- CN108843344B CN108843344B CN201810573622.1A CN201810573622A CN108843344B CN 108843344 B CN108843344 B CN 108843344B CN 201810573622 A CN201810573622 A CN 201810573622A CN 108843344 B CN108843344 B CN 108843344B
- Authority
- CN
- China
- Prior art keywords
- slip casting
- grouting
- chamber
- pipe
- collapses
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
- 238000010276 construction Methods 0.000 title claims abstract description 28
- 238000007569 slipcasting Methods 0.000 claims abstract description 128
- 239000011435 rock Substances 0.000 claims abstract description 66
- 238000012544 monitoring process Methods 0.000 claims abstract description 62
- 239000013589 supplement Substances 0.000 claims abstract description 10
- 238000005259 measurement Methods 0.000 claims abstract description 5
- 239000002002 slurry Substances 0.000 claims description 17
- 239000000463 material Substances 0.000 claims description 15
- 238000005516 engineering process Methods 0.000 claims description 12
- 238000000034 method Methods 0.000 claims description 12
- 229910000831 Steel Inorganic materials 0.000 claims description 10
- 239000010959 steel Substances 0.000 claims description 10
- 239000004568 cement Substances 0.000 claims description 7
- 239000004567 concrete Substances 0.000 claims description 7
- 238000005553 drilling Methods 0.000 claims description 6
- 239000011378 shotcrete Substances 0.000 claims description 6
- 238000006073 displacement reaction Methods 0.000 claims description 5
- 230000008569 process Effects 0.000 claims description 4
- 230000003014 reinforcing effect Effects 0.000 claims description 4
- 239000011083 cement mortar Substances 0.000 claims description 3
- 238000013461 design Methods 0.000 claims description 3
- 230000001815 facial effect Effects 0.000 claims description 3
- 230000002093 peripheral effect Effects 0.000 claims description 3
- 238000004080 punching Methods 0.000 claims description 3
- 239000004744 fabric Substances 0.000 claims description 2
- 238000007711 solidification Methods 0.000 claims 1
- 230000008023 solidification Effects 0.000 claims 1
- 238000009412 basement excavation Methods 0.000 description 5
- 238000010586 diagram Methods 0.000 description 5
- 230000000694 effects Effects 0.000 description 2
- 238000002474 experimental method Methods 0.000 description 2
- 230000006872 improvement Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000008859 change Effects 0.000 description 1
- 239000012141 concentrate Substances 0.000 description 1
- 230000001086 cytosolic effect Effects 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000005065 mining Methods 0.000 description 1
- 239000000203 mixture Substances 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000004570 mortar (masonry) Substances 0.000 description 1
- 210000003205 muscle Anatomy 0.000 description 1
- 230000035772 mutation Effects 0.000 description 1
- 239000002689 soil Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000003325 tomography Methods 0.000 description 1
- 210000003462 vein Anatomy 0.000 description 1
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E21—EARTH OR ROCK DRILLING; MINING
- E21D—SHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
- E21D11/00—Lining tunnels, galleries or other underground cavities, e.g. large underground chambers; Linings therefor; Making such linings in situ, e.g. by assembling
- E21D11/04—Lining with building materials
- E21D11/10—Lining with building materials with concrete cast in situ; Shuttering also lost shutterings, e.g. made of blocks, of metal plates or other equipment adapted therefor
- E21D11/105—Transport or application of concrete specially adapted for the lining of tunnels or galleries ; Backfilling the space between main building element and the surrounding rock, e.g. with concrete
Landscapes
- Engineering & Computer Science (AREA)
- Structural Engineering (AREA)
- Architecture (AREA)
- Mining & Mineral Resources (AREA)
- Civil Engineering (AREA)
- Life Sciences & Earth Sciences (AREA)
- General Life Sciences & Earth Sciences (AREA)
- Geochemistry & Mineralogy (AREA)
- Geology (AREA)
- Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)
- Lining And Supports For Tunnels (AREA)
Abstract
Description
Claims (10)
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810573622.1A CN108843344B (zh) | 2018-06-05 | 2018-06-05 | 一种塌腔密实填筑方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810573622.1A CN108843344B (zh) | 2018-06-05 | 2018-06-05 | 一种塌腔密实填筑方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108843344A CN108843344A (zh) | 2018-11-20 |
CN108843344B true CN108843344B (zh) | 2019-11-26 |
Family
ID=64210393
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810573622.1A Active CN108843344B (zh) | 2018-06-05 | 2018-06-05 | 一种塌腔密实填筑方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108843344B (zh) |
Families Citing this family (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111878121B (zh) * | 2020-08-03 | 2022-09-30 | 中铁九局集团第五工程有限公司 | 一种隧道修复方法 |
CN112523806A (zh) * | 2020-10-23 | 2021-03-19 | 中铁二局集团有限公司 | 一种上下层重叠隧道初支及衬砌施工的监控方法 |
CN113006825B (zh) * | 2021-04-09 | 2022-10-21 | 中铁六局集团太原铁路建设有限公司 | 隧道塌方处的换拱施工方法 |
Family Cites Families (10)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
SU1027402A1 (ru) * | 1982-03-31 | 1983-07-07 | Горловский Филиал Донецкого Ордена Трудового Красного Знамени Политехнического Института | Пневматическа опалубка дл подземных работ |
JP2963357B2 (ja) * | 1994-10-26 | 1999-10-18 | 謙三 村上 | コンクリート壁構造およびその製造方法 |
JP3767239B2 (ja) * | 1999-03-29 | 2006-04-19 | 東海ゴム工業株式会社 | 空洞充填工法 |
CN101906977B (zh) * | 2010-07-21 | 2012-05-23 | 中国矿业大学(北京) | 井下软岩巷道大变形塌方预防及治理方法 |
CN203321531U (zh) * | 2013-06-27 | 2013-12-04 | 中国水电顾问集团成都勘测设计研究院 | 地下洞室顶拱塌方后的衬砌处理结构 |
CN103775102B (zh) * | 2014-02-11 | 2016-06-08 | 中国水利水电第五工程局有限公司 | 潜孔钻跟管成孔回填砼稳定临空面处理塌方施工方法 |
CN104975861A (zh) * | 2015-07-21 | 2015-10-14 | 招商局重庆交通科研设计院有限公司 | 用于隧道拱顶塌腔处理的非扰动型支护结构 |
CN106150532A (zh) * | 2016-06-28 | 2016-11-23 | 冯飞燕 | 一种基于两次支护的顶板塌陷疏通方法 |
CN206144571U (zh) * | 2016-11-01 | 2017-05-03 | 何双龙 | 一种松散软弱围岩巷道喷锚支护结构 |
CN107420115A (zh) * | 2017-05-16 | 2017-12-01 | 江门市政企业集团有限公司 | 一种浅埋暗挖隧道冒顶塌方换拱处理装置及其处理方法 |
-
2018
- 2018-06-05 CN CN201810573622.1A patent/CN108843344B/zh active Active
Also Published As
Publication number | Publication date |
---|---|
CN108843344A (zh) | 2018-11-20 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN103089275B (zh) | 富水极破碎围岩隧道塌方段围岩控制方法 | |
CN108843344B (zh) | 一种塌腔密实填筑方法 | |
CN108708743B (zh) | 一种采用灌浆处理隧洞塌方的方法 | |
CN108915736A (zh) | 强富水弱胶结含水层下掘进巷道的水害防治方法 | |
CN110878696B (zh) | 上软下硬地层盾构法与矿山法交界处隧道段围岩加固方法 | |
CN105804761A (zh) | 适用于液化砂土地层盾构近距离穿越建筑物的施工方法 | |
CN105257301A (zh) | 一种浅埋暗挖隧道软弱围岩塌方加固处理方法 | |
Chen et al. | Recent advances in high slope reinforcement in China: Case studies | |
CN105134219B (zh) | 软岩地层冻结井筒井壁施工工艺 | |
CN109611103B (zh) | 一种针对盾构区间上悬孤石群加固处理的方法 | |
CN102383813A (zh) | 一种特长黄土堆积岩隧道的施工方法 | |
WO2021098444A1 (zh) | 一种隧道盾构掘进始发端头孤石区盾构机的掘进参数的控制工艺 | |
CN104141500B (zh) | 一种板结砂砾石地层洞室施工方法 | |
CN108756901B (zh) | 昔格达特殊地层浅埋隧道施工方法 | |
CN107201913A (zh) | 一种交叠隧道精细减振爆破施工方法 | |
CN109209443A (zh) | 一种破碎围岩隧道结构的修建方法 | |
CN109057802A (zh) | 大断面浅埋隧道下穿高速公路施工方法 | |
CN107514266A (zh) | 盾构进出洞锚杆加固土体施工方法 | |
CN105840209A (zh) | 锚桩在隧道洞身段控制变形施工工法 | |
CN209444332U (zh) | 一种针对盾构区间上悬孤石群加固的施工结构 | |
CN206129278U (zh) | 土压平衡盾构机近距离侧穿初支暗挖隧道的施工结构 | |
CN108914947A (zh) | 基坑锚定墙拉锚支护的施工方法及其钻具和形成的支护结构 | |
CN114483055A (zh) | 特大跨度超浅埋高铁隧道穿越水塘洞段施工方法 | |
CN107447775A (zh) | 滑坡灾害体造地排水加筋土挡墙结构 | |
CN208472721U (zh) | 一种在松散体地层中采用手风钻施工的锚杆 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Applicant after: China Railway Second Bureau Construction Co.,Ltd. Applicant after: CHINA RAILWAY ERJU 6TH ENGINEERING CO.,LTD. Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Applicant before: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. Applicant before: CHINA RAILWAY ERJU 6TH ENGINEERING CO.,LTD. |
|
CB02 | Change of applicant information | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20190821 Address after: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Applicant after: CHINA RAILWAY NO.2 ENGINEERING GROUP Co.,Ltd. Applicant after: CHINA RAILWAY ERJU 6TH ENGINEERING CO.,LTD. Address before: Jinniu District Kam Tong Road Chengdu city Sichuan province 610031 No. 16 Applicant before: China Railway Second Bureau Construction Co.,Ltd. Applicant before: CHINA RAILWAY ERJU 6TH ENGINEERING CO.,LTD. |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |