mechanism for this field researcher provides new approaches, It solves the problems, such as to collapse quantification, visual research in geology Disaster Study field to a certain extent, is geological hazards prediction Forecast provides new method.
How the purpose of the present invention, which is realized, please refers to following description part, does not repeat to repeat herein.
Detailed description of the invention
Fig. 1 is that pore water and karst pressure difference cause the schematic diagram that collapses;
Fig. 2 is that upper lower resistance type cap rock collapses schematic diagram;
Fig. 3 is experimental provision front view of the invention;
Fig. 4 is experimental provision rearview of the invention;
Fig. 5 is experimental provision left view of the invention;
Fig. 6 is experimental provision top view of the invention;
Fig. 7 is the A-A cross-sectional view of Fig. 3.
It is marked in figure:1- geologic body simulation box, 11- cap rock simulation box, 12- solution cavity simulation box, 13- are with respect to pervious bed, 14- Opposite water blocking layer, 15- water injection well, 2- partition, 21- simulate solution cavity upper opening, 3- water tank, 31- first pipe, 32- second Pipeline, 33- third pipeline, the first valve of 34-, the second valve of 35-, 4- manograph, the contactless deformation observation system of 5-, in 6- Between water tank, 61- demarcation plate, 62- water feeding tank, 63- spill box, 7- water pump, 8- jacking system, 9- drainage pipeline, 91- drain valve, 10- scale.
Specific embodiment
Below in conjunction with the accompanying drawings and embodiment the invention will be further described.
As shown in Fig. 3~Fig. 7, the present invention includes geologic body simulation box 1, measuring system and water injection system.
Geologic body simulation box 1 is provided with horizontal positioned partition 2 in its cabinet, and partition 2 is by 1 one points of geologic body simulation box It is two, upper half is the cap rock simulation box 11 for simulating upper lower resistance type cap rock, and bottom half is can lava and can for simulation The solution cavity simulation box 12 of solution cavity is developed in lava;The hole for simulating solution cavity opening is offered in the middle part of partition 2;Cap rock simulation box 11 2 top surface of partition is provided with upper lower resistance type cap rock, the upper layer of upper lower resistance type cap rock is opposite pervious bed 13, lower layer is opposite Water blocking layer 14 is provided with water injection well 15 in opposite pervious bed 13, and water injection well 15 vertically protrudes into opposite pervious bed 13, and is filling the water 15 bottom of well is provided with permeable hole, is equivalent to chimney filter in simulation well.The effect of water injection well 15 is to allow in opposite pervious bed 13 realize Stable level of ground water, the water level by changing water injection well 15 can be used for simulating penetration different in strong permeable formation.
Measuring system includes manograph 4 and contactless deformation observation system 5, and manograph 4 is set to geologic body simulation box 1 Lateral wall, the measurement end of manograph 4 penetrates the sidewall paneling of solution cavity simulation box 12 and solution cavity simulation box 12 is connected;Contactless deformation Observation system 5 is set to 1 over top of geologic body simulation box.
Water injection system includes water tank 3, intermediate water tank 6 and water pump 7, and the water inlet of water pump 7 is connected to water tank 3, water pump 7 Water outlet the water inlet of intermediate water tank 6 is connected to by first pipe 31, the water outlet of intermediate water tank 6 is connected by second pipe 32 Lead to the bottom of solution cavity simulation box 12, is provided with the first valve 34 in first pipe 31, is provided with the second valve on second pipe 32 35;Intermediate water tank 6 is equipped with the jacking system 8 for driving its vertical lifting.
To make 6 steady operation of intermediate water tank, the present invention is provided with stable flow structure in intermediate water tank 6, specific implementation Mode is as follows:Intermediate water tank 6 is provided with the demarcation plate 61 being vertically arranged, the top of 6 surrounding sidewall paneling of intermediate water tank in its cabinet Face is above the top surface of demarcation plate 61, and intermediate water tank 6 is divided into two by demarcation plate 61, and side is water feeding tank 62, the other side is excessive Case 63 is flowed, two connectors are arranged in the bottom plate of water feeding tank 62, and a connector is for connecting first pipe 31, another connector For connecting second pipe 32;Overflow drainage mouth is arranged in the bottom of spill box 63, and Overflow drainage mouth is preferably disposed to spill box 63 On bottom plate, and water tank 3 is connected to by third pipeline 33.First pipe 31, second pipe 32 and third pipeline in device 33 preferably use rubber hose.After water pump 7, which powers on, to draw water, water is introduced into water feeding tank 62, and 62 water level of water feeding tank is gradually It increases, is just stabilized after water is full, extra water is back to water storage into spill box 63, and through third pipeline 33 from top overflow In case 3, and the second pipe 32 that most of test water then passes through 62 bottom of water feeding tank is flow in solution cavity simulation box 12.It is molten in this way Water level in hole is gradually increasing, and simulates the rising of ground water of karst caves position.Conversely, switch off the pump, close the first valve, if will in Between water tank 6 some lower position is adjusted to by jacking system 8, the second pipe 32 that the water in solution cavity just passes through bottom flows backward to In water feeding tank 62, after a certain period of time, the water level in solution cavity can be consistent with the water level in water feeding tank 62, just realize ground in this way Lower water level decreasing, to control the water level in solution cavity simulation box 12.
Jacking system 8 is preferably implemented in the following way:Jacking system 8 includes mutually matched sliding block and sliding rail, sliding block It is connected to a fixed with intermediate water tank 6, sliding rail is fixed at the lateral wall of geologic body simulation box 1, the outside of geologic body simulation box 1 Wall, which is additionally provided with, to be threadedly coupled with sliding rail threaded rod disposed in parallel, threaded rod with sliding block, is made by the rotation of driving threaded rod It obtains sliding block and makees elevating movement along sliding rail.Which low manufacture cost, at the same while testing operate it is more convenient.Threaded rod can be electronic Driving, can also manual actuation, using rotating by the way of handwheel is operated manually in the present embodiment.
In addition, second pipe 32 is preferably attached on the bottom plate of solution cavity simulation box 12, and the bottom plate of solution cavity simulation box 12 On be also connected with drainage pipeline 9, the water outlet of drainage pipeline 9 is connected to water tank 3, drain valve 91 is provided on drainage pipeline 9. For convenience of operation, after experiment, solution cavity simulation box 12 can be drained by drainage pipeline 9.
Opposite pervious bed 13 in the present invention is made of sandy soil layer, and opposite water blocking layer is made of stickiness soil layer 14; Lower layer's stickiness soil layer infiltration coefficient is 10-6~10-3Cm/s, upper layer sandy soil layer infiltration coefficient are 8 × 10-3~2 × 10-2Cm/s, Can guarantee test smoothly carry out, thus obtain be conducive to analyze nature in such karst collapse geological disaster substantive characteristics and The data of rule.The infiltration coefficient of the present embodiment sandy soil layer at the middle and upper levels is 10 times of lower layer's stickiness soil layer infiltration coefficient, lower layer Stickiness soil layer infiltration coefficient 10-3Cm/s, upper layer sandy soil layer infiltration coefficient 10-2cm/s.It is gone on smoothly for convenience of test, comprehensively Different penetrations, water injection well 15 are preferably made of lucite tube in the strong permeable formation of accurate simulation, and water injection well 15 is vertical Penetrate entire opposite pervious bed 13, up to the basal surface position of opposite pervious bed 13, permeable hole is uniformly arranged in 15 bottom of water injection well.
For convenience of production, space occupied is saved, while facilitating experimental implementation and observation, geologic body simulation box 1 and partition 2 are equal It is made of poly (methyl methacrylate) plate, geologic body simulation box 1 is set on the top plate of water tank 3.In the present embodiment, geologic body simulation box 1 box sizes are long 1900mm, wide 420mm, high 870mm.Partition 2 is using the poly (methyl methacrylate) plate with a thickness of 10mm, the partition 2 Geologic body simulation box 1 is divided into two, the cap rock simulation box 11 of upper half is having a size of long 1900mm, wide 420mm, high 350mm;Under The solution cavity simulation box 12 in halfth area is having a size of long 1900mm, wide 420mm, high 520mm.Water tank having a size of:Length × width × height= 1900mm × 420mm × 400mm, using the PVC material production with a thickness of 10mm, with the angle steel bound edge of some strength.In addition, this The circular hole that diameter is 200mm is opened up in embodiment in the middle part of partition 2 to be open for simulating solution cavity.For the ease of in simulation nature The various sizes of solution cavity that underlies, position of opening is folded equipped with baffle in the middle for 2 top surface of partition of the invention, and baffle is in partition 2 Position of opening is provided with the second aperture, and the diameter of the second aperture is less than the diameter of 2 middle part aperture of partition.It is adopted in the present embodiment Mode is to configure muti-piece length × width x thickness=250mm × 250mm × 10mm square plate to hold hole successfully in square plate central openings Afterwards, according to the circular hole size of requirement of experiment, aperture square plate is placed on the circular hole of the 200mm at 2 middle part of partition, to change Circular hole size.Bore size mainly has a 150mm, and 3 kinds of 100mm, 50mm etc., and can be according to actual size increase in demand when experiment Aperture square plate, thus preferably simulation solution cavity opening.
Manograph 4 is preferably U-shaped pressure-measuring pipe in the present invention, is arranged side by side multiple, and 3 are set as in the present embodiment, is used for Pressure changing rule in solution cavity caused by measurement changes because of ground water of karst caves position;Contactless deformation observation system 5 is preferably Laser multipoint displacement meter can record the overburden deformation amount and deformation rule of different moments during the experiment.In addition, for convenience of straight Reading water level is connect, the side wall of geologic body simulation box 1 is provided with the scale 10 of measurement vertical height.
The purpose of the present invention is realized in the following way:
One, the formation of the weak infiltration soil layer erosion of lower layer:
1. weak infiltration soil sample and strong infiltration soil sample are piled up and are simulated in geologic body in the state of guaranteeing that instrument works normally In case 1, upper lower resistance type cap rock is formed in 2 top surface of partition, upper layer is opposite pervious bed 13 (permeating soil sample by force), lower layer is opposite Water blocking layer 14 (weak infiltration soil sample).The physico-mechanical properties and hydrophysical property parameter reference field Practical Project of soil sample, using master The similar progress of the high level of influence factor is wanted, specific analog material selection can be determined by a series of related soil tests.
2. all valves are under closed state in a device, by jacking system 8 by the outside of geologic body simulation box 1 Intermediate water tank 6 is increased to 2 corresponding position of partition being horizontally arranged in geologic body simulation box 1, opens the first valve 34 and the second valve Door 35 starts water pump 7, after the water in water tank 3 enters the water feeding tank 62 in intermediate water tank 6 by first pipe 31, by the Two pipelines 32 enter in the solution cavity simulation box 12 of 1 bottom half of geologic body simulation box, after a certain period of time, in solution cavity simulation box 12 all It is filled by underground water, stability of groundwater level is in 14 bottom surface of opposite water blocking layer (namely 2 top side location of partition) of lower layer, this process mould The natural ground-water level in nature in solution cavity is intended.Hereafter, underground water is entered by the circular hole in horizontal positioned 2 center of partition In opposite water blocking layer 14, erosion is gradually developed at any time.
3. being filled the water to the water injection well 15 in opposite pervious bed 13, after a certain period of time, in geologic body simulation box 1 Opposite pervious bed 13 has stable level of ground water.This process is equivalent to natural groundwater in the strong permeable formation in simulation nature Position.Specific water level value directly can be measured and be read in water injection well 15.
Two, the extension of soil cave and cap rock surface crack occur:
Due to being constantly etched for opposite 14 bottom plate of water blocking layer, soil cave gradually extends upwards, the thickness of opposite water blocking layer 14 It is being gradually reduced.In the case where the highly permeable penetration in upper layer, the extension of soil cave and soil thickness reduce collective effect, opposite water blocking layer 14 soil particle is gradually pulled away, and soil block gradually generates avalanche.This opposite pervious bed 13 for directly resulting in upper layer sink, ground There is crack in table.
Three, the generation of karst collapse:
With the continuous action of penetration, fine grained is gradually disengaged in lower layer's soil body, the accumulation of soil block body avalanche, surface cracks Will extension, when the resist collapse ability of cap rock itself be less than these cause collapse factor synergy when, collapse generation.The entire examination of record Test the water discharge time of process, the variation of U-shaped 4 water level of pressure-measuring pipe, the expanded configuration of soil cave.With high speed camera record cap rock surface The form of fracture development, Collapse Pit, overall process acquire overburden deformation-time relationship etc..

Claims (10)

1. resistance type cap rock is descended to collapse to because of experimental provision thoroughly on, it is characterised in that:Including geologic body simulation box (1), measuring system And water injection system;
Geologic body simulation box (1) is provided with horizontal positioned partition (2) in its cabinet, and partition (2) is by geologic body simulation box (1) It is divided into two, upper half is the cap rock simulation box (11) for simulating upper lower resistance type cap rock, and bottom half is solvable for simulating Rock and the solution cavity simulation box (12) that solution cavity can be developed in lava;The hole for simulating solution cavity opening is offered in the middle part of partition (2);Lid Layer simulation box (11) is provided with upper lower resistance type cap rock in partition (2) top surface, and the upper layer of upper lower resistance type cap rock is relatively permeable Layer (13), lower layer are opposite water blocking layer (14), are provided in opposite pervious bed (13) water injection well (15), and water injection well (15) is vertical Opposite pervious bed (13) are protruded into, and water injection well (15) bottom is provided with permeable hole;
Measuring system includes manograph (4) and contactless deformation observation system (5), and manograph (4) is set to geologic body simulation box (1) lateral wall, the measurement end of manograph (4) penetrates the sidewall paneling of solution cavity simulation box (12) and solution cavity simulation box (12) are connected; Contactless deformation observation system (5) is set to geologic body simulation box (1) over top;
Water injection system includes water tank (3), intermediate water tank (6) and water pump (7), and the water inlet of water pump (7) is connected to water tank (3), water inlet of the water outlet of water pump (7) by first pipe (31) connection intermediate water tank (6), the water outlet of intermediate water tank (6) Mouth is connected to the bottom of solution cavity simulation box (12) by second pipe (32), is provided with the first valve (34) in first pipe (31), The second valve (35) are provided on second pipe (32);Intermediate water tank (6) is equipped with the lifting system for driving its vertical lifting It unites (8).
2. upper thoroughly lower resistance type cap rock as described in claim 1 is collapsed to because of experimental provision, it is characterised in that:Intermediate water tank (6) The demarcation plate (61) being vertically arranged is provided in its cabinet, the top surface of intermediate water tank (6) surrounding sidewall paneling is above demarcation plate (61) intermediate water tank (6) is divided into two by top surface, demarcation plate (61), and side is water feeding tank (62), the other side is spill box (63), two connectors are arranged in the bottom plate of water feeding tank (62), and a connector is for connecting first pipe (31), another connection Mouth is for connecting second pipe (32);Overflow drainage mouth is arranged in the bottom of spill box (63).
3. upper thoroughly lower resistance type cap rock as claimed in claim 2 is collapsed to because of experimental provision, it is characterised in that:Overflow drainage mouth is set Water tank (3) are connected on the bottom plate of spill box (63), and by third pipeline (33).
4. upper thoroughly lower resistance type cap rock as described in claim 1 is collapsed to because of experimental provision, it is characterised in that:Jacking system (8) Including mutually matched sliding block and sliding rail, sliding block is connected to a fixed with intermediate water tank (6), and sliding rail is fixed at geologic body simulation The lateral wall of case (1), the lateral wall of geologic body simulation box (1) be additionally provided with sliding rail threaded rod disposed in parallel, threaded rod with Sliding block is threadedly coupled, by driving threaded rod rotation come so that sliding block makees elevating movement along sliding rail.
5. upper thoroughly lower resistance type cap rock as described in claim 1 is collapsed to because of experimental provision, it is characterised in that:Second pipe (32) It is connected on the bottom plate of solution cavity simulation box (12), and is also connected with drainage pipeline (9) on the bottom plate of solution cavity simulation box (12), arrange The water outlet of waterpipe (9) is connected to water tank (3), and drain valve (91) are provided on drainage pipeline (9).
6. upper thoroughly lower resistance type cap rock as described in claim 1 is collapsed to because of experimental provision, it is characterised in that:Opposite pervious bed (13) it is made of sandy soil layer, opposite water blocking layer is made of stickiness soil layer (14);Lower layer's stickiness soil layer infiltration coefficient is 10-6 ~10-3Cm/s, upper layer sandy soil layer infiltration coefficient are 8 × 10-3~2 × 10-2cm/s;Water injection well (15) uses lucite tube, Vertically penetrate entire opposite pervious bed (13), up to the basal surface position of opposite pervious bed (13), permeable hole is at water injection well (15) bottom Portion is uniformly arranged.
7. the upper lower resistance type cap rock as described in any one of claim 1 to 6 is collapsed to because of experimental provision, feature exists In:Geologic body simulation box (1) and partition (2) are all made of poly (methyl methacrylate) plate production, and geologic body simulation box (1) is set to water tank (3) on top plate.
8. the upper lower resistance type cap rock as described in any one of claim 1 to 6 is collapsed to because of experimental provision, feature exists In:Position of opening is folded equipped with baffle in the middle for partition (2) top surface, and baffle is provided with second in the position of opening of partition (2) and opens Hole, and the diameter of the second aperture is less than the diameter of aperture in the middle part of partition (2).
9. the upper lower resistance type cap rock as described in any one of claim 1 to 6 is collapsed to because of experimental provision, feature exists In:Manograph (4) is U-shaped pressure-measuring pipe, is arranged side by side multiple;Contactless deformation observation system (5) is laser multipoint displacement meter.
10. the upper lower resistance type cap rock as described in any one of claim 1 to 6 is collapsed to because of experimental provision, feature exists In:The side wall of geologic body simulation box (1) is provided with the scale (10) of measurement vertical height.
CN201810948510.XA 2018-08-20 2018-08-20 Upper thoroughly lower resistance type cap rock is collapsed to because of experimental provision Pending CN108877451A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810948510.XA CN108877451A (en) 2018-08-20 2018-08-20 Upper thoroughly lower resistance type cap rock is collapsed to because of experimental provision

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810948510.XA CN108877451A (en) 2018-08-20 2018-08-20 Upper thoroughly lower resistance type cap rock is collapsed to because of experimental provision

Publications (1)

Publication Number Publication Date
CN108877451A true CN108877451A (en) 2018-11-23

Family

ID=64321243

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810948510.XA Pending CN108877451A (en) 2018-08-20 2018-08-20 Upper thoroughly lower resistance type cap rock is collapsed to because of experimental provision

Country Status (1)

Country Link
CN (1) CN108877451A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110161213A (en) * 2019-05-31 2019-08-23 贵州大学 A kind of experimental provision for simulating Karst region karst collapse
CN112946778A (en) * 2021-01-29 2021-06-11 中国地质科学院岩溶地质研究所 Method for early warning karst collapse based on underground water turbidity monitoring
CN114371273A (en) * 2022-01-14 2022-04-19 中国电建集团成都勘测设计研究院有限公司 Physical test device for detecting collapse influence range of dangerous rock mass

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1399805A1 (en) * 1985-11-19 1988-05-30 Стахановский Филиал Коммунарского Горно-Металлургического Института Device for modeling carst
CN105572319A (en) * 2015-12-11 2016-05-11 河海大学 Hydraulic-induced covered karst collapse simulation testing device and using method
CN105810075A (en) * 2016-05-13 2016-07-27 成都理工大学 Water-pumping triggered karst collapse process experimental device
CN107167579A (en) * 2017-06-28 2017-09-15 中国地质大学(武汉) A kind of covered karst area hydrodynamic force causes the catastrophe Evolution Simulation experimental rig that collapses

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
SU1399805A1 (en) * 1985-11-19 1988-05-30 Стахановский Филиал Коммунарского Горно-Металлургического Института Device for modeling carst
CN105572319A (en) * 2015-12-11 2016-05-11 河海大学 Hydraulic-induced covered karst collapse simulation testing device and using method
CN105810075A (en) * 2016-05-13 2016-07-27 成都理工大学 Water-pumping triggered karst collapse process experimental device
CN107167579A (en) * 2017-06-28 2017-09-15 中国地质大学(武汉) A kind of covered karst area hydrodynamic force causes the catastrophe Evolution Simulation experimental rig that collapses

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
丁庆忠: "弱透水盖层岩溶塌陷的水-气压力致塌机理物理模型研究", 《中国优秀硕士学位论文全文数据库》 *
程星等: "岩溶塌陷的地质概化模型", 《水文地质工程地质》 *
雷明堂等: "岩溶塌陷模型试验—以武昌为例", 《地质灾害与环境保护》 *
雷明堂等: "岩溶塌陷试验、评估与管理方法研究", 《地质灾害与环境保护》 *

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110161213A (en) * 2019-05-31 2019-08-23 贵州大学 A kind of experimental provision for simulating Karst region karst collapse
CN112946778A (en) * 2021-01-29 2021-06-11 中国地质科学院岩溶地质研究所 Method for early warning karst collapse based on underground water turbidity monitoring
CN112946778B (en) * 2021-01-29 2022-05-03 中国地质科学院岩溶地质研究所 Method for early warning karst collapse based on underground water turbidity monitoring
CN114371273A (en) * 2022-01-14 2022-04-19 中国电建集团成都勘测设计研究院有限公司 Physical test device for detecting collapse influence range of dangerous rock mass
CN114371273B (en) * 2022-01-14 2023-11-14 中国电建集团成都勘测设计研究院有限公司 Physical test device for detecting dangerous rock body caving influence range

Similar Documents

Publication Publication Date Title
CN109036065A (en) Single layer waterproofing type cap rock is collapsed to because of experimental provision
CN108318396B (en) Test method of tailing dam seepage field similarity simulation test system
CN108195723B (en) Permeation grouting test system and method for reinforcing loose gravel soil
CN105810075A (en) Water-pumping triggered karst collapse process experimental device
Bouwer A double tube method for measuring hydraulic conductivity of soil in situ above a water table
CN103389260B (en) Pile foundation hinders the simulation laboratory test method of seepage action of ground water
CN108877451A (en) Upper thoroughly lower resistance type cap rock is collapsed to because of experimental provision
Tang et al. Groundwater engineering
CN108986624A (en) Saturating type cap rock is collapsed to because of experimental provision under upper resistance
CN105547967A (en) Indoor measuring device for permeability tensor of fissure medium system
Song et al. Heterogeneity of hydraulic conductivity and Darcian flux in the submerged streambed and adjacent exposed stream bank of the Beiluo River, northwest China
CN104318843B (en) Artesian well water injection test device
Malusis et al. Comparison of laboratory and field measurements of backfill hydraulic conductivity for a large-scale soil-bentonite cutoff wall
Yuan et al. Numerical simulation of dewatering thick unconsolidated aquifers for safety of underground coal mining
Xiao et al. Effects of declining water levels on water-air interactions in cover collapse sinkhole
Kasenow Aquifer test data: analysis and evaluation
LIU et al. Experimental study on seepage erosion induced by pipeline damage under full pipe flow condition
Tehrani Developing a new instrumented soil column to study climate-induced ground movement in expansive soil
Liu et al. Instability Mechanism of Cavity‐Bearing Formation under Tunnel Excavation Disturbance
Lachmar Application of fracture-flow hydrogeology to acid-mine drainage at the Bunker Hill Mine, Kellogg, Idaho
DAO STABILITY EVALUATION ON INTERNAL EROSION OF VOLCANIC COARSE GRAINED SOILS
Song et al. Experimental study to estimate the criteria for shallow landslides under various geological conditions in South Korea
CN108267563A (en) A kind of water supply installation and application method of large-scale three dimensional geologic model test
CN218974351U (en) Shield tunnel vehicle induced settlement model test device
Zhao et al. Geological survey and drilling technology of karst land

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123

RJ01 Rejection of invention patent application after publication