CN108867315A - The pre-locked method of large bridge steel reinforced concrete adapter section - Google Patents

The pre-locked method of large bridge steel reinforced concrete adapter section Download PDF

Info

Publication number
CN108867315A
CN108867315A CN201810754635.9A CN201810754635A CN108867315A CN 108867315 A CN108867315 A CN 108867315A CN 201810754635 A CN201810754635 A CN 201810754635A CN 108867315 A CN108867315 A CN 108867315A
Authority
CN
China
Prior art keywords
locking
locked
anchor
skeleton
girder
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810754635.9A
Other languages
Chinese (zh)
Inventor
李俊
辛德武
陈松
杨豪
张苏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Ge Zhou Ba Group Is Second Project Co Ltd
China Gezhouba Group No 2 Engineering Co Ltd
Original Assignee
China Ge Zhou Ba Group Is Second Project Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Ge Zhou Ba Group Is Second Project Co Ltd filed Critical China Ge Zhou Ba Group Is Second Project Co Ltd
Priority to CN201810754635.9A priority Critical patent/CN108867315A/en
Publication of CN108867315A publication Critical patent/CN108867315A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D11/00Suspension or cable-stayed bridges
    • E01D11/02Suspension bridges
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The present invention provides method pre-locked when a kind of construction of large bridge steel reinforced concrete adapter section, this method is first fixedly welded on anchor slab in advance according to the determining steel box-girder end top of measurement, bottom surface, vertical and horizontal diaphragm center line corresponding position;Pre-buried stiffening plate is embedded in advance according to the determining concrete box beam end top of measurement, backplate surface, partition center line corresponding position when last segment of anchor span box beam pours;The one end for locking skeleton is fixedly welded in pre-buried stiffening plate in advance, carries out reinforcing bar binding, the formwork erection construction of toughened internal stress;Before will starting toughened internal stress concreting, will locking the skeleton other end and the anchor slab at steel box-girder end be welded and fixed, realization anchor span and steel box-girder it is pre-locked;Carry out concrete pours operation;Concreting is completed and removes anchor slab, pre-buried stiffening plate, locking skeleton after completing tensioning construction, unlocks.It is efficiently accurate that the method for the present invention can effectively control toughened internal stress deflection, locking and positioning.

Description

The pre-locked method of large bridge steel reinforced concrete adapter section
Technical field
The present invention relates to a kind of pre-locked methods of large bridge steel reinforced concrete adapter section.
Background technique
Country's Long span self-anchored suspension bridge is to reduce bridge self weight while increasing across footpath as far as possible, increase bridge at present Bearing capacity, girder generally uses the box girder construction of steel plate, and its both ends anchor span is then generally PC Box Girder Structure, Concrete box girder must be linked together with steel box-girder by toughened internal stress;It is installed in place in steel box-girder, anchor span concrete construction Start to carry out toughened internal stress construction after the completion;Since steel box-girder linear expansion coefficient is larger, by day and night temperature influenced to generate compared with Big dilatation, and the concrete wire coefficient of expansion is then smaller such as in the toughened internal stress construction time and pours completion initial stage and does not take Measure is developed as one pleases, steel box-girder will to combine section concrete and box beam generate squeeze, stretching action, easily cause concrete axial to or Failure by shear;Structure is complicated for toughened internal stress, is the key node that main push-towing rope anchor point horizontal component is transmitted to steel box-girder by anchor span, If toughened internal stress goes wrong, will lead to bed rearrangement bridge force-bearing structural system can not be formed;Therefore, it is necessary in toughened internal stress It construction time and pours completion initial stage and takes measures to limit smooth formation of its deflection to ensure bridge integral structural system.It is domestic The general construction that toughened internal stress is carried out using Direct stenting method, the elastic restraint by the way that interim sliding support and bracket is arranged are limited The deflection of toughened internal stress processed, deflection are often unable to get effective control.
Summary of the invention
In order to overcome the above shortcomings, it is an object of the present invention to provide one kind can effectively control toughened internal stress deflection, Reasonable stress, it is at low cost, it is easy to operate, accurate effective locking effect, lock can be quickly obtained in toughened internal stress construction period Fixed and positioning is efficiently accurate, and is able to satisfy the pre-locked method of large bridge steel reinforced concrete adapter section of bridge beam body force request completely.
The object of the present invention is achieved like this:
The pre-locked method of large bridge steel reinforced concrete adapter section of the present invention, this method are first will at least 8 pieces of anchor slabs to be fixedly welded in advance According to the determining steel box-girder end top of measurement, bottom surface, vertical and horizontal diaphragm center line corresponding position;Then last in anchor span box beam When one segment pours by least 8 pieces of pre-buried stiffening plates be embedded in advance according to the determining concrete box beam end top of measurement, backplate surface, Partition center line corresponding position;At least 8 locking framework locations are used again, are in advance fixedly welded on the one end for locking skeleton pre- It buries in stiffening plate, then carries out reinforcing bar binding, the formwork erection construction of toughened internal stress;After completing above-mentioned operation, steel reinforced concrete will be started Before adapter section concreting, the locking skeleton other end and the anchor slab at steel box-girder end are welded and fixed, realize anchor span and steel box-girder It is pre-locked;Carry out concrete after the completion of pre-locked immediately pours operation;Concreting is completed and completes prestressed stretch-draw Anchor slab, pre-buried stiffening plate, locking skeleton are removed after construction, are unlocked.
Above-mentioned pre-locked and toughened internal stress concreting opportunity should select in one day temperature lower and change The amplitude the smallest period carries out.
Above-mentioned anchor slab is 8 pieces, and pre-buried stiffening plate is 8 pieces, and locking skeleton is 8.
The method of the present invention can effectively control toughened internal stress deformation, and reasonable stress is at low cost, easy to operate, pass through In such a way that toughened internal stress both ends are connected and fixed by skeleton in advance, essence can be quickly obtained in toughened internal stress construction period Effect locking effect is truly had, locking and positioning are more efficiently accurate, and are able to satisfy bridge beam body force request completely.
Detailed description of the invention
Fig. 1 be toughened internal stress stiff skeleton structural schematic diagram of the present invention.
Fig. 2 is A-A cross-sectional view in Fig. 1.
Fig. 3 is B-B cross-sectional view in Fig. 1.
Fig. 4 is toughened internal stress stiff skeleton plan view.
Fig. 5 is assembling figure of the invention.
Fig. 6 is C-C, D-D cross-sectional view in Fig. 5.
Specific embodiment
Referring to FIG. 1 to FIG. 6, the pre-locked method of the present embodiment large bridge steel reinforced concrete adapter section includes the following steps:
1, production processing all parts are accurate to install anchor slab and pre-buried stiffening plate:
Totally 8 pieces of 400mm × 400mm × 20mm anchor slab 1 of self-control is fixedly welded on the steel box-girder end top determining according to measurement in advance Bottom surface, 5 corresponding position of vertical and horizontal diaphragm center line;When last segment of anchor span box beam is poured by homemade pre-buried stiffening plate 2 totally 8 pieces(It each include that 6 pieces of 100mm × 580mm × 20mm steel plate and 12 Φ 25, L=1000mm round steel welding production form) It is embedded in advance according to the determining concrete box beam end roof and floor surface of measurement, partition center line corresponding position;The external lock of self-control Determine totally 8, skeleton 3(It is formed using Two bors d's oeuveres 36b channel steel and small steel plate welding production).Anchor slab, pre-buried stiffening plate and locking skeleton group At preliminary latch means.To be accurately positioned preliminary latch means, it is necessary in advance that anchor slab and pre-buried stiffening plate is fixed accurate.Existing Field can position it using the precise measurements instrument such as total station, and 4 both ends beam body end of toughened internal stress top, bottom table are set to Face, beam body central axes monosymmetric two partition center lines corresponding position(Every 5~6m upper and lower surface is arranged one in principle It is right).Anchor slab is fixedly welded on steel box-girder top bottom surface after position is determining, pre-buried stiffening plate is embedded in the concrete box to be poured built in advance Box girder segment is carried out after back bottom surface to pour.The external locking frame center line and beam that determining position should be able to be such that the later period installs Body partition center line is overlapped;Each toughened internal stress has the fixed device of 8 prelock(Top, bottom plate each 4), serial number in Fig. 1, Fig. 4 6,7 be respectively steel box-girder end face, box beam end face;
2, after first locking one end, carry out the binding of toughened internal stress reinforcing bar and formwork erection operation:
One end of homemade locking skeleton is fixedly welded in pre-buried stiffening plate in advance, then carries out the reinforcing bar of toughened internal stress The operations such as binding, formwork erection;
3, apparent time machine locks the other end, completes pre-locked:
After the operations such as reinforcing bar binding, formwork erection, before toughened internal stress concreting will be started, then will locking the skeleton other end with The anchor slab at steel box-girder end is welded and fixed, and realizes the pre-locked of anchor span and steel box-girder;Pre-locked and toughened internal stress concreting Opportunity should select that temperature is lower in one day and the amplitude of variation the smallest period carries out;It should be carried out immediately after the completion of pre-locked Concrete pours operation;
4, it releases pre-locked:
Concreting is completed and removes anchor slab, pre-buried stiffening plate, locking skeleton after completing tensioning construction, and lock is released It is fixed.
The method of the present invention is by external locking skeleton and to be embedded in the pre-buried stiffening plate of concrete box girder and be welded in steel case The anchor slab of beam-ends top bottom surface, which is welded to connect, to be fixed, and the steel box-girder that need to be joined the two sections of a bridge, etc and concrete beam body structure are linked to be entirety in advance, To make toughened internal stress length keep relative stability within certain period, reaching prevents toughened internal stress concrete from pouring In journey and there is the purpose being destroyed because steel and concrete wire expansion coefficient difference are big in concrete setting initial stage.Steel reinforced concrete combines Section preliminary latch means are able to satisfy force request through stress accounting completely, and practical, at low cost, strong operability greatly improves The protection of toughened internal stress construction quality.
Above-described embodiment is to be further described to above content of the invention, but this should not be interpreted as in the present invention The range for stating theme is only limitted to above-described embodiment.It is all to be all belonged to the scope of the present invention based on the technology that above content is realized.

Claims (3)

1. the pre-locked method of large bridge steel reinforced concrete adapter section, this method be first will at least 8 pieces of anchor slabs be fixedly welded in advance according to Measure determining steel box-girder end top, bottom surface, vertical and horizontal diaphragm center line corresponding position;Then in anchor span box beam final section At least 8 pieces of pre-buried stiffening plates are embedded in advance according to the determining concrete box beam end top of measurement, backplate surface, partition when section pours Center line corresponding position;At least 8 locking framework locations are used again, and the one end for locking skeleton is fixedly welded on pre-buried add in advance In strong plate, reinforcing bar binding, the formwork erection construction of toughened internal stress are then carried out;After completing above-mentioned operation, steel reinforced concrete combination will be started Before section concrete pours, will locking the skeleton other end and the anchor slab at steel box-girder end be welded and fixed, realization anchor span and steel box-girder it is pre- Locking;Carry out concrete after the completion of pre-locked immediately pours operation;Concreting is completed and completes tensioning construction Anchor slab, pre-buried stiffening plate, locking skeleton are removed afterwards, are unlocked.
2. the pre-locked method of large bridge steel reinforced concrete adapter section according to claim 1, it is characterised in that pre-locked and steel reinforced concrete The opportunity of adapter section concreting should select that temperature is lower in one day and the amplitude of variation the smallest period carries out.
3. the pre-locked method of large bridge steel reinforced concrete adapter section according to claim 1 or 2, it is characterised in that anchor slab is 8 pieces, Pre-buried stiffening plate is 8 pieces, and locking skeleton is 8.
CN201810754635.9A 2018-07-11 2018-07-11 The pre-locked method of large bridge steel reinforced concrete adapter section Pending CN108867315A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810754635.9A CN108867315A (en) 2018-07-11 2018-07-11 The pre-locked method of large bridge steel reinforced concrete adapter section

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810754635.9A CN108867315A (en) 2018-07-11 2018-07-11 The pre-locked method of large bridge steel reinforced concrete adapter section

Publications (1)

Publication Number Publication Date
CN108867315A true CN108867315A (en) 2018-11-23

Family

ID=64300521

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810754635.9A Pending CN108867315A (en) 2018-07-11 2018-07-11 The pre-locked method of large bridge steel reinforced concrete adapter section

Country Status (1)

Country Link
CN (1) CN108867315A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109371848A (en) * 2018-12-10 2019-02-22 中交四公局第五工程有限公司 The longitudinal temporary connecting structure and method of suspension bridge concrete stiffening girder installation

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201296900Y (en) * 2008-08-20 2009-08-26 北京锦泰安联桥梁钢构技术有限公司 Temporary locking device for combined box beam seaming section of corrugated steel web plate
CN105088971A (en) * 2015-09-09 2015-11-25 上海城建市政工程(集团)有限公司 Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge
CN205295967U (en) * 2015-12-31 2016-06-08 中铁二十局集团有限公司 Large -span continuous beam bridge strides existing station midspan closure section locking structure for rotation construction
KR101749959B1 (en) * 2016-11-28 2017-07-03 (주)신화 Assembly type arch structure and method for constructing it
CN206495141U (en) * 2017-02-25 2017-09-15 中铁十八局集团第二工程有限公司 The temporary locking device constructed for steel pipe arch bridge closure segment

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN201296900Y (en) * 2008-08-20 2009-08-26 北京锦泰安联桥梁钢构技术有限公司 Temporary locking device for combined box beam seaming section of corrugated steel web plate
CN105088971A (en) * 2015-09-09 2015-11-25 上海城建市政工程(集团)有限公司 Mid-span closure construction method of corrugated steel web PC box girder cable-stayed bridge
CN205295967U (en) * 2015-12-31 2016-06-08 中铁二十局集团有限公司 Large -span continuous beam bridge strides existing station midspan closure section locking structure for rotation construction
KR101749959B1 (en) * 2016-11-28 2017-07-03 (주)신화 Assembly type arch structure and method for constructing it
CN206495141U (en) * 2017-02-25 2017-09-15 中铁十八局集团第二工程有限公司 The temporary locking device constructed for steel pipe arch bridge closure segment

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
周筱留等: "宁波南翔大桥中跨合拢技术", 《石家庄铁道大学学报》 *
王俊如等: "钢-混凝土混合连续刚构桥主跨钢混接头施工技术简介", 《公路交通技术》 *

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109371848A (en) * 2018-12-10 2019-02-22 中交四公局第五工程有限公司 The longitudinal temporary connecting structure and method of suspension bridge concrete stiffening girder installation

Similar Documents

Publication Publication Date Title
CN104264592A (en) Construction method of continuous beam
CN101691742B (en) Construction method for back cable-balancing single-side cantilever concreted beam bodies of slant-legged rigid frame bridges
KR101991930B1 (en) Rahman bridge and construction method thereof
CN109281438A (en) Multilayer prefabricated post and construction method of the one-pass molding with bracket
CN111576619A (en) Production method of high-strength concrete post-cast assembled frame system
CN104831639B (en) A kind of ultra-wide nonprismatic continuous beam 0# block consolidation and releasing construction method
JP3844743B2 (en) Box girder bridge structure and its construction method
CN110359487A (en) A kind of fabricated construction side wall prefabricated component and its with arch sheet connecting structure
KR101196874B1 (en) Girder making methos for precast end seggement using end mold and girder therewith
CN109137720A (en) Prefabricated case beam and construction method
JP5217428B2 (en) Composite hollow structure of bridge column head or girder end
KR20100003791A (en) A precast type pre-stress box girder bridge excution method
CN108867315A (en) The pre-locked method of large bridge steel reinforced concrete adapter section
CN212656384U (en) High-strength concrete connecting piece, high-strength concrete post-cast assembled frame system and support frame
CN108775085A (en) The assembled integral concrete frame structure and its construction method of beam-ends connection
CN108316150A (en) The construction system and construction method of Cable stayed Bridge Main Tower and steel anchor beam
CN209584813U (en) Frame bridge system
CN110374012A (en) A kind of prefabricated engineering method of T beam original position Support Method
KR101906322B1 (en) Rahmen bridge allowing longitudinal displacement and construction method therefor
KR100462966B1 (en) Prestressed Concrete U-Girder of compositive girder bridge
CN215857179U (en) Reinforced structure for transforming rib type abutment into pier
CN108775086A (en) The additional assembled integral beam-column node structure and construction method for being closed connection reinforcing bar
CN201605528U (en) Bridge pier column for installing steel-structure bent cap
CN203960756U (en) A kind of No. 0 interim prestressed strand system of piece case beam
Xie et al. Arch first and beam later: Arch-rib integral installation construction technology for large-span tied-arch bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181123

WD01 Invention patent application deemed withdrawn after publication