CN108867397A - The installation method for improving of bridge construction mobile formwork - Google Patents

The installation method for improving of bridge construction mobile formwork Download PDF

Info

Publication number
CN108867397A
CN108867397A CN201810918638.1A CN201810918638A CN108867397A CN 108867397 A CN108867397 A CN 108867397A CN 201810918638 A CN201810918638 A CN 201810918638A CN 108867397 A CN108867397 A CN 108867397A
Authority
CN
China
Prior art keywords
fixed block
supporting plate
transverse slat
bridge construction
crane
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810918638.1A
Other languages
Chinese (zh)
Inventor
卢莺莺
朱碎月
李江涛
郭利
卢五妹
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810918638.1A priority Critical patent/CN108867397A/en
Publication of CN108867397A publication Critical patent/CN108867397A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Abstract

The invention discloses a kind of installation method for improving of bridge construction mobile formwork, bridge construction mobile formwork includes pedestal, crane is installed above the pedestal, transverse slat is installed, two sides are mounted on hydraulic cylinder above the transverse slat, and the hydraulic cylinder output end is fixedly connected with support plate above the crane, supporting plate is equipped with above the support plate, it is provided with card slot above the transverse slat, is connected with fixed block above the card slot, the fixed block upper center is equipped with bearing block.Started by electric speed reducer and drives driving gear rotation, after driving gear drives driven gear to turn to the angle of needs, stop decelerating motor, while starting hydraulic cylinder, so that supporting plate is fixed in the support of hydraulic cylinder upper support plate, by the setting of crane, realizes that supporting plate can be elevated, pass through the setting of self-locking universal wheel, so that device integrally transhipment easy to remove, the setting of card slot and fixed block fixes the fixed block of bottom end, and decelerating motor drives supporting plate mobile.

Description

The installation method for improving of bridge construction mobile formwork
Technical field
The present invention relates to technical field of bridge construction, specially a kind of installation promotion side of bridge construction mobile formwork Method.
Background technique
Bridge mould bases is essential tool in bridge construction.Such as application No. is:One kind of CN201711330429.7 The installation method of the installation method for improving of bridge construction mobile formwork, the installation method for improving of bridge construction mobile formwork is Carry out a kind of method of bridge construction for mobile formwork, it is mobile formwork main supporting leg after including, back launching nose, girder, front launching nose, preceding Main supporting leg, girder head linkage section, girder tail linkage section, hanging external fin, outer modular system and inner formwork system, the front-end and back-end of girder Be fixedly mounted respectively and stablize strut, stablize strut can transversal stretching, for being supported with the pier shaft of the first bridge pier and the second bridge pier, the One bridge pier and the second bridge pier are two adjacent bridge piers of construction bridges section, the installation method for improving of bridge construction mobile formwork Include the following steps:Installation on ground of the mobile formwork between the first bridge pier and the second bridge pier is finished, prepares to mention by step 1 It rises;Front launching nose, back launching nose, girder head linkage section and girder tail linkage section are overlayed on girder respectively, are then lifted out to technique It is required that height, then preceding main supporting leg, rear main supporting leg, hanging external fin, outer modular system and template system are assembled on girder.
Although above-mentioned mould bases is able to carry out effective promotion, but be fixed-direction there are the direction of mould bases, is not easy to move Mould bases rotates the angle of mould bases, so that the more accurate convenience of the installation site of mould bases, described to provide a kind of bridge construction movement The installation method for improving of mould bases solves the above problems.
Summary of the invention
The purpose of the present invention is to provide a kind of installation method for improving of bridge construction mobile formwork, to solve above-mentioned back The problem of being proposed in scape technology.
To achieve the above object, the present invention provides the following technical solutions:A kind of installation of bridge construction mobile formwork mentions Lifting method, bridge construction mobile formwork include pedestal, and crane, installation above the crane are equipped with above the pedestal There is transverse slat, two sides are mounted on hydraulic cylinder above the transverse slat, and the hydraulic cylinder output end is fixedly connected with support plate, the branch It is equipped with supporting plate above fagging, card slot is provided with above the transverse slat, fixed block, the fixed block top are connected with above the card slot Middle part is equipped with bearing block, and first rotating shaft is socketed with above the bearing block, is fixedly connected on supporting plate at the top of the first rotating shaft Bottom, the fixed block upper side are equipped with decelerating motor, and the decelerating motor output end is connected with second by shaft coupling Shaft, the second shaft top are equipped with driving gear, driven gear are equipped in the first rotating shaft, including walk as follows Suddenly:
S1:Crane and transverse slat are installed, pedestal, crane and transverse slat is taken, crane and transverse slat side is mounted on pedestal Top;
S2:Fixed block and hydraulic cylinder are installed, fixed block is installed on inside the card slot above transverse slat, four groups of hydraulic cylinders are pacified The quadrangle above fixed block;
S3:Supporting plate and motor are installed, bearing block is mounted on fixed block upper center, to bearing block inside grafting installation the One bearing, fixed block top installation decelerating motor and the second shaft, are equipped in the second shaft and first rotating shaft actively respectively Gear and driven gear, and driving gear and driven gear are meshed;
S4:Support rod and self-locking universal wheel are installed, four groups of support rods are welded in pedestal following four corners, under four groups of support rods Side is mounted on self-locking universal wheel, and installs reinforcing rib between four groups of support rods;
S5:Regulating device hoisting depth adjusts crane and supporting plate is moved up and down by fixing of the forming frame above supporting plate;
S6:Supporting plate rotational angle is adjusted, electric speed reducer is started and drives driving gear rotation, driving gear drives driven tooth After wheel turns to the angle of needs, stop decelerating motor, while starting hydraulic cylinder, so that the support plate support above hydraulic cylinder is solid Surely supporting plate is lived.
Preferably, the pedestal following four corners is fixedly connected to support rod, is fixedly connected between support rod described in four groups There is reinforcing rib, support rod bottom end described in four groups is equipped with self-locking universal wheel.
Preferably, the supporting plate two sides are fixedly connected to baffle.
Preferably, fixing seat is installed on the outside of the decelerating motor, the fixing seat bottom end is fixedly connected on fixed block Side.
Preferably, the transverse slat is circular configuration, and the card slot and fixed block are square structure.
Preferably, rubber pad is connected with above the support plate.
Preferably, the driving gear and driven gear are meshed.
Compared with prior art, the beneficial effects of the invention are as follows:A kind of installation of bridge construction mobile formwork of the present invention Method for improving, structure novel, while enabling to mould bases movable lifting, additionally it is possible to the rotational angle of mould bases is adjusted, So that mould bases is convenient for calibrating position when in use, the speed of fixing of the forming frame is improved.Started by electric speed reducer and is driven actively Gear rotation after driving gear drives driven gear to turn to the angle of needs, stops decelerating motor, while starting hydraulic cylinder, So that supporting plate is fixed in the support plate support above hydraulic cylinder, by the setting of crane, realizes that supporting plate can be elevated, pass through The setting of self-locking universal wheel, so that device integrally transhipment easy to remove, the setting of card slot and fixed block, so that the fixed block of bottom end It can fix, decelerating motor can drive supporting plate mobile.
Detailed description of the invention
Fig. 1 is schematic view of the front view of the present invention;
Fig. 2 is transverse slat of the present invention and fixed block overlooking structure diagram;
Fig. 3 is part A partial enlargement structural representation of the present invention.
In figure:1 pedestal, 2 transverse slats, 3 cranes, 4 hydraulic cylinders, 5 support bases, 6 supporting plates, 7 card slots, 8 fixed blocks, 9 bearing blocks, 10 first rotating shafts, 11 decelerating motors, 12 second shafts, 13 driving gears, 14 driven gears, 15 fixing seats, 16 baffles, 17 supports Bar, 18 self-locking universal wheels, 19 reinforcing ribs.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
Fig. 1-3 is please referred to, the present invention provides a kind of technical solution:A kind of installation promotion side of bridge construction mobile formwork Method, bridge construction mobile formwork include pedestal 1, and crane 3 is equipped with above the pedestal 1, is installed above the crane 3 There is transverse slat 2, the 2 top two sides of transverse slat are mounted on hydraulic cylinder 4, and 4 output end of hydraulic cylinder is fixedly connected with support plate 5, It is equipped with supporting plate 6 above the support plate 5, is provided with card slot 7 above the transverse slat 2, fixed block 8, institute is connected with above the card slot 7 It states 8 upper center of fixed block and bearing block 9 is installed, first rotating shaft 10, the first rotating shaft 10 are socketed with above the bearing block 9 Top is fixedly connected on 6 bottom of supporting plate, and decelerating motor 11 is equipped at the upper side of the fixed block 8, and the decelerating motor 11 is defeated Outlet is connected with the second shaft 12 by shaft coupling, is equipped with driving gear 13 above second shaft 12, and described first turn Driven gear 14 is installed on axis 10, is included the following steps:
S1:Crane 3 and transverse slat 2 are installed, pedestal 1, crane 3 and transverse slat 2 are taken, crane 2 and 3 side of transverse slat are installed Above pedestal 1;
S2:Fixed block 8 and hydraulic cylinder 4 are installed, fixed block 4 is installed on inside the card slot 7 of 2 top of transverse slat, four groups of liquid Cylinder pressure 4 is mounted on 8 top quadrangle of fixed block;
S3:Supporting plate 6 and motor 11 are installed, bearing block 9 is mounted on 8 upper center of fixed block, to 9 inside grafting of bearing block First bearing 10 is installed, decelerating motor 11 and the second shaft 12 are installed above fixed block 8, respectively to the second shaft 12 and first turn Driving gear 13 and driven gear 14 are installed on axis 10, and driving gear 13 and driven gear 14 are meshed;
S4:Support rod 17 and self-locking universal wheel 18 are installed, four groups of support rods 17 are welded in 1 following four corners of pedestal, four groups It is mounted on self-locking universal wheel 18 below support rod 17, and reinforcing rib 19 is installed between four groups of support rods 17;
S5:Regulating device hoisting depth adjusts crane 3 and to move down on supporting plate 6 by fixing of the forming frame above supporting plate 6 It is dynamic;
S6:6 rotational angle of supporting plate is adjusted, electric speed reducer 11 is started, driving gear 13 is driven to rotate, 13 band of driving gear After dynamic driven gear 14 turns to the angle of needs, stop decelerating motor 11, while starting hydraulic cylinder 4, so that 4 top of hydraulic cylinder Support plate 5 support fix supporting plate 6.
1 following four corners of pedestal is fixedly connected to support rod 17, is fixedly connected between support rod 17 described in four groups Reinforcing rib 19,17 bottom end of support rod described in four groups are equipped with self-locking universal wheel 18.6 two sides of supporting plate are fixedly connected to baffle 16.Fixing seat 15 is installed, 15 bottom end of fixing seat is fixedly connected on 8 top of fixed block on the outside of the decelerating motor 11.Institute Stating transverse slat 2 is circular configuration, and the card slot 7 and fixed block 8 are square structure.Rubber pad is connected with above the support plate 5. The driving gear 13 and driven gear 14 are meshed.
A kind of installation method for improving of bridge construction mobile formwork of the present invention, structure novel enable to mould bases mobile While promotion, additionally it is possible to be adjusted to the rotational angle of mould bases, so that mould bases is convenient for calibrating position when in use, mention The speed of high fixing of the forming frame.Being started by electric speed reducer 11 drives driving gear 13 to rotate, and driving gear 13 drives driven gear After 14 turn to the angle of needs, stop decelerating motor 11, while starting hydraulic cylinder 4, so that the support plate 5 of 4 top of hydraulic cylinder Supporting plate 6 is fixed in support, by the setting of crane 3, realizes that supporting plate 6 can be elevated, by the setting of self-locking universal wheel 18, So that device integrally transhipment easy to remove, the setting of card slot 7 and fixed block 8 are fixed the fixed block 8 of bottom end, are subtracted Speed motor 11 can drive supporting plate 6 mobile.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with A variety of variations, modification, replacement can be carried out to these embodiments without departing from the principles and spirit of the present invention by understanding And modification, the scope of the present invention is defined by the appended.

Claims (7)

1. a kind of installation method for improving of bridge construction mobile formwork, bridge construction mobile formwork includes pedestal (1), described It is equipped with crane (3) above pedestal (1), is equipped with transverse slat (2) above the crane (3), two sides above the transverse slat (2) It is mounted on hydraulic cylinder (4), hydraulic cylinder (4) output end is fixedly connected with support plate (5), is set above the support plate (5) Have supporting plate (6), be provided with card slot (7) above the transverse slat (2), is connected with fixed block (8), the fixation above the card slot (7) Block (8) upper center is equipped with bearing block (9), is socketed with first rotating shaft (10), the first rotating shaft above the bearing block (9) (10) top is fixedly connected on supporting plate (6) bottom, is equipped with decelerating motor (11) at the upper side of the fixed block (8), described to subtract Speed motor (11) output end is connected with the second shaft (12) by shaft coupling, is equipped with driving tooth above second shaft (12) It takes turns (13), driven gear (14) is installed on the first rotating shaft (10), it is characterised in that:Include the following steps:
S1:Crane (3) and transverse slat (2) are installed, pedestal (1), crane (3) and transverse slat (2) are taken, crane (2) and transverse slat (3) side is mounted on above pedestal (1);
S2:Fixed block (8) and hydraulic cylinder (4) are installed, fixed block (4) is installed on the inside of the card slot (7) above transverse slat (2), Four groups of hydraulic cylinders (4) are mounted on quadrangle above fixed block (8);
S3:Supporting plate (6) and motor (11) are installed, bearing block (9) is mounted on fixed block (8) upper center, into bearing block (9) First bearing (10) are installed in portion's grafting, installation decelerating motor (11) and the second shaft (12) above fixed block (8), respectively to second Driving gear (13) and driven gear (14) are installed in shaft (12) and first rotating shaft (10), and make driving gear (13) and Driven gear (14) is meshed;
S4:Support rod (17) and self-locking universal wheel (18) are installed, four groups of support rods (17) are welded in pedestal (1) following four corners, It is mounted on self-locking universal wheel (18) below four groups of support rods (17), and reinforcing rib (19) is installed between four groups of support rods (17);
S5:Regulating device hoisting depth adjusts crane (3) and makes supporting plate (6) up and down by fixing of the forming frame above supporting plate (6) It is mobile;
S6:Supporting plate (6) rotational angle is adjusted, electric speed reducer (11) are started and drive driving gear (13) rotation, driving gear (13) after driving driven gear (14) to turn to the angle of needs, stop decelerating motor (11), while starting hydraulic cylinder (4), make It obtains support plate (5) support above hydraulic cylinder (4) and fixes supporting plate (6).
2. a kind of installation method for improving of bridge construction mobile formwork according to claim 1, it is characterised in that:It is described Pedestal (1) following four corners is fixedly connected to support rod (17), and support rod described in four groups is fixedly connected with reinforcing rib between (17) (19), support rod described in four groups (17) bottom end is equipped with self-locking universal wheel (18).
3. a kind of installation method for improving of bridge construction mobile formwork according to claim 1, it is characterised in that:It is described Supporting plate (6) two sides are fixedly connected to baffle (16).
4. a kind of installation method for improving of bridge construction mobile formwork according to claim 1, it is characterised in that:It is described It is equipped with fixing seat (15) on the outside of decelerating motor (11), fixing seat (15) bottom end is fixedly connected on above fixed block (8).
5. a kind of installation method for improving of bridge construction mobile formwork according to claim 1, it is characterised in that:It is described Transverse slat (2) is circular configuration, and the card slot (7) and fixed block (8) are square structure.
6. a kind of installation method for improving of bridge construction mobile formwork according to claim 1, it is characterised in that:It is described Rubber pad is connected with above support plate (5).
7. a kind of installation method for improving of bridge construction mobile formwork according to claim 1, it is characterised in that:It is described Driving gear (13) and driven gear (14) are meshed.
CN201810918638.1A 2018-08-13 2018-08-13 The installation method for improving of bridge construction mobile formwork Pending CN108867397A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810918638.1A CN108867397A (en) 2018-08-13 2018-08-13 The installation method for improving of bridge construction mobile formwork

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810918638.1A CN108867397A (en) 2018-08-13 2018-08-13 The installation method for improving of bridge construction mobile formwork

Publications (1)

Publication Number Publication Date
CN108867397A true CN108867397A (en) 2018-11-23

Family

ID=64317790

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810918638.1A Pending CN108867397A (en) 2018-08-13 2018-08-13 The installation method for improving of bridge construction mobile formwork

Country Status (1)

Country Link
CN (1) CN108867397A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111270613A (en) * 2020-02-14 2020-06-12 王利民 Installation and lifting system of movable formwork for bridge construction
CN112376432A (en) * 2020-11-03 2021-02-19 南京元琅建设工程有限公司 Follow-up pretreatment device for precast beam plate
CN115573260A (en) * 2022-10-19 2023-01-06 惠州市普盈金属科技有限公司 Movable formwork with adjustable height in assembly

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2455420C1 (en) * 2011-03-01 2012-07-10 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Rolling scaffold
CN204392154U (en) * 2015-01-30 2015-06-10 华南理工大学广州学院 Be applied to the angular adjustment apparatus of device of solar generating
CN206408526U (en) * 2016-11-04 2017-08-15 徐恒毅 A kind of bridge construction hoisting bracket
CN107338948A (en) * 2017-08-22 2017-11-10 芜湖超源力工业设计有限公司 A kind of wall plaster machine people
CN206903168U (en) * 2017-04-14 2018-01-19 熊跃华 A kind of movable up-down builds scaffold by laying bricks or stones

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
RU2455420C1 (en) * 2011-03-01 2012-07-10 Открытое акционерное общество по проектированию строительства мостов "Институт Гипростроймост" Rolling scaffold
CN204392154U (en) * 2015-01-30 2015-06-10 华南理工大学广州学院 Be applied to the angular adjustment apparatus of device of solar generating
CN206408526U (en) * 2016-11-04 2017-08-15 徐恒毅 A kind of bridge construction hoisting bracket
CN206903168U (en) * 2017-04-14 2018-01-19 熊跃华 A kind of movable up-down builds scaffold by laying bricks or stones
CN107338948A (en) * 2017-08-22 2017-11-10 芜湖超源力工业设计有限公司 A kind of wall plaster machine people

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111270613A (en) * 2020-02-14 2020-06-12 王利民 Installation and lifting system of movable formwork for bridge construction
CN111270613B (en) * 2020-02-14 2021-07-27 义乌市高洋建筑工程有限公司 Installation and lifting system of movable formwork for bridge construction
CN112376432A (en) * 2020-11-03 2021-02-19 南京元琅建设工程有限公司 Follow-up pretreatment device for precast beam plate
CN115573260A (en) * 2022-10-19 2023-01-06 惠州市普盈金属科技有限公司 Movable formwork with adjustable height in assembly
CN115573260B (en) * 2022-10-19 2023-08-04 惠州市普盈金属科技有限公司 Movable die carrier with adjustable assembly height

Similar Documents

Publication Publication Date Title
CN108867397A (en) The installation method for improving of bridge construction mobile formwork
CN111021719B (en) Sponge city foaming concrete post-cast floor forming system and construction method
CN211286622U (en) Hoop type lead screw creeping formwork system for cylindrical pier construction
CN113622311A (en) Self-climbing safe operation platform for pouring construction of pier column and construction method thereof
CN109398326A (en) A kind of battery replacing vehicle for electric transfer car(buggy)
CN211522924U (en) Bridge construction is with hanging basket convenient to adjusting position
CN115217312A (en) Movable and adjustable slope operation platform and construction method thereof
CN213571568U (en) Pouring device for bridge prestressed concrete cast-in-place box girder construction
CN211664533U (en) Rotary lifting appliance for lifting segmental beam
CN213328944U (en) Corridor lining template capable of moving integrally
CN215326630U (en) High mound bridge material lifting device
CN211549720U (en) Tunnel cable slot trolley prefabricated mould adjusting structure
CN213159345U (en) Eccentric inclined type rotating amusement device
CN211006823U (en) Automatic change integrated hydraulic grab trash remover
CN216729441U (en) Automatic mold overturning device for slurry pump casting
CN220300132U (en) Hoisting mechanism for road and bridge construction
CN216515189U (en) Be used for bridge roof beam body to rotate strutting arrangement
CN214527620U (en) Equipment maintenance device for construction machinery
CN220317133U (en) Stable earthwork transfer device
CN214997799U (en) Traction device for mining hydraulic support
CN220008189U (en) Middle wall movable formwork capable of removing concrete bubbles
CN219297006U (en) Hoisting structure convenient to adjust
CN214614575U (en) Energy-saving anti-seismic steel component
CN102756120B (en) Hydraulic slagging-off machine
CN218227006U (en) Gantry crane for assembling water cutting machine

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181123

RJ01 Rejection of invention patent application after publication