Prior art keywords
reinforcing rib
welding
broadwise
longitudinal direction
hollow ball
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810611513.4A
Other languages
Chinese (zh)
Inventor
赵学建
徐左祥
潘植华
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Hong Yuan Steel Tower Co Ltd
Original Assignee
Anhui Hong Yuan Steel Tower Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Hong Yuan Steel Tower Co Ltd filed Critical Anhui Hong Yuan Steel Tower Co Ltd
Priority to CN201810611513.4A priority Critical patent/CN108856985A/en
Publication of CN108856985A publication Critical patent/CN108856985A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/16Arc welding or cutting making use of shielding gas
    • B23K9/167Arc welding or cutting making use of shielding gas and of a non-consumable electrode
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B23MACHINE TOOLS; METAL-WORKING NOT OTHERWISE PROVIDED FOR
    • B23KSOLDERING OR UNSOLDERING; WELDING; CLADDING OR PLATING BY SOLDERING OR WELDING; CUTTING BY APPLYING HEAT LOCALLY, e.g. FLAME CUTTING; WORKING BY LASER BEAM
    • B23K9/00Arc welding or cutting
    • B23K9/235Preliminary treatment

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Plasma & Fusion (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)
  • Arc Welding In General (AREA)

Abstract

The present invention provides a kind of steel tube tower hollow ball and its welding preparation process, the identical hollow hemisphere of two structures including being welded into sphere;The hollow hemisphere includes sphere and reinforcing rib, and reinforcing rib is vertically welded in ball interior surface;The reinforcing rib includes broadwise reinforcing rib and waling, orthogonal between the broadwise reinforcing rib and waling;The broadwise reinforcing rib includes the first broadwise reinforcing rib, the second broadwise reinforcing rib and third broadwise reinforcing rib, and the first broadwise reinforcing rib, the second broadwise reinforcing rib and third broadwise reinforcing rib radius are sequentially increased.A kind of steel tube tower hollow ball provided by the invention and its welding preparation process, increase the stress demand of hollow ball, and improve the qualification rate of steel tube tower hollow ball welding.

Description

A kind of steel tube tower hollow ball and its welding preparation process
Technical field
The present invention relates to transmission line ball node weld fields, and in particular to a kind of steel tube tower hollow ball and its welding system Standby technique.
Background technique
With the design application of Zhoushan steel tube tower over strait, hollow ball connection will be widely applied, but hollow ball connection section Spot welding does not have processing experience in most of steel tower production units, the not formed efficient task instruction scheme of unification, also without borrowing The institute of mirror.To meet hollow sphere force request, internal densely covered longitude and latitude reinforcing rib, its welding sequence of hollow ball inside reinforcing rib and The elimination of stress largely determines the quality of sphere, and in terms of stress elimination, common practice cannot ensure stress at present It eliminates.The equator weld seam welding difficulty of sphere is larger, and since sphere plate thickness is thicker, a large amount of welding increases the surface hardness of sphere Add, increase the crack sensitivity of weld seam, forms security risk.And the groove problem of sphere does not have the technical support of strength, it is comprehensive On, with current weld horizontal it is difficult to ensure that first-time qualification rate.
Summary of the invention
Technical problem to be solved of the invention is to provide a kind of steel tube tower hollow ball and its welding preparation process, The stress demand for increasing hollow ball, ensure that the qualification rate of welding.
The present invention solves above-mentioned technical problem using following technical scheme:
A kind of steel tube tower hollow ball, which is characterized in that the identical hollow hemisphere of two structures including being welded into sphere Body;
The hollow hemisphere includes sphere and reinforcing rib, and reinforcing rib is vertically welded in ball interior surface;
The reinforcing rib includes broadwise reinforcing rib and waling, between the broadwise reinforcing rib and waling mutually It is perpendicular;
The broadwise reinforcing rib includes the first broadwise reinforcing rib, the second broadwise reinforcing rib and third broadwise reinforcing rib, described First broadwise reinforcing rib, the second broadwise reinforcing rib and third broadwise reinforcing rib radius are sequentially increased;
The waling includes first longitudinal direction reinforcing rib and second longitudinal direction reinforcing rib, between the first longitudinal direction reinforcing rib Angle between setting, two neighboring first longitudinal direction reinforcing rib is 30-60 °;The setting of second longitudinal direction reinforcing rib interval, phase Angle between adjacent two second longitudinal direction reinforcing ribs is 30-60 °.
Further, the first longitudinal direction reinforcing rib and second longitudinal direction reinforcing rib be in the same plane.
Further, the first longitudinal direction reinforcing rib and second longitudinal direction reinforcing rib be not in the same plane
Further, the angle between the two neighboring first longitudinal direction reinforcing rib is 45 °, and described two neighboring second is vertical It is 45 ° to the angle between reinforcing rib.
The welding preparation process of this steel tube tower hollow ball, includes the following steps:
1) welding preparation:All welding surfaces are processed by shot blasting, until leaking out metallic luster;
2) reinforcing rib welds:Reinforcing rib and hollow hemisphere are subjected to counterpart assembly, welded, the welding of reinforcing rib is suitable Sequence is followed successively by:First broadwise reinforcing rib, first longitudinal direction reinforcing rib, the second broadwise reinforcing rib, second longitudinal direction reinforcing rib and third latitude To reinforcing rib, using work carbon dioxide and argon gas gaseous mixture gas shielded arc welding, welding wire is ¢ 1.2mm gas shielded arc welding for the welding Welding wire, welding current 350-360, voltage 35-40;
3) hollow ball welds:
(1) preparing steel hollow hemisphere groove is 30 °, is processed by shot blasting to all welding surfaces, until leaking out metal light Two hemispheres of steel tube tower hollow ball are carried out counterpart assembly by pool, and confirm soldered position and its edge without pit And other surface defects;
(2) carbon dioxide and argon gas gaseous mixture gas shielded arc welding, welding wire are the weldering of ¢ 1.2mm gas shielded arc welding by hand first Silk, welding current 330-350, voltage 35-40;
(3) one layer of layer of air cooling type argon arc welding gun bottom welding is utilized by the way of climbing welding, welding wire selects ¢ 2.5mm, JQ.TG50 special welding wire;Tungsten electrode is ¢ 3.2mm, is 20-28L/min when argon flow starts;Argon flow when welding It is maintained at 20L/min or so, 99.95% or more purity of argon, welding arc voltage electric current is 205-225, speed of welding 70- 80mm/min;
(4) internal capping:Using manual carbon dioxide and argon gas gaseous mixture gas shielded arc welding, welding wire is ¢ 1.2mm gas Welding wire is protected, cover welding electric current is 350-360, voltage 35-40;
(5) external capping:6 cappings are carried out to sphere after room temperature cooling 12h, using manual carbon dioxide and argon when capping Gas gaseous mixture gas shielded arc welding, welding wire are ¢ 1.2mm welding wire for gas shielded welding, and preceding 5 cover welding electric currents are 330-350, electricity Pressure is 35-40, and the electric current of last time capping is 350-360, voltage 35-40.
Further, the capping need to carry out sanding and polishing pre-treatment to surface, need to carry out weld seam with low temperature after capping Tempering.
Further, the low temperature is 20-60 DEG C.
The advantage of the invention is that:
A kind of steel tube tower hollow ball of the present invention, internal densely covered longitude and latitude reinforcing rib, stress-bearing capability are strong;
Its welding of hollow sphere internal stiffeners preparation process improves the quality of sphere in the present invention;While hollow ball Welding uses bottom argon arc welding, and the method for multilayer capping is realized, in terms of stress elimination, is tempered using room temperature cooling and destressing The mode combined is realized, the welding defect generated since stress is not eliminated is sufficiently solved, also can preferably solve weld seam due to The welding defects such as non-penetration caused by bevel angle size.
Detailed description of the invention
Fig. 1 is a kind of 1 schematic diagram of steel tube tower hollow ball embodiment of the present invention;
Fig. 2 is a kind of 1 structure top view of steel tube tower hollow ball embodiment of the present invention;
Fig. 3 is a kind of 1 structure top view of steel tube tower hollow ball embodiment of the present invention.
Specific embodiment
The present invention is described in detail below in conjunction with Detailed description of the invention.
Embodiment 1
A kind of steel tube tower hollow ball, the identical hollow hemisphere of two structures including being welded into sphere;
The hollow hemisphere includes sphere 1 and reinforcing rib 2, and reinforcing rib 2 is vertically welded in 1 interior surface of sphere;
The reinforcing rib 2 include broadwise reinforcing rib 21 and waling 22, the broadwise reinforcing rib 21 with it is longitudinally reinforced It is orthogonal between muscle 22;
The broadwise reinforcing rib 21 includes that the first broadwise reinforcing rib 211, the second broadwise reinforcing rib 212 and third broadwise are reinforced Muscle 213, the first broadwise reinforcing rib 211, the second broadwise reinforcing rib 212 and 213 radius of third broadwise reinforcing rib are sequentially increased;
The waling 22 includes first longitudinal direction reinforcing rib 221 and second longitudinal direction reinforcing rib 222, the first longitudinal direction The interval of reinforcing rib 221 is arranged, and the angle between two neighboring first longitudinal direction reinforcing rib 221 is 45 °;The second longitudinal direction reinforcing rib 222 intervals are arranged, and the angle between two neighboring second longitudinal direction reinforcing rib 222 is 45 °.
The first longitudinal direction reinforcing rib 221 and second longitudinal direction reinforcing rib 222 are in the same plane.
The welding preparation process of this steel tube tower hollow ball, step include:
1) welding preparation:All welding surfaces are processed by shot blasting, until leaking out metallic luster;
2) reinforcing rib welds:Reinforcing rib and hollow hemisphere are subjected to counterpart assembly, welded, the welding of reinforcing rib is suitable Sequence is followed successively by:First broadwise reinforcing rib, first longitudinal direction reinforcing rib, the second broadwise reinforcing rib, second longitudinal direction reinforcing rib and third latitude To reinforcing rib, using work carbon dioxide and argon gas gaseous mixture gas shielded arc welding, welding wire is ¢ 1.2mm gas shielded arc welding for the welding Welding wire, welding current 350, voltage 35;
3) hollow ball welds:
(1) preparing steel hollow hemisphere groove is 30 °, is processed by shot blasting to all welding surfaces, until leaking out metal light Two hemispheres of steel tube tower hollow ball are carried out counterpart assembly by pool, and confirm soldered position and its edge without pit And other surface defects;
(2) carbon dioxide and argon gas gaseous mixture gas shielded arc welding, welding wire are the weldering of ¢ 1.2mm gas shielded arc welding by hand first Silk, welding current 330, voltage 35;
(3) one layer of layer of air cooling type argon arc welding gun bottom welding is utilized by the way of climbing welding, welding wire selects ¢ 2.5mm, JQ.TG50 special welding wire;Tungsten electrode is ¢ 3.2mm, is 20L/min when argon flow starts;Argon flow is protected when welding It holds in 20L/min or so, 99.95% or more purity of argon, welding arc voltage electric current is 205, speed of welding 70mm/min;
(4) internal capping:Using manual carbon dioxide and argon gas gaseous mixture gas shielded arc welding, welding wire is ¢ 1.2mm gas Welding wire is protected, cover welding electric current is 350, voltage 35;
(5) external capping:6 cappings are carried out to sphere after room temperature cooling 12h, using manual carbon dioxide and argon when capping Gas gaseous mixture gas shielded arc welding, welding wire are ¢ 1.2mm welding wire for gas shielded welding, and preceding 5 cover welding electric currents are 330, and voltage is 35, the electric current of last time capping is 350, voltage 35-40.
Capping need to carry out sanding and polishing pre-treatment to surface, need to carry out tempering to weld seam with 20 DEG C after capping.
Embodiment 2
A kind of steel tube tower hollow ball, the identical hollow hemisphere of two structures including being welded into sphere, i.e. left hemisphere Body 10 and right hemisphere 20;
The hollow hemisphere includes sphere 1 and reinforcing rib 2, and reinforcing rib 2 is vertically welded in 1 interior surface of sphere;
The reinforcing rib 2 include broadwise reinforcing rib 21 and waling 22, the broadwise reinforcing rib 21 with it is longitudinally reinforced It is orthogonal between muscle 22;
The broadwise reinforcing rib 21 includes that the first broadwise reinforcing rib 211, the second broadwise reinforcing rib 212 and third broadwise are reinforced Muscle 213, the first broadwise reinforcing rib 211, the second broadwise reinforcing rib 212 and 213 radius of third broadwise reinforcing rib are sequentially increased;
The waling 22 includes first longitudinal direction reinforcing rib 221 and second longitudinal direction reinforcing rib 222, the first longitudinal direction The interval of reinforcing rib 221 is arranged, and the angle between two neighboring first longitudinal direction reinforcing rib 221 is 45 °;The second longitudinal direction reinforcing rib 222 intervals are arranged, and the angle between two neighboring second longitudinal direction reinforcing rib 222 is 45 °.
The first longitudinal direction reinforcing rib 221 and second longitudinal direction reinforcing rib 222 are not in the same plane.
The welding preparation process of this steel tube tower hollow ball, step include:
1) welding preparation:All welding surfaces are processed by shot blasting, until leaking out metallic luster;
2) reinforcing rib welds:Reinforcing rib and hollow hemisphere are subjected to counterpart assembly, welded, the welding of reinforcing rib is suitable Sequence is followed successively by:First broadwise reinforcing rib, first longitudinal direction reinforcing rib, the second broadwise reinforcing rib, second longitudinal direction reinforcing rib and third latitude To reinforcing rib, using work carbon dioxide and argon gas gaseous mixture gas shielded arc welding, welding wire is ¢ 1.2mm gas shielded arc welding for the welding Welding wire, welding current 360, voltage 40;
3) hollow ball welds:
(1) preparing steel hollow hemisphere groove is 30 °, is processed by shot blasting to all welding surfaces, until leaking out metal light Two hemispheres of steel tube tower hollow ball are carried out counterpart assembly by pool, and confirm soldered position and its edge without pit And other surface defects;
(2) carbon dioxide and argon gas gaseous mixture gas shielded arc welding, welding wire are the weldering of ¢ 1.2mm gas shielded arc welding by hand first Silk, welding current 350, voltage 40;
(3) one layer of layer of air cooling type argon arc welding gun bottom welding is utilized by the way of climbing welding, welding wire selects ¢ 2.5mm, JQ.TG50 special welding wire;Tungsten electrode is ¢ 3.2mm, is 28L/min when argon flow starts;Argon flow is protected when welding It holds in 20L/min or so, 99.95% or more purity of argon, welding arc voltage electric current is 225, speed of welding 80mm/min;
(4) internal capping:Using manual carbon dioxide and argon gas gaseous mixture gas shielded arc welding, welding wire is ¢ 1.2mm gas Welding wire is protected, cover welding electric current is 360, voltage 40;
(5) external capping:6 cappings are carried out to sphere after room temperature cooling 12h, using manual carbon dioxide and argon when capping Gas gaseous mixture gas shielded arc welding, welding wire are ¢ 1.2mm welding wire for gas shielded welding, and preceding 5 cover welding electric currents are 350, and voltage is 40, the electric current of last time capping is 360, voltage 40.
Capping need to carry out sanding and polishing pre-treatment to surface, need to carry out tempering to weld seam with 60 DEG C after capping.
The integral solder work to ball docking is completed after capping, behind under room temperature natural cooling 26 hours, Ultrasonic flaw detection is carried out to weld seam, through carrying out flaw detection, the first-order weld qualification rate of whole equator weld seam is high.
This steel tube tower hollow ball, internal densely covered longitude and latitude reinforcing rib, stress-bearing capability are strong;Hollow ball inside reinforcing rib its Welding preparation process improves the quality of sphere, while welding has been effectively ensured in the welding procedure of this steel tube tower hollow ball First-time qualification rate prevents from eliminating defect and leading to the generation of other defect, significant increase working efficiency and quality level.In the present There is very big reference function in the weld job of hollow ball afterwards, also can preferably apply to the welding of other welding workpieces.
The foregoing is merely the preferred embodiments of the invention, are not intended to limit the invention creation, all at this Made any modifications, equivalent replacements, and improvements etc., should be included in the invention within the spirit and principle of innovation and creation Protection scope within.

Claims (7)

1. a kind of steel tube tower hollow ball, which is characterized in that two structures including being welded into sphere are identical
Hollow hemisphere;
The hollow hemisphere includes sphere and reinforcing rib, and reinforcing rib is vertically welded in ball interior surface;
The reinforcing rib includes broadwise reinforcing rib and waling, the broadwise reinforcing rib and waling
Between it is orthogonal;
The broadwise reinforcing rib includes the first broadwise reinforcing rib, the second broadwise reinforcing rib and third broadwise reinforcing rib,
The first broadwise reinforcing rib, the second broadwise reinforcing rib and third broadwise reinforcing rib radius are sequentially increased;
The waling includes first longitudinal direction reinforcing rib and second longitudinal direction reinforcing rib, and the first longitudinal direction adds
Strengthening tendons interval is arranged, and the angle between two neighboring first longitudinal direction reinforcing rib is 30-60 °;The second longitudinal direction reinforcing rib Interval is arranged, and the angle between two neighboring second longitudinal direction reinforcing rib is 30-60 °.
2. a kind of steel tube tower hollow ball according to claim 1, which is characterized in that described first is vertical
In the same plane to reinforcing rib and second longitudinal direction reinforcing rib.
3. a kind of steel tube tower hollow ball according to claim 1, which is characterized in that described first is vertical
Not in the same plane to reinforcing rib and second longitudinal direction reinforcing rib.
4. a kind of steel tube tower hollow ball according to claim 1, which is characterized in that described adjacent two
Angle between a first longitudinal direction reinforcing rib is 45 °, and the angle between the two neighboring second longitudinal direction reinforcing rib is 45°。
5. a kind of a kind of such as described in any item welding preparation processes of steel tube tower hollow ball of claim 1-4,
It is characterized by comprising the following steps:
1)Welding preparation:All welding surfaces are processed by shot blasting, until leaking out metallic luster;
2)Reinforcing rib welding:Reinforcing rib and hollow hemisphere are subjected to counterpart assembly, welded, reinforcing rib
Welding sequence be followed successively by:First broadwise reinforcing rib, first longitudinal direction reinforcing rib, the second broadwise reinforcing rib,
Two walings and third broadwise reinforcing rib, the welding is using work carbon dioxide and argon gas gaseous mixture gas
Protection weldering, welding wire are ¢ 1.2mm welding wire for gas shielded welding, welding current 350-360, voltage 35-40;
3)Hollow ball welding:
(1)Preparing steel hollow hemisphere groove is 30 °, is processed by shot blasting to all welding surfaces, until leakage
Two hemispheres of steel tube tower hollow ball carry out counterpart assembly by metallic luster out, and confirm and be soldered
Position and its edge are without pit and other surface defects;
(2)Carbon dioxide and argon gas gaseous mixture gas shielded arc welding, welding wire are ¢ 1.2mm gas by hand first
Protect welding wire, welding current 330-350, voltage 35-40;
(3)One layer of layer of air cooling type argon arc welding gun bottom welding, welding wire choosing are utilized by the way of climbing welding
With ¢ 2.5mm, JQ.TG50 special welding wire;Tungsten electrode is ¢ 3.2mm, is 20-28L/min when argon flow starts;Welding When argon flow be maintained at 20L/min or so, 99.95% or more purity of argon, welding arc voltage electric current is 205-225, weldering Connecing speed is 70-80mm/min;
(4)Internal capping:Using manual carbon dioxide and argon gas gaseous mixture gas shielded arc welding, welding wire ¢
1.2mm welding wire for gas shielded welding, cover welding electric current are 350-360, voltage 35-40;
(5)External capping:6 cappings are carried out to sphere after room temperature cooling 12h, using by hand two when capping
Carbonoxide and argon gas gaseous mixture gas shielded arc welding, welding wire are ¢ 1.2mm welding wire for gas shielded welding, preceding 5 cover weldings Electric current is 330-350, and voltage 35-40, the electric current of last time capping is 350-360, voltage 35-40.
6. a kind of welding preparation process of steel tube tower hollow ball, feature according to claim 5 exist
In the capping need to carry out sanding and polishing pre-treatment to surface, need to be tempered weld seam with low temperature after capping
Processing.
7. a kind of steel tube tower hollow ball according to claim 6 and its welding preparation process, described low
Temperature is 20-60 DEG C.
CN201810611513.4A 2018-06-14 2018-06-14 A kind of steel tube tower hollow ball and its welding preparation process Pending CN108856985A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810611513.4A CN108856985A (en) 2018-06-14 2018-06-14 A kind of steel tube tower hollow ball and its welding preparation process

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810611513.4A CN108856985A (en) 2018-06-14 2018-06-14 A kind of steel tube tower hollow ball and its welding preparation process

Publications (1)

Publication Number Publication Date
CN108856985A true CN108856985A (en) 2018-11-23

Family

ID=64338169

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810611513.4A Pending CN108856985A (en) 2018-06-14 2018-06-14 A kind of steel tube tower hollow ball and its welding preparation process

Country Status (1)

Country Link
CN (1) CN108856985A (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110370881A (en) * 2019-07-31 2019-10-25 天人汽车底盘(芜湖)股份有限公司 A kind of molding high-strength vehicle torsion beam of thermoforming steel making
CN112238283A (en) * 2020-10-26 2021-01-19 广州增立钢管结构股份有限公司 Tower sphere equator seam welding process
CN116220195A (en) * 2023-05-08 2023-06-06 山西六建集团有限公司 Welded hollow ball joint and processing method thereof

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0853880A (en) * 1994-08-11 1996-02-27 Tomoe Corp Joint structure of steel pipe truss
CN101259562A (en) * 2008-03-20 2008-09-10 浙江盛达铁塔有限公司 Welding technique for rolled steel
CN101439433A (en) * 2008-12-24 2009-05-27 浙江盛达铁塔有限公司 Method for automatically soldering steel component filament of large diameter protected by mixture gas
CN201305928Y (en) * 2008-11-27 2009-09-09 浙江省电力设计院 Extra-large welded hollow spherical joint
CN201679093U (en) * 2010-04-06 2010-12-22 温州泰昌铁塔制造有限公司 Steel ball joint of power transmission tower
CN105499819A (en) * 2015-12-31 2016-04-20 扬州大洋造船有限公司 Multifunctional ocean platform supply ship special cabin wall welding method
CN105750823A (en) * 2014-12-13 2016-07-13 重庆迎瑞升压铸有限公司 Hollow ball welding technique
CN106392255A (en) * 2016-10-31 2017-02-15 中车长春轨道客车股份有限公司 Welding control process for vehicle body doorway stand column stress relief hole

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH0853880A (en) * 1994-08-11 1996-02-27 Tomoe Corp Joint structure of steel pipe truss
CN101259562A (en) * 2008-03-20 2008-09-10 浙江盛达铁塔有限公司 Welding technique for rolled steel
CN201305928Y (en) * 2008-11-27 2009-09-09 浙江省电力设计院 Extra-large welded hollow spherical joint
CN101439433A (en) * 2008-12-24 2009-05-27 浙江盛达铁塔有限公司 Method for automatically soldering steel component filament of large diameter protected by mixture gas
CN201679093U (en) * 2010-04-06 2010-12-22 温州泰昌铁塔制造有限公司 Steel ball joint of power transmission tower
CN105750823A (en) * 2014-12-13 2016-07-13 重庆迎瑞升压铸有限公司 Hollow ball welding technique
CN105499819A (en) * 2015-12-31 2016-04-20 扬州大洋造船有限公司 Multifunctional ocean platform supply ship special cabin wall welding method
CN106392255A (en) * 2016-10-31 2017-02-15 中车长春轨道客车股份有限公司 Welding control process for vehicle body doorway stand column stress relief hole

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110370881A (en) * 2019-07-31 2019-10-25 天人汽车底盘(芜湖)股份有限公司 A kind of molding high-strength vehicle torsion beam of thermoforming steel making
CN112238283A (en) * 2020-10-26 2021-01-19 广州增立钢管结构股份有限公司 Tower sphere equator seam welding process
CN112238283B (en) * 2020-10-26 2022-06-24 广州增立钢管结构股份有限公司 Tower sphere equator seam welding process
CN116220195A (en) * 2023-05-08 2023-06-06 山西六建集团有限公司 Welded hollow ball joint and processing method thereof

Similar Documents

Publication Publication Date Title
CN110640277B (en) Q420 high-strength steel thick plate non-preheating double-wire submerged-arc welding process
CN101623790B (en) Welding method of cupronickel weldment
CN108856985A (en) A kind of steel tube tower hollow ball and its welding preparation process
CN103170712B (en) A kind of tube socket fillet weld reheat crack prevention method
CN109967842B (en) Non-preheating submerged arc welding method for EH36 high-strength steel thick plate
CN105195872A (en) Double-sided submerged arc back-chipping-free welding technology for pipeline steel
CN104191072A (en) Welding method of stainless steel clad plate
CN110560849A (en) soft gasket single-side submerged arc welding process for EH36 high-strength steel thick plate
CN101954566A (en) Process for fixedly connecting titanium cooling tube in cooler and radiating fins and titanium tube plate
CN108057940A (en) A kind of welding method of extremely cold area high-performance weatherable bridge steel
CN104259633A (en) Efficient single-side submerged arc welding method
CN106563868A (en) Two-sided welding method for U-shaped ribbed slab unit welding seam
CN107252977A (en) A kind of single fillet welded methods of laser+MIG/MAG
Sidhu et al. Role of shielded metal arc welding consumables on pipe weld joint
Mazuera Robledo et al. Development of a welding procedure for mil a 46100 armor steel joints using gas metal arc welding
CN106270930A (en) Two-side synchronous welding method inside and outside a kind of U rib
CN111347131A (en) CLF-1 and 316L dissimilar steel TIG welding method
CN110449698A (en) A kind of 6-16mm welding method for steel plates
CN103128427A (en) Welding construction method of large cast steel modes under low temperature condition
CN105643061B (en) For the CO of superhigh intensity steel plate2The welding method of gas shielded arc welding
CN111069801B (en) A940 steel single-side welding and double-side forming welding method
CN108788404A (en) A kind of welding procedure of steel tube tower hollow ball equator weld seam
CN114289836A (en) Swing submerged arc welding method suitable for EH47 crack arrest steel
CN110773844B (en) Downward automatic welding method of gas shielded alkaline flux-cored wire for long-distance pipeline
CN110421229A (en) A kind of EH36+CCSB ceramic substrate welding method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181123