CN108868857A - Keep off cash lapping device and gear cash laydown process - Google Patents

Keep off cash lapping device and gear cash laydown process Download PDF

Info

Publication number
CN108868857A
CN108868857A CN201810597364.0A CN201810597364A CN108868857A CN 108868857 A CN108868857 A CN 108868857A CN 201810597364 A CN201810597364 A CN 201810597364A CN 108868857 A CN108868857 A CN 108868857A
Authority
CN
China
Prior art keywords
gear cash
tunnel
net
cash
gear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810597364.0A
Other languages
Chinese (zh)
Inventor
宋立兵
蔚保宁
胡建平
王庆雄
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Shenhua Energy Co Ltd
Shenhua Shendong Coal Group Co Ltd
Original Assignee
China Shenhua Energy Co Ltd
Shenhua Shendong Coal Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Shenhua Energy Co Ltd, Shenhua Shendong Coal Group Co Ltd filed Critical China Shenhua Energy Co Ltd
Priority to CN201810597364.0A priority Critical patent/CN108868857A/en
Publication of CN108868857A publication Critical patent/CN108868857A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D23/00Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor
    • E21D23/03Mine roof supports for step- by- step movement, e.g. in combination with provisions for shifting of conveyors, mining machines, or guides therefor having protective means, e.g. shields, for preventing or impeding entry of loose material into the working space or support

Abstract

The invention discloses a kind of gear cash lapping device and gear cash laydown process.Keeping off cash lapping device includes face end support, and face end support is located in tunnel, and face end support includes the top surface of the top beam being arranged towards coal wall and the top plate for being used to support tunnel;Gear cash net includes the fixing end being oppositely arranged and promotes end along its length, and fixing end is hung and is fixed on the ground in tunnel backwards to one end of coal wall from face end support;Promote end can be arranged on top beam to folding and unfolding, the part that gear cash is located between fixing end and propulsion end on the net pastes and between top surface and top plate, and pastes and be fixed on top plate by top surface, and the spoil in tunnel is limited between top plate and gear cash net.It keeps off cash laydown process and is used for the lapping gear cash in tunnel.Gear cash lapping device provided by the invention and gear cash laydown process, avoid the inside that the spoil being caving pours in tunnel, are not necessarily to manual cleaning spoil, time saving and energy saving, and increase operating personnel in the safety coefficient of underground work.

Description

Keep off cash lapping device and gear cash laydown process
Technical field
The present invention relates to coal mine machinery technical field more particularly to a kind of gear cash lapping device and gear cash laydown process.
Background technique
Tunnel is the various accesses that Drilling goes out between earth's surface and ore body, for transporting mine, ventilation and drainage, pedestrian and being The various necessary preparation engineerings etc. that metallurgical equipment extracted ore is newly dug.
In the prior art, the spoil that tunnel goaf is caving, which is easy to happen, to be poured in tunnel, causes danger to operating personnel, To prevent the spoil in goaf from pouring in tunnel, lane need to be stayed to carry out linked network and gear cash supporting goaf.At present using after frame The mode of cash is kept off, i.e. fully-mechanized mining working back production carries out gear cash at bracket rear later.Inventor is in the process for realizing innovation and creation Middle discovery, above-mentioned gear cash method have the following disadvantages:First, the spoil being caving is easy to pour in lane along the caving shield of fully mechanized mining supporter In road, cause to keep off cash difficulty, needs to carry out gear cash after manually cleaning out spoil, it is time-consuming and laborious;Second, operating personnel is close to adopt When the operation of dead zone, the spoil that mined out operation area is caving pours in tunnel after face end support, is easy to injure operating personnel by a crashing object, increases well The danger coefficient of lower operation.
Therefore, it is necessary to solve above-mentioned technical problem.
Summary of the invention
The present invention provides a kind of gear cash lapping device and gear cash laydown process, to solve problems of the prior art, It avoids the spoil being caving from pouring in the inside in tunnel, is not necessarily to manual cleaning spoil, it is time saving and energy saving, and operating personnel is increased in underground The safety coefficient of operation.
The present invention provides a kind of gear cash lapping devices, including:Face end support, the face end support are located in tunnel, institute State the top surface that face end support includes the top beam being arranged towards coal wall and the top plate for being used to support the tunnel;Keep off cash net, the gear Cash net includes the fixing end being oppositely arranged and promotes end along its length, and the fixing end is from the face end support backwards to described One end of coal wall hangs and is fixed on the ground in the tunnel;The propulsion end can be arranged in folding and unfolding on the top beam, with Promote the propulsion end jointly with the face end support, the gear cash is located on the net between the fixing end and the propulsion end Part patch and paste and be fixed on the top plate between the top surface and the top plate, and through the top surface, the lane Spoil in road is limited between the top plate and the gear cash net.
Optionally, shaft is provided on the top beam, the propulsion end is wrapped in the shaft, and the shaft is along institute The rotatable setting of axial direction of shaft is stated, to promote end described in folding and unfolding.
Optionally, rocking bar is connected in the shaft, the first end of the rocking bar is connected by connecting rod with the shaft It connects, the second end of the rocking bar extends along the direction far from the shaft, and the rocking bar is parallel to the shaft.
Optionally, the spoil is located at the top of the fixing end, with the fixation fixing end.
Optionally, the gear cash lapping device further includes the monomer hydraulic bracket being arranged in tunnel, the monomer hydraulic The top of bracket is connected to the gear cash and is located at the fixing end and the part promoted between end on the net.
Optionally, the gear cash lapping device further includes waste rock board, and the front of the waste rock board is connected to the monomer liquid The top of bracket is pressed, it is online that the back side of the waste rock board is connected to the gear cash.
Optionally, the distance of the gear cash net along its length is L, L=Ld+H+Ly+ d, wherein LdFor the tunnel Length, H are the average height of the top plate, LyTo be located at the length below the spoil in the fixing end, d is the gear cash Net wraps up the distance sunk after the spoil.
Optionally, the gear cash net is wire netting.
Optionally, top net is provided on the top plate, the top net is connected and is oppositely arranged with the gear cash net.
Based on the same inventive concept, the present invention also provides a kind of gear cash laydown process, according to any of the above one Gear cash lapping device in tunnel lapping keep off cash, include the following steps:Face end support is set in tunnel, makes the end branch Frame includes towards the top surface of the top beam and the top plate for being used to support the tunnel of coal wall;Gear cash net, institute are laid in the tunnel Gear cash net is stated along its length to include the fixing end that is oppositely arranged and promote end, the fixing end from the face end support backwards One end of the coal wall hangs and is fixed on the ground in the tunnel, and the top beam can be arranged in folding and unfolding in the propulsion end On, so that the propulsion end promotes jointly with the face end support, the gear cash is located at the fixing end and the propulsion on the net Part between end is pasted and is fixed on the top plate by the top surface, and the spoil in the tunnel is limited at the top plate Between the gear cash net;The face end support is promoted, makes folding and unfolding on the propulsion end that part on top beam is set from top beam Upper stretching, and paste and be fixed on the top plate of the face end support direction of propulsion.
Gear cash lapping device provided by the invention and gear cash laydown process, by the way that gear cash net, gear are arranged on face end support The fixing end of cash net is fixed on the ground in tunnel, keeps off the propulsion end of cash net as face end support tunnels jointly, is newly excavated with supporting The top plate in tunnel out, the spoil in tunnel are limited between top plate and gear cash net, effectively avoid in tunneling process, It avoids the spoil being caving from pouring in the inside in tunnel, is not necessarily to manual cleaning spoil, it is time saving and energy saving, and operating personnel is increased in underground The safety coefficient of operation.
Detailed description of the invention
Preferred embodiment in attached drawing the present invention is described in detail will be passed through below, it will help understand the purpose of the present invention and excellent Point, wherein:
Fig. 1 is the structural schematic diagram for the gear cash lapping device that alternative embodiment of the present invention provides.
Fig. 2 is the top view for the gear cash lapping device that alternative embodiment of the present invention provides.
Fig. 3 is the flow chart for the gear cash laydown process that alternative embodiment of the present invention provides.
Specific embodiment
It mentions in the present specification or up, down, left, right, before and after, front, the back side, top, the bottom that may mention etc. Positional terms are defined relative to each construction shown in the drawings, and word "inner" and "outside" refer respectively to direction or remote From the direction of geometric center of specific component, they are opposite concepts, and it is therefore possible to can different location, difference according to locating for it Use state and correspondingly changed.So also these or other positional terms should not be construed to restricted use Language.
Fig. 1 is the structural schematic diagram for the gear cash lapping device that alternative embodiment of the present invention provides, and Fig. 2 is the optional reality of the present invention The top view of the gear cash lapping device of example offer is provided.As shown in Figure 1 to Figure 2, the present invention provides a kind of gear cash lapping device, packets Include face end support 1 and gear cash net 2.
Referring to Fig. 1 to Fig. 2, face end support 1 is located in tunnel, and face end support 1 includes the top being arranged towards coal wall 4 The top surface of beam 11 and the top plate 5 for being used to support tunnel.Top beam 11 is located at the direction on face end support 1 close to wall 4 to be mined, top surface It is arranged towards the top plate 5 in tunnel.Gear cash net 2 includes the fixing end 21 being oppositely arranged and propulsion end 22, fixing end along its length On the ground that 21 one end from face end support 1 backwards to coal wall 4 hung and be fixed on tunnel.Promote end 22 that can be arranged in folding and unfolding On top beam 11, so as to end 22 and face end support 1 is promoted to promote jointly, i.e., propulsion end 22 is deposited in a manner of storage etc. by winding or concentrating Storage is on top beam 11, and when face end support 1 is pushed ahead, the part for promoting end 22 to store extends out past the top surface of face end support 1 Supporting role after paste and be fixed on the top plate 5 in tunnel.The part being located between fixing end 21 and propulsion end 22 is kept off on cash net 2 Patch and between top surface and top plate 5, and by top surface patch and be fixed on top plate 5, the spoil 6 in tunnel is limited at top plate 5 Between gear cash net 2, the inside that the spoil 6 being caving pours in tunnel is avoided, is not necessarily to manual cleaning spoil 6, it is time saving and energy saving, and increase Add operating personnel in the safety coefficient of underground work.
Gear cash lapping device provided in an embodiment of the present invention, by the way that gear cash net 2 is arranged on face end support 1, gear cash net 2 Fixing end 21 is fixed on the ground in tunnel, keeps off the propulsion end 22 of cash net 2 as face end support 1 tunnels jointly, is newly excavated with supporting The top plate 5 in tunnel out, the spoil 6 in tunnel are limited between top plate 5 and gear cash net 2, effectively prevent in tunneling process In the spoil 6 that is caving pour in the inside in tunnel, be not necessarily to manual cleaning spoil 6, it is time saving and energy saving, and increase operating personnel in underground The safety coefficient of operation.
Optionally, be provided with shaft 3 on top beam 11, end 22 promoted to be wrapped in shaft 3, shaft 3 along shaft 3 axial direction Rotatable setting promotes end 22 with folding and unfolding.Being located on gear cash net 2 promotes 22 part of end to be wrapped in shaft 3, and is turned by rotation Axis 3 realize promote end 22 can folding and unfolding setting.When face end support 1 moves forward, rotating shaft 3 will promote the gear cash net at end 22 2 release, and are connected on the top plate 5 in the tunnel newly produced by top surface, simplify and are located at propulsion end on release gear cash net 2 The operation difficulty of 22 parts, securely and reliably.
Preferably, be connected with rocking bar in shaft 3, the first end of rocking bar is connected by connecting rod with shaft 3, the of rocking bar Two ends extend along the direction far from shaft 3, and rocking bar is parallel to shaft 3.By shake rocking bar move in a circle, drive shaft 3 into Row rotation is located at the part-structure promoted on end 22 to discharge gear cash net 2, further saves manpower, improve and operate just Victory.
As an optional implementation process, spoil 6 is located at the top of fixing end 21, to be fixed end 21.Fixing end 21 hang behind the ground in tunnel, and spoil 6 is directly placed on fixing end 21, the quilt under the gravity of spoil 6 of fixing end 21 It is fixed.Since 6 quantity of spoil in tunnel is more, behind the lower section that fixing end 21 is arranged in, pressure that spoil 6 applies fixing end 21 Power is sufficiently large, and what can be consolidated is fixed on fixing end 21 on the ground in tunnel.
Further, gear cash lapping device further includes the monomer hydraulic bracket being arranged in tunnel, monomer hydraulic bracket Top is connected to the part being located between fixing end 21 and propulsion end 22 on gear cash net 2.It can be to gear cash net 2 between monomer hydraulic Further supporting role is played, the stability that gear cash net 2 keeps off cash is increased.
Optionally, gear cash lapping device further includes waste rock board, and the front of waste rock board is connected to the top of monomer hydraulic bracket, The back side of waste rock board is connected on gear cash net 2.Waste rock board can increase monomer hydraulic bracket and keep off the contact surface between cash net 2 Product improves monomer hydraulic bracket to the support effect of gear cash net 2.
Preferably, the distance of gear cash net 2 along its length is L, L=Ld+H+Ly+ d, wherein LdFor the length in tunnel, H is The average height of top plate 5, LyFor the length for being located at 6 lower section of spoil in fixing end 21, d gear cash net 2 sinks after wrapping up spoil 6 Distance.With the propulsion and site operation situation of face end support 1, keeps off cash net 2 and wrap up after spoil 6 that there are under certain distance It is heavy, and it is located at the distance of 6 lower section of spoil and the sinking distance of gear cash net 2 in fixing end 21 there are certain relationship, work as fixing end When 21 distances for being located at 6 lower section of spoil are 0.2m~0.35m, it is 3cm~18cm that gear cash net 2, which wraps up the distance sunk after spoil 6, Effect is preferable, is more suitable for.
Optionally, gear cash net 2 is wire netting.Wire netting has biggish rigidity, can have preferable support to spoil 6 Effect, while wire netting has preferable flexibility, can produce deformation to adapt to spoil 6 of different shapes, further to increase Add the effect of gear cash.Wherein gear cash net 2 can also be flexible net made of other metal materials, effectively to support spoil 6.
Preferably, being provided with top net on top plate 5, top net is connected and is oppositely arranged with gear cash net 2.The mesh for pushing up net is smaller, The lesser spoil 6 of partial size can be blocked, and plays the role of pre- support to the top plate in tunnel 5 is whole, top net can be with gear cash net 2 It is connected by iron wire, it is convenient to carry out.
Fig. 3 is the flow chart for the gear cash laydown process that alternative embodiment of the present invention provides.
As shown in figure 3, based on the same inventive concept, present invention also provides a kind of gear cash laydown process, according to take up an official post The lapping in tunnel of the gear cash lapping device of meaning one keeps off cash, includes the following steps:S1:Face end support 1 is set in tunnel, is made Face end support 1 includes towards the top surface of the top beam 11 and the top plate 5 for being used to support tunnel of coal wall 4;S2:Gear cash is laid in tunnel Net 2, gear cash net 2 include the fixing end 21 being oppositely arranged and promote end 22 along its length, and fixing end 21 is carried on the back from face end support 1 On the ground for hanging and being fixed on tunnel to one end of coal wall 4, promote end 22 that can be arranged in folding and unfolding on top beam 11, so as to promote End 22 with face end support 1 jointly promote, keep off cash net 2 on be located at fixing end 21 and promote end 22 between part by top surface paste with It is fixed on the top plate 5 in tunnel, the spoil 6 in tunnel is limited between top plate 5 and gear cash net 2;S3:Face end support 1 is promoted, Make that the part that folding and unfolding is arranged on top beam 11 on end 22 is promoted to stretch out from top beam 11, and pastes and be fixed on positioned at face end support 1 On the top plate 5 of direction of propulsion.
Gear cash lapping device provided in an embodiment of the present invention and gear cash laydown process, are kept off by being arranged on face end support 1 The fixing end 21 of cash net 2, gear cash net 2 is fixed on the ground in tunnel, keeps off the propulsion end 22 of cash net 2 as face end support 1 is dug jointly Into with the top plate 5 in the tunnel that supporting is newly excavated, the spoil 6 in tunnel is limited between top plate 5 and gear cash net 2, effectively It avoids in tunneling process, the spoil being caving 6 is avoided to pour in the inside in tunnel, be not necessarily to manual cleaning spoil 6, it is time saving and energy saving, And operating personnel is increased in the safety coefficient of underground work.
Finally it should be noted that:The above embodiments are merely illustrative of the technical solutions of the present invention, rather than its limitations;Although Present invention has been described in detail with reference to the aforementioned embodiments, those skilled in the art should understand that:It still may be used To modify the technical solutions described in the foregoing embodiments or equivalent replacement of some of the technical features; And these are modified or replaceed, the range for technical solution of various embodiments of the present invention that it does not separate the essence of the corresponding technical solution.

Claims (10)

1. a kind of gear cash lapping device, which is characterized in that including:
Face end support, the face end support are located in tunnel, and the face end support includes the top beam being arranged towards coal wall and is used for Support the top surface of the top plate in the tunnel;
Keep off cash net, the gear cash net includes the fixing end that is oppositely arranged and promotes end along its length, and the fixing end is from described One end on face end support backwards to the coal wall hangs and is fixed on the ground in the tunnel;The propulsion end can be set to folding and unfolding It sets on the top beam, so that the propulsion end promotes jointly with the face end support, the gear cash is located at the fixation on the net End and the part promoted between end paste and paste and be fixed between the top surface and the top plate, and through the top surface On the top plate, the spoil in the tunnel is limited between the top plate and the gear cash net.
2. gear cash lapping device according to claim 1, which is characterized in that shaft is provided on the top beam, it is described to push away Inlet side is wrapped in the shaft, the shaft along the shaft the rotatable setting of axial direction, to promote end described in folding and unfolding.
3. gear cash lapping device according to claim 2, which is characterized in that rocking bar is connected in the shaft, it is described to shake The first end of bar is connected by connecting rod with the shaft, and the second end of the rocking bar is prolonged along the direction far from the shaft It stretches, the rocking bar is parallel to the shaft.
4. gear cash lapping device according to claim 1, which is characterized in that the spoil is located at the upper of the fixing end Side, with the fixation fixing end.
5. gear cash lapping device according to claim 1, which is characterized in that the gear cash lapping device further includes that setting exists Monomer hydraulic bracket in tunnel, the top of the monomer hydraulic bracket be connected to the gear cash be located on the net the fixing end and Part between the propulsion end.
6. gear cash lapping device according to claim 5, which is characterized in that the gear cash lapping device further includes gear cash Plate, the front of the waste rock board are connected to the top of the monomer hydraulic bracket, and the back side of the waste rock board is connected to the gear Cash is online.
7. gear cash lapping device described in -6 any one according to claim 1, which is characterized in that the gear cash net is along length side To distance be L, L=Ld+H+Ly+ d, wherein LdFor the length in the tunnel, H is the average height of the top plate, LyFor institute The length being located at below the spoil in fixing end is stated, d is that the gear cash net wraps up the distance sunk after the spoil.
8. gear cash lapping device described in -6 any one according to claim 1, which is characterized in that the gear cash net is iron wire Net.
9. gear cash lapping device according to claim 8, which is characterized in that be provided with top net, the top on the top plate Net is connected and is oppositely arranged with the gear cash net.
10. a kind of gear cash laydown process, which is characterized in that gear cash lapping device described in -9 any one according to claim 1 Lapping keeps off cash in tunnel, includes the following steps:
Face end support is set in tunnel, make the face end support include towards coal wall top beam and be used to support the tunnel The top surface of top plate;
It is laid with gear cash net in the tunnel, the gear cash net includes the fixing end that is oppositely arranged and promotes end along its length, The fixing end hangs and is fixed on the ground in the tunnel backwards to one end of the coal wall from the face end support, described Promote end that can be arranged in folding and unfolding on the top beam, so that the propulsion end promotes jointly with the face end support, the gear cash The part being located between the fixing end and the propulsion end on the net is pasted and is fixed on the top plate by the top surface, described Spoil in tunnel is limited between the top plate and the gear cash net;
Promote the face end support, stretch out the part that is arranged on top beam of folding and unfolding on the propulsion end from top beam, and paste and It is fixed on the top plate of the face end support direction of propulsion.
CN201810597364.0A 2018-06-11 2018-06-11 Keep off cash lapping device and gear cash laydown process Pending CN108868857A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810597364.0A CN108868857A (en) 2018-06-11 2018-06-11 Keep off cash lapping device and gear cash laydown process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810597364.0A CN108868857A (en) 2018-06-11 2018-06-11 Keep off cash lapping device and gear cash laydown process

Publications (1)

Publication Number Publication Date
CN108868857A true CN108868857A (en) 2018-11-23

Family

ID=64337810

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810597364.0A Pending CN108868857A (en) 2018-06-11 2018-06-11 Keep off cash lapping device and gear cash laydown process

Country Status (1)

Country Link
CN (1) CN108868857A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882220A (en) * 2019-04-08 2019-06-14 安徽理工大学 A kind of guide tracked steel wire transmitting device of weak seam working face and application method

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3003806A1 (en) * 1980-02-02 1981-08-13 Bergwerksverband Gmbh Hydraulic mine shield support frame - has multiple inwardly foldable protruding roof cap, pref. with three sections
SU941614A1 (en) * 1980-11-20 1982-07-07 Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ" Unit of power roof support for sloping beds
CN103967519A (en) * 2014-05-15 2014-08-06 山东科技大学 Method for reinforcing gob-side entry retaining through fallen gangue in gob of composite top board inclined seam
CN106401623A (en) * 2016-11-09 2017-02-15 安徽理工大学 Full-closed coal mining device for soil-like coal working face and coal mining method of full-closed coal mining device

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3003806A1 (en) * 1980-02-02 1981-08-13 Bergwerksverband Gmbh Hydraulic mine shield support frame - has multiple inwardly foldable protruding roof cap, pref. with three sections
SU941614A1 (en) * 1980-11-20 1982-07-07 Всесоюзный научно-исследовательский и проектно-конструкторский угольный институт "КузНИУИ" Unit of power roof support for sloping beds
CN103967519A (en) * 2014-05-15 2014-08-06 山东科技大学 Method for reinforcing gob-side entry retaining through fallen gangue in gob of composite top board inclined seam
CN106401623A (en) * 2016-11-09 2017-02-15 安徽理工大学 Full-closed coal mining device for soil-like coal working face and coal mining method of full-closed coal mining device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109882220A (en) * 2019-04-08 2019-06-14 安徽理工大学 A kind of guide tracked steel wire transmitting device of weak seam working face and application method

Similar Documents

Publication Publication Date Title
CN106869933B (en) A method of block is filled to stop adopting coal pillar width in conjunction with reduction super high seam
CN106761819B (en) A kind of tunnel duct piece quick-assembling equipment and its assembling method
CN104747199B (en) A kind of open type TBM with section of jurisdiction installation function
CN105443143B (en) A kind of coal mine gob roadway support device and its construction method
CN105003288B (en) A kind of method and support system of medium-thickness seam gob side entry retaining
CN102979535B (en) Draining type section of jurisdiction is used in a kind of tunnel lining
CN103850691A (en) Full face tunnel boring machine concrete spraying device
CN104712333A (en) Large-width one-step roadway formation roadway rapid excavation technology
CN106907177B (en) A kind of girdle gob side entry retaining roadside packing method for protecting support
CN102720498A (en) Gob-side entry retaining mining process for coal face
CN108625894A (en) The waste filling solid grouting construction method of the flat working face of shortwall lane water acquisition
CN107178384A (en) The advanced telescopic cantilever suspension device of tunnelling and its construction method
CN205277446U (en) Colliery collecting space area roadway support device
CN104533408A (en) Large-width comprehensive coal road driving anchor machine with simultaneous drifting function
CN108868857A (en) Keep off cash lapping device and gear cash laydown process
CN208431006U (en) Shield machine and its double shields support shoe apparatus
CN110043260B (en) Method for performing filling coal mining by using conventional hydraulic support
CN109268042A (en) A kind of small pilot tunnel leading support equipment and construction method
CN108756906A (en) Shield machine and its inclined wedge support shoe apparatus
CN218150940U (en) Adjustable tunnel is first to be propped up and two lining supporting devices
CN208441848U (en) Freezing Method for Cross-passage Construction class rectangle push-bench
CN107246268A (en) A kind of shaft sinking gib equipment
CN104806271B (en) Precutting-groove U-shaped steel bracket with automatic propelling function and construction method thereof
CN209115129U (en) A kind of small pilot tunnel leading support equipment
CN207212354U (en) Folding telescopic gob side entry retaining roadside packing Flexible formwork assembly

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123