CN108843866A - A kind of connection method of high-temperature service adapter tube - Google Patents

A kind of connection method of high-temperature service adapter tube Download PDF

Info

Publication number
CN108843866A
CN108843866A CN201810862204.4A CN201810862204A CN108843866A CN 108843866 A CN108843866 A CN 108843866A CN 201810862204 A CN201810862204 A CN 201810862204A CN 108843866 A CN108843866 A CN 108843866A
Authority
CN
China
Prior art keywords
welding
ribs
connection method
adapter tube
supervisor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810862204.4A
Other languages
Chinese (zh)
Inventor
陈敬
陈敬一
王槐春
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu New Hengji Special Equipment Co Ltd
Original Assignee
Jiangsu New Hengji Special Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu New Hengji Special Equipment Co Ltd filed Critical Jiangsu New Hengji Special Equipment Co Ltd
Priority to CN201810862204.4A priority Critical patent/CN108843866A/en
Publication of CN108843866A publication Critical patent/CN108843866A/en
Pending legal-status Critical Current

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F16ENGINEERING ELEMENTS AND UNITS; GENERAL MEASURES FOR PRODUCING AND MAINTAINING EFFECTIVE FUNCTIONING OF MACHINES OR INSTALLATIONS; THERMAL INSULATION IN GENERAL
    • F16LPIPES; JOINTS OR FITTINGS FOR PIPES; SUPPORTS FOR PIPES, CABLES OR PROTECTIVE TUBING; MEANS FOR THERMAL INSULATION IN GENERAL
    • F16L13/00Non-disconnectible pipe-joints, e.g. soldered, adhesive or caulked joints
    • F16L13/02Welded joints

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Butt Welding And Welding Of Specific Article (AREA)

Abstract

A kind of connection method of high-temperature service adapter tube, it is characterised in that it includes the following steps:The Zhi Guanti that will need to be connected first(1)Root formed ribs(2), and thinned place is formed in the outer ring of ribs(3), then place is being thinned(3)Outer ring formed pedestal groove(4);Secondly, being responsible for(5)Connecting portion is processed to be formed and pedestal groove(4)The welding groove of matching;Third, by Zhi Guanti(1)And supervisor(5)Butt welding forms butt weld together.The present invention has the characteristics that uniform force, the factor of stress concentration are small, bearing capacity is high;And pedestal and supervisor(5)Welding, welding position are transferred to the connection at supervisor position from the connection of adapter tube and supervisor, fillet weld are converted to butt weld, performance is greatly improved.

Description

A kind of connection method of high-temperature service adapter tube
Technical field
The present invention relates to a kind of connection methods of high-temperature service adapter tube, belong to pipe fitting welding technical field.Pass through The pedestal of branch pipe welded directly to the run pipe is responsible for connect, suitable for the use under the complex working conditions such as high temperature under petroleum and petrochemical industry.
Background technique
Pipe branch pipe fitting can be divided into two kinds of common forms of threeway and branch holder.Threeway type in domestic industry pipeline It is various, in the past usually using forms such as casting three-way, welding tee, extruded piping branch tees.Threeway is normal in novel pipe-line system With component, but relative under worst hot case system, general casting three-way, welding tee and extruded piping branch tee, which are not able to satisfy, to be made With requiring, the either distribution of welding stress or shape stress can all cause the failure of product at high temperature.Therefore, it sends out The connection structure of bright this suitable high-temperature service adapter tube makes welding position be transferred to supervisor from the connection of adapter tube and supervisor Fillet weld is converted to butt weld by the connection at position, and uniform force, the factor of stress concentration are small, bearing capacity is high, satisfaction pair The requirement of 100% ray detection of weld seam.
Forging and machining adapter tube are suitable for being pressurized under the operating condition more, situation is more complex;Built-up welding is molding to be connect Guan Ze can be used in the better simply pipe-line system of operating condition.
Summary of the invention
The purpose of the present invention is, in complex conditions such as top load, high temperature, be unable to satisfy for traditional pipe fitting connection type The problem of requirement, invents a kind of connection type of high-temperature service adapter tube, constructs based on ASME NC-3643.4 (a) reinforcement of -1 extruding outlet, innovative design is completed on traditional adapting method.
The technical scheme is that:
A kind of connection method of high-temperature service adapter tube, it is characterised in that it includes the following steps:The branch pipe that will need to be connected first The root of body 1 forms ribs 2, and is formed in the outer ring of ribs and place 3 is thinned, then forms pedestal slope in the outer ring that place 3 is thinned Mouth 4;Secondly, processing the welding groove to be formed and be matched with pedestal groove 4 being responsible for 5 connecting portions;Third, by Zhi Guanti 1 and master 5 butt welding of pipe forms butt weld together.
The ribs is made and to be formed by forging, machining or weld metal built-up welding.
When the described Zhi Guanti pressure-bearing, shoulder inner wall is maximum stress intensity distributed area, passes through and increases ribs 2 and branch The tube body angle axis angle θ suitably increases inside and outside radius of corner R1 and R2, can effectively reduce branch pipe base inner wall corner and shoulder The stress intensity that portion is subject to.
The thinned place 3 is in up-small and down-big cone structure.
As shown in Figure 1, a kind of connection method of suitable high-temperature service adapter tube, it is characterised in that the knot of shown connection type Structure includes Zhi Guanti 1, ribs 2, the thinned place 3 of pedestal and pedestal groove 4.Its transition portion is ribs 2, and base end is subtracted It is thin make be responsible for wall thickness it is equal with pedestal wall thickness, and pedestal 2 by pedestal groove 4 and supervisor ontology 3 welding so that welding position from The connection of adapter tube and supervisor are transferred to the connection at supervisor position, fillet weld are converted to butt weld, weld seam position passes through 100% Ray detects whether it meets performance requirement.
According to the applicant's test research and analysis shows, the Zhi Guanti 1 in pressure-bearing, answer for maximum by shoulder inner wall It power intensity distribution area can by suitably increasing changeover portion angle theta angle at Fig. 1 or suitably increasing inside and outside radius of corner R1 and R2 Effectively to reduce the stress intensity that 2 inner wall corner of branch pipe pedestal and shoulder are subject to.
Ribs shown in Fig. 1 is made of the method that can be applied by forging, machining or weld metal heap.Forging and machine The adapter tube of machine-shaping is suitable for being pressurized under the operating condition more, situation is more complex;The molding adapter tube of built-up welding then can be used in work In the better simply pipe-line system of condition.
This structure type of the adapter tube eliminates the irregular and shape mutation of weld seam, shifts welding position, eliminates Originally dog-ear position welding fabrication bring shape stress and welding stress shown in Fig. 2, elimination increase in high-load region The possibility of weld seam, while the creep that weld seam generates under metal temperature is also eliminated, guarantee adapter tube in high temperature, top load environment Safe and reliable operation down.
Fillet weld is changed into butt weld by the connection type, and fillet weld has molten metal reactor to apply on one side, do not have on one side Have, compared with the butt weld of through welding, aspect of performance can be lower, it is difficult to meet Product Acceptance Review requirement.
The adapter tube pedestal is thinned while guaranteeing wall thickness, also to guarantee the intact of tube body inner arc, reduction pair at outer arc The influence of tube fluid.
The beneficial effects of the invention are as follows:
The configuration of the present invention is simple, it is easily molded, supervisor with, mutually to pass through connection, butt weld is convenient for square using ray detection etc. between branch pipe Method carry out volume inspection, effectively increase the safety of structure, and meet inservice inspection reachability requirements, meet top load and Use under the complex working conditions such as high temperature.
Detailed description of the invention
Fig. 1 is adapter tube attachment structure schematic diagram of the invention.
Fig. 2 is the contrast schematic diagram of connection type and prior welding mode of the invention.
Specific embodiment
The present invention is further illustrated with reference to the accompanying drawings and detailed description.
As shown in Figs. 1-2.
A kind of connection method of high-temperature service adapter tube, it includes the following steps:First by the root for the Zhi Guanti 1 that need to be connected Portion forms ribs 2, and ribs is made and to be formed by forging, machining or weld metal built-up welding.Ribs 2 and branch pipe body axis Angle theta angle directly affects branch pipe bearing capacity, therefore, when it is implemented, the angle θ is the bigger the better, while can also be by increasing or appropriate Inside and outside radius of corner R1 and R2 is increased effectively to reduce the stress intensity that branch pipe base inner wall corner and shoulder are subject to., It is secondary, the thinned place 3 of positive cone-shaped should be formed in the outer ring of ribs, third forms pedestal groove 4 in the outer ring that place 3 is thinned;The Four, the welding groove to be formed and be matched with pedestal groove 4 is processed being responsible for 5 connecting portions;Finally, again using conventional welding method Zhi Guanti 1 is formed into butt weld together with 5 butt welding of supervisor.
As shown in Figure 1, the structure that connection method of the invention is used includes Zhi Guanti 1, ribs 2,3 and of the thinned place of pedestal Pedestal groove 4.Its transition portion is ribs 2, and base end, which is thinned, keeps supervisor's wall thickness equal with pedestal wall thickness, and pedestal 2 It is welded by pedestal groove 4 and supervisor's ontology 3, so that welding position is transferred to the company at supervisor position from the connection of adapter tube and supervisor It connects, fillet weld is converted into butt weld, weld seam position detects whether it meets performance requirement by 100% ray.
According to the applicant's test research and analysis shows, the Zhi Guanti 1 in pressure-bearing, answer for maximum by shoulder inner wall It power intensity distribution area can by suitably increasing changeover portion angle theta angle at Fig. 1 or suitably increasing inside and outside radius of corner R1 and R2 Effectively to reduce the stress intensity that 2 inner wall corner of branch pipe pedestal and shoulder are subject to.
Ribs shown in Fig. 1 is made of the method that can be applied by forging, machining or weld metal heap.Forging and machine The adapter tube of machine-shaping is suitable for being pressurized under the operating condition more, situation is more complex;The molding adapter tube of built-up welding then can be used in work In the better simply pipe-line system of condition.Structure type of the invention eliminates the irregular and shape mutation of weld seam, shifts weld part Position is eliminated dog-ear position welding fabrication bring shape stress and welding stress shown in Fig. 2 originally, is eliminated in high-load region The interior possibility for increasing weld seam, while the creep that weld seam generates under metal temperature is also eliminated, guarantee that adapter tube is carried in high temperature, height Safe and reliable operation under lotus environment.Fillet weld is changed into butt weld by the present invention, and fillet weld has molten metal reactor to apply on one side, Do not have on one side, compared with the butt weld of through welding, aspect of performance can be lower, it is difficult to meet Product Acceptance Review requirement.
Present invention adapter tube pedestal is thinned as at outer arc, thick while guaranteeing wall thickness, also guarantee tube body inner arc is intact, The influence to tube fluid is reduced, bearing capacity is greatly strengthened.
Details are as follows:
Embodiments of the present invention can be divided into 5 steps.First according to the extruding outlet of ASME NC-3643.4 (a) -1 Reinforcement and the drawing requirement of client determine the specific size of joint pipe structure, as shown in Figure 1, following construction ginseng can be determined Number:Manifold size D, weld spacing W, ribs angle, θ, mouth of pipe wall thickness t, round radius R1 and fillet radius R2.Such as Shown in Fig. 1, Zhi Guanti 1 is connected with main pipe 5 by butt-welded connection method.The Zhi Guanti 1 with by ribs 2, the pedestal that pedestal is thinned place 3 and pedestal groove 4 forms is monolithic construction, can by forging or mach mode at Shape uses the integrity of 100% ultrasound examination entirety, prepares for lower step process after forming.Then by the knot of forming Pedestal is connected by structure with supervisor's ontology by welding, as shown in Fig. 2, conventional coupling arrangement is fillet weld, is changed into Novel connection type butt weld facilitates detection, and performance is improved, and then polishes weld seam by polishing and carries out to weld seam 100% ray detection meets the requirement of inservice inspection accessibility to guarantee the safety of structure.
Part that the present invention does not relate to is identical as existing technology or can be realized by using the prior art.

Claims (4)

1. a kind of connection method of high-temperature service adapter tube, it is characterised in that it includes the following steps:The branch that will need to be connected first Tube body(1)Root formed ribs(2), and thinned place is formed in the outer ring of ribs(3), then place is being thinned(3)Outer ring Form pedestal groove(4);Secondly, being responsible for(5)Connecting portion is processed to be formed and pedestal groove(4)The welding groove of matching;The Three, by Zhi Guanti(1)And supervisor(5)Butt welding forms butt weld together.
2. connection method according to claim 1, it is characterized in that the ribs passes through forging, machining or weld seam gold Belong to built-up welding to make to be formed.
3. connection method according to claim 1, it is characterized in that shoulder inner wall is maximum when the described Zhi Guanti pressure-bearing Stress intensity distributed area, by increasing ribs(2)With branch pipe body axis angle theta angle or suitably increase inside and outside radius of corner R1 And R2, it can effectively reduce the stress intensity that branch pipe base inner wall corner and shoulder are subject to.
4. connection method according to claim 1, it is characterized in that the thinned place(3)In up-small and down-big conical surface knot Structure.
CN201810862204.4A 2018-08-01 2018-08-01 A kind of connection method of high-temperature service adapter tube Pending CN108843866A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810862204.4A CN108843866A (en) 2018-08-01 2018-08-01 A kind of connection method of high-temperature service adapter tube

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810862204.4A CN108843866A (en) 2018-08-01 2018-08-01 A kind of connection method of high-temperature service adapter tube

Publications (1)

Publication Number Publication Date
CN108843866A true CN108843866A (en) 2018-11-20

Family

ID=64192167

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810862204.4A Pending CN108843866A (en) 2018-08-01 2018-08-01 A kind of connection method of high-temperature service adapter tube

Country Status (1)

Country Link
CN (1) CN108843866A (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110697653A (en) * 2019-11-16 2020-01-17 中化泉州石化有限公司 Safety structure for improving reliability of high-temperature collecting furnace tube and operation method
CN112780849A (en) * 2021-01-05 2021-05-11 中国石油大学(北京) Unequal wall thickness pipeline with internal transition section and design method

Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2109915A (en) * 1936-02-27 1938-03-01 Standard Oil Co Tubular connection
US2981556A (en) * 1957-05-16 1961-04-25 Bonney Forge & Tool Works Welding stress-free outlet fitting
US3342209A (en) * 1963-08-21 1967-09-19 Hiltscher Unsymmetrical connection-piece nozzle
US3392994A (en) * 1966-06-16 1968-07-16 Bonney Forge & Foundry Inc Connector means for pressure pipelines
DE2305424A1 (en) * 1973-02-03 1974-08-22 Mannesmann Roehren Werke Ag Connecting pipe for welding to pressure vessels - with smooth transition to welded flange
EP0293721B1 (en) * 1987-06-04 1991-05-29 Siemens Aktiengesellschaft Pressure tank with a connecting branch piece with thermal protection
US5104155A (en) * 1985-02-22 1992-04-14 Promat Engineering Services Limited Transition pieces
CN201162908Y (en) * 2008-01-18 2008-12-10 江阴市东发管件制造有限公司 Triplet joint with temperature-sensing and pressure-measuring port
CN202082534U (en) * 2011-06-15 2011-12-21 里学集团有限公司 Novel equal-diameter tee joint
CN104014916A (en) * 2014-06-06 2014-09-03 南通国电电站阀门有限公司 F91 valve body and 10CrMo910 tubing dissimilar steel welding method
CN204493957U (en) * 2015-02-06 2015-07-22 中国海洋石油总公司 A kind of Forged Tee pipe for natural gas line
CN106051352A (en) * 2016-06-30 2016-10-26 河南光大管业有限公司 Processing technology of reducing tee pipe fitting of large-size pressure pipeline

Patent Citations (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US2109915A (en) * 1936-02-27 1938-03-01 Standard Oil Co Tubular connection
US2981556A (en) * 1957-05-16 1961-04-25 Bonney Forge & Tool Works Welding stress-free outlet fitting
US3342209A (en) * 1963-08-21 1967-09-19 Hiltscher Unsymmetrical connection-piece nozzle
US3392994A (en) * 1966-06-16 1968-07-16 Bonney Forge & Foundry Inc Connector means for pressure pipelines
DE2305424A1 (en) * 1973-02-03 1974-08-22 Mannesmann Roehren Werke Ag Connecting pipe for welding to pressure vessels - with smooth transition to welded flange
US5104155A (en) * 1985-02-22 1992-04-14 Promat Engineering Services Limited Transition pieces
EP0293721B1 (en) * 1987-06-04 1991-05-29 Siemens Aktiengesellschaft Pressure tank with a connecting branch piece with thermal protection
CN201162908Y (en) * 2008-01-18 2008-12-10 江阴市东发管件制造有限公司 Triplet joint with temperature-sensing and pressure-measuring port
CN202082534U (en) * 2011-06-15 2011-12-21 里学集团有限公司 Novel equal-diameter tee joint
CN104014916A (en) * 2014-06-06 2014-09-03 南通国电电站阀门有限公司 F91 valve body and 10CrMo910 tubing dissimilar steel welding method
CN204493957U (en) * 2015-02-06 2015-07-22 中国海洋石油总公司 A kind of Forged Tee pipe for natural gas line
CN106051352A (en) * 2016-06-30 2016-10-26 河南光大管业有限公司 Processing technology of reducing tee pipe fitting of large-size pressure pipeline

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110697653A (en) * 2019-11-16 2020-01-17 中化泉州石化有限公司 Safety structure for improving reliability of high-temperature collecting furnace tube and operation method
CN112780849A (en) * 2021-01-05 2021-05-11 中国石油大学(北京) Unequal wall thickness pipeline with internal transition section and design method

Similar Documents

Publication Publication Date Title
CN108843866A (en) A kind of connection method of high-temperature service adapter tube
CN208196014U (en) A kind of anti-welding deformation tooling for starching spool
CN113199201B (en) Sleeve for repairing butt-joint girth weld defects of tee main pipe and machining and repairing method
CN215568809U (en) Connecting pipe structure for high-temperature and high-pressure equipment
CN106216924A (en) A kind of low head nozzle inner wall fixing tool during built-up welding on positioner
CN209800942U (en) Manifold branch
CN207402004U (en) A kind of lined composite steel tube socket joint welding system
CN111151845A (en) Main loop of nuclear main pump test bed and inner wall surfacing and circumferential weld butt welding method thereof
CN208322472U (en) Composite bimetal pipe
CN211936866U (en) Reinforcement plate structure
CN206912484U (en) One kind welding pressure-applying tooling
CN210318991U (en) Novel double-clamping-pressing type four-way pipe fitting for carbon steel
CN113295313B (en) Pipeline welded junction stress monitoring and evaluating method
CN213317740U (en) Clamp for machining straight tee joint part through lathe
CN205504250U (en) Double -deck leak -proof structure that follow -on zirconium or titanium metal clad sheet equipment were taken over
CN207600679U (en) A kind of W types radiant tube pressure testing device
CN104343976B (en) Pressure vessel turnover material opening fluidization adapter flange and pressure vessel thereof
JP2018001262A (en) Nipple welding method, nipple inspection method, and nipple manufacturing method
CN212019270U (en) Nuclear island steam generator integration barrel forging
CN110712005A (en) Tank storage device based on hydraulic forming technology
CN212122030U (en) Main loop of nuclear main pump test bed
CN107044575A (en) A kind of metal three-way pipe of hot extrusion molding
CN204284426U (en) Pressurized container turnover material opening fluidization adapter flange and pressurized container thereof
CN206943657U (en) A kind of metal three-way pipe of hot extrusion molding
CN214535022U (en) Novel high-pressure pipe fitting

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181120

RJ01 Rejection of invention patent application after publication