CN108868288A
CN108868288A CN201810687154.0A CN201810687154A CN108868288A CN 108868288 A CN108868288 A CN 108868288A CN 201810687154 A CN201810687154 A CN 201810687154A CN 108868288 A CN108868288 A CN 108868288A
Authority
CN
China
Prior art keywords
cross
arms
steel pole
pole
module
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810687154.0A
Other languages
Chinese (zh)
Inventor
刘闯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Haining City Golden Energy Power Industry Co Ltd
Original Assignee
Haining City Golden Energy Power Industry Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Haining City Golden Energy Power Industry Co Ltd filed Critical Haining City Golden Energy Power Industry Co Ltd
Priority to CN201810687154.0A priority Critical patent/CN108868288A/en
Publication of CN108868288A publication Critical patent/CN108868288A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2207Sockets or holders for poles or posts not used
    • E04H12/2215Sockets or holders for poles or posts not used driven into the ground
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D27/00Foundations as substructures
    • E02D27/32Foundations for special purposes
    • E02D27/42Foundations for poles, masts or chimneys
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/02Structures made of specified materials
    • E04H12/08Structures made of specified materials of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/24Cross arms

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Materials Engineering (AREA)
  • Wood Science & Technology (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The invention discloses a kind of steel pipe poles of distribution line,Including steel pole module and pour basic module,The basic module that pours is equipped with steel pole module,Described pour is equipped with foundation bolt in basic module,The lateral wall of the steel pole module is equipped with multiple fixinig plates,Installation U-shaped steel plate has been bolted to connection on the fixinig plate,Through equipped with pole-climbing between the installation U-shaped steel plate,Pedal is alternately equipped in the pole-climbing,The outer surface of the steel pole module is equipped with cable upper rod bracket module,Staff can select required shaft tower according to required loop-type shaft tower height,The type and quantity of cross-arm can be selected according to the model of shaft tower,Different type may be selected according to the difference of the soil property landforms on steel pole installation ground and pour basic module,Realize the modularization of shaft tower installation,Module required for site environment situation selects need to only be had more and carry out assembly,Reducing costs also makes installment work simpler clear.

Description

A kind of steel pipe pole of distribution line
Technical field
The present invention relates to power supply unit technical field, specific field is a kind of steel pipe pole of distribution line.
Background technique
10kv transmission line of electricity is the important component of power supply line of China, in the erection of transmission line of electricity, according to erection The reasons such as ground temperature, wind speed, precipitation and snowfall lead to the safety coefficient of required shaft tower, and height, strain insulator coefficient is not quite similar, therefore Customization shaft tower is usually required in power circuit erection to adapt to different environment, but in actual electricity transmission process, to shaft tower The cost being customized is excessively high, and the 10kv transmission line of electricity less to trnamission capacity not very uses, so the present invention devises one kind and matches Electric line has been solved the above problems with steel pipe pole.
Summary of the invention
The purpose of the present invention is to provide a kind of steel pipe poles of distribution line, mentioned above in the background art to solve Problem.
To achieve the above object, the present invention provides the following technical solutions:A kind of steel pipe pole of distribution line, including steel pole Module is equipped with steel pole module with basic module, the basic module that pours is poured, and described pour is equipped with lower margin in basic module Bolt, the lateral wall of the steel pole module are equipped with multiple fixinig plates, and installation U-shaped steel has been bolted on the fixinig plate Plate is alternately equipped with pedal, the outer surface of the steel pole module in the pole-climbing through pole-climbing is equipped on the installation U-shaped steel plate Equipped with cable upper rod bracket module, the top of the steel pole module sets cross-arm fixinig plate, the cross-arm fixinig plate and cross-arm module It is connected.
Preferably, the steel pipe module includes mono- time steel pole of 11m, mono- time steel pole of 12m, 13.5m double back steel pole, 12m double back Steel pole, 11.5m double back steel pole and 11m tri- return steel pole, mono- time steel pole of the 12m, 13.5m double back steel pole, 12m double back steel pole, 11.5m double back steel pole and 11m tri- return steel pole and are divided into two sections, and internode is all made of flange method connection.
Preferably, the cross-arm module includes No. 1 cross-arm, No. 2 cross-arms, No. 3 cross-arms, No. 4 cross-arms, No. 5 cross-arms, No. 6 cross Load and No. 7 cross-arms, the length of No. 1 cross-arm are 700mm, and the length of No. 2 cross-arms is 800mm, the length of No. 3 cross-arms Degree is 900mm, and the length of No. 4 cross-arms is 1000mm, and the length of No. 5 cross-arms is 1100mm, the length of No. 6 cross-arms Degree is 1400mm, and the length of No. 7 cross-arms is 1600mm.
Preferably, No. 2 cross-arms are symmetrically arranged on mono- time steel pole of the 11m, the number of No. 2 cross-arms on mono- time steel pole of the 11m Amount is 2, mono- time steel pole of the 12m is equipped with No. 3 cross-arms and No. 2 cross-arms, the quantity of No. 3 cross-arms on mono- time steel pole of the 12m It is 2, and symmetrically, the quantity of No. 2 cross-arms on mono- time steel pole of the 12m is 1, and is located at the top of No. 3 cross-arms, described 13.5m double back steel pole is equipped with No. 4 cross-arms and No. 5 cross-arms, and the quantity of No. 4 cross-arms on the 13.5m double back steel pole is 4, and Being symmetrically arranged is two rows, and the quantity of No. 5 cross-arms on the 13.5m double back steel pole is 2, and is located at No. 4 cross described in upper and lower two row Between load, the 12m double back steel pole is equipped with No. 2 cross-arms and No. 4 cross-arms, the quantity of No. 2 cross-arms on the 12m double back steel pole It is 4, and being symmetrically arranged is two rows, the quantity of No. 4 cross-arms on the 12m double back steel pole is 2, and is located at 2 described in upper and lower two row Between number cross-arm, the 11.5m double back steel pole be equipped with No. 1 cross-arm and No. 6 cross-arms, No. 6 cross on the 11.5m double back steel pole The quantity of load is 2, and symmetrically, and the quantity of No. 1 cross-arm on the 11.5m double back steel pole is 2, and is located at No. 6 cross-arms Top, the 11m tri- return steel pole equipped with No. 1 cross-arm, No. 3 cross-arms, No. 4 cross-arms and No. 7 cross-arms, and the 11m tri- is returned on steel pole The quantity of No. 3 cross-arms be 4, and being symmetrically arranged is two rows, and the quantity that the 11m tri- returns No. 4 cross-arms on steel pole is 2, and position Between No. 4 cross-arms described in upper and lower two row, No. 1 cross-arm and No. 7 cross-arm quantity that the 11m tri- is returned on steel pole are 1, and equal position In the lower section of No. 4 cross-arms.
Preferably, it is described pour basic module include step pour basis and it is telescopic pour basis, step pours Basis is made up of principal post and multilayer steps, and the principal post is connect by bolt with steel pole module, and the step pours basis Principal post diameter have tri- kinds of specifications of 1800mm, 2000mm and 2200mm, the telescopic basis that pours passes through foundation bolt and steel Bar module is attached, and the telescopic depth for pouring basis has tri- kinds of specifications of 7965mm, 10365mm and 10820mm.
Preferably, each cable upper rod bracket module is by the fixed anchor ear of cable tube, cable fixed anchor ear, cable protection It manages, the quantity of the fixed anchor ear of the cable tube in each cable upper rod bracket module is 2, each cable upper rod bracket mould The quantity of the fixed anchor ear of cable in block is 4, and the quantity of the cable protection pipe in each cable upper rod bracket module is 1, The diameter length of the fixed anchor ear of the cable tube has seven kinds of 599mm, 619mm, 672mm, 698mm, 704mm, 731mm and 621mm Specification, the diameter length of the fixed anchor ear of the cable have 411mm, 436mm, 456mm, 471mm, 482mm, 546mm, 503mm, 15 kinds of specifications of 507mm, 531mm, 541mm, 558mm, 580mm, 585mm, 608mm, 638mm.
Compared with prior art, the beneficial effects of the invention are as follows:A kind of steel pipe pole of distribution line, staff can roots According to shaft tower needed for required loop-type shaft tower height selection, the type and quantity of cross-arm can be selected according to the model of shaft tower, Different type may be selected according to the difference of the soil property landforms on steel pole installation ground and pour basic module, realize the module of shaft tower installation Change, need to only have more site environment situation and select required module progress assembled, reducing costs also makes installment work more It is simple clear to add.
Detailed description of the invention
Fig. 1 is structure of the main view of the invention;
Fig. 2 is pole-climbing of the invention and pedal structure schematic diagram;
Fig. 3 is the structure of mono- time steel pole of 11m of the invention, mono- time steel pole of 12m, 13.5m double back steel pole and 12m double back steel pole Schematic diagram;
Fig. 4 is the structural schematic diagram that 11.5m double back steel pole and 11m tri- of the invention return steel pole;
Fig. 5 is that step of the invention pours basis and the telescopic structural schematic diagram for pouring basis;
Fig. 6 is the structural schematic diagram of fixinig plate and installation U-shaped steel plate of the invention;
Fig. 7 is the structural schematic diagram of the fixed anchor ear of cable tube of the invention and the fixed anchor ear of cable.
In figure:1- steel pole module, mono- time steel pole of 101-11m, mono- time steel pole of 102-12m, 103-13.5m double back steel pole, 104-12m double back steel pole, 105-11.5m double back steel pole, 106-11m tri- returns steel pole, 2- pours basic module, 201- step is poured Build basis, 202- it is telescopic pour basis, 3- foundation bolt, 4- fixinig plate, 5- install U-shaped steel plate, 6- pole-climbing, 7- pedal, 8- The fixed anchor ear of cable upper rod bracket module, 801- cable tube, the fixed anchor ear of 802- cable, 803- cable protection pipe, 9- cross-arm are solid Stator, 10- cross-arm module, 1001-1 cross-arm, 1002-2 cross-arm, 1003-3 cross-arm, 1004-4 cross-arm, No. 1005-5 Cross-arm, 1006-6 cross-arm, 1007-7 cross-arm.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-7 is please referred to, the present invention provides a kind of technical solution:A kind of steel pipe pole of distribution line, including steel pole mould Block 1 is equipped with steel pole module with basic module 2, the basic module that pours is poured, and described pour is equipped with lower margin in basic module Bolt 3, enhances stability and impact resistance of the invention by foundation bolt, and the lateral wall of the steel pole module is equipped with more A fixinig plate 4, has been bolted installation U-shaped steel plate 5 on the fixinig plate, through equipped with climbing on the installation U-shaped steel plate Bar 6 is alternately equipped with pedal 7 in the pole-climbing, by installation pole-climbing and pedal facilitate staff climb up steel pole easy access with The replacement of structure is installed, and the outer surface of the steel pole module is equipped with cable upper rod bracket module 8, can be with by cable bearer module By on buried cable guide steel pole, cable crossing is facilitated to be not easy buried region, is carried out being guided after cable split-phase on electric pole Transmitting electricity work can be in the lower area of the density of population using non-buried power supply, simultaneously compared to cost is relatively low for buried power supply By cable bearer module supply lines can be carried out into handle, will put cable underground unsuitable can be transmitted electricity using shaft towers some Area use, the top of the steel pole module sets cross-arm fixinig plate 9, and the cross-arm fixinig plate is connected with cross-arm module 10.
Specifically, the steel pipe module includes mono- time steel pole 101 of 11m, mono- time steel pole 102 of 12m, 13.5m double back steel pole 103,12m double back steel pole 104,11.5m double back steel pole 105 and 11m tri- return steel pole 106, mono- time steel pole of the 12m, 13.5m double back Steel pole, 12m double back steel pole, 11.5m double back steel pole and 11m tri- return steel pole and are divided into two sections, and internode is all made of flange method company It connects, mono- time steel pole of above-mentioned 11m, mono- time steel pole of 12m, 13.5m double back steel pole, 12m double back steel pole, 11.5m double back steel pole and 11m The lowest temperature that bears of three times steel poles is -10 DEG C, and the highest temperature is 40 DEG C, maximum wind velocity 30m/s, and maximum ice covering thickness is 5mm, horizontal span and vertical span are 60m, wherein mono- time steel pole of 11m, 13.5m double back steel pole, 11.5m double back steel pole and It is the safety coefficient of mono- time steel pole of 4,12m and 12m double back steel pole is 5 that 11m tri-, which returns the safety coefficient of steel pole, and staff can basis Shaft tower needed for required loop-type shaft tower height selection.
Specifically, the cross-arm module includes No. 1 1003, No. 4 cross-arms of cross-arm of cross-arm 1002,3 of cross-arm 1001,2 1004,1005, No. 6 cross-arm 1006 and No. 7 cross-arms 1007 of No. 5 cross-arms, the length of No. 1 cross-arm are 700mm, No. 2 cross The length of load is 800mm, and the length of No. 3 cross-arms is 900mm, and the length of No. 4 cross-arms is 1000mm, No. 5 cross The length of load is 1100mm, and the length of No. 6 cross-arms is 1400mm, and the length of No. 7 cross-arms is 1600mm different model Cross-arm can voluntarily be deployed according to the difference of power transmission line by staff.
Specifically, be symmetrically arranged with No. 2 cross-arms on mono- time steel pole of the 11m, No. 2 cross-arms on mono- time steel pole of the 11m Quantity is that 2, mono- time steel pole of the 12m is equipped with No. 3 cross-arms and No. 2 cross-arms, the number of No. 3 cross-arms on mono- time steel pole of the 12m Amount is 2, and symmetrically, and the quantity of No. 2 cross-arms on mono- time steel pole of the 12m is 1, and is located at the top of No. 3 cross-arms, described 13.5m double back steel pole is equipped with No. 4 cross-arms and No. 5 cross-arms, and the quantity of No. 4 cross-arms on the 13.5m double back steel pole is 4, and Being symmetrically arranged is two rows, and the quantity of No. 5 cross-arms on the 13.5m double back steel pole is 2, and is located at No. 4 cross described in upper and lower two row Between load, the 12m double back steel pole is equipped with No. 2 cross-arms and No. 4 cross-arms, the quantity of No. 2 cross-arms on the 12m double back steel pole It is 4, and being symmetrically arranged is two rows, the quantity of No. 4 cross-arms on the 12m double back steel pole is 2, and is located at 2 described in upper and lower two row Between number cross-arm, the 11.5m double back steel pole be equipped with No. 1 cross-arm and No. 6 cross-arms, No. 6 cross on the 11.5m double back steel pole The quantity of load is 2, and symmetrically, and the quantity of No. 1 cross-arm on the 11.5m double back steel pole is 2, and is located at No. 6 cross-arms Top, the 11m tri- return steel pole equipped with No. 1 cross-arm, No. 3 cross-arms, No. 4 cross-arms and No. 7 cross-arms, and the 11m tri- is returned on steel pole The quantity of No. 3 cross-arms be 4, and being symmetrically arranged is two rows, and the quantity that the 11m tri- returns No. 4 cross-arms on steel pole is 2, and position Between No. 4 cross-arms described in upper and lower two row, No. 1 cross-arm and No. 7 cross-arm quantity that the 11m tri- is returned on steel pole are 1, and equal position In the lower section of No. 4 cross-arms, above scheme gives the cross-arm assembling scheme that can be actually used, and each steel pole is made to can reach it Nominal feeder number.
Specifically, it is described pour basic module include step pour basis 201 and it is telescopic pour basis 202, platform Stepwise pours basis and is made up of principal post and multilayer steps, and the principal post is connect by bolt with steel pole module, the step The principal post diameter for pouring basis has tri- kinds of specifications of 1800mm, 2000mm and 2200mm, and the telescopic basis that pours passes through lower margin Bolt is attached with steel pole module, and the telescopic depth for pouring basis has tri- kinds of 7965mm, 10365mm and 10820mm Specification may be selected different type according to the difference of the soil property landforms on steel pole installation ground and pour basic module, and staff is combinable Local geology pours basis with steel pole type selection different bearer power.
Specifically, each cable upper rod bracket module fixes anchor ear 801 by cable tube, cable fixes anchor ear 802, The quantity of cable protection pipe 803, the fixed anchor ear of cable tube in each cable upper rod bracket module is 2, each electricity The quantity of the fixed anchor ear of cable in cable upper rod bracket module is 4, the cable protection in each cable upper rod bracket module The quantity of pipe is 1, and the diameter length of the fixed anchor ear of the cable tube has 599mm, 619mm, 672mm, 698mm, 704mm, 731mm With seven kinds of specifications of 621mm, the diameter length of the fixed anchor ear of the cable have 411mm, 436mm, 456mm, 471mm, 482mm, 15 kinds of specifications of 546mm, 503mm, 507mm, 531mm, 541mm, 558mm, 580mm, 585mm, 608mm, 638mm, pass through electricity The fixed anchor ear of cable pipe and the fixed cable protection pipe of the fixed anchor ear of cable enable cable smoothly upper boom and to enter ground, according to different rule The fixed anchor ear of various sizes of cable tube and the fixed anchor ear of cable can be selected in the cable of lattice, and fixed effect can be made more outstanding.
Working principle:The present invention is based on steel pole module, by the basis of being fixed on and pouring by steel pole module, then passes through Foundation bolt can enhance stability and impact resistance of the invention, facilitate staff to climb up steel by installation pole-climbing and pedal Bar easy access and the replacement of structure are installed, and can facilitate electricity on buried cable guide steel pole by cable bearer module Cable carries out transmission of electricity work on electric pole across buried region is not easy, by guiding after cable split-phase, compared to cost for buried power supply It is lower, non-buried power supply can be used in the lower area of the density of population, while can be by supply lines by cable bearer module Carry out into handle, will put cable underground can it is some it is unsuitable using shaft tower transmit electricity area use, steel pipe module includes 11m mono- It returns steel pole, mono- time steel pole of 12m, 13.5m double back steel pole, 12m double back steel pole, 11.5m double back steel pole and 11m tri- and returns six kinds of types of steel pole Number, it is -10 DEG C that the steel pole of this six kinds of models, which can bear the lowest temperature, and the highest temperature is 40 DEG C, maximum wind velocity 30m/s, maximum Ice covering thickness is 5mm, and horizontal span and vertical span are 60m, and wherein mono- time steel pole of 11m, 13.5m double back steel pole, 11.5m are bis- Returning steel pole and 11m tri- and returning the safety coefficient of steel pole be the safety coefficient of mono- time steel pole of 4,12m and 12m double back steel pole is 5, work people Member can select the type of cross-arm according to steel pole needed for required loop-type and shaft tower height selection according to the model of shaft tower It can voluntarily be deployed according to the difference of power transmission line by staff with the cross-arm of quantity, different model, according to steel pole installation ground The difference of soil property landforms may be selected different type and pour basic module, and staff selects in combination with local geology and steel pole type Different bearer power is different types of to pour basis.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (6)

1. a kind of steel pipe pole of distribution line, including steel pole module (1) and pour basic module (2), it is characterised in that:It is described Basic module (2) are poured equipped with steel pole module (1), described pour in basic module (2) is equipped with foundation bolt (3), the steel The lateral wall of bar module (1) is equipped with multiple fixinig plates (4), and installation U-shaped steel plate has been bolted on the fixinig plate (4) (5), pedal (7) alternately are equipped on the pole-climbing (6), the steel pole through pole-climbing (6) are equipped on the installation U-shaped steel plate (5) The outer surface of module (1) is equipped with cable upper rod bracket module (8), and the top of the steel pole module (1) sets cross-arm fixinig plate (9), The cross-arm fixinig plate (9) is connected with cross-arm module (10).
2. a kind of steel pipe pole of distribution line according to claim 1, it is characterised in that:Steel pipe module (1) packet Include mono- time steel pole (101) of 11m, mono- time steel pole (102) of 12m, 13.5m double back steel pole (103), 12m double back steel pole (104), 11.5m Double back steel pole (105) and 11m tri- are returned steel pole (106), and mono- time steel pole (102) of the 12m, 13.5m double back steel pole (103), 12m are bis- It returns steel pole (104), 11.5m double back steel pole (105) and 11m tri- to return steel pole (106) and be divided into two sections, and internode is all made of flange side Formula connection.
3. a kind of steel pipe pole of distribution line according to claim 1, it is characterised in that:Cross-arm module (10) packet Include No. 1 cross-arm (1001), No. 2 cross-arms (1002), No. 3 cross-arms (1003), No. 4 cross-arms (1004), No. 5 cross-arms (1005), No. 6 cross (1006) and No. 7 cross-arms (1007) are carried on a shoulder pole, the length of No. 1 cross-arm (1001) is 700mm, the length of No. 2 cross-arms (1002) Degree is 800mm, and the length of No. 3 cross-arms (1003) is 900mm, and the length of No. 4 cross-arms (1004) is 1000mm, described The length of No. 5 cross-arms (1005) is 1100mm, and the length of No. 6 cross-arms (1006) is 1400mm, No. 7 cross-arms (1007) Length be 1600mm.
4. a kind of steel pipe pole of distribution line according to claim 1, it is characterised in that:Mono- time steel pole of the 11m (101) No. 2 cross-arms (1002) are symmetrically arranged on, the quantity of upper No. 2 cross-arms (1002) of mono- time steel pole (101) of the 11m is 2, institute Mono- time steel pole (102) of 12m is stated equipped with No. 3 cross-arms (1003) and No. 2 cross-arms (1002), on mono- time steel pole (102) of the 12m The quantity of No. 3 cross-arms (1003) is 2, and symmetrically, the quantity of No. 2 cross-arms (1002) on mono- time steel pole (102) of the 12m It is 1, and is located at the top of No. 3 cross-arms (1003), the 13.5m double back steel pole (103) is equipped with No. 4 cross-arms (1004) and No. 5 Cross-arm (1005), the quantity of No. 4 cross-arms (1004) on the 13.5m double back steel pole (103) are 4, and being symmetrically arranged is two rows, The quantity of No. 5 cross-arms (1005) on the 13.5m double back steel pole (103) is 2, and is located at No. 4 cross-arms described in upper and lower two row (1004) between, the 12m double back steel pole (104) is equipped with No. 2 cross-arms (1002) and No. 4 cross-arms (1004), the 12m double back The quantity of No. 2 cross-arms (1002) on steel pole (104) is 4, and being symmetrically arranged is two rows, on the 12m double back steel pole (104) The quantity of No. 4 cross-arms (1004) is 2, and is located between No. 2 cross-arms (1002) described in upper and lower two row, the 11.5m double back steel pole (105) No. 1 cross-arm (1001) and No. 6 cross-arms (1006), No. 6 cross-arms on the 11.5m double back steel pole (105) are equipped with (1006) quantity is 2, and symmetrically, and the quantity of No. 1 cross-arm (1001) on the 11.5m double back steel pole (105) is 2, And it is located at the top of No. 6 cross-arms (1006), the 11m tri- goes back to steel pole (106) equipped with No. 1 cross-arm (1001), No. 3 cross-arms (1003), No. 4 cross-arms (1004) and No. 7 cross-arms (1007), the 11m tri- return the number of No. 3 cross-arms (1003) on steel pole (106) Amount is 4, and being symmetrically arranged is two rows, and the quantity that the 11m tri- returns No. 4 cross-arms (1004) on steel pole (106) is 2, and is located at Between No. 4 cross-arms (1004) described in upper and lower two row, the 11m tri- returns No. 1 cross-arm (1001) and No. 7 cross-arms on steel pole (106) (1007) quantity is 1, and is respectively positioned on the lower section of No. 4 cross-arms (1004).
5. a kind of steel pipe pole of distribution line according to claim 1, it is characterised in that:It is described to pour basic module (2) include step pour basic (201) and it is telescopic pour basic (202), step pour basic (201) by principal post with Multilayer steps composition, the principal post are connect by bolt with steel pole module (1), and the step pours the principal post of basic (201) Diameter has tri- kinds of specifications of 1800mm, 2000mm and 2200mm, it is described it is telescopic pour basic (202) by foundation bolt (3) with Steel pole module is attached, and the telescopic depth for pouring basic (202) has tri- kinds of 7965mm, 10365mm and 10820mm rule Lattice.
6. a kind of steel pipe pole of distribution line according to claim 1, it is characterised in that:Each cable upper boom branch Frame module (8) is by cable tube fixed anchor ear (801), cable fixed anchor ear (802), cable protection pipe (803), each cable The quantity of cable tube fixed anchor ear (801) in upper rod bracket module (8) is 2, in each cable upper rod bracket module (8) The quantity of cable fixed anchor ear (802) be 4, the cable protection pipe (803) in each cable upper rod bracket module (8) Quantity is 1, the diameter length of the cable tube fixed anchor ear (801) have 599mm, 619mm, 672mm, 698mm, 704mm, Seven kinds of specifications of 731mm and 621mm, the diameter length of the cable fixed anchor ear (802) have 411mm, 436mm, 456mm, 15 kinds of 471mm, 482mm, 546mm, 503mm, 507mm, 531mm, 541mm, 558mm, 580mm, 585mm, 608mm, 638mm Specification.
CN201810687154.0A 2018-06-28 2018-06-28 A kind of steel pipe pole of distribution line Pending CN108868288A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810687154.0A CN108868288A (en) 2018-06-28 2018-06-28 A kind of steel pipe pole of distribution line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810687154.0A CN108868288A (en) 2018-06-28 2018-06-28 A kind of steel pipe pole of distribution line

Publications (1)

Publication Number Publication Date
CN108868288A true CN108868288A (en) 2018-11-23

Family

ID=64296311

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810687154.0A Pending CN108868288A (en) 2018-06-28 2018-06-28 A kind of steel pipe pole of distribution line

Country Status (1)

Country Link
CN (1) CN108868288A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924730A (en) * 2019-12-09 2020-03-27 广州增立钢管结构股份有限公司 General tower structure
CN115305942A (en) * 2022-06-23 2022-11-08 国网河南省电力公司西峡县供电公司 Overhead cable prevents to scrape disconnected detection alarm device's installation basis

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003018731A (en) * 2001-06-28 2003-01-17 Souki Kk Telescopic power pole and cable installation method
CN201252381Y (en) * 2008-08-27 2009-06-03 曾亮 Power line single-circuit T connection steel pipe pole
CN104242208A (en) * 2014-09-22 2014-12-24 国家电网公司 Double-circuit cable terminal steel pipe pole for overhead transmission line
CN204112830U (en) * 2014-09-30 2015-01-21 莱芜鲁能开源铁塔有限公司 A kind of power steel pipe tower
CN204283201U (en) * 2014-11-10 2015-04-22 湖北日海通讯技术有限公司 Tower room integrated communication base station and Anti-drop ladder thereof
CN204299268U (en) * 2014-12-04 2015-04-29 国网福建省电力有限公司 A kind of mixed pressure three loop steel tube tower
CN206471765U (en) * 2017-02-16 2017-09-05 国网冀北电力有限公司唐山供电公司 A kind of steel pipe pole cable upper boom structure

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2003018731A (en) * 2001-06-28 2003-01-17 Souki Kk Telescopic power pole and cable installation method
CN201252381Y (en) * 2008-08-27 2009-06-03 曾亮 Power line single-circuit T connection steel pipe pole
CN104242208A (en) * 2014-09-22 2014-12-24 国家电网公司 Double-circuit cable terminal steel pipe pole for overhead transmission line
CN204112830U (en) * 2014-09-30 2015-01-21 莱芜鲁能开源铁塔有限公司 A kind of power steel pipe tower
CN204283201U (en) * 2014-11-10 2015-04-22 湖北日海通讯技术有限公司 Tower room integrated communication base station and Anti-drop ladder thereof
CN204299268U (en) * 2014-12-04 2015-04-29 国网福建省电力有限公司 A kind of mixed pressure three loop steel tube tower
CN206471765U (en) * 2017-02-16 2017-09-05 国网冀北电力有限公司唐山供电公司 A kind of steel pipe pole cable upper boom structure

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
国家电力公司东北电力设计院: "《架空送点线路钢管杆设计规定》", 1 February 2002, 国家电力公司东北电力设计院 *

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110924730A (en) * 2019-12-09 2020-03-27 广州增立钢管结构股份有限公司 General tower structure
CN115305942A (en) * 2022-06-23 2022-11-08 国网河南省电力公司西峡县供电公司 Overhead cable prevents to scrape disconnected detection alarm device's installation basis
CN115305942B (en) * 2022-06-23 2023-08-22 国网河南省电力公司西峡县供电公司 Installation foundation of overhead cable scratch-proof detection alarm device

Similar Documents

Publication Publication Date Title
CN101410581B (en) Modular antenna tower structure
CN102747856B (en) Compound material insulating pole tower for power transmission and distribution lines
US20080209842A1 (en) Prefabricated Modular Tower
AU2010203130A1 (en) Wind turbine power module mounted on the tower foundation
CN108868288A (en) A kind of steel pipe pole of distribution line
WO2013020436A1 (en) Central pylon for vertical axis wind turbine and construction method thereof
CN103362343B (en) A kind of with tower six circuit pole tower
CN202059135U (en) Distributing structure of cable brackets in cable tunnel
CN101858316A (en) Construction engineering structure mode for tower wind power generation station
CN201883720U (en) Wind and solar hybrid power generation intensive self-supporting communication base station with adjustable verticality
DE102006025832A1 (en) Offshore installation structure for wind turbine, has tubular pile stretched above waterline during low tide, and structural part with smaller cross section connected above tubular pile in water column
CN109462202B (en) Novel lightning protection device of overhead distribution line
CN212358012U (en) Widening platform device of hydraulic creeping formwork for quickly constructing double-limb cable tower
CN111472598A (en) Prestressed concrete pole and production process thereof
CN109510003B (en) Lightning protection grounding structure of high-rise building
CN207459557U (en) Livewire work segmentation brace type roofbolt insulated platform
CN207459558U (en) Livewire work spar-type insulated platform
CN110162840B (en) Method for calculating windproof grade of distribution line pole
CN214379685U (en) Box transformer substation foundation of 35KV and below in north wind power plant
CN112160642A (en) Double-return pi-shaped connecting tower
CN107591684A (en) A kind of 330kV transformer stations GIS vertical wire outlet structure
CN206309105U (en) One kind is used for 10kV transmission lines large crossing shaft towers
CN211572830U (en) Novel anti platform of anti ice of mountain area distribution network circuit is with door lever that acts as go-between
CN215715416U (en) A vegetation slope protection structure for soil and water conservation
CN216290105U (en) Self-supporting cable terminal support platform

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123