CN108824754A - A kind of integral bathroom ground installation structure and installation method - Google Patents

A kind of integral bathroom ground installation structure and installation method Download PDF

Info

Publication number
CN108824754A
CN108824754A CN201810836119.0A CN201810836119A CN108824754A CN 108824754 A CN108824754 A CN 108824754A CN 201810836119 A CN201810836119 A CN 201810836119A CN 108824754 A CN108824754 A CN 108824754A
Authority
CN
China
Prior art keywords
fastener
macroplate
stone
wallboard
back box
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810836119.0A
Other languages
Chinese (zh)
Inventor
丁泽成
周东珊
王文广
潘�清
余广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Yasha Decoration Co Ltd
Original Assignee
Zhejiang Yasha Decoration Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Yasha Decoration Co Ltd filed Critical Zhejiang Yasha Decoration Co Ltd
Priority to CN201810836119.0A priority Critical patent/CN108824754A/en
Publication of CN108824754A publication Critical patent/CN108824754A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/02Flooring or floor layers composed of a number of similar elements
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04FFINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
    • E04F15/00Flooring
    • E04F15/18Separately-laid insulating layers; Other additional insulating measures; Floating floors
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G21/00Preparing, conveying, or working-up building materials or building elements in situ; Other devices or measures for constructional work
    • E04G21/14Conveying or assembling building elements

Abstract

The invention discloses a kind of integral bathroom ground installation structure and installation methods, including ground, waterproof back box on the ground is set, wallboard on the inside of waterproof back box is set and the floor in waterproof back box and between wallboard is set, the floor includes the floor ceramic tile that macroplate stone is moulded substrate and is fixed on macroplate stone modeling substrate, macroplate stone modeling substrate one end is adjacent to wallboard, the first fastener is fixedly installed in the other end, junction of first fastener between macroplate stone modeling substrate is symmetrical arranged, and first plane is concordant on fastener and macroplate stone modeling substrate is arranged;The second fastener is fixedly installed in corresponding position in the waterproof back box;The beneficial effects of the invention are as follows:Macroplate stone moulds substrate and forms overall plate by the way that Nian Jie glue-line is fixed with floor ceramic tile, and macroplate stone modeling substrate side is mounted with the first fastener, and is fixed by the cooperation of second the first fastener of fastener, and the structure install convenient, speed of application are fast.

Description

A kind of integral bathroom ground installation structure and installation method
Technical field
The present invention relates to building decoration technical fields, and in particular to a kind of integral bathroom ground installation structure and installation side Method.
Background technique
A kind of integral bathroom ground mounting means be suitable for integral bathroom ground facing, can be widely applied to public building and Residential architecture.Prefabrication, in-site installation can reach the effect that construction efficiency is high, speed of application is fast.Ground needs between conventional sanitation Waterproof is done, with cement mortar paving, construction efficiency is low, complicated construction technique.
Summary of the invention
In order to solve the problems in the existing technology, the present invention provides a kind of integral bathroom ground of high construction efficiency peaces Assembling structure and installation method.
Technical scheme is as follows:
A kind of integral bathroom ground installation structure, which is characterized in that including ground, setting waterproof back box on the ground, setting Wallboard on the inside of waterproof back box and the floor in waterproof back box and between wallboard is set, the floor includes macroplate Stone modeling substrate and the floor ceramic tile being fixed on macroplate stone modeling substrate, described macroplate stone modeling substrate one end and wallboard paste Tightly, the first fastener is fixedly installed in the other end, and junction of first fastener between macroplate stone modeling substrate is symmetrically set It sets, and plane is concordant on the first fastener and macroplate stone modeling substrate is arranged;Corresponding position fixation is set in the waterproof back box The second fastener is set, second fastener is engaged by clamping with the first fastener respectively, and two macroplate stones modeling substrate is fixed Connection.
A kind of integral bathroom ground installation structure, which is characterized in that close to wall on the macroplate stone modeling substrate Waterproof adhesive tape is equipped at the position of plate.
A kind of integral bathroom ground installation structure, which is characterized in that the macroplate stone modeling substrate is equipped with viscous Glue-line is connect, and is fixedly connected by bonding glue-line with floor ceramic tile.
A kind of integral bathroom ground installation structure, which is characterized in that the floor ceramic tile is being located at macroplate stone The junction moulded between substrate is equipped with filler rod.
A kind of integral bathroom ground installation structure, which is characterized in that the wallboard includes wallboard base and setting Wallboard surface layer in wallboard base.
A kind of integral bathroom ground installation structure, which is characterized in that the floor ceramic tile is arranged in macroplate stone Mould substrate on and with the first fastener end position flush.
A kind of integral bathroom ground installation method, which is characterized in that include the following steps:
1) waterproof back box is placed into ground, the position of waterproof back box edge is determined according to finished surface unwrapping wire, it is ensured that waterproof back box Position and drawing position consistency;
2)MS glue is played at waterproof back box external corner, waterproof back box position is fixed, it is ensured that back box position will not occur when subsequent installation Offset;
3)Integral bathroom metope is installed:Wallboard base and wallboard surface layer are installed;
4)The installation of ground plate:It is installed from most Edge BOB(beginning of block), waterproof adhesive tape is pasted onto macroplate stone-plastic plate and ground porcelain The side of brick;Plate is put it on the ground, it is flat-pushing, so that macroplate stone-plastic plate is inserted into wallboard surface layer bottom, waterproof adhesive tape is by wallboard The gap of surface layer and floor ceramic tile stoppers;By the second fastener back full coat MS glue, there is the first fastener for aforementioned panels are packaged One end is lifted, and the second fastener is caught in the first fastener, and macroplate stone-plastic plate is laid flat, and guarantees the back of the second fastener It is come into full contact with the surface of waterproof back box;Waterproof adhesive tape is pasted macroplate stone-plastic plate and floor ceramic tile by the installation of another plate Side equipped with waterproof adhesive tape is put into waterproof back box surface, the side equipped with the first fastener is raised, made equipped with anti-by side The side macroplate stone-plastic plate of glue item is inserted into wallboard surface layer bottom, and waterproof adhesive tape is by the seam of wallboard surface layer and macroplate stone-plastic plate Gap stoppers;Side equipped with the first fastener is slowly put down, is caught in the first fastener in the second fastener;Firmly by filler rod It is inserted among two plates, guarantees the gap for keeping 1-3mm among two first fasteners, guarantee that the first fastener is not fallen out.
The beneficial effects of the invention are as follows:
1)Macroplate stone moulds substrate and forms overall plate by the way that Nian Jie glue-line is fixed with floor ceramic tile, and macroplate stone moulds substrate side It is mounted with the first fastener, and is fixed by the cooperation of second the first fastener of fastener, the structure install convenient, construction Speed is fast, and scene is not necessarily to cement mortar.
2)Second fastener can be bonding in factory with macroplate stone modeling substrate, is positioned in advance, guarantees that positioning is quasi- Really, in-site installation is convenient.
3)Macroplate stone moulds substrate side, and bonding waterproof adhesive tape is, it can be achieved that water-proof function in advance, and scene is without further Installation.
Detailed description of the invention
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is schematic enlarged-scale view at A of the present invention;
Fig. 3 is schematic enlarged-scale view at B of the present invention;
In figure:The ground 1-, 2- waterproof back box, 3- wallboard base, 4- wallboard surface layer, 5- macroplate stone modeling substrate, 6- floor ceramic tile, 7- is bonded glue-line, 8- filler rod, the second fastener of 9-, 10- waterproof adhesive tape, the first fastener of 11-.
Specific embodiment
Below in conjunction with Figure of description, the invention will be further described.
As shown in Figure 1-3, a kind of integral bathroom ground installation structure, including ground 1, waterproof back box 2, wallboard base 3, wall Board finish 4, macroplate stone modeling substrate 5, floor ceramic tile 6, bonding glue-line 7, filler rod 8, the second fastener 9, waterproof adhesive tape 10 and the One fastener 11.
Waterproof back box 2 is arranged on ground 1, wallboard setting is arranged in waterproof back box 2 on 2 inside of waterproof back box, floor And between wallboard, wallboard includes wallboard base 3 and the wallboard surface layer 4 being arranged in wallboard base 3, and macroplate stone moulds substrate Waterproof adhesive tape 10 is equipped on 5 at the position of wallboard surface layer 4;Floor includes macroplate stone modeling substrate 5 and is fixed at big Slabstone moulds the floor ceramic tile 6 on substrate 5, and macroplate stone moulds substrate 5 and is equipped with bonding glue-line 7, and passes through bonding glue-line 7 and ground Furring tile 6 is fixedly connected;Macroplate stone modeling 5 one end of substrate is adjacent to wallboard, the other end the first fastener 11 of fixed setting, and first Junction of the fastener 11 between macroplate stone modeling substrate 5 is symmetrical arranged, and the first fastener 11 moulds substrate 5 with macroplate stone Upper plane is concordantly arranged, and the setting of floor ceramic tile 6 is on macroplate stone modeling substrate 5 and equal with 11 end position of the first fastener Together;The second fastener 9 is fixedly installed in corresponding position in waterproof back box 2, and the second fastener 9 is clamped with the first fastener 11 respectively Cooperation, and two macroplate stones modeling substrate 5 is fixedly connected;Floor ceramic tile 6 is in the junction being located between macroplate stone modeling substrate 5 Equipped with filler rod 8.Waterproof back box 2 is first placed into original ground 1, then carries out the installation of integral bathroom metope, including wallboard base 3 And the installation of wallboard surface layer 4;Metope carries out the installation of ground facing after being installed.First fastener 11 is caught in the second fastener In 12, wherein in factory, bonding, accurate positioning, in-site installation are convenient with waterproof back box 2 for the second fastener 12;It will carry out ground Face composite plates(Macroplate stone is moulded substrate 5 and is fixedly connected with floor ceramic tile 6 by Nian Jie glue-line 7)Installation, finally be caught in it is embedding Item 8, is fixed, and prevents plate mobile or falls off.
A kind of integral bathroom ground installation method, includes the following steps:
1) waterproof back box 2 is placed into ground 1, the position of 2 edge of waterproof back box is determined according to finished surface unwrapping wire, it is ensured that the anti-bottom 2 position of box and drawing position consistency;
2)MS glue is played at 2 external corner of waterproof back box, 2 position of waterproof back box is fixed, it is ensured that back box position will not be sent out when subsequent installation Raw offset;
3)Integral bathroom metope is installed:Wallboard base 3 and wallboard surface layer 4 are installed;
4)The installation of ground plate:It is installed from most Edge BOB(beginning of block), waterproof adhesive tape 10 is pasted onto macroplate stone-plastic plate 5 and ground The side of ceramic tile 6;Plate is placed on ground 1, it is flat-pushing, so that macroplate stone-plastic plate 5 is inserted into 4 bottom of wallboard surface layer, waterproof adhesive tape 10 stopper wallboard surface layer 4 and the gap of floor ceramic tile 6;By 9 back full coat MS glue of the second fastener, have for aforementioned panels are packaged One end of one fastener 11 is lifted, and the second fastener 9 is caught in the first fastener 11, macroplate stone-plastic plate 5 is laid flat, and is guaranteed The back of second fastener 9 and the surface of waterproof back box 2 come into full contact with;Another plate installation, pastes big plate for waterproof adhesive tape 10 Side equipped with waterproof adhesive tape 10 is put into 2 surface of waterproof back box by the side of block stone-plastic plate 5 and floor ceramic tile 6, will be equipped with first The side of fastener 11 is raised, and the side macroplate stone-plastic plate 5 equipped with waterproof adhesive tape 10 is made to be inserted into 4 bottom of wallboard surface layer, waterproof Adhesive tape 10 stoppers wallboard surface layer 4 and the gap of macroplate stone-plastic plate 5;Side equipped with the first fastener is slowly put down, is made First fastener 11 is caught in the second fastener 9;Firmly filler rod 8 is inserted among two plates, guarantees two first fasteners 11 Centre keeps the gap of 2mm, guarantees that the first fastener 11 is not fallen out.

Claims (7)

1. a kind of integral bathroom ground installation structure, which is characterized in that including ground(1), be arranged on ground(1)On the anti-bottom Box(2), be arranged in waterproof back box(2)The wallboard of inside and setting are in waterproof back box(2)Floor interior and between wallboard, institute Stating floor includes macroplate stone modeling substrate(5)And it is fixed at macroplate stone modeling substrate(5)On floor ceramic tile(6), described Macroplate stone moulds substrate(5)One end is adjacent to wallboard, and the first fastener is fixedly installed in the other end(11), first fastener (11)Substrate is moulded in macroplate stone(5)Between junction be symmetrical arranged, and the first fastener(11)Substrate is moulded with macroplate stone (5)Upper plane is concordantly arranged;The waterproof back box(2)The second fastener is fixedly installed in upper corresponding position(9), second card Fastener(9)Respectively with the first fastener(11)It is engaged by clamping, and two macroplate stones is moulded into substrate(5)It is fixedly connected.
2. a kind of integral bathroom ground installation structure according to claim 1, which is characterized in that the macroplate stone moulds base Plate(5)It is upper that waterproof adhesive tape is equipped at the position of wallboard(10).
3. a kind of integral bathroom ground installation structure according to claim 1, which is characterized in that the macroplate stone moulds base Plate(5)It is equipped with bonding glue-line(7), and pass through bonding glue-line(7)With floor ceramic tile(6)It is fixedly connected.
4. a kind of integral bathroom ground installation structure according to claim 1, which is characterized in that the floor ceramic tile(6) Substrate is moulded being located at macroplate stone(5)Between junction be equipped with filler rod(8).
5. a kind of integral bathroom ground installation structure according to claim 1, which is characterized in that the wallboard includes wallboard Base(3)And it is arranged in wallboard base(3)On wallboard surface layer(4).
6. a kind of integral bathroom ground installation structure according to claim 1, which is characterized in that the floor ceramic tile(6) Setting moulds substrate in macroplate stone(5)It is upper and with the first fastener(11)End position flush.
7. -6 any a kind of integral bathroom ground installation method according to claim 1, which is characterized in that including walking as follows Suddenly:
1) by waterproof back box(2)It is placed into ground(1), waterproof back box is determined according to finished surface unwrapping wire(2)The position of edge, it is ensured that Waterproof back box(2)Position and drawing position consistency;
2)Waterproof back box(2)MS glue is played at external corner, by waterproof back box(2)Position is fixed, it is ensured that back box position is not when subsequent installation It can shift;
3)Integral bathroom metope is installed:Wallboard base is installed(3)And wallboard surface layer(4);
4)The installation of ground plate:It is installed from most Edge BOB(beginning of block), by waterproof adhesive tape(10)It is pasted onto macroplate stone-plastic plate(5)With Floor ceramic tile(6)Side;Plate is placed on ground(1)On, it is flat-pushing, make macroplate stone-plastic plate(5)It is inserted into wallboard surface layer(4)Bottom Portion, waterproof adhesive tape(10)By wallboard surface layer(4)With floor ceramic tile(6)Gap stopper;By the second fastener(9)Back full coat MS Glue has the first fastener for aforementioned panels are packaged(11)One end lift, by the second fastener(9)It is caught in the first fastener(11) In, by macroplate stone-plastic plate(5)It is laid flat, guarantees the second fastener(9)Back and waterproof back box(2)Surface come into full contact with; Another plate installation, by waterproof adhesive tape(10)Paste macroplate stone-plastic plate(5)With floor ceramic tile(6)Side, waterproof will be housed Adhesive tape(10)Side be put into waterproof back box(2)Surface will be equipped with the first fastener(11)Side raise, make equipped with marine glue Item(10)Side macroplate stone-plastic plate(5)It is inserted into wallboard surface layer(4)Bottom, waterproof adhesive tape(10)By wallboard surface layer(4)With it is big Plate stone-plastic plate(5)Gap stopper;Side equipped with the first fastener is slowly put down, the first fastener is made(11)It is caught in Two fasteners(9)In;Firmly by filler rod(8)It is inserted among two plates, guarantees two first fasteners(11)Centre keeps 1-3mm Gap, guarantee the first fastener(11)It does not fall out.
CN201810836119.0A 2018-07-26 2018-07-26 A kind of integral bathroom ground installation structure and installation method Pending CN108824754A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810836119.0A CN108824754A (en) 2018-07-26 2018-07-26 A kind of integral bathroom ground installation structure and installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810836119.0A CN108824754A (en) 2018-07-26 2018-07-26 A kind of integral bathroom ground installation structure and installation method

Publications (1)

Publication Number Publication Date
CN108824754A true CN108824754A (en) 2018-11-16

Family

ID=64141204

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810836119.0A Pending CN108824754A (en) 2018-07-26 2018-07-26 A kind of integral bathroom ground installation structure and installation method

Country Status (1)

Country Link
CN (1) CN108824754A (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577589A (en) * 2018-11-26 2019-04-05 浙江亚厦装饰股份有限公司 A kind of external corner wallboard splicing construction and its joining method
CN110065276A (en) * 2019-04-30 2019-07-30 上海今润装饰材料有限公司 Novel SPC latches ceramic tile composite floor board
CN112982885A (en) * 2021-03-10 2021-06-18 德才装饰股份有限公司 Floor structure and paving method thereof
CN114575550A (en) * 2022-03-23 2022-06-03 安徽三建工程有限公司 Wet pasting process for floor tiles in kitchens and bathrooms

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203924585U (en) * 2014-04-30 2014-11-05 蔡逸民 Weather strip and wood floor bolck concatenation unit
CN205063051U (en) * 2015-10-09 2016-03-02 浙江亚厦装饰股份有限公司 End box on ground between whole bathroom
CN108265938A (en) * 2017-12-30 2018-07-10 浙江亚厦装饰股份有限公司 Ground paving system and method

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN203924585U (en) * 2014-04-30 2014-11-05 蔡逸民 Weather strip and wood floor bolck concatenation unit
CN205063051U (en) * 2015-10-09 2016-03-02 浙江亚厦装饰股份有限公司 End box on ground between whole bathroom
CN108265938A (en) * 2017-12-30 2018-07-10 浙江亚厦装饰股份有限公司 Ground paving system and method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109577589A (en) * 2018-11-26 2019-04-05 浙江亚厦装饰股份有限公司 A kind of external corner wallboard splicing construction and its joining method
CN110065276A (en) * 2019-04-30 2019-07-30 上海今润装饰材料有限公司 Novel SPC latches ceramic tile composite floor board
CN112982885A (en) * 2021-03-10 2021-06-18 德才装饰股份有限公司 Floor structure and paving method thereof
CN114575550A (en) * 2022-03-23 2022-06-03 安徽三建工程有限公司 Wet pasting process for floor tiles in kitchens and bathrooms

Similar Documents

Publication Publication Date Title
CN108824754A (en) A kind of integral bathroom ground installation structure and installation method
CN207332369U (en) A kind of assembled integral vacuum toilet
CN103774817A (en) Special-shaped decorative stone wall surface sticking method
CN204343622U (en) A kind of syndeton of combined floor
CN102535807A (en) Modular wall tile pre-bonding structure and construction method thereof
CN210482881U (en) General fabricated floor tile with all specifications of floor tiles in market
CN100462515C (en) External wall ceramic tile wall surface with heat insulation function and constructing method thereof
CN201531072U (en) Cast-in-situ non-bearing internal partition free from plastering
CN113718994A (en) Connecting structure and method for keel wall and masonry wall
CN102644376B (en) Construction method of recycled concrete wall
CN211369445U (en) Compound ceramic tile spreads fast and pastes structure
JPH11315601A (en) Building exterior heat insulating wall and execution method thereof
CN211229273U (en) Assembled 90 degrees wallboard reentrant corner connection structure of non-
CN216920808U (en) Keel wall and masonry wall connecting structure
CN211646851U (en) Assembled bathroom imitative texture partition wall bottom waterproof construction
CN201588366U (en) Mesh connection type facing brick
CN206554331U (en) A kind of sound insulation cracking resistance decorates prefabricated indoor partition panel
CN209990034U (en) Light-duty equipment base node structure
CN115405060B (en) Method for combining ceramic tile and putty at bealock
CN214498158U (en) Wall body reentrant corner ceramic tile mounting structure
CN210767619U (en) Household ceramic tile structure
CN215054760U (en) Embedded structure of wall brick mirror surface
CN211396406U (en) Cement-based ceramic tile
CN2742070Y (en) Reinforced cement binding force porcelain tile
JPH0211534Y2 (en)

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination