CN108871630A - It is a kind of for monitoring the instrument of tower bar steel structure stress - Google Patents
It is a kind of for monitoring the instrument of tower bar steel structure stress Download PDFInfo
- Publication number
- CN108871630A CN108871630A CN201810587730.4A CN201810587730A CN108871630A CN 108871630 A CN108871630 A CN 108871630A CN 201810587730 A CN201810587730 A CN 201810587730A CN 108871630 A CN108871630 A CN 108871630A
- Authority
- CN
- China
- Prior art keywords
- clip
- side take
- thin slice
- tiger
- casing
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/02—Structures made of specified materials
- E04H12/08—Structures made of specified materials of metal
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01L—MEASURING FORCE, STRESS, TORQUE, WORK, MECHANICAL POWER, MECHANICAL EFFICIENCY, OR FLUID PRESSURE
- G01L1/00—Measuring force or stress, in general
- G01L1/20—Measuring force or stress, in general by measuring variations in ohmic resistance of solid materials or of electrically-conductive fluids; by making use of electrokinetic cells, i.e. liquid-containing cells wherein an electrical potential is produced or varied upon the application of stress
- G01L1/22—Measuring force or stress, in general by measuring variations in ohmic resistance of solid materials or of electrically-conductive fluids; by making use of electrokinetic cells, i.e. liquid-containing cells wherein an electrical potential is produced or varied upon the application of stress using resistance strain gauges
- G01L1/2206—Special supports with preselected places to mount the resistance strain gauges; Mounting of supports
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Life Sciences & Earth Sciences (AREA)
- Chemical & Material Sciences (AREA)
- Materials Engineering (AREA)
- Wood Science & Technology (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Physics & Mathematics (AREA)
- General Physics & Mathematics (AREA)
- Clamps And Clips (AREA)
Abstract
The present invention relates to a kind of for monitoring the instrument of tower bar steel structure stress, including left side take-up clip, right side take-up clip, thin slice, foil gauge, screw rod and casing;The tiger's jaw interconnecting piece of left side take-up clip is equipped with bulbous recess;The tiger's jaw interconnecting piece of right side take-up clip is equipped with kidney ellipsoid through-hole;One end of screw rod is equipped with sphere, and sphere is hinged in bulbous recess;Casing is equipped with internal screw thread corresponding with screw rod, and the both ends of casing are equipped with baffle, and casing can slide up and down in kidney ellipsoid through-hole, and baffle can stop casing to fall off from kidney ellipsoid through-hole;Foil gauge is bonded on thin slice, and left side take-up clip and right side take-up clip clamp thin slice both ends respectively.The present invention can effectively prevent thin slice gas supply or fall off, and is laid in thin slice on steelframe to greatest extent, plays the test effect of foil gauge to greatest extent, improve the accuracy of measurement.The present disclosure applies equally to the steelframes of arc.
Description
Technical field
The invention belongs to power grid tower bar fields, and in particular to a kind of for monitoring the instrument of tower bar steel structure stress.
Background technique
Power grid tower bar is one of basic equipment in overhead distribution, and power grid tower bar is mostly by angle steel or armored concrete system
At.It in certain locations, is influenced by geology avalanche, landslide and karst ground subsidence etc., tower bar ground settles, to make tower-shaped
Deformation, or occur the destruction such as obvious crack between tower bar basis and mask, cause pylon mechanics failure phenomenon occur, this
When, power analog study need to be done in the column foot sedimentation of tower bar, establish finite element mechanical model, analyze each angle steel in tower bar
Stress distribution situation determines the weak component in sedimentation tower bar, then these weak spots is accurately positioned, so as in weakness
Foil gauge, the safe condition of real-time monitoring tower bar are installed on point angle steel.
Common foil gauge mounting means is then tagger to be adhered on steelframe by strain gauge adhesion on tagger.
Due to steelframe be exposed to throughout the year it is outer, inevitably occur to corrode perhaps get rusty phenomenon this will cause tagger and arch upward or therefrom steelframe
On fall off, especially at those arc steelframe positions, this phenomenon is become apparent.
Summary of the invention
The present invention in view of the above-mentioned problems, provide a kind of fixation and can apply to arc steelframe for monitoring tower bar
The instrument of steel structure stress.
It is provided by the invention a kind of for monitoring the instrument of tower bar steel structure stress, including left side take-up clip, right side take-up clip,
Thin slice, foil gauge, screw rod and casing;The tiger's jaw interconnecting piece of left side take-up clip is equipped with bulbous recess;The tiger's jaw of right side take-up clip connects
Socket part is equipped with kidney ellipsoid through-hole;One end of screw rod is equipped with sphere, and sphere is hinged in bulbous recess;Casing is equipped with opposite with screw rod
The both ends of the internal screw thread answered, casing are equipped with baffle, and casing can slide up and down in kidney ellipsoid through-hole, and baffle can stop casing from waist
Circular through hole falls off;Foil gauge is bonded on thin slice, and left side take-up clip and right side take-up clip clamp thin slice both ends respectively.
It is advanced optimized as of the invention, the both ends of thin slice are equipped with flanging;It is on the inside of the tiger's jaw portion of left side take-up clip and right
Groove corresponding with flanging is equipped on the inside of the tiger's jaw portion of side take-up clip.
It is advanced optimized as of the invention, the tiger's jaw portion of left side take-up clip is equipped with anti-with the tiger's jaw portion of right side take-up clip
Sliding line.
It is advanced optimized as of the invention, left side take-up clip clamps thin slice by wing bolt with right side take-up clip.
It is advanced optimized as of the invention, baffle is regular prism.
It is advanced optimized as of the invention, further includes installation method, steps are as follows:
S1:After the flanging at thin slice both ends is respectively clamped into the groove on the inside of left side take-up clip and right side take-up clip, stamp
Silicone rubber adhesive is fixed in a groove by flanging;
S2:The corrosion on the steelframe surface at thin slice will be installed with sand paper and paint processing is clean, expose bright and clean metal
Face;
S3:After silicone rubber adhesive solidification, cleaned slice mounting surface and in the uniform spreading glue in the face;
S4:The thin slice for being coated with glue is attached to bright and clean steelframe surface of polishing, tightens left side take-up clip and right side take-up clip
On bolt make left side take-up clip and right side take-up clip thin slice is fixed on steelframe;
S5:Rotating casing is flattened thin slice under left side take-up clip and the pulling force effect of right side take-up clip;
S6:Foil gauge is bonded on thin slice with glue;
S7:After glue is dry, in the tiger's jaw portion of the tiger's jaw part and right side take-up clip of foil gauge, thin slice, left side take-up clip
Divide and plays extruding glue.
It is provided by the invention a kind of for monitoring the instrument of tower bar steel structure stress, left side take-up clip and right side tiger's jaw can be passed through
The thin slice for being bonded with foil gauge is fixed on steelframe by folder, be can effectively prevent thin slice gas supply or is fallen off.The present invention can pass through
Rotating casing pulls open the mode of the spacing of left side take-up clip and right side take-up clip to even up thin slice, and thin slice is made to tile to greatest extent
On steelframe, the test effect of foil gauge is played to greatest extent, improves the accuracy of measurement.The present disclosure applies equally to arcs
Steelframe.
Detailed description of the invention
Fig. 1 is left side take-up clip structural schematic diagram;
Fig. 2 is right side take-up clip structural schematic diagram;
Fig. 3 is 1 structural schematic diagram of embodiment;
Fig. 4 is 2 structural schematic diagram of embodiment;
Fig. 5 is cannula structure schematic diagram;
Wherein, left side take-up clip 100, tiger's jaw interconnecting piece 110, bulbous recess 111, tiger's jaw portion 120, right side take-up clip 200,
Kidney ellipsoid through-hole 211, thin slice 300, flanging 310, foil gauge 400, screw rod 500, casing 600, baffle 610, steelframe 700.
Specific embodiment
It elaborates below in conjunction with specific embodiment to the present invention.
Embodiment 1
As shown in Figure 1-Figure 3, the present embodiment includes left side take-up clip 100, right side take-up clip 200, thin slice 300, foil gauge
400, screw rod 500 and casing 600;The tiger's jaw interconnecting piece 110 of left side take-up clip 100 is equipped with bulbous recess 111;Right side take-up clip
200 tiger's jaw interconnecting piece 110 is equipped with kidney ellipsoid through-hole 211;One end of screw rod 500 is equipped with sphere, and sphere is hinged on bulbous recess
In 111;Casing 600 is equipped with internal screw thread corresponding with screw rod 500, and the both ends of casing 600 are equipped with baffle 610, and casing 600 can be
It is slided up and down in kidney ellipsoid through-hole 211, baffle 610 can stop casing 600 to fall off from kidney ellipsoid through-hole 211;Foil gauge 400 is bonded
On thin slice 300, left side take-up clip 100 and right side take-up clip 200 clamp 300 both ends of thin slice respectively.
When steel structure is horizontality, as shown in figure 3, left side take-up clip 100 and right side take-up clip 200 pass through bolt, most
The thin slice 300 for being bonded with foil gauge 400 is fixed on the steelframe 700 of horizontality for wing bolt well, therefore the structure energy
It effectively prevent foil gauge 400 to fall off.This structure can also pass through threaded sleeve 600 and 500 screw thread of screw rod by rotating casing 600
The spacing of left side take-up clip 100 and right side take-up clip 200, left side take-up clip 100 and right side take-up clip 200 are pulled open in the effect of engagement
Thin slice 300 can be evened up by frictional force in the process of moving, to effectively prevent that thin slice 300 arches upward or fold influences strain
The detection accuracy of piece 400.
It, can be in left side tiger's jaw in order to which the effect for making left side take-up clip 100 and right side take-up clip 200 even up thin slice 300 is more preferable
The inside in the tiger's jaw portion 120 of the inside and right side take-up clip 200 in the tiger's jaw portion 120 of folder 100 sets anti-skid chequer, increases tiger's jaw portion 120
With the frictional force of thin slice 300;Or it is equipped with flanging 310 at the both ends of thin slice 300, and in the tiger's jaw portion 120 of left side take-up clip 100
And the tiger's jaw portion 120 of right side take-up clip 200 is equipped with groove corresponding with flanging 310, and flanging 310 can be caught in groove, pass through
Flanging 310 is pulled to even up thin slice 300.
It preferably, further include installation method, steps are as follows:
S1:The flanging 310 at 300 both ends of thin slice is respectively clamped into recessed on the inside of left side take-up clip 100 and right side take-up clip 200
After in slot, silicone rubber adhesive is stamped flanging 310 is fixed in a groove;
S2:The corrosion on 700 surface of steelframe at thin slice 300 will be installed with sand paper and paint processing is clean, exposed bright and clean
Metal covering;
S3:After silicone rubber adhesive solidification, 300 mounting surface of cleaned slice and in the uniform spreading glue in the face;
S4:The thin slice 300 for being coated with glue is attached to bright and clean 700 surface of steelframe of polishing, tightens left side take-up clip 100 and the right side
Bolt on side take-up clip 200 is fixed on left side take-up clip 100 and right side take-up clip 200 on steelframe 700 thin slice 300;
S5:Rotating casing 600 makes the quilt under the pulling force effect of left side take-up clip 100 and right side take-up clip 200 of thin slice 300
It evens up;
S6:Foil gauge 400 is bonded on thin slice 300 with glue;
The bonding of foil gauge 400 is got on again after being straightened rather than foil gauge 400 is bonded in thin slice at the very start by thin slice 300
On 300, such step design can effectively avoid evening up thin slice 300, be especially foil gauge in arcuate structure in steelframe 700
400 there is the generation of alice dropping situations.
S7:After glue is dry, in foil gauge 400, thin slice 300, the tiger's jaw part of left side take-up clip 100 and right side take-up clip
Extruding glue is played in 200 tiger's jaw part;
It should be noted that tiger's jaw is made as far as possible when extruding glue is played in tiger's jaw part, especially bolt part, such energy
Guarantee that bolt will not loosen easily, improves stability.
Embodiment 2
As shown in figure 4, its structure and principle are the same manner as in Example 1, difference is the present embodiment, the steelframe in the present embodiment
700 be arc, and since thin slice 300 usually selects tagger or scale copper, easily deformable, what can be agreed with very much is adjacent in arc
On steelframe 700.Since screw rod 500 is hinged on the take-up clip 100 of left side, screw rod 500 can arbitrarily be rotated around bulbous recess 111
Until screw rod 500 is vertical with right side take-up clip 200, and the kidney ellipsoid through-hole 211 on right side take-up clip 200 is turning for screw rod 500
Dynamic to provide enough spaces, therefore, even arc steelframe 700 can also even up thin slice 300 by rotating casing 600.
Preferably, as shown in figure 5, baffle 610 is regular prism, which is to exert a force for convenience, such as convenient for tiger
Brank clamps baffle, thus rotating casing 600.
Finally it should be noted that the above embodiments are merely illustrative of the technical solutions of the present invention, rather than the present invention is protected
The limitation of range is protected, although explaining in detail referring to preferred embodiment to the present invention, those skilled in the art are answered
Work as understanding, it can be with modification or equivalent replacement of the technical solution of the present invention are made, without departing from the reality of technical solution of the present invention
Matter and range.
Claims (6)
1. a kind of for monitoring the instrument of tower bar steel structure stress, which is characterized in that including left side take-up clip, right side take-up clip, thin
Piece, foil gauge, screw rod and casing;The tiger's jaw interconnecting piece of left side take-up clip is equipped with bulbous recess;The tiger's jaw of right side take-up clip connects
Portion is equipped with kidney ellipsoid through-hole;One end of screw rod is equipped with sphere, and sphere is hinged in bulbous recess;Casing is equipped with corresponding with screw rod
Internal screw thread, the both ends of casing are equipped with baffle, and casing can slide up and down in kidney ellipsoid through-hole, and baffle can stop casing from oval
Shape through-hole falls off;Foil gauge is bonded on thin slice, and left side take-up clip and right side take-up clip clamp thin slice both ends respectively.
2. a kind of for monitoring the instrument of tower bar steel structure stress according to claim 1, which is characterized in that the both ends of thin slice are set
There is flanging;Groove corresponding with flanging is equipped on the inside of the tiger's jaw portion of left side take-up clip and on the inside of the tiger's jaw portion of right side take-up clip.
3. a kind of for monitoring the instrument of tower bar steel structure stress according to claim 1, which is characterized in that left side take-up clip
Tiger's jaw portion and the tiger's jaw portion of right side take-up clip are equipped with anti-skid chequer.
4. a kind of for monitoring the instrument of tower bar steel structure stress according to claim 1, which is characterized in that left side take-up clip with
Right side take-up clip clamps thin slice by wing bolt.
5. a kind of for monitoring the instrument of tower bar steel structure stress according to claim 1, which is characterized in that baffle is regular prism
Body.
6. a kind of for detecting the instrument of tower bar steel structure stress according to claim 2, which is characterized in that further include installation side
Method, steps are as follows:
S1:After the flanging at thin slice both ends is respectively clamped into the groove on the inside of left side take-up clip and right side take-up clip, silicon rubber is stamped
Viscose binder is fixed in a groove by flanging;
S2:The corrosion on the steelframe surface at thin slice will be installed with sand paper and paint processing is clean, expose bright and clean metal covering;
S3:After silicone rubber adhesive solidification, cleaned slice mounting surface and in the uniform spreading glue in the face;
S4:The thin slice for being coated with glue is attached to bright and clean steelframe surface of polishing, is tightened on left side take-up clip and right side take-up clip
Bolt is fixed on left side take-up clip and right side take-up clip on steelframe thin slice;
S5:Rotating casing is flattened thin slice under left side take-up clip and the pulling force effect of right side take-up clip;
S6:Foil gauge is bonded on thin slice with glue;
S7:After glue is dry, beaten in the tiger's jaw part of foil gauge, thin slice, the tiger's jaw part of left side take-up clip and right side take-up clip
Extruding glue.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810587730.4A CN108871630A (en) | 2018-06-08 | 2018-06-08 | It is a kind of for monitoring the instrument of tower bar steel structure stress |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810587730.4A CN108871630A (en) | 2018-06-08 | 2018-06-08 | It is a kind of for monitoring the instrument of tower bar steel structure stress |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108871630A true CN108871630A (en) | 2018-11-23 |
Family
ID=64337423
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810587730.4A Pending CN108871630A (en) | 2018-06-08 | 2018-06-08 | It is a kind of for monitoring the instrument of tower bar steel structure stress |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108871630A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113654496A (en) * | 2021-08-26 | 2021-11-16 | 上海电力大学 | Power transmission tower body rod piece monitoring device |
CN114993816A (en) * | 2022-05-24 | 2022-09-02 | 三峡大学 | Method for measuring average crack width of concrete surface |
-
2018
- 2018-06-08 CN CN201810587730.4A patent/CN108871630A/en active Pending
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN113654496A (en) * | 2021-08-26 | 2021-11-16 | 上海电力大学 | Power transmission tower body rod piece monitoring device |
CN114993816A (en) * | 2022-05-24 | 2022-09-02 | 三峡大学 | Method for measuring average crack width of concrete surface |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108871630A (en) | It is a kind of for monitoring the instrument of tower bar steel structure stress | |
CN207487535U (en) | A kind of position degree detection apparatus of threaded hole | |
CN108534730A (en) | A kind of device for measuring soil body deeply mixing cement-soil pile and surface settlement in real time | |
CN103389082A (en) | 360-degree free-of-leveling forced centering collimation equipment and using method thereof | |
CN204612719U (en) | A kind of settlement observer | |
CN204389083U (en) | A kind of model test suspension cable anchoring and cable tension test device | |
CN215497967U (en) | Cable testing bridge location line unwrapping wire auxiliary device | |
CN204007588U (en) | The servicing unit of levelling pole | |
CN210774243U (en) | Universal clamping type underground water well water level measuring device | |
CN205980984U (en) | Internal thread sampling tool | |
CN204192728U (en) | With the self-taped type screw of ring gauges | |
CN206740020U (en) | A kind of crack measures guide frame device | |
CN212843337U (en) | Metal embedded type crack measuring mark | |
CN201476909U (en) | Bolt stress detection device | |
CN211042033U (en) | Simple tool for accurately measuring perpendicularity of wall column template | |
CN210757335U (en) | Screw disassembly auxiliary clamp | |
CN208346789U (en) | Concrete pressure cell Embedded installation device | |
CN204228667U (en) | A kind of calibrate AE sensor pushing tow coupling device | |
CN207570754U (en) | A kind of straight type Pitot pipe holder of wind-tunnel | |
CN208171142U (en) | A kind of detection device of concrete spray coating thickness | |
CN106705802A (en) | Hole distance detection fixture used for automobile condenser | |
CN207231987U (en) | Suitable for FRP tendons and a kind of grip device of bonding wood slip property experiment | |
CN106017253A (en) | Internal thread sampling tool and sampling method | |
CN205091011U (en) | Flowmeter installation device | |
CN216115690U (en) | Concrete spraying thickness measuring scale |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181123 |