CN108833171A - A kind of electric power networks equipment teaching management implementation method based on Web - Google Patents
A kind of electric power networks equipment teaching management implementation method based on Web Download PDFInfo
- Publication number
- CN108833171A CN108833171A CN201810642492.2A CN201810642492A CN108833171A CN 108833171 A CN108833171 A CN 108833171A CN 201810642492 A CN201810642492 A CN 201810642492A CN 108833171 A CN108833171 A CN 108833171A
- Authority
- CN
- China
- Prior art keywords
- topological diagram
- module
- case
- case library
- courseware
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/02—Protocols based on web technology, e.g. hypertext transfer protocol [HTTP]
-
- G—PHYSICS
- G09—EDUCATION; CRYPTOGRAPHY; DISPLAY; ADVERTISING; SEALS
- G09B—EDUCATIONAL OR DEMONSTRATION APPLIANCES; APPLIANCES FOR TEACHING, OR COMMUNICATING WITH, THE BLIND, DEAF OR MUTE; MODELS; PLANETARIA; GLOBES; MAPS; DIAGRAMS
- G09B9/00—Simulators for teaching or training purposes
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/12—Discovery or management of network topologies
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L41/00—Arrangements for maintenance, administration or management of data switching networks, e.g. of packet switching networks
- H04L41/14—Network analysis or design
- H04L41/145—Network analysis or design involving simulating, designing, planning or modelling of a network
-
- H—ELECTRICITY
- H04—ELECTRIC COMMUNICATION TECHNIQUE
- H04L—TRANSMISSION OF DIGITAL INFORMATION, e.g. TELEGRAPHIC COMMUNICATION
- H04L67/00—Network arrangements or protocols for supporting network services or applications
- H04L67/01—Protocols
- H04L67/12—Protocols specially adapted for proprietary or special-purpose networking environments, e.g. medical networks, sensor networks, networks in vehicles or remote metering networks
Landscapes
- Engineering & Computer Science (AREA)
- Signal Processing (AREA)
- Computer Networks & Wireless Communication (AREA)
- Theoretical Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Educational Technology (AREA)
- Educational Administration (AREA)
- Physics & Mathematics (AREA)
- Business, Economics & Management (AREA)
- Health & Medical Sciences (AREA)
- Computing Systems (AREA)
- General Health & Medical Sciences (AREA)
- Medical Informatics (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The electric power networks equipment teaching management implementation method based on Web that the present invention relates to a kind of, including teaching experiment chamber unit and case library unit;The teaching experiment chamber unit includes modular laboratory, device management module and topological diagram preserving module;The case library unit includes courseware case library module and case reconstructed module.Practical operation environment is transplanted in web terminal by the present invention, and student only needs browser that can emulate the true environment that topology goes out electric power networks equipment at any time.
Description
Technical field
The present invention relates to electric power networks teaching field, especially a kind of electric power networks equipment teaching management based on Web is real
Existing method.
Background technique
In existing electric power networks device structure, the culture of the IP talent generallys use traditional teaching pattern, i.e., different
The network equipment of manufacturer's model uses different practical operation environment and training soft ware.If containing 3-5 factory in a topological diagram
The network equipment of quotient, then student just has to the operation interface and security configuration technology of 5 simulation softwares of different vendor of association,
The a large amount of training time will be consumed in this way, and completing technology ability can not be referred in true network environment.
Summary of the invention
In view of this, the purpose of the present invention is to propose to a kind of electric power networks equipment teaching management implementation method based on Web,
Practical operation environment is transplanted in web terminal, student only needs browser that can emulate topology electric power networks equipment out at any time
True environment.
The present invention is realized using following scheme:A kind of electric power networks equipment teaching management implementation method based on Web, including
Teaching experiment chamber unit and case library unit;The teaching experiment chamber unit include modular laboratory, device management module, with
And topological diagram preserving module;The case library unit includes courseware case library module and case reconstructed module;
Include the following steps:
Step S1:Teacher constructs mixed topology structural topology figure by web terminal, and the topological diagram preserving module saves teacher in real time
The mixed topology structural topology figure of building;
Step S2:The device management module will be in the topological diagram in the topological diagram preserving module by generating configuration feature
Structural information is transferred to modular laboratory, and notice web terminal is done after the modular laboratory records the structural information of the topological diagram
Start the preparation of every network element node well;
Step S3:One-key start button is provided on the device management module, on topological diagram described in teacher's one-key start
All devices, and the correspondence equipment in the topology is logged in, the configuration teaching cases of the environment and safety that start the network equipment construct;
Step S4:The modular laboratory saves order configuration of the teacher in building teaching cases, while the equipment in real time
Include generating snapshot functions in management module, is bound together configuring the order with the topological diagram;
Step S5:Topological diagram data is transmitted to the courseware case library mould in case library unit by the topological diagram preserving module in real time
The topological diagram data received is stored in the private courseware case library list of teacher by block, the courseware case library module in real time
In;When teacher selects using some topological diagram data in private courseware case library list as when classics case, courseware case library
Module changes the state of the topological diagram, and is shared to the web terminal of student;
Step S6:When student needs to reconstruct the classics case, transferred from courseware case library module by case reconstructed module
The case, and by the recovery snapshot functions in device management module, the network that teacher has prepared in the topological diagram case is set
Standby configuration is restored to state when experiment.
Further, the network element equipment in the mixed topology structural topology figure include Cisco, Huawei, China three,
Juniper;Host equipment in the mixed topology structural topology figure includes windows, linux.
Further, in the step S4, the landing approach for logging in the correspondence equipment in the topology includes that order line logs in
Mode or host landing approach.
It further, further include the device management module in step S5 further include marking Function, to for present topology
Title or description set by figure addition teacher.
Further, step S7 further includes also preserving in the topological diagram preserving module in the teaching experiment chamber unit
The operating method video or picture and text step for the correspondence topological diagram that teacher is recorded by web terminal, the topological diagram preserving module will
The private courseware case library list of the video or picture and text step real-time Transmission into courseware case library module, for student downloading or
Online viewing.
Compared with prior art, the invention has the following beneficial effects:The method of the present invention puts forth effort on a kind of this teaching pipe of solution
Practical operation environment is transplanted in web terminal by the short slab of reason method, and student only needs browser that can emulate at any time topology to go out
The true environment of electric power networks equipment can quickly promote student by the combination of teaching experiment room module, case library module
Safe practice ability, greatly reduced the time cost that student spends in IP technical training.
Detailed description of the invention
Fig. 1 is Method And Principle schematic diagram of the invention.
Specific embodiment
The present invention will be further described with reference to the accompanying drawings and embodiments.
It is noted that following detailed description is all illustrative, it is intended to provide further instruction to the application.Unless another
It indicates, all technical and scientific terms used herein has usual with the application person of an ordinary skill in the technical field
The identical meanings of understanding.
It should be noted that term used herein above is merely to describe specific embodiment, and be not intended to restricted root
According to the illustrative embodiments of the application.As used herein, unless the context clearly indicates otherwise, otherwise singular
Also it is intended to include plural form, additionally, it should be understood that, when in the present specification using term "comprising" and/or " packet
Include " when, indicate existing characteristics, step, operation, device, component and/or their combination.
As shown in Figure 1, present embodiments providing a kind of electric power networks equipment teaching management implementation method based on Web, wrap
Include teaching experiment chamber unit and case library unit;The teaching experiment chamber unit include modular laboratory, device management module,
And topological diagram preserving module;The case library unit includes courseware case library module and case reconstructed module;
Include the following steps:
Step S1:Teacher constructs mixed topology structural topology figure by web terminal, and the topological diagram preserving module saves teacher in real time
The mixed topology structural topology figure of building;
Step S2:The device management module will be in the topological diagram in the topological diagram preserving module by generating configuration feature
Structural information is transferred to modular laboratory, and notice web terminal is done after the modular laboratory records the structural information of the topological diagram
Start the preparation of every network element node well;
Step S3:One-key start button is provided on the device management module, on topological diagram described in teacher's one-key start
All devices, and the correspondence equipment in the topology is logged in, the configuration teaching cases of the environment and safety that start the network equipment construct;
Step S4:The modular laboratory saves order configuration of the teacher in building teaching cases, while the equipment in real time
Include generating snapshot functions in management module, is bound together configuring the order with the topological diagram;
Step S5:Topological diagram data is transmitted to the courseware case library mould in case library unit by the topological diagram preserving module in real time
The topological diagram data received is stored in the private courseware case library list of teacher by block, the courseware case library module in real time
In;When teacher selects using some topological diagram data in private courseware case library list as when classics case, courseware case library
Module changes the state of the topological diagram, and is shared to the web terminal of student;
Step S6:When student needs to reconstruct the classics case, transferred from courseware case library module by case reconstructed module
The case, and by the recovery snapshot functions in device management module, the network that teacher has prepared in the topological diagram case is set
Standby configuration is restored to state when experiment.
In the present embodiment, the network element equipment in the mixed topology structural topology figure includes Cisco, Huawei, China
Three, Juniper;Host equipment in the mixed topology structural topology figure includes windows, linux.Particularly, Jiao Shitong
Cross the web graph shape page, using convenient and fast mouse drag network model appliance icon, linkage function after click, construct including
The mixed topology figure of above equipment.
In the present embodiment, in the step S4, the landing approach for logging in the correspondence equipment in the topology includes order line
Landing approach or host landing approach.
It in the present embodiment, further include the device management module in step S5 further include marking Function, to be current
Topological diagram adds title or description set by teacher, can effectively distinguish learning the essentials for different topology figure.
In the present embodiment, step S7 further includes also protecting in the topological diagram preserving module in the teaching experiment chamber unit
There are the operating method video or picture and text step of the correspondence topological diagram that teacher is recorded by web terminal, the topological diagram saves mould
Private courseware case library list of the block by the video or picture and text step real-time Transmission into courseware case library module, under student
It carries or watches online.
Particularly, the present embodiment includes the case library unit of courseware case;It can be suitable for arbitrary large-scale synthesis net
The teaching experiment chamber unit of network device structure emulation.The present embodiment method is provided to teacher on to the teaching of electric power networks equipment
Great convenience, teacher by teaching experiment chamber unit generate by the existing mainstream producer router of each electric power, interchanger, fire prevention
The network topology structure case of the network element devices such as wall and all kinds of host servers, computer operating system composition;Topological diagram courseware case
Example will be stored in real time in courseware case library unit;Student is learning the classical case generated by teacher, recording by web terminal
Courseware video and courseware text.This method combines the practical operation in electric power networks equipment and technology theoretical knowledge and laboratory,
It greatly saves the training cost of the electric power IP talent, shorten the period required for study heterogeneous networks equipment, student passes through
Web terminal can carry out simulation modeling to the existing network equipment topological structure of electric power, can further promote student to true
The ability of real network environment safe practice configuration.
The foregoing is merely presently preferred embodiments of the present invention, all equivalent changes done according to scope of the present invention patent with
Modification, is all covered by the present invention.
Claims (5)
1. a kind of electric power networks equipment teaching management implementation method based on Web, it is characterised in that:Including teaching experiment chamber unit
And case library unit;The teaching experiment chamber unit includes that modular laboratory, device management module and topological diagram save mould
Block;The case library unit includes courseware case library module and case reconstructed module;
Include the following steps:
Step S1:Teacher constructs mixed topology structural topology figure by web terminal, and the topological diagram preserving module saves teacher in real time
The mixed topology structural topology figure of building;
Step S2:The device management module will be in the topological diagram in the topological diagram preserving module by generating configuration feature
Structural information is transferred to modular laboratory, and notice web terminal is done after the modular laboratory records the structural information of the topological diagram
Start the preparation of every network element node well;
Step S3:One-key start button is provided on the device management module, on topological diagram described in teacher's one-key start
All devices, and the correspondence equipment in the topology is logged in, the configuration teaching cases of the environment and safety that start the network equipment construct;
Step S4:The modular laboratory saves order configuration of the teacher in building teaching cases, while the equipment in real time
Include generating snapshot functions in management module, is bound together configuring the order with the topological diagram;
Step S5:Topological diagram data is transmitted to the courseware case library mould in case library unit by the topological diagram preserving module in real time
The topological diagram data received is stored in the private courseware case library list of teacher by block, the courseware case library module in real time
In;When teacher selects using some topological diagram data in private courseware case library list as when classics case, courseware case library
Module changes the state of the topological diagram, and is shared to the web terminal of student;
Step S6:When student needs to reconstruct the classics case, transferred from courseware case library module by case reconstructed module
The case, and by the recovery snapshot functions in device management module, the network that teacher has prepared in the topological diagram case is set
Standby configuration is restored to state when experiment.
2. a kind of electric power networks equipment teaching management implementation method based on Web according to claim 1, feature exist
In:Network element equipment in the mixed topology structural topology figure includes Cisco, Huawei, magnificent three, Juniper;The mixing
Host equipment in topological structure topological diagram includes windows, linux.
3. a kind of electric power networks equipment teaching management implementation method based on Web according to claim 1, feature exist
In:In the step S4, the landing approach for logging in the correspondence equipment in the topology includes that order line landing approach or host log in
Mode.
4. a kind of electric power networks equipment teaching management implementation method based on Web according to claim 1, feature exist
In:It further include the device management module in step S5 further include marking Function, to be added set by teacher for present topology figure
The title set or description.
5. a kind of electric power networks equipment teaching management implementation method based on Web according to claim 1, feature exist
In:Step S7 further includes also preserving teacher in the topological diagram preserving module in the teaching experiment chamber unit to record by web terminal
The operating method video or picture and text step of the correspondence topological diagram of system, the topological diagram preserving module walk the video or picture and text
Rapid private courseware case library list of the real-time Transmission into courseware case library module, for student's downloading or online viewing.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810642492.2A CN108833171A (en) | 2018-06-21 | 2018-06-21 | A kind of electric power networks equipment teaching management implementation method based on Web |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810642492.2A CN108833171A (en) | 2018-06-21 | 2018-06-21 | A kind of electric power networks equipment teaching management implementation method based on Web |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108833171A true CN108833171A (en) | 2018-11-16 |
Family
ID=64141747
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810642492.2A Pending CN108833171A (en) | 2018-06-21 | 2018-06-21 | A kind of electric power networks equipment teaching management implementation method based on Web |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108833171A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112331007A (en) * | 2020-11-03 | 2021-02-05 | 国网江苏省电力有限公司南通供电分公司 | Distribution transformer intelligent terminal optimization stationing skill training system and training method |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103617760A (en) * | 2013-09-29 | 2014-03-05 | 江苏省电力公司 | Power distribution network DTS (Dispatcher Training Simulation) simulation system and simulation method thereof |
CN104537908A (en) * | 2014-12-17 | 2015-04-22 | 国电南瑞科技股份有限公司 | Multi-stage scheduling integrated simulation system based on model sharing and method |
CN104778073A (en) * | 2015-04-17 | 2015-07-15 | 广东电网有限责任公司信息中心 | Novel information security attack and defense experiment platform and implementation method thereof |
CN105391586A (en) * | 2015-12-09 | 2016-03-09 | 瑞斯康达科技发展股份有限公司 | Fault positioning analysis method and system |
CN105869086A (en) * | 2016-04-05 | 2016-08-17 | 池州职业技术学院 | Computer network simulation training teaching system |
CN106790046A (en) * | 2016-10-11 | 2017-05-31 | 长春理工大学 | Network-combination yarn dummy emulation system based on super fusion architecture |
US20170357928A1 (en) * | 2016-06-08 | 2017-12-14 | Honeywell International Inc. | System and method for industrial process control and automation system operator evaluation and training |
CN108091193A (en) * | 2017-12-21 | 2018-05-29 | 华中科技大学 | A kind of cell phone intelligent teaching and management platform |
-
2018
- 2018-06-21 CN CN201810642492.2A patent/CN108833171A/en active Pending
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN103617760A (en) * | 2013-09-29 | 2014-03-05 | 江苏省电力公司 | Power distribution network DTS (Dispatcher Training Simulation) simulation system and simulation method thereof |
CN104537908A (en) * | 2014-12-17 | 2015-04-22 | 国电南瑞科技股份有限公司 | Multi-stage scheduling integrated simulation system based on model sharing and method |
CN104778073A (en) * | 2015-04-17 | 2015-07-15 | 广东电网有限责任公司信息中心 | Novel information security attack and defense experiment platform and implementation method thereof |
CN105391586A (en) * | 2015-12-09 | 2016-03-09 | 瑞斯康达科技发展股份有限公司 | Fault positioning analysis method and system |
CN105869086A (en) * | 2016-04-05 | 2016-08-17 | 池州职业技术学院 | Computer network simulation training teaching system |
US20170357928A1 (en) * | 2016-06-08 | 2017-12-14 | Honeywell International Inc. | System and method for industrial process control and automation system operator evaluation and training |
CN106790046A (en) * | 2016-10-11 | 2017-05-31 | 长春理工大学 | Network-combination yarn dummy emulation system based on super fusion architecture |
CN108091193A (en) * | 2017-12-21 | 2018-05-29 | 华中科技大学 | A kind of cell phone intelligent teaching and management platform |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN112331007A (en) * | 2020-11-03 | 2021-02-05 | 国网江苏省电力有限公司南通供电分公司 | Distribution transformer intelligent terminal optimization stationing skill training system and training method |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
De Oliveira et al. | Using mininet for emulation and prototyping software-defined networks | |
CN111555913A (en) | Simulation method, system, electronic device and storage medium for simulating real network environment based on virtualization | |
CN104778073A (en) | Novel information security attack and defense experiment platform and implementation method thereof | |
Ko et al. | Creating web-based laboratories | |
CN106209825B (en) | A kind of customizable Botnet pilot system | |
CN105227375B (en) | A kind of method and system building virtual switch network | |
CN112040011A (en) | Simulation training method and device based on RPA and AI, computing equipment and medium | |
CN108833171A (en) | A kind of electric power networks equipment teaching management implementation method based on Web | |
CN108768771A (en) | Network equipments configuration automatic scoring method based on emulation data network equipment | |
Coti et al. | Practical activities in network courses for MOOCs, SPOCs and eLearning with Marionnet | |
CN109003211A (en) | A kind of emergency drilling system and method | |
CN104375422A (en) | Emulation system based on STATCOM controller | |
CN104318833A (en) | Working method for of power grid dispatching automation training system | |
CN103345564B (en) | A kind of alternating-current transmission test simulation system | |
Puys et al. | SCADA cybersecurity awareness and teaching with Hardware-In-The-Loop platforms | |
CN102904757B (en) | Power information communication backbone Dynamic Display method | |
Ghazali et al. | Simulation tool for active learning of introductory computer network subjects | |
CN110557288B (en) | Network visualization editing and automatic deployment system based on OpenStack | |
CN115134127A (en) | Electric power monitoring network safety test system | |
Laverell et al. | Isn't it time you had an emulab? | |
Tao et al. | Design and research of a virtual computer network experimental teaching system | |
Ekisa et al. | VICSORT-A Virtualised ICS Open-source Research Testbed | |
Brylow et al. | Hands-on networking labs with embedded routers | |
Wang et al. | Construction of network comprehensive experimental platform based on virtual simulation | |
Temani et al. | Online remote accessible laboratory (ORAL) |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181116 |