- CN108867627A CN108867627A CN201810859939.1A CN201810859939A CN108867627A CN 108867627 A CN108867627 A CN 108867627A CN 201810859939 A CN201810859939 A CN 201810859939A CN 108867627 A CN108867627 A CN 108867627A
- Authority
- CN
- China
- Prior art keywords
- stake
- pile
- construction
- mud
- transmission
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Withdrawn
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/34—Concrete or concrete-like piles cast in position ; Apparatus for making same
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D19/00—Keeping dry foundation sites or other areas in the ground
- E02D19/02—Restraining of open water
- E02D19/04—Restraining of open water by coffer-dams, e.g. made of sheet piles
-
- E—FIXED CONSTRUCTIONS
- E02—HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
- E02D—FOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
- E02D5/00—Bulkheads, piles, or other structural elements specially adapted to foundation engineering
- E02D5/22—Piles
- E02D5/60—Piles with protecting cases
Abstract
The invention discloses a kind of construction methods convenient for transmission of electricity stake disassembly, and described method includes following steps:S1:Levelling of the land is carried out first, will first be evened whole barrier on removing subsurface, ground within the scope of foundation construction out by Center stake formation level, is repaired the sidewalk led into stake position;S2:Water supply pipe and power supply line are installed, carries out a point hole by design drawing requirement and measures, in the place setting pile foundation axis not influenced by pile foundation construction and high process control stake, and perform record;S3:Shaft tower number in pool is drained using sand pocket cofferdam, and by the water in cofferdam, and filling pile construction should be segmented according to the length of reinforcing cage of design, and steel reinforcement cage machining shed and cement is arranged and stores canopy, backup power source should also be arranged, sandstone stacks field and cinder field out;S4:Using mud off percussive drill pore-creating filling pile, the clay storage field of 2 times of single pile side's amounts should be set, using mud off rotary rig pore-creating filling pile.
Description
Technical field
The present invention relates to a kind of construction methods, and in particular to a kind of construction method convenient for transmission of electricity stake disassembly.
Background technique
With the fast development of urban economy and the quickening of urbanization process, power engineering construction project is increasing.No
It needs not take up an area space of planes in road surface erection shaft tower and conducting wire, is easy to keep the power cable engineering of appearance of the city neat appearance also to get over
Come more.
The construction of normal cable engineering is all that fluting is laid with power pipe, causes to enable the disgustful road " zipper of citizen
Phenomenon ".Simultaneously during building power channel, for example all kinds of municipal administrations of node that can not be passed through by traditional excavation technology are encountered unavoidably
Cross pipe-line point, highway, railway, bridge, river and above ground structure etc..Therefore, conventional heavy excavation construction technology is increasingly
It is not suitable with the needs of urban development.
An emerging technology --- trenchless technology has obtained more and more extensive answer in power pipe engineering in recent years
With.Although trenchless technology is started late, but popularizing with application, and no matter theoretically trenchless technology, or is constructing
Process aspect has the development advanced by leaps and bounds.Although trenchless technology is come out first with high-tech advantage, no-dig technique
There is also many risks directly or indirectly in construction for technology.Since construction has scene property, complexity, mutability under earth's surface
And comprehensive feature, easily cause in construction surface buildings depression, roadbed subsidence cracking, underground structure and underground to have pipeline
Damage etc. the problems such as.
Since the method that Horizontal Directional Drilling is excavated relative to tradition has many advantages, so that it is being laid with city electricity
Hydraulic piping using more and more extensive.
Power pipe construction is combined back there are multitube and is dragged with construction characteristics such as compaction groutings, resistance when not only back to drag
Increase, and the grouting pressure that acts on pipeline outer wall while pipeline critical external compressive resistance ability can be reduced, with time dragging for single pipe
Construction has significant difference.
To guarantee the safety of pipeline itself and the quality of engineering, the pull-back force in construction should be carried out before going back to hauling pipe road
It calculates, and force analysis is carried out to electricity channel, to guarantee the safety in pipeline returning and mortar depositing construction.
Summary of the invention
The technical problem to be solved by the present invention is to the disassembly installation steps of current power transmission stake are cumbersome, the construction in entire stake face
Process is slowly, and it is an object of the present invention to provide a kind of construction method convenient for transmission of electricity stake disassembly, solves the problem above-mentioned.
The present invention is achieved through the following technical solutions:
A kind of construction method convenient for transmission of electricity stake disassembly, described method includes following steps:S1:It is flat that place is carried out first
It is whole, will first be evened out by Center stake formation level whole within the scope of foundation construction, remove subsurface, the barrier on ground, repair lead into
The sidewalk of stake position;S2:Water supply pipe and power supply line are installed, carries out a point hole by design drawing requirement and measures, not by pile foundation
The place setting pile foundation axis of construction infection and high process control stake, and perform record;S3:Shaft tower number in pool uses
Sand pocket cofferdam, and the water in cofferdam is drained, filling pile construction should be segmented according to the length of reinforcing cage of design, and reinforcing bar is arranged
Cage machining shed and cement store canopy, backup power source should also be arranged, sandstone stacks field and cinder field out;S4:It is impacted using mud off
The clay storage field of 2 times of single pile sides amount should be arranged in drilling machine pore-creating filling pile, using mud off rotary rig pore-creating filling pile,
The mud pit of one 3 times of single pile sides amount and the mud-settling pit of 2 times of single pile side amount should be set.
Casing is made of 4~8mm steel plate, should be greater than bit diameter 100mm with its diameter when rotary rig;Use impact drill
When machine, preferably greater than bit diameter 200mm.
Casing position should be buried correctly, tamp between casing and crater wall using clay, casing center and stake position centre deviation
It is not greater than 50mm.
Shield-tube embedment depth is not preferably less than 1m in clay, and 1.5m, and mud face in retaining hole are not preferably less than in sand
It is higher by level of ground water 1m or more.
Compared with prior art, the present invention having the following advantages and benefits:By trenchless technology and power cable
Laying combine, for guarantee pipeline itself safety and engineering quality, return hauling pipe road before reply construction in return drag
Power is calculated, and carries out force analysis to electricity channel, to guarantee the safety in pipeline returning and mortar depositing construction.To current
Power transmission and transformation comb trenchless engineering construction method has carried out effective supplement, has also standardized supervisor in non-excavation laying electric power
Supervisory basis and supervision behavior in pipeline construction.
Specific embodiment
To make the objectives, technical solutions, and advantages of the present invention clearer, below with reference to embodiment, the present invention is made
Further to be described in detail, exemplary embodiment of the invention and its explanation for explaining only the invention, are not intended as to this
The restriction of invention.
Embodiment
A kind of construction method convenient for transmission of electricity stake disassembly, described method includes following steps:S1:It is flat that place is carried out first
It is whole, will first be evened out by Center stake formation level whole within the scope of foundation construction, remove subsurface, the barrier on ground, repair lead into
The sidewalk of stake position;S2:Water supply pipe and power supply line are installed, carries out a point hole by design drawing requirement and measures, not by pile foundation
The place setting pile foundation axis of construction infection and high process control stake, and perform record;S3:Shaft tower number in pool uses
Sand pocket cofferdam, and the water in cofferdam is drained, filling pile construction should be segmented according to the length of reinforcing cage of design, and reinforcing bar is arranged
Cage machining shed and cement store canopy, backup power source should also be arranged, sandstone stacks field and cinder field out;S4:It is impacted using mud off
The clay storage field of 2 times of single pile sides amount should be arranged in drilling machine pore-creating filling pile, using mud off rotary rig pore-creating filling pile,
The mud pit of one 3 times of single pile sides amount and the mud-settling pit of 2 times of single pile side amount should be set.
Casing is made of 4~8mm steel plate, should be greater than bit diameter 100mm with its diameter when rotary rig;Use impact drill
When machine, preferably greater than bit diameter 200mm.
Casing position should be buried correctly, tamp between casing and crater wall using clay, casing center and stake position centre deviation
It is not greater than 50mm.
Shield-tube embedment depth is not preferably less than 1m in clay, and 1.5m, and mud face in retaining hole are not preferably less than in sand
It is higher by level of ground water 1m or more.
The performance and technical indicator of slurrying are generally by four indices such as the specific gravity of mud, viscosity, sand factor, colloiditys Lai really
It is fixed.When modulating drilling slurry, different mud properties is selected according to the condition of the method for drilling, geological condition and bored concrete pile itself
Index is generally selected referring to table one.
Geological condition | Specific gravity | Viscosity (second) | Percent sand (%) | Colloidity (%) |
General geology | 1.1~1.3 | 16~22 | ≤ 4~8 | 〉95 |
Loose geology of easily collapsing | 1.4~1.6 | 19~28 | ≤ 4~8 | 〉95 |
Table one
Compared with prior art, the present invention having the following advantages and benefits:By trenchless technology and power cable
Laying combine, for guarantee pipeline itself safety and engineering quality, return hauling pipe road before reply construction in return drag
Power is calculated, and carries out force analysis to electricity channel, to guarantee the safety in pipeline returning and mortar depositing construction.To current
Power transmission and transformation comb trenchless engineering construction method has carried out effective supplement, has also standardized supervisor in non-excavation laying electric power
Supervisory basis and supervision behavior in pipeline construction.
Above-described specific embodiment has carried out further the purpose of the present invention, technical scheme and beneficial effects
It is described in detail, it should be understood that being not intended to limit the present invention the foregoing is merely a specific embodiment of the invention
Protection scope, all within the spirits and principles of the present invention, any modification, equivalent substitution, improvement and etc. done should all include
Within protection scope of the present invention.
Claims (4)
1. a kind of construction method convenient for transmission of electricity stake disassembly, which is characterized in that described method includes following steps:
S1:First carry out levelling of the land, will first be evened out within the scope of foundation construction by Center stake formation level it is whole, remove subsurface,
Barrier on ground repairs the sidewalk led into stake position;
S2:Water supply pipe and power supply line are installed, carries out a point hole by design drawing requirement and measures, do not influenced by pile foundation construction
Place setting pile foundation axis and high process control stake, and perform record;
S3:Shaft tower number in pool is drained using sand pocket cofferdam, and by the water in cofferdam, and filling pile construction should be according to setting
The length of reinforcing cage of meter is segmented, and steel reinforcement cage machining shed is arranged and cement stores canopy, backup power source should also be arranged, sandstone is stacked
Field and out cinder field;
S4:Using mud off percussive drill pore-creating filling pile, the clay of 2 times of single pile sides amount should be arranged in the shield-tube embedment of bored concrete pile
Field is stored, using mud off rotary rig pore-creating filling pile, the mud pit and one 2 times that 3 times of single pile side is measured should be set
The mud-settling pit of single pile side's amount.
2. a kind of construction method convenient for transmission of electricity stake disassembly according to claim 1, which is characterized in that casing using 4~
The production of 8mm steel plate, should be greater than bit diameter 100mm with its diameter when rotary rig;When with percussive drill, preferably greater than bit diameter
200mm。
3. a kind of construction method convenient for transmission of electricity stake disassembly according to claim 1, which is characterized in that casing position should bury
If correct, tamped between casing and crater wall using clay, casing center and stake position centre deviation are not greater than 50mm.
4. a kind of construction method convenient for transmission of electricity stake disassembly according to claim 1, which is characterized in that shield-tube embedment depth
It is not preferably less than 1m in clay, 1.5m is not preferably less than in sand, and mud face is higher by level of ground water 1m or more in retaining hole.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810859939.1A CN108867627A (en) | 2018-08-01 | 2018-08-01 | A kind of construction method convenient for transmission of electricity stake disassembly |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810859939.1A CN108867627A (en) | 2018-08-01 | 2018-08-01 | A kind of construction method convenient for transmission of electricity stake disassembly |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108867627A true CN108867627A (en) | 2018-11-23 |
Family
ID=64306704
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810859939.1A Withdrawn CN108867627A (en) | 2018-08-01 | 2018-08-01 | A kind of construction method convenient for transmission of electricity stake disassembly |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108867627A (en) |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101109179A (en) * | 2007-06-21 | 2008-01-23 | 河北建设勘察研究院有限公司 | Gas lifting reverse circulation porus cleaning construction method for slurry bulkhead cast-in-situ bored pile |
CN202500147U (en) * | 2012-03-19 | 2012-10-24 | 中国电力科学研究院 | Power transmission line enlarged top filling pile base |
CN204590062U (en) * | 2015-04-17 | 2015-08-26 | 国家电网公司 | A kind of pole tower pile used for transmission line |
CN107165160A (en) * | 2017-07-19 | 2017-09-15 | 上海宝冶集团有限公司 | Electric drill bores construction filling pile construction engineering method with rotary digging relay |
CN107938700A (en) * | 2017-11-17 | 2018-04-20 | 九州职业技术学院 | A kind of installation method of assembled underground pipe gallery |
-
2018
- 2018-08-01 CN CN201810859939.1A patent/CN108867627A/en not_active Withdrawn
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101109179A (en) * | 2007-06-21 | 2008-01-23 | 河北建设勘察研究院有限公司 | Gas lifting reverse circulation porus cleaning construction method for slurry bulkhead cast-in-situ bored pile |
CN202500147U (en) * | 2012-03-19 | 2012-10-24 | 中国电力科学研究院 | Power transmission line enlarged top filling pile base |
CN204590062U (en) * | 2015-04-17 | 2015-08-26 | 国家电网公司 | A kind of pole tower pile used for transmission line |
CN107165160A (en) * | 2017-07-19 | 2017-09-15 | 上海宝冶集团有限公司 | Electric drill bores construction filling pile construction engineering method with rotary digging relay |
CN107938700A (en) * | 2017-11-17 | 2018-04-20 | 九州职业技术学院 | A kind of installation method of assembled underground pipe gallery |
Non-Patent Citations (1)
Title |
---|
吴远波: "浅析钻孔(泥浆护壁)灌注桩的施工技术", 《城市建筑》 * |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
Chen et al. | Long rectangular box jacking project: a case study | |
CN109371974A (en) | A kind of PHC tubular pole implantation construction method suitable for hard geology | |
CN102392458B (en) | Piling beam cofferdam construction method used for bare rock foundation construction in water | |
CN103924602B (en) | Deep Thick Soft Ground foundation ditch construction method | |
CN204199335U (en) | A kind of pressure release well reducing PHC tube pile construction soil compaction effect | |
CN111851597B (en) | Penetration protection structure of pipe jacking close-distance downward-penetrating pipe gallery and construction method | |
CN202194148U (en) | Waterproof curtain | |
CN103015429A (en) | Long auger rotary-jet mixing steel reinforced cement-soil pile foundation pit water-resisting and supporting method | |
CN111705786A (en) | Method for vertical combination construction of composite stratum underground continuous wall and cast-in-situ bored pile | |
CN103016842B (en) | Mud soft soil foundation earth source heat pump direct-burried heat exchanger reverse construction engineering method | |
CN108071110A (en) | Rotary drilling rig Pile method under complex geological condition | |
CN101481913A (en) | Construction method of rock-socketed underground continuous wall punching slot section | |
CN105926626B (en) | Overlength pneumatic down hole hammer vibrates jet grouting pile construction technique | |
CN110512594A (en) | The simple and easy method of churning driven opportunity cavity pore-forming | |
CN101597903B (en) | Construction method of cylindrical slurry core pile for retaining and protecting foundation pit | |
CN216787094U (en) | Real-time active servo steel underground diaphragm wall construction method pile | |
CN108867627A (en) | A kind of construction method convenient for transmission of electricity stake disassembly | |
Hwang et al. | Design and construction of deep excavations in Taiwan | |
CN108798717A (en) | A kind of borehole design method that tunnel vault wall rock grouting under urban road is reinforced | |
CN110778788B (en) | Protection method for laying heat supply pipeline after shallow earth covering under road surface | |
CN220318548U (en) | Soil retaining structure for water-facing pit support in narrow region | |
CN102561390B (en) | The application of contrary sequence method technique in the structure construction of underground substation | |
Sinna | Application of trenchless construction technology in construction of water supply and drainage in urban road construction | |
Huang | Construction Technology of Deep Foundation Pit Support in Municipal Civil Engineering Foundation Construction | |
Zhou et al. | Design of Municipal Sewer Pipe Jacking under Complex Geological Conditions in Plateau Regions |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WW01 | Invention patent application withdrawn after publication |
Application publication date: 20181123 |
|
WW01 | Invention patent application withdrawn after publication |