- CN108824938A CN108824938A CN201810851598.3A CN201810851598A CN108824938A CN 108824938 A CN108824938 A CN 108824938A CN 201810851598 A CN201810851598 A CN 201810851598A CN 108824938 A CN108824938 A CN 108824938A
- Authority
- CN
- China
- Prior art keywords
- sleeve
- telescopic rod
- rod
- loop bar
- pipeline bracket
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000000034 method Methods 0.000 title claims abstract description 14
- 238000010276 construction Methods 0.000 title claims abstract description 13
- 238000009434 installation Methods 0.000 claims abstract description 8
- 230000000087 stabilizing effect Effects 0.000 claims description 19
- 238000009435 building construction Methods 0.000 claims description 15
- 238000004904 shortening Methods 0.000 claims description 5
- 238000004873 anchoring Methods 0.000 claims description 3
- 230000005611 electricity Effects 0.000 description 4
- 230000000994 depressogenic effect Effects 0.000 description 3
- 239000000463 material Substances 0.000 description 3
- 230000007306 turnover Effects 0.000 description 3
- 241001391944 Commicarpus scandens Species 0.000 description 2
- 229910000831 Steel Inorganic materials 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 239000010959 steel Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000010421 standard material Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/18—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic
- E04H12/182—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic telescopic
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/18—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic
- E04H12/187—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures movable or with movable sections, e.g. rotatable or telescopic with hinged sections
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/22—Sockets or holders for poles or posts
- E04H12/2238—Sockets or holders for poles or posts to be placed on the ground
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04H—BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
- E04H12/00—Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
- E04H12/24—Cross arms
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Supports For Pipes And Cables (AREA)
Abstract
The invention discloses a kind of construction Moveable Pipeline bracket and its application methods, line holder includes folding cross tube, adjustable column and folded supporting foot, wherein, the folding cross tube includes joist, the both ends of the joist are hinged with several collapsible rods, several installation hooks or hollow electro-insulating rubber support roller are mounted in the every collapsible rod;The adjustable column includes the telescoping tube for being fixed on the joist lower part, and it is set in the casing outside the telescoping tube, the telescoping tube can be slided relative to described sleeve pipe and be elongated or shortened with realizing, the fastener being fixed temporarily for the two is additionally provided between the telescoping tube and casing;The folded supporting foot includes several loop bars for being fixed on described sleeve pipe lower part, telescopic rod is equipped in the every loop bar, the telescopic rod can be slided relative to the loop bar and be elongated or shortened with realizing, the fastener being fixed temporarily for the two is additionally provided between the telescopic rod and loop bar.
Description
Technical Field
The invention relates to the field of temporary electricity utilization in building construction, in particular to a movable pipeline support for building construction and a using method thereof.
Background
The arrangement mode of the temporary pipeline on the construction site at present comprises the following three modes: (1) is directly arranged on the ground; (2) making bamboo and wood poles overhead; (3) the mopping floor is combined with the frame.
The following problems exist in the arrangement of pipelines by the above method:
(1) the field power utilization equipment is more, the cable is randomly dragged to the ground or overhead, the arrangement is messy, the construction image is serious, and the construction temporary power utilization safety standard is violated;
(2) cables are arranged randomly, and potential safety hazards can be buried in the operation space range once the cables are damaged and leak electricity;
(3) temporary overhead materials are added by adopting a temporary overhead method, so that the non-standard materials are difficult to use in a turnover way;
(4) no effective protection measure exists, the device is easy to tread and extrude, and the requirements of national safety regulations on the arrangement height of the pipeline, the protection measure and the like cannot be met;
(5) the protection to the pipeline can not be realized, and casualty accidents such as electric shock, fire and the like can be easily caused after the pipeline is damaged, so that great potential safety hazards exist.
Disclosure of Invention
The invention aims to overcome the defects in the prior art and provide a movable pipeline bracket for building construction and a using method thereof.
In order to achieve the above purpose, the invention provides the following technical scheme:
a movable pipeline bracket for building construction, which comprises a foldable upper cross bar, an adjustable upright post and foldable supporting legs, wherein,
the foldable upper cross rod comprises a joist, a plurality of foldable rods are hinged to two ends of the joist, and a plurality of mounting hooks or hollow insulating rubber riding wheels are mounted on each foldable rod;
the adjustable upright post comprises a telescopic pipe fixed at the lower part of the joist and a sleeve pipe sleeved outside the telescopic pipe, the telescopic pipe can slide relative to the sleeve pipe to realize extension or shortening, and a fastener for temporarily fixing the telescopic pipe and the sleeve pipe is also arranged between the telescopic pipe and the sleeve pipe;
the folding supporting legs comprise a plurality of loop bars fixed on the lower portion of the sleeve, a telescopic rod is arranged in each loop bar, the telescopic rod can slide relative to the loop bars to achieve extension or shortening, and a fastener for temporarily fixing the telescopic rod and the loop bars is further arranged between the telescopic rod and the loop bars.
The movable pipeline bracket is adjustable in height and good in stability. The telescopic folding structure is adopted at multiple positions in the device, so that the movable pipeline support can be conveniently unfolded and folded, the floor area of the device is reduced, and the device is convenient to transport and circulate. The hollow insulating rubber riding wheel required by long wire arrangement is arranged, and the rubber material has good anti-skid performance, is not easy to break and has low cost.
When the cable is used, the cables can be arranged at intervals one by one, the pipeline arrangement is greatly standardized, the probability that the cables are damaged under the action of external force is reduced, and the safety risks of electricity, water and gas utilization are reduced, so that the construction site is more standardized and civilized. In addition, the movable pipeline support can be repeatedly used in a turnover mode for many times, and the utilization rate is high.
Preferably, every the telescopic link bottom articulates there is the stable sole, every the other end anchor of stabilizing the sole subaerial, and stability is good, specially adapted ground unevenness's condition.
Preferably, a plurality of horizontal connecting rods are fixed on the lower portion of the sleeve, and each horizontal connecting rod is rotatably connected with the sleeve rod.
Preferably, the loop bar is connected to the horizontal connecting bar through a rotating bolt. During the use, adjustable the angle of rotating the bolt makes the installation of loop bar more firm on the one hand, and on the other hand also is convenient for draw in the loop bar in.
Preferably, all the horizontal connecting rods are symmetrically arranged with respect to the circumferential direction of the casing. When the number of loop bars is 3, the number of horizontal connecting rod also is 3, and the horizontal contained angle between each other is 120.
Preferably, the mounting hook or the hollow insulating rubber riding wheel is detachably mounted on the foldable rod, so that the mounting and the dismounting are convenient. In the use, can decide the number of installation couple or hollow insulating rubber riding wheel according to actual conditions to satisfy the demand of different operating modes.
Preferably, the telescopic pipe and the sleeve pipe are respectively provided with a plurality of mounting holes and are fixed through puller bolts.
Preferably, each bottom end of the telescopic rod is provided with a sunken area, and the shape of the sunken area is matched with the stable foot plate. One end of the stabilizing foot plate can be provided with a groove-shaped structure, so that the stabilizing foot plate can be directly buckled and pressed in the depressed area conveniently.
Preferably, the other end of the stabilizing foot plate is provided with a ground anchor hole and is fixed on the ground through a bolt.
Preferably, the number of loop bars is 3, and the stability of triangle-shaped structure is best, adopts 3 loop bars to make whole set of device more firm.
Preferably, the sleeve is further provided with a storage barrel for storing various fasteners, so that various small parts can be conveniently taken and placed.
Preferably, the lower part of the sleeve is also provided with a plurality of counterweight hooks, and the stability of the device can be improved by adding counterweights.
Preferably, the joist is a channel steel structure, and two sides are used for fixing the position of the foldable rod, so that the offset is reduced.
The invention also discloses a use method of the movable pipeline bracket for building construction, which comprises the following steps:
a: unfolding support
a 1: extending the telescopic rod out of the sleeve rod, adjusting the length of the telescopic rod, and fixing the telescopic rod through a fastener; adjusting the included angle between the loop bar and the sleeve, and fixing the loop bar and the sleeve through a fastener;
a 2: unfolding the collapsible rod;
a 3: the extension tube is heightened and is fixed on the sleeve through a fastener;
a 4: arranging a cable pipeline on the mounting hook or the hollow insulating rubber riding wheel;
b: folding support
b 1: recovering the cable pipeline at the position of the installation hook or the hollow insulating rubber supporting wheel;
b 2: releasing the fastening between the extension tube and the sleeve and reducing the height of the extension tube;
b 3: folding the foldable rod;
b 4: releasing the fastening between the telescopic rod and the loop bar, and contracting the telescopic rod into the loop bar; and adjusting the included angle between the loop bar and the sleeve, and furling the loop bar.
Wherein the sequence of the steps a2 and a3 can be switched, and the sequence of the steps b2 and b3 can be switched.
Preferably, when the ground surface is uneven, the stabilizing foot plate needs to be unfolded and anchored to the ground after the step a1 is completed, and the anchoring of the stabilizing foot plate needs to be released and the stabilizing foot plate needs to be retracted before the step b4 is performed.
Compared with the prior art, the movable pipeline bracket has the beneficial effects that:
the movable pipeline support is adjustable in height, and is anchored on the ground through the stabilizing foot plate, so that the stability is good. The telescopic folding structure is adopted at multiple positions in the device, so that the movable pipeline support can be conveniently unfolded and folded, the floor area of the device is reduced, and the device is convenient to transport and circulate. The hollow insulating rubber riding wheel required by long wire arrangement is arranged, and the rubber material has good anti-skid performance, is not easy to break and has low cost.
When the cable is used, the cables can be arranged at intervals one by one, the pipeline arrangement is greatly standardized, the probability that the cables are damaged under the action of external force is reduced, and the safety risks of electricity, water and gas utilization are reduced, so that the construction site is more standardized and civilized. In addition, the movable pipeline support can be repeatedly used in a turnover mode for many times, and the utilization rate is high.
Compared with the prior art, the using method has the beneficial effects that:
the cable arranging device is simple and convenient to operate, can be operated and completed by one person, reduces labor cost, can meet the cable standard arrangement requirement, reduces the probability that a cable is randomly arranged to be damaged under the action of external force, and is small in occupied area, convenient to transport and capable of being circulated for many times to use, and the utilization rate of the device is improved.
Description of the drawings:
fig. 1 is a schematic structural view of a mobile pipeline bracket for construction according to the present invention in a deployed state.
Fig. 2 is a schematic structural view of a mobile pipeline bracket for building construction according to the present invention in a collapsed state.
The labels in the figure are: 1-foldable upper cross bar, 11-joist, 12-foldable bar, 13-installation hook, 14-hollow insulating rubber riding wheel, 2-adjustable upright post, 21-telescopic tube, 22-sleeve, 23-installation hole, 3-foldable supporting leg, 31-telescopic rod, 32-sleeve rod, 33-stabilizing foot plate, 34-rotating bolt, 35-horizontal connecting rod, 36-counterweight hook, 4-pin, 5-puller bolt, 6-pin and 7-storage barrel.
Detailed Description
The present invention will be described in further detail with reference to test examples and specific embodiments. It should be understood that the scope of the above-described subject matter is not limited to the following examples, and any techniques implemented based on the disclosure of the present invention are within the scope of the present invention.
Example 1
As shown in fig. 1-2, a movable pipeline bracket for building construction comprises a foldable upper cross bar 1, an adjustable upright post 2 and foldable supporting legs 3. Wherein,
the foldable upper cross rod 1 comprises a joist 11, the joist 11 is of a channel steel structure, two ends of the joist 11 are hinged with two foldable rods 12, and the foldable rods 12 are fixed on the joist 11 through pins 4. Two mounting hooks 13 are detachably mounted on one foldable rod 12, and two hollow insulating rubber riding wheels 14 are detachably mounted on the other foldable rod 12.
The adjustable upright post 2 comprises an extension tube 21 fixed at the lower part of the joist 11 and a sleeve 22 sleeved outside the extension tube 21, wherein the extension tube 21 can slide relative to the sleeve 22 to realize extension or shortening, and the adjustable height is about 40cm-80 cm. Specifically, the extension tube 21 and the sleeve 22 are both provided with a plurality of mounting holes 23 and are fixed by tightening bolts 5.
The folding supporting leg 3 comprises three sleeve rods 32 fixed on the lower portion of the sleeve 22, specifically, three horizontal connecting rods 35 are welded on the lower portion of the sleeve 22, the horizontal included angles among the three horizontal connecting rods 35 are 120 degrees, the sleeve rods 32 are connected to the horizontal connecting rods 35 through rotating bolts 34, and in an unfolding working state, the included angles between the sleeve rods 32 and the sleeve 22 are about 45 degrees.
Each telescopic rod 31 is arranged in the loop bar 32, the telescopic rod 31 can slide relative to the loop bar 32 to extend or shorten, and specifically, a plurality of mounting holes are formed in the telescopic rod 31 and the loop bar 32 and are fixed through the puller bolt 5. Every telescopic link 31 bottom articulates there is stable sole 33, every the bottom of telescopic link 31 all is equipped with the depressed area, the shape of depressed area with stabilize sole 33 looks adaptation, be convenient for fold and accomodate stabilize sole 33. The other end of each stabilizing foot plate 33 is provided with a ground anchor hole and is fixed on the ground through a bolt 6.
Preferably, the lower portion of the sleeve 22 is further provided with a plurality of weight hooks 36, so as to improve the stability of the device by adding weights.
Preferably, the sleeve 22 is further provided with a storage barrel 7 for storing various fasteners, so that various small parts can be conveniently taken and placed, such as the pin 4, the puller bolt 5 and the bolt 6.
Example 2
A use method of a movable pipeline bracket for building construction comprises the following steps:
a: unfolding support
a 1: extending the telescopic rod 31 out of the sleeve rod 32, adjusting the length of the telescopic rod 31, and fixing the telescopic rod 31 through a puller bolt 5; adjusting the included angle between the loop bar 32 and the sleeve 22 by rotating the latch 34 until the included angle between the loop bar 32 and the sleeve 22 is about 45 °;
a 2: unfolding the stabilizing foot plate 33, and fixing one end of the stabilizing foot plate 33 on the ground through a bolt 6;
a 3: unfolding the collapsible rod 12;
a 4: the extension tube 21 is heightened and is fixed on the sleeve 22 through a puller bolt 5;
a 5: a cable pipeline is arranged on the mounting hook 13 or the hollow insulating rubber riding wheel 14;
b: folding support
b 1: recovering the cable pipeline at the position of the installation hook 13 or the hollow insulating rubber riding wheel 14;
b 2: the puller bolt 5 is pulled out, the telescopic pipe 21 and the sleeve 22 are released from fastening, and the height of the telescopic pipe 21 is reduced;
b 3: collapsing the collapsible rod 12;
b 4: the bolt 6 is pulled out, the anchoring of the stabilizing foot plate 33 is released, and the stabilizing foot plate 33 is retracted:
b 5: the puller bolt 5 is pulled out, the fastening between the telescopic rod 31 and the loop bar 32 is released, and the telescopic rod 31 is contracted into the loop bar 32; the angle between the loop bar 32 and the sleeve 22 is adjusted by rotating the latch 34, and the loop bar 32 is folded.
Wherein the sequence of the steps a3 and a4 can be switched, and the sequence of the steps b2 and b3 can be switched. Preferably, a weight may be provided at the weight hook 36 at the lower portion of the sleeve 22 to improve the stability of the device.
The above embodiments are only used for illustrating the invention and not for limiting the technical solutions described in the invention, and although the present invention has been described in detail in the present specification with reference to the above embodiments, the present invention is not limited to the above embodiments, and therefore, any modification or equivalent replacement of the present invention is made; all such modifications and variations are intended to be included herein within the scope of this disclosure and the appended claims.
Claims (10)
1. A movable pipeline bracket for building construction is characterized by comprising a foldable upper cross rod (1), an adjustable upright post (2) and foldable supporting legs (3), wherein,
the foldable upper cross bar (1) comprises a joist (11), a plurality of foldable rods (12) are hinged to two ends of the joist (11), and a plurality of mounting hooks (13) or hollow insulating rubber riding wheels (14) are mounted on each foldable rod (12);
the adjustable upright post (2) comprises an extension tube (21) fixed at the lower part of the joist (11) and a sleeve (22) sleeved outside the extension tube (21), the extension tube (21) can slide relative to the sleeve (22) to realize extension or shortening, and a fastener for temporarily fixing the extension tube (21) and the sleeve (22) is further arranged between the extension tube (21) and the sleeve (22);
the folding supporting legs (3) comprise a plurality of loop bars (32) fixed at the lower part of the sleeve (22), a telescopic rod (31) is arranged in each loop bar (32), the telescopic rod (31) can slide relative to the loop bars (32) to realize extension or shortening, and a fastener for temporarily fixing the telescopic rod (31) and the loop bars (32) is further arranged between the telescopic rod (31) and the loop bars (32).
2. The construction movable pipeline bracket as claimed in claim 1, wherein a bottom end of each telescopic rod (31) is hinged with a stabilizing foot plate (33), and the other end of each stabilizing foot plate (33) is anchored on the ground.
3. The movable pipeline bracket for building construction according to claim 2, characterized in that the bottom end of each telescopic rod (31) is provided with a recessed area, and the shape of the recessed area is matched with the stabilizing foot plate (33).
4. The construction movable pipeline bracket as claimed in claim 1, wherein a plurality of horizontal connecting rods (35) are fixed to the lower part of the sleeve (22), and each horizontal connecting rod (35) is rotatably connected with the sleeve rod (32).
5. A construction mobile line support according to claim 4, characterised in that all the horizontal connecting rods (35) are arranged symmetrically with respect to the circumference of the sleeve (22).
6. A construction mobile line support according to claim 1, characterised in that the mounting hooks (13) or hollow insulating rubber joists (14) are detachably mounted on the collapsible rod (12).
7. The movable pipeline bracket for building construction according to any one of claims 1-6, characterized in that the sleeve (22) is further provided with a receiving cylinder (7) for receiving various fasteners.
8. The construction movable pipeline bracket as claimed in any one of claims 1 to 6, wherein the lower part of the sleeve (22) is further provided with a plurality of counterweight hooks (36).
9. A method for using a movable pipeline bracket for building construction, which is characterized by comprising the movable pipeline bracket for building construction as claimed in any one of claims 1 to 8, and the method for using the same comprises the following steps:
a: unfolding support
a 1: the telescopic rod (31) extends out of the sleeve rod (32), the length of the telescopic rod (31) is adjusted, and the telescopic rod is fixed through a fastener; adjusting the included angle between the loop bar (32) and the sleeve (22) and fixing the loop bar and the sleeve by a fastener;
a 2: -unfolding the collapsible rod (12);
a 3: the telescopic pipe (21) is heightened and is fixed on the sleeve (22) through a fastener;
a 4: a cable pipeline is arranged on the mounting hook (13) or the hollow insulating rubber riding wheel (14);
b: folding support
b 1: recovering the cable pipeline at the position of the installation hook (13) or the hollow insulating rubber riding wheel (14);
b 2: releasing the fastening between the telescopic pipe (21) and the sleeve (22) and reducing the height of the telescopic pipe (21);
b 3: -collapsing said collapsible rod (12);
b 4: releasing the fastening between the telescopic rod (31) and the loop bar (32), and retracting the telescopic rod (31) into the loop bar (32); adjusting the included angle between the loop bar (32) and the sleeve (22), and drawing the loop bar (32);
wherein the sequence of the steps a2 and a3 can be switched, and the sequence of the steps b2 and b3 can be switched.
10. The method for using a portable pipeline bracket for building construction according to claim 9, wherein when the ground surface is uneven, the stabilizing foot plate (33) is unfolded and anchored on the ground after the step a1 is completed, and the anchoring of the stabilizing foot plate (33) is released and the stabilizing foot plate (33) is retracted before the step b4 is performed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810851598.3A CN108824938A (en) | 2018-07-27 | 2018-07-27 | A kind of construction Moveable Pipeline bracket and its application method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810851598.3A CN108824938A (en) | 2018-07-27 | 2018-07-27 | A kind of construction Moveable Pipeline bracket and its application method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108824938A true CN108824938A (en) | 2018-11-16 |
Family
ID=64152216
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810851598.3A Pending CN108824938A (en) | 2018-07-27 | 2018-07-27 | A kind of construction Moveable Pipeline bracket and its application method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108824938A (en) |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109830917A (en) * | 2019-03-15 | 2019-05-31 | 中国三冶集团有限公司 | A kind of device and method setting up temporary cable |
CN110847682A (en) * | 2019-11-26 | 2020-02-28 | 六安丰恺尼机电科技有限公司 | Base component of 5G signal supporting tower |
CN110864200A (en) * | 2019-11-26 | 2020-03-06 | 六安丰恺尼机电科技有限公司 | Portable 5G receiving and dispatching base station |
CN110878655A (en) * | 2019-11-26 | 2020-03-13 | 六安丰恺尼机电科技有限公司 | Extension building method of 5G signal transmitting base station |
CN111734011A (en) * | 2020-07-08 | 2020-10-02 | 宝业湖北建工集团有限公司 | Supporting device for prefabricated building construction |
CN113612182A (en) * | 2021-08-25 | 2021-11-05 | 中国一冶集团有限公司 | Quick assembly folding telescopic temporary electric wire overhead device |
CN113624678A (en) * | 2021-07-28 | 2021-11-09 | 华侨大学 | On-site testing device and method for tangential bonding strength of steel structure fireproof coating |
CN114508679A (en) * | 2019-02-01 | 2022-05-17 | 深圳市道通科技股份有限公司 | Calibration system and calibration support thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001197625A (en) * | 2000-01-13 | 2001-07-19 | Nippon Anzen Sangyo Kk | Device for supporting hot line gripping tool |
CN107196238A (en) * | 2017-06-16 | 2017-09-22 | 徐州市久发工程机械有限责任公司 | A kind of portable stringing machine of fast erecting |
CN206770790U (en) * | 2017-05-15 | 2017-12-19 | 青建集团股份公司 | Portable interim line holder |
CN206789999U (en) * | 2017-05-27 | 2017-12-22 | 国网河南禹州市供电公司 | Cable termination makes automatic erector |
CN208734190U (en) * | 2018-07-27 | 2019-04-12 | 中铁二局第二工程有限公司 | A kind of construction Moveable Pipeline bracket |
-
2018
- 2018-07-27 CN CN201810851598.3A patent/CN108824938A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JP2001197625A (en) * | 2000-01-13 | 2001-07-19 | Nippon Anzen Sangyo Kk | Device for supporting hot line gripping tool |
CN206770790U (en) * | 2017-05-15 | 2017-12-19 | 青建集团股份公司 | Portable interim line holder |
CN206789999U (en) * | 2017-05-27 | 2017-12-22 | 国网河南禹州市供电公司 | Cable termination makes automatic erector |
CN107196238A (en) * | 2017-06-16 | 2017-09-22 | 徐州市久发工程机械有限责任公司 | A kind of portable stringing machine of fast erecting |
CN208734190U (en) * | 2018-07-27 | 2019-04-12 | 中铁二局第二工程有限公司 | A kind of construction Moveable Pipeline bracket |
Cited By (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114508679A (en) * | 2019-02-01 | 2022-05-17 | 深圳市道通科技股份有限公司 | Calibration system and calibration support thereof |
CN109830917A (en) * | 2019-03-15 | 2019-05-31 | 中国三冶集团有限公司 | A kind of device and method setting up temporary cable |
CN110847682A (en) * | 2019-11-26 | 2020-02-28 | 六安丰恺尼机电科技有限公司 | Base component of 5G signal supporting tower |
CN110864200A (en) * | 2019-11-26 | 2020-03-06 | 六安丰恺尼机电科技有限公司 | Portable 5G receiving and dispatching base station |
CN110878655A (en) * | 2019-11-26 | 2020-03-13 | 六安丰恺尼机电科技有限公司 | Extension building method of 5G signal transmitting base station |
CN111734011A (en) * | 2020-07-08 | 2020-10-02 | 宝业湖北建工集团有限公司 | Supporting device for prefabricated building construction |
CN113624678A (en) * | 2021-07-28 | 2021-11-09 | 华侨大学 | On-site testing device and method for tangential bonding strength of steel structure fireproof coating |
CN113612182A (en) * | 2021-08-25 | 2021-11-05 | 中国一冶集团有限公司 | Quick assembly folding telescopic temporary electric wire overhead device |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108824938A (en) | A kind of construction Moveable Pipeline bracket and its application method | |
CN208734190U (en) | A kind of construction Moveable Pipeline bracket | |
CN206545424U (en) | A kind of power communication multi-function emergency electric pole | |
CN106677588A (en) | Multifunctional emergency telegraph pole used for electric power communication | |
CN205445450U (en) | Foldable safe cat ladder | |
CN212428000U (en) | Civil engineering construction is with simple and easy equipment support | |
CN209396843U (en) | Portable supporting device | |
CN107181198A (en) | Lift single pole crossing frame | |
CN210313183U (en) | Truss tower and contain its strideing across construction protective equipment | |
CN105905829A (en) | Hand-cranked triple-foldable bridge type rescue equipment | |
CN211169358U (en) | Remote control crawler-type self-propelled bypass vehicle | |
CN105672867A (en) | Foldable safety crawling ladder | |
CN102864966A (en) | Wind-prevention turning-over-resistant guardrail | |
CN221447928U (en) | Retractable force-bearing rod device | |
CN207278171U (en) | A kind of Extensible portable hanging ladder | |
CN106006505A (en) | Hand shaking three-fold stretching bridge type rescue device | |
CN216042570U (en) | Retractable removes scaffold frame safety fixing device | |
CN221742221U (en) | Outdoor tent convenient to dismantle equipment | |
CN209306827U (en) | The complete A-frame of Portable electric self-supporting | |
CN219343908U (en) | Multi-functional auxiliary stand for interior decoration | |
CN105569441B (en) | A kind of substation's rail bar fixing bracket | |
CN219509583U (en) | Outdoor power engineering overhauls ladder | |
CN212099358U (en) | Portable aircraft cat ladder | |
CN202755729U (en) | Wind-proof anti-turnover guardrail | |
CN219973843U (en) | Scaffold frame |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |