CN108846214A - The complete trails optical fiber cable port node traversal search method and its equipment of substation - Google Patents

The complete trails optical fiber cable port node traversal search method and its equipment of substation Download PDF

Info

Publication number
CN108846214A
CN108846214A CN201810640292.3A CN201810640292A CN108846214A CN 108846214 A CN108846214 A CN 108846214A CN 201810640292 A CN201810640292 A CN 201810640292A CN 108846214 A CN108846214 A CN 108846214A
Authority
CN
China
Prior art keywords
port
complete trails
optical fiber
fiber cable
substation
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810640292.3A
Other languages
Chinese (zh)
Inventor
高旭
杜延菱
马迎新
张兆广
杜丽艳
庄博
武同心
吴炜
吕铭刚
刘海涛
郝怡鹏
靳智嵩
张斯梁
于彬
曾剑锋
刘少情
卢德宏
杜杨华
汤小兵
陆小荣
蔡宇翔
孙泽
石磊
毛春岳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Sp Nice Technology Development Ltd By Share Ltd
State Grid Corp of China SGCC
State Grid Jibei Electric Power Co Ltd
Original Assignee
Nanjing Sp Nice Technology Development Ltd By Share Ltd
State Grid Corp of China SGCC
State Grid Jibei Electric Power Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Sp Nice Technology Development Ltd By Share Ltd, State Grid Corp of China SGCC, State Grid Jibei Electric Power Co Ltd filed Critical Nanjing Sp Nice Technology Development Ltd By Share Ltd
Priority to CN201810640292.3A priority Critical patent/CN108846214A/en
Publication of CN108846214A publication Critical patent/CN108846214A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/18Network design, e.g. design based on topological or interconnect aspects of utility systems, piping, heating ventilation air conditioning [HVAC] or cabling
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/30Circuit design
    • G06F30/36Circuit design at the analogue level
    • G06F30/367Design verification, e.g. using simulation, simulation program with integrated circuit emphasis [SPICE], direct methods or relaxation methods

Abstract

The invention discloses a kind of complete trails optical fiber cable port nodes of substation to traverse search method, includes the following steps:The SPCD file of the element including optical cable inventory and design drawing is formed by the way of physical modeling;Physics complete trails relationship is combed out by device port involved in the SPCD file and its optical fiber cable circuit information in such a way that SCD file is index, is retrieved using traversal.The invention also discloses a kind of complete trails optical fiber cable port nodes of substation to traverse retrieval facility.By above embodiment, while providing intelligent substation optical fiber cable physics complete trails and effectively describing means, logical links is improved with physical loop and matches accuracy, a large amount of manual operations is also avoided, has saved a large amount of time.

Description

The complete trails optical fiber cable port node traversal search method and its equipment of substation
Technical field
The present invention relates to electrical equipment technical field more particularly to a kind of complete trails optical fiber cable port nodes of substation Traverse search method and its equipment.
Background technique
That generallyd use due to current power industry is SCD (Substation Configuration Description) Model file describes first and second equipment of intelligent substation and its information that interconnects as transformer substation system configuration file, But lack the file that intelligent substation optical fiber cable physics complete trails can be fully described out.Therefore, intelligent power transformation how is established Stand optical fiber cable physical loop configuration file, realize SCD model file port matching be practice function key point and Difficult point.
Currently, the main use technological means to solve the above problems has:Optical fiber addressing, optical cable inventory, design drawing, manually The methods of check.However:
1. the mode of optical fiber addressing then can not be combed out accurately in the case where the cascade situation of multi-exchange occurs in intelligent substation Physics complete trails, leads to that there are a large amount of error situations;
2. optical cable inventory uses excel file, design drawing, both can not be with intelligent substation using cad file SCD model is merged, and can not be directly effectively matched the logical links of intelligent substation with physical loop;
3. checking then bring huge workload manually, it will take a lot of manpower and time.
Summary of the invention
The present invention provides a kind of complete trails optical fiber cable port node traversal inspection of substation to solve above-mentioned technical problem Suo Fangfa and its equipment, while providing intelligent substation optical fiber cable physics complete trails and effectively describing means, raising is patrolled It collects link and matches accuracy with physical loop, also avoid a large amount of manual operations, saved a large amount of time.
In order to solve the above technical problems, the present invention provides a kind of complete trails optical fiber cable port node traversal inspection of substation Suo Fangfa includes the following steps:The SPCD of the element including optical cable inventory and design drawing is formed by the way of physical modeling File;By device port and its light involved in the SPCD file in such a way that SCD file is index, is retrieved using traversal Fine optical cable circuit information combs out physics complete trails relationship.
Further, after the step of combing out physics complete trails relationship, including:By the physics complete trails relationship with Patterned mode is shown.
Further, in the SPCD text for forming the element including optical cable inventory and design drawing by the way of physical modeling Among the step of part, specifically:According to the element of the optical cable inventory, design drawing and substation equipment, the element of fine cable Building intelligent substation optical fiber cable physics complete trails model forms the SPCD file in turn.
Further, the element of the optical cable inventory, design drawing and substation equipment includes title, board, port; The element of the fibre cable includes title, type, number, length, core number.
Further, by being set involved in the SPCD file in such a way that SCD file is index, is retrieved using traversal Among the step of standby port and its optical fiber cable circuit information comb out physics complete trails relationship, including:
Received input data set is retrieved by the logical links of the SCD file, is determined and is received according to the input data set Equipment and sending device, while counting the connection relationship quantity N between the receiving device and sending device;By described defeated Enter the receiving port that data set determines receiving device;Association is retrieved in SPCD file by the receiving port of the receiving device Physical loop;The port of opposite equip. is retrieved in SPCD file by the association physical loop retrieved;Described in judgement Opposite equip. whether be IED type equipment;If the opposite equip. is the equipment of IED type, checks the opposite end and set It is standby whether consistent with sending device;If check result is consistent, a physics complete trails combing is completed;It is set according to the reception The standby connection relationship quantity N between sending device is repeated(N-1)Secondary above-mentioned steps, until completion is to the receiving device and respectively The combing of every physics complete trails between sending device.
Further, the port of opposite equip. is retrieved in SPCD file in the association physical loop by retrieving The step of after, judge the step of whether opposite equip. is the equipment of IED type before, including:Judge that the opposite end is set Whether standby be interchanger;If the opposite equip. is not interchanger, judge whether the opposite equip. is light with frame;If The opposite equip. is not light with frame, then enters the step of whether opposite equip. is the equipment of IED type judged.
Further, judging whether the opposite equip. is among the step of light is with frame, if the opposite equip. is Light matches frame, then continues to retrieve the opposite side port that light matches frame in the SPCD file, subsequently enter through the receiving device Receiving port retrieves the step of association physical loop in SPCD file.
Further, judging among the step of whether opposite equip. is interchanger, if the opposite equip. is Interchanger then traverses the port of the interchanger, while counting the port number X of the interchanger, and enters logical The receiving port for crossing the receiving device retrieves the step of being associated with physical loop in SPCD file;Judging the opposite equip. Among the step of whether being the equipment of IED type, if the opposite equip. is not the equipment of IED type, according to the friendship The port number X maximum changed planes may be repeated the receiving port that X times enters through the receiving device and examine in SPCD file The step of Suo Guanlian physical loop, until the port that one physics complete trails of completion combed or traversed the interchanger is not looked for yet To physics complete trails.
In order to solve the above technical problems, the present invention also provides a kind of computer readable storage medium, it is described computer-readable Storage medium is stored with computer program, realizes when the computer program is executed by processor such as any of the above-described embodiment institute The complete trails optical fiber cable port node of the substation stated traverses the step of search method.
In order to solve the above technical problems, the present invention also provides a kind of complete trails optical fiber cable port node of substation traversals Retrieval facility, including:Generation unit, for forming the element including optical cable inventory and design drawing by the way of physical modeling SPCD file;And Traversal Unit, for passing through the SPCD text in such a way that SCD file is index, is retrieved using traversal Device port involved in part and its optical fiber cable circuit information comb out physics complete trails relationship.
The complete trails optical fiber cable port node traversal search method and its equipment of substation of the invention, have has as follows Beneficial effect:
By the way of constructing physical model, the optical fiber cable physics complete trails of intelligent substation is fully described out, be standardized The standardization of intelligent substation optical fiber cable circuit designing unit, manufacturer has unified intelligent substation from construction to fortune Description of each stage to optical fiber cable is tieed up, the convenience of work is improved;Meanwhile it ensure that using traversal searching algorithm in intelligence Substation occurs accurately combing out optical fiber cable physics complete trails in the cascade situation of multi-exchange, avoids a large amount of The phenomenon that error;Therefore it can save time, manpower, improve work efficiency;
In addition, using the patterned mode of complete trails can directviewing description smart substation equipment, optical fiber cable complete trails and its The information carried solves the dependence of the design drawing in maintenance work to the optical cable inventory of excel format, CAD format.
Detailed description of the invention
Fig. 1 is the process of the complete trails optical fiber cable port node traversal search method first embodiment of substation of the present invention Figure.
Fig. 2 is the process of the complete trails optical fiber cable port node traversal search method second embodiment of substation of the present invention Figure.
Fig. 3 is the structural frames of the complete trails optical fiber cable port node traversal retrieval facility embodiment of substation of the present invention Figure.
Specific embodiment
The present invention is described in detail with embodiment with reference to the accompanying drawing.
Referring to Fig. 1, the present invention provides a kind of complete trails optical fiber cable port node traversal search method of substation.It should Method includes the following steps:
Step S1 forms the SPCD file of the element including optical cable inventory and design drawing by the way of physical modeling.
Specifically, step S1 is mainly according to the member of the element of optical cable inventory, design drawing and substation equipment, fine cable Element building intelligent substation optical fiber cable physics complete trails model and then formation SPCD file.The building of the physics complete trails model After the completion, it can be used for a long time, be not usually required to again pull up.
Wherein, the element of optical cable inventory, design drawing and substation equipment includes title, board, port.The member of fine cable Element includes title, type, number, length, core number.
Step S2, by device port involved in SPCD file in such a way that SCD file is index, is retrieved using traversal And its optical fiber cable circuit information combs out physics complete trails relationship.
And step S3, physics complete trails relationship is shown in a manner of patterned.
Specifically, step S3 is by the smart substation equipment that automatic carding comes out, optical fiber cable complete trails and its is held The information of load is intuitively shown in a manner of patterned.
It carries out in conjunction with Fig. 2 refering to step S2 being described in detail below, cardinal principle is from receiving device side It is reversed to find sending device side, complete the combing of the connection relationship of all associate devices physically between the rwo.It is specific and Speech, step S2 include:
Step S201 retrieves received input data set by the logical links of SCD file, and determines that receiving device and transmission are set It is standby, while counting the connection relationship quantity N between receiving device and sending device.Wherein, receiving device usually only one, Sending device is usually one or more.
Step S202 determines the receiving port of receiving device according to the input data set in SCD file.
Step S203 retrieves association physical loop by the receiving port of receiving device in SPCD file.
Step S204 retrieves the port of opposite equip. by the association physical loop retrieved in SPCD file.
Step S205 judges whether opposite equip. is IED (Intelligent Electronic Device, intelligent electric power Monitoring device, mainly include protective device, measure and control device, combining unit, intelligent terminal, fault oscillograph, Network Analyzer, Timing device, monitoring device, telecontrol equipment) type equipment.
If judgement show that opposite equip. is the equipment of IED type in step S205, S206 is entered step.
Whether consistent with predetermined sending device step S206 checks opposite equip..
Wherein, whether the port description for mainly checking opposite equip. is consistent with link signal.The port describes usual source In the inputs data set of SCD file(That is input data set)The partial character of information, such as 1-A character indicate the end 1# board A Mouthful, which is typically derived from the APPID field description of SCD file.
If judgement show that check result is consistent in step S206, S207 is entered step.
Step S207 completes a physics complete trails combing.After step S207, S212 is entered step.
In a preferred embodiment, specifically, further including after step S205, before step S206:
Step S208 judges whether opposite equip. is interchanger(Switch).
If judgement show that opposite equip. is not interchanger in step S208, S209 is entered step.If in step Judgement show that opposite equip. is interchanger in S208, then enters step S210.
Step S209 judges whether opposite equip. is light with frame(ODF).
If it is light with frame that judgement, which obtains opposite equip. not, in step S209, enters aforementioned step S205, that is, sentence Disconnected opposite equip. whether be IED type equipment.If judgement show that opposite equip. is light with frame in step S209, enter Step S211.
Step S210 traverses the port of interchanger, while counting the port number X of interchanger.In the step After S210, S203 is entered step.The purpose of step S210 setting is:Interchanger all of the port is found out, and according to interchanger The connection relationship of port continues to be found toward opposite equip.(It is found using tree root → branch → leaf branch's principle pair End equipment)And then comb out physics complete trails.
Step S211 continues to retrieve opposite side port in SPCD file.Then it is again introduced into step S203.The opposite side port Namely light matches the receiving port of the frame other end.
Step S212, counts n=n-1, and the initial value of n is Y.
Step S213, judges whether n is greater than 0.If n > 0(It indicates not comb there are also physics complete trails), then reenter Step S202, to continue comb to the physics complete trails between receiving device and remaining sending device until completing to reception The combing of every physics complete trails between equipment and each sending device;Otherwise, i.e. n≤0(Indicate whole physics complete trails all by It combed), then terminate entirely to traverse retrieval flow.
In addition, being entered step if it is the equipment of IED type that judgement, which obtains opposite equip. not, in above-mentioned steps S205 S214, the i.e. initial value of counting x=x-1, x are X.
Step S215, judges whether x is greater than 0.If x > 0(Indicating the port not is the last one port of interchanger), S203 is then entered step, until completing a physics complete trails combing;Otherwise, i.e. x≤0(Indicate that the port has been interchanger The last one port), it is judged as that physics complete trails is not found in the port for having traversed interchanger yet(Namely interchanger all of the port Associated device is not all found, path has exception), and terminate entire traversal retrieval flow.Wherein, enter step S203's Number at most can be X times, i.e., traverse to each port, certainly, if completing a physics in less than X times repetition Complete trails combing, the physics complete trails combing between receiving device and one of them sending device terminate in advance, into connecing Physics complete trails between receiving unit and remaining sending device combs process.
In above-described embodiment, judge opposite equip. whether be interchanger, light with frame or IDE type equipment the step of Sequence can be arranged and execute on demand, not it should be understood that in being only limitted to foregoing description or sequence shown in the drawings execution.
Wherein, the case where above-described embodiment may include the cascade of interchanger multilayer, at this point, using by the way of nested recycle pairs The port of the interchanger of each level carries out traversal retrieval.For example, there is the 1st level interchanger(Directly connect with receiving device The interchanger connect), the 2nd level interchanger of Single port that is connected on the 1st level interchanger(By the 2nd level interchanger with The interchanger that receiving device is indirectly connected with)... and it is connected to the m level exchange of the Single port on m-1 level interchanger Machine, the port number of the 1st level interchanger are X1, the port number of the 2nd level interchanger is X2... m-1 level interchanger Port number is Xm-1, the port number of m level interchanger is Xm.Wherein, for convenience of description, citing only there is the 1st level to hand over It changes planes and the 2nd level interchanger, traversal process is as follows:
The port in the 1st level interchanger is traversed, when traversing the port is to connect the port of the 2nd level interchanger, pause To the traversal of the port in the 1st level interchanger, start to traverse the port of the 2nd level interchanger, be handed over when to the 2nd level After the completion of all of the port traversal changed planes, it is further continued for traversing remaining port in the 1st level interchanger.Certainly, work as grade In the case where joining more level interchangers, the principle followed is about:First complete all ends of the interchanger minimum to level The traversal of mouth, then the traversal ... of all of the port of the interchanger low to level time is completed until completing to the highest interchanger of level All of the port traversal, wherein the level highest for defining the 1st level interchanger, and in the feelings for not meeting other exit criterias All interchangers are completed to traverse according to above-mentioned principle under condition.
The present invention also provides a kind of computer readable storage medium, which has computer journey Sequence realizes the complete trails optical fiber cable port of the substation such as any of the above-described embodiment when computer program is executed by processor The step of node traverses search method.
Referring to Fig. 3, the present invention also provides a kind of complete trails optical fiber cable port nodes of substation to traverse retrieval facility, The complete trails optical fiber cable port node traversal retrieval facility of the substation includes generation unit 1 and Traversal Unit 2.
Wherein, generation unit 1, for forming the member including optical cable inventory and design drawing by the way of physical modeling The SPCD file of element.The Traversal Unit 2, for passing through SPCD file institute as index, by the way of traversal retrieval using SCD file The device port and its optical fiber cable circuit information being related to comb out physics complete trails relationship.
In one embodiment, the complete trails optical fiber cable port node traversal retrieval facility of the substation further includes figure Shape unit 3.The graphical unit 3, for physics complete trails relationship to be shown in a manner of patterned.
The complete trails optical fiber cable port node traversal search method and its equipment of substation of the invention, have has as follows Beneficial effect:
By the way of constructing physical model, the optical fiber cable physics complete trails of intelligent substation is fully described out, be standardized The standardization of intelligent substation optical fiber cable circuit designing unit, manufacturer has unified intelligent substation from construction to fortune Description of each stage to optical fiber cable is tieed up, the convenience of work is improved;Meanwhile it ensure that using traversal searching algorithm in intelligence Substation occurs accurately combing out optical fiber cable physics complete trails in the cascade situation of multi-exchange, avoids a large amount of The phenomenon that error;Therefore it can save time, manpower, improve work efficiency;
In addition, using the patterned mode of complete trails can directviewing description smart substation equipment, optical fiber cable complete trails and its The information carried solves the dependence of the design drawing in maintenance work to the optical cable inventory of excel format, CAD format.
The above is only embodiments of the present invention, are not intended to limit the scope of the invention, all to utilize the present invention Equivalent structure or equivalent flow shift made by specification and accompanying drawing content is applied directly or indirectly in other relevant technologies Field is included within the scope of the present invention.

Claims (10)

1. a kind of complete trails optical fiber cable port node of substation traverses search method, which is characterized in that include the following steps:
The SPCD file of the element including optical cable inventory and design drawing is formed by the way of physical modeling;
By device port and its light involved in the SPCD file in such a way that SCD file is index, is retrieved using traversal Fine optical cable circuit information combs out physics complete trails relationship.
2. the complete trails optical fiber cable port node of substation according to claim 1 traverses search method, feature exists In:
After the step of combing out physics complete trails relationship, including:By the physics complete trails relationship in a manner of patterned It is shown.
3. the complete trails optical fiber cable port node of substation according to claim 1 traverses search method, feature exists In:
It is being formed by the way of physical modeling among the SPCD file for including the steps that the element of optical cable inventory and design drawing, Specifically:Intelligent substation is constructed according to the element of the element of the optical cable inventory, design drawing and substation equipment, fine cable Optical fiber cable physics complete trails model and then formation SPCD file.
4. the complete trails optical fiber cable port node of substation according to claim 1 traverses search method, feature exists In:
The element of the optical cable inventory, design drawing and substation equipment includes title, board, port;The member of the fibre cable Element includes title, type, number, length, core number.
5. the complete trails optical fiber cable port node of substation according to claim 1 traverses search method, feature exists In:
By device port and its light involved in the SPCD file in such a way that SCD file is index, is retrieved using traversal Fine optical cable circuit information combed out among the step of physics complete trails relationship, including:
Received input data set is retrieved by the logical links of the SCD file, is determined and is received according to the input data set Equipment and sending device, while counting the connection relationship quantity N between the receiving device and sending device;
The receiving port of receiving device is determined by the input data set;
Association physical loop is retrieved in SPCD file by the receiving port of the receiving device;
The port of opposite equip. is retrieved in SPCD file by the association physical loop retrieved;
Judge the opposite equip. whether be IED type equipment;
If the opposite equip. is the equipment of IED type, whether consistent with sending device the opposite equip. is checked;
If check result is consistent, a physics complete trails combing is completed;
It is repeated according to the connection relationship quantity N between the receiving device and sending device(N-1)Secondary above-mentioned steps, until completing Combing to every physics complete trails between the receiving device and each sending device.
6. the complete trails optical fiber cable port node of substation according to claim 5 traverses search method, feature exists In:
After the step of association physical loop by retrieving retrieves the port of opposite equip. in SPCD file, sentence Before the step of whether opposite equip. that breaks is the equipment of IED type, including:
Judge whether the opposite equip. is interchanger;
If the opposite equip. is not interchanger, judge whether the opposite equip. is light with frame;
If the opposite equip. is not light with frame, enter judge the opposite equip. whether be IED type equipment step Suddenly.
7. the complete trails optical fiber cable port node of substation according to claim 6 traverses search method, feature exists In:
Judging whether the opposite equip. is, if the opposite equip. is light with frame, to continue among the step of light is with frame The opposite side port that light matches frame is retrieved in the SPCD file, subsequently enters the receiving port by the receiving device in SPCD In file the step of retrieval association physical loop.
8. the complete trails optical fiber cable port node of substation according to claim 7 traverses search method, feature exists In:
Judging among the step of whether opposite equip. is interchanger, if the opposite equip. is interchanger, to institute The port for stating interchanger is traversed, while counting the port number X of the interchanger, and enter through the receiving device Receiving port retrieved in SPCD file association physical loop the step of;
Judging among the step of whether opposite equip. is the equipment of IED type, if the opposite equip. is not IED class The equipment of type then may be repeated X times according to the port number X maximum of the interchanger and enter through connecing for the receiving device Receiving end mouth retrieves the step of association physical loop in SPCD file, until completing a physics complete trails combing or having traversed institute Physics complete trails is not found yet in the port for stating interchanger.
9. a kind of computer readable storage medium, it is characterised in that:
The computer-readable recording medium storage has computer program, realizes such as when the computer program is executed by processor The complete trails optical fiber cable port node of substation according to any one of claims 1 to 8 traverses the step of search method.
10. a kind of complete trails optical fiber cable port node of substation traverses retrieval facility, which is characterized in that including:
Generation unit, for forming the SPCD text of the element including optical cable inventory and design drawing by the way of physical modeling Part;
And Traversal Unit, for passing through involved by the SPCD file in such a way that SCD file is index, is retrieved using traversal Device port and its optical fiber cable circuit information comb out physics complete trails relationship.
CN201810640292.3A 2018-06-21 2018-06-21 The complete trails optical fiber cable port node traversal search method and its equipment of substation Pending CN108846214A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810640292.3A CN108846214A (en) 2018-06-21 2018-06-21 The complete trails optical fiber cable port node traversal search method and its equipment of substation

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810640292.3A CN108846214A (en) 2018-06-21 2018-06-21 The complete trails optical fiber cable port node traversal search method and its equipment of substation

Publications (1)

Publication Number Publication Date
CN108846214A true CN108846214A (en) 2018-11-20

Family

ID=64203099

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810640292.3A Pending CN108846214A (en) 2018-06-21 2018-06-21 The complete trails optical fiber cable port node traversal search method and its equipment of substation

Country Status (1)

Country Link
CN (1) CN108846214A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109617746A (en) * 2019-01-17 2019-04-12 广东电网有限责任公司 A kind of SCD network configuration method of calibration based on SPCD file
CN112803304A (en) * 2021-03-03 2021-05-14 中国电力工程顾问集团中南电力设计院有限公司 Cable laying method
CN113536740A (en) * 2021-07-16 2021-10-22 国网河北省电力有限公司电力科学研究院 Method and terminal for generating SPCD file based on SCD file
WO2022083416A1 (en) * 2020-10-19 2022-04-28 许继集团有限公司 Virtual and real combined panoramic visualization method and device for substation communication network

Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120173035A1 (en) * 2009-09-10 2012-07-05 Rikiya Abe Multi-terminal power conversion device, multi-terminal power transfer device, and power network system
CN104732021A (en) * 2015-03-17 2015-06-24 国家电网公司 Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation
CN105931132A (en) * 2016-04-20 2016-09-07 中国能源建设集团江苏省电力设计院有限公司 Intelligent substation secondary system physical circuit file complete path analysis method
CN107565693A (en) * 2017-09-28 2018-01-09 国网青海省电力公司 The visualization system and method for visualizing of the optical fiber circuit of intelligent substation

Patent Citations (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20120173035A1 (en) * 2009-09-10 2012-07-05 Rikiya Abe Multi-terminal power conversion device, multi-terminal power transfer device, and power network system
CN104732021A (en) * 2015-03-17 2015-06-24 国家电网公司 Secondary system physical loop modeling and void and actuality correspondence method of intelligent substation
CN105931132A (en) * 2016-04-20 2016-09-07 中国能源建设集团江苏省电力设计院有限公司 Intelligent substation secondary system physical circuit file complete path analysis method
CN107565693A (en) * 2017-09-28 2018-01-09 国网青海省电力公司 The visualization system and method for visualizing of the optical fiber circuit of intelligent substation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
高磊等: "智能变电站二次系统物理回路建模方法及设计实现", 《电力系统保护与控制》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109617746A (en) * 2019-01-17 2019-04-12 广东电网有限责任公司 A kind of SCD network configuration method of calibration based on SPCD file
WO2022083416A1 (en) * 2020-10-19 2022-04-28 许继集团有限公司 Virtual and real combined panoramic visualization method and device for substation communication network
CN112803304A (en) * 2021-03-03 2021-05-14 中国电力工程顾问集团中南电力设计院有限公司 Cable laying method
CN113536740A (en) * 2021-07-16 2021-10-22 国网河北省电力有限公司电力科学研究院 Method and terminal for generating SPCD file based on SCD file

Similar Documents

Publication Publication Date Title
CN108846214A (en) The complete trails optical fiber cable port node traversal search method and its equipment of substation
CN104468191A (en) Electric power telecommunication fault early warning method and system based on time window and network model
CN108199879B (en) Method for forming intelligent station process layer network topology based on SPCD and SCD
CN112834865B (en) Quick fault finder for secondary circuit of power system
CN107563023A (en) A kind of nuclear power plant's three-dimensional Design of Cable Layout system and method
CN109299160B (en) Power CPS security analysis method based on monitoring big data mining
CN116500385B (en) Power transmission network monitoring and checking method, device, equipment and medium
CN108054719A (en) Intelligent substation networking secondary circuit modeling method and method for diagnosing faults
CN115441448A (en) Power conversion and supply verification method, device and equipment for power distribution network line and storage medium
CN117112630A (en) Topological structure generation method, device and equipment of power grid data and storage medium
CN107517079B (en) Power communication optical path alternate path analysis method and device
CN115297048B (en) Routing path generation method and device based on optical fiber network
CN115689181A (en) Method, system and non-transitory computer readable medium for error proofing of power system
CN114567562A (en) Method for identifying key nodes of coupling network of power grid and communication network
CN111352818B (en) Application program performance analysis method and device, storage medium and electronic equipment
CN111950104A (en) Resource management method and system for optical cable core pulling
CN116432353A (en) Method, device, equipment and medium for generating planned CIM (common information model) of power distribution network
Wang et al. Operation and maintenance technology of smart substations
CN113761781B (en) Distributed protection device model sharing method and device based on ant colony algorithm
CN116628275B (en) Method for realizing bidirectional conversion between graph database and standardized topology
CN112488337B (en) Intelligent auxiliary overhaul flow analysis method and system
JP4562125B2 (en) Medium inventory totalizing apparatus and method, and program
CN116632826A (en) Method and device for processing problems of power distribution network, electronic equipment and storage medium
CN116595713A (en) SCD process layer virtual loop configuration method and system based on standard virtual loop model
CN113138858A (en) Data processing method and device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181120