CN108824835A - Wait tear the regeneration method of reinforced concrete beam column Component- Based Development level in structure open - Google Patents

Wait tear the regeneration method of reinforced concrete beam column Component- Based Development level in structure open Download PDF

Info

Publication number
CN108824835A
CN108824835A CN201810689038.2A CN201810689038A CN108824835A CN 108824835 A CN108824835 A CN 108824835A CN 201810689038 A CN201810689038 A CN 201810689038A CN 108824835 A CN108824835 A CN 108824835A
Authority
CN
China
Prior art keywords
reinforced
column
concrete
regeneration
wait tear
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810689038.2A
Other languages
Chinese (zh)
Inventor
徐杰
周晓娜
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shandong Jianzhu University
Original Assignee
Shandong Jianzhu University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shandong Jianzhu University filed Critical Shandong Jianzhu University
Priority to CN201810689038.2A priority Critical patent/CN108824835A/en
Publication of CN108824835A publication Critical patent/CN108824835A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/02Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/20Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts consisting of concrete, e.g. reinforced concrete, or other stonelike material
    • E04B1/21Connections specially adapted therefor
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G23/00Working measures on existing buildings
    • E04G23/08Wrecking of buildings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Chemical & Material Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Electrochemistry (AREA)
  • Mechanical Engineering (AREA)
  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)
  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The regeneration method that this application provides a kind of wait tear reinforced concrete beam column Component- Based Development level in structure open, reinforced column and reinforced beam are directly cut down on building from wait tear open, then the bar planting on the reinforced column and reinforced beam cut down, then exposed steel bar resulting after bar planting is bound into the steel reinforcement cage at beam-column connection again, then formwork casting concrete, cast-in-place connecting node is made after the completion of maintenance, so far obtains armored concrete regeneration beam column;To take full advantage of wait tear the available component in structure open, reduce building waste, it is energy saving, it is environmentally protective;The regeneration mode that novel reinforced concrete is formd from component level, avoids regeneration concrete and is based on material level and be first ground into aggregate and carry out the complicated procedures of forming such as pouring again;By beam column cast-in-place concrete node, bearing capacity, anti-seismic performance and the stress performance of armored concrete regeneration beam column are improved.

Description

Wait tear the regeneration method of reinforced concrete beam column Component- Based Development level in structure open
Technical field
The present invention relates to building castoff regenerative use technology fields, more particularly, to one kind wait tear reinforced concrete in structure open The regeneration method of native beam column Component- Based Development level.
Background technique
With China's economic development, old building is constantly removed, and new building is largely built, and appearance of city shines right one Newly, but simultaneously serious environmental problem is also brought:One side new building consumes large number of cement and sandstone etc. and builds Material is built, new building is on the other hand built and dismounting Old building produces a large amount of building waste again.China in 2010 according to statistics Building waste is about 800,000,000 tons in bulk solid waste.Building waste overwhelming majority in China's is transported to countryside or rural area dew at present It is stacked or landfill disposal, occupies a large amount of arable lands, while new building and a large amount of exploitation natural sand stones, serious to destroy nature ring Border.
Building castoff regeneration is one after another studied in countries in the world, and one of importance is exactly mixed to regeneration Coagulate the research of soil.Recycled concrete is that discarded concrete after broken, cleaning, classification, is formed recycled aggregate, portion Divide or all instead of natural aggregate again mixing at the technology of novel concrete.
But since regeneration concrete structure to the regeneration of concrete is needed original is mixed based on material level Xtah Crude Clay structure such as is crushed, is transported, being poured at the processes, greatly limits the application of regeneration concrete structure.
Summary of the invention
Being designed to provide for the embodiment of the present invention is a kind of wait tear reinforced concrete beam column Component- Based Development level in structure open Regeneration method.
In order to solve the above technical problems, technical solution provided by the invention is:
Wait tear the regeneration method of reinforced concrete beam column Component- Based Development level in structure open, include the following steps:
1) it will be cut in structure wait tear reinforced column in structure and reinforced beam open from wait tear open in building It cuts off, then hangs down;
2) reinforced column and reinforced beam under hanging to step 1) carry out reinforcing steel implant processing;
3) resulting exposed steel bar after reinforced column bar planting described in step 2) and the reinforced beam are planted Resulting exposed steel bar binding is at existing at the connecting node for the reinforced column and the reinforced beam after muscle The steel reinforcement cage of pouring concrete;
4) formwork casting concrete is carried out to the steel reinforcement cage made from step 3), it is mixed that the reinforcing bar is made after the completion of maintenance The cast-in-place connecting node of solidifying earth pillar and the reinforced beam so far obtains armored concrete regeneration beam column.
Preferably, in step 1), the intensity of the concrete in reinforced column and reinforced beam cut down For C20~C50, the yield strength of the reinforcing bar in reinforced column and reinforced beam cut down is 235N/mm2~ 500N/mm2
Preferably, in step 1), the cross section of the reinforced column and reinforced beam that cut down is rectangle, circle Shape or odd-shaped cross section.
The regeneration method that this application provides a kind of wait tear reinforced concrete beam column Component- Based Development level in structure open, will One whole reinforced column, the one whole reinforcing bar that has used certain time limit but still can continue to use with enough performances mix It coagulates a certain section in earth pillar or a few sections in one whole reinforced column is directly cut down on building from wait tear open, will make One whole reinforced beam, the one whole reinforced concrete that can be continued to use with certain time limit but still with enough performances A certain section in native beam or a few sections in one whole reinforced beam are directly cut down on building from wait tear open, are then existed Bar planting on the reinforced column and reinforced beam cut down, then again by reinforced column and reinforced beam Resulting exposed steel bar binding is at the steel reinforcement cage for cast-in-place concrete at beam-column connection after bar planting, and then formwork pours mixed Solidifying soil is made the cast-in-place connecting node of reinforced column and reinforced beam, so far obtains reinforced concrete after the completion of maintenance Soil regeneration beam column;To take full advantage of wait tear the available component in structure open, reduce building waste, energy saving, green ring It protects;The regeneration mode that novel reinforced concrete is formd from component level avoids regeneration concrete and is based on material level Aggregate is first ground into carry out the complicated procedures of forming such as pouring again;By beam column cast-in-place concrete node, armored concrete regeneration is improved Bearing capacity, anti-seismic performance and the stress performance of beam column.
Specific embodiment
For a further understanding of the present invention, the preferred embodiment of the invention is described below with reference to embodiment, still It should be appreciated that these descriptions only further illustrate feature and advantage of the invention, rather than to the limit of the claims in the present invention System.
The regeneration method that this application provides a kind of wait tear reinforced concrete beam column Component- Based Development level in structure open, packet Include following steps:
1) it will be cut in structure wait tear reinforced column in structure and reinforced beam open from wait tear open in building It cuts off, then hangs down;
2) reinforced column and reinforced beam under hanging to step 1) carry out reinforcing steel implant processing;
3) resulting exposed steel bar after reinforced column bar planting described in step 2) and the reinforced beam are planted Resulting exposed steel bar binding is at existing at the connecting node for the reinforced column and the reinforced beam after muscle The steel reinforcement cage of pouring concrete;
4) formwork casting concrete is carried out to the steel reinforcement cage made from step 3), it is mixed that the reinforcing bar is made after the completion of maintenance The cast-in-place connecting node of solidifying earth pillar and the reinforced beam so far obtains armored concrete regeneration beam column.
In one embodiment of the application, in step 1), the reinforced column and reinforced beam that cut down In concrete intensity be C20~C50, the surrender of the reinforcing bar in reinforced column and reinforced beam cut down Intensity is 235N/mm2~500N/mm2
In one embodiment of the application, in step 1), the reinforced column and reinforced beam that cut down Cross section be rectangle, circle or odd-shaped cross section.
The regeneration method that this application provides a kind of wait tear reinforced concrete beam column Component- Based Development level in structure open, will One whole reinforced column, the one whole reinforcing bar that has used certain time limit but still can continue to use with enough performances mix It coagulates a certain section in earth pillar or a few sections in one whole reinforced column is directly cut down on building from wait tear open, will make One whole reinforced beam, the one whole reinforced concrete that can be continued to use with certain time limit but still with enough performances A certain section in native beam or a few sections in one whole reinforced beam are directly cut down on building from wait tear open, are then existed Bar planting on the reinforced column and reinforced beam cut down, then again by reinforced column and reinforced beam Resulting exposed steel bar binding is at the steel reinforcement cage for cast-in-place concrete at beam-column connection after bar planting, and then formwork pours mixed Solidifying soil is made the cast-in-place connecting node of reinforced column and reinforced beam, so far obtains reinforced concrete after the completion of maintenance Soil regeneration beam column;To take full advantage of wait tear the available component in structure open, reduce building waste, energy saving, green ring It protects;The regeneration mode that novel reinforced concrete is formd from component level avoids regeneration concrete and is based on material level Aggregate is first ground into carry out the complicated procedures of forming such as pouring again;By beam column cast-in-place concrete node, armored concrete regeneration is improved Bearing capacity, anti-seismic performance and the stress performance of beam column.
The method, apparatus and materials of the not detailed description of the present invention are the prior art, are repeated no more.
Principle and implementation of the present invention are described for specific embodiment used herein, above embodiments Illustrate to be merely used to help understand method and its core concept of the invention.It should be pointed out that for the common skill of the art , without departing from the principle of the present invention, can be with several improvements and modifications are made to the present invention for art personnel, these change It is also fallen within the protection scope of the claims of the present invention into modification.

Claims (3)

1. the regeneration method wait tear reinforced concrete beam column Component- Based Development level in structure open, which is characterized in that including following Step:
1) by building wait tear reinforced column in structure and reinforced beam open from wait under tearing open and cutting in structure Come, then hangs down;
2) reinforced column and reinforced beam under hanging to step 1) carry out reinforcing steel implant processing;
It 3) will be after resulting exposed steel bar after reinforced column bar planting described in step 2) and the reinforced beam bar planting Resulting exposed steel bar binding is at cast-in-place mixed at the connecting node for the reinforced column and the reinforced beam Coagulate the steel reinforcement cage of soil;
4) formwork casting concrete is carried out to the steel reinforcement cage made from step 3), the armored concrete is made after the completion of maintenance The cast-in-place connecting node of column and the reinforced beam so far obtains armored concrete regeneration beam column.
2. regeneration method according to claim 1, which is characterized in that in step 1), the reinforced concrete that cuts down The intensity of concrete in earth pillar and reinforced beam is C20~C50, the reinforced column and reinforced concrete cut down The yield strength of reinforcing bar in native beam is 235N/mm2~500N/mm2
3. regeneration method according to claim 1, which is characterized in that in step 1), the reinforced concrete that cuts down The cross section of earth pillar and reinforced beam is rectangle, circle or odd-shaped cross section.
CN201810689038.2A 2018-06-28 2018-06-28 Wait tear the regeneration method of reinforced concrete beam column Component- Based Development level in structure open Pending CN108824835A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810689038.2A CN108824835A (en) 2018-06-28 2018-06-28 Wait tear the regeneration method of reinforced concrete beam column Component- Based Development level in structure open

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810689038.2A CN108824835A (en) 2018-06-28 2018-06-28 Wait tear the regeneration method of reinforced concrete beam column Component- Based Development level in structure open

Publications (1)

Publication Number Publication Date
CN108824835A true CN108824835A (en) 2018-11-16

Family

ID=64133688

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810689038.2A Pending CN108824835A (en) 2018-06-28 2018-06-28 Wait tear the regeneration method of reinforced concrete beam column Component- Based Development level in structure open

Country Status (1)

Country Link
CN (1) CN108824835A (en)

Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951986A (en) * 2016-06-17 2016-09-21 中国十七冶集团有限公司 Edge joint connecting structure and method of prefabricated integrated type frame column beam
CN107268782A (en) * 2017-07-01 2017-10-20 广东电网有限责任公司清远供电局 A kind of prefabricated frame posture device and its implementation

Patent Citations (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105951986A (en) * 2016-06-17 2016-09-21 中国十七冶集团有限公司 Edge joint connecting structure and method of prefabricated integrated type frame column beam
CN107268782A (en) * 2017-07-01 2017-10-20 广东电网有限责任公司清远供电局 A kind of prefabricated frame posture device and its implementation

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
李文贵等: "4R原则在混凝土历史建筑修缮中的应用", 《工业建筑》 *

Similar Documents

Publication Publication Date Title
CN105350475B (en) Crash bearer and preparation method thereof
CN108842557A (en) A kind of temporary road pavement structure and method of constructing roadway
CN205205600U (en) Regeneration road surface structure
CN106522456A (en) Green and environmentally-friendly concrete hollow block and production method thereof
CN101418629B (en) Regenerated composite reinforced concrete beam and construction method thereof
CN108724452A (en) prefabricated centrifugal pile production method
CN109020430A (en) A kind of construction refuse regenerated mixture of two ash stability and preparation method thereof
CN104556766A (en) Construction method for building foundation bed employing recycled concrete
CN106437034A (en) Steel tube and semi-prefabricated semi-cast-in-place construction waste recycled concrete combined column and preparation method thereof
CN108689659A (en) A kind of construction refuse regenerated mixture of cement stabilizing and preparation method thereof
CN107268607A (en) The concrete-pile prepared using building waste and waste old ceramics
CN109356185A (en) A kind of prefabricated pier foundation of regeneration monolith and its construction method
CN110344844A (en) A kind of track engineering section of track well construction method
CN104074113B (en) Mineral powder stable graded broken stone cushion layer
CN101892637A (en) Ring type anchor rod locking method for repairing cracks on abutment side wall of highway bridge abutment
CN109400072A (en) A kind of anti-crack and anti-seepage type bridge hinge seam concrete and its construction method
CN209652686U (en) A kind of micelle water-permeable brick that surface layer is replaceable
CN108824834A (en) Wait tear the regeneration method of reinforced column Component- Based Development level in structure open
CN108824835A (en) Wait tear the regeneration method of reinforced concrete beam column Component- Based Development level in structure open
CN111119079A (en) Reinforcing construction method of solid-belly masonry arch bridge
CN202644518U (en) Post-inserted reinforcement cage cement fly ash gravel pile
CN106381956A (en) Concrete prefabricated shell-regenerated mixed concrete combination column and preparation method thereof
CN109020415A (en) A kind of preparation method of regenerated aggregate pervious concrete
CN105906232B (en) Mending mortar, preparation method and the construction method mated formation are repaired for bridge pavement
CN209636834U (en) A kind of prefabricated pier foundation of regeneration monolith

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination