CN108824529A - A kind of hydraulic engineering desilting equipment stirring-head - Google Patents

A kind of hydraulic engineering desilting equipment stirring-head Download PDF

Info

Publication number
CN108824529A
CN108824529A CN201810722517.XA CN201810722517A CN108824529A CN 108824529 A CN108824529 A CN 108824529A CN 201810722517 A CN201810722517 A CN 201810722517A CN 108824529 A CN108824529 A CN 108824529A
Authority
CN
China
Prior art keywords
stirring
cavity
threaded rod
seat
hydraulic engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810722517.XA
Other languages
Chinese (zh)
Other versions
CN108824529B (en
Inventor
朱红兵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Suzhou Multitech Automation Equipment Co Ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN201810722517.XA priority Critical patent/CN108824529B/en
Publication of CN108824529A publication Critical patent/CN108824529A/en
Application granted granted Critical
Publication of CN108824529B publication Critical patent/CN108824529B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02FDREDGING; SOIL-SHIFTING
    • E02F5/00Dredgers or soil-shifting machines for special purposes
    • E02F5/28Dredgers or soil-shifting machines for special purposes for cleaning watercourses or other ways
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02BHYDRAULIC ENGINEERING
    • E02B3/00Engineering works in connection with control or use of streams, rivers, coasts, or other marine sites; Sealings or joints for engineering works in general
    • E02B3/02Stream regulation, e.g. breaking up subaqueous rock, cleaning the beds of waterways, directing the water flow
    • E02B3/023Removing sediments

Abstract

The invention discloses a kind of hydraulic engineering desilting equipment stirring-heads, including stirring seat, it is equidistant in the stirring seat to offer multiple groups placing groove, stirring rod is rotatably connected on the inner wall of each placing groove, it is equidistant in the stirring seat to offer multiple groups mounting groove, it is equidistant in the stirring seat to offer multiple equipment chamber, limited post is equipped in each mounting groove vertically, sliding block is arranged on each limited post, it is fixedly connected with sleeve jointly on corresponding two sliding blocks in position, the first threaded rod is threaded on each sliding block, the upper end of first threaded rod extends in the corresponding equipment cavity in position and is arranged with first bevel gear seat.Structure of the invention is ingenious, easy to use, and resistance is smaller during decline, and decrease speed is fast, does not need the i.e. replaceable stirring seat of professional tool when stirring rod or stirring seat break down, saves a large amount of time and efforts, reduces the influence to work dredging.

Description

A kind of hydraulic engineering desilting equipment stirring-head
Technical field
The present invention relates to water conservancy construction technical field more particularly to a kind of hydraulic engineering desilting equipment stirring-heads.
Background technique
Currently, riverway sludge desilting is the principal element for influencing water conservancy dredging in hydraulic engineering, so that water level rises, Calculation of Ship Grounding's, it is therefore desirable to regularly carry out dredging work, existing dredging mostly uses dredger, the mud on riverbed is passed through Pick bucket is dug out, but since water level rises the limited length of pick bucket, and crawl can be along with many water bodys, and when to encounter bulk hard every time When matter deposit, pick bucket is difficult to be grabbed, and the vibration for hitting generation will affect the stability of hull, and with vessel draft amount Increase, the load-bearing capacity of hull reaches the limit of, and construction speed slows down, it is therefore desirable to replace hull, in the existing method, pass through Stirring bucket to mud upset and water mixing extract after, separated, and then mud is collected carrying, this method It is easy to block pipeline by rotten water plant sucking desilting equipment, damage equipment, need to rot in river before extracting mud Water plant remove, and suffered resistance is larger during the decline of existing stirring-head, and decrease speed is slower, while occurring in stirring-head It needs to replace stirring-head by professional tool dismounting couplers when failure, wastes a large amount of time and efforts, influence clear Silt work.
Summary of the invention
The purpose of the present invention is to solve the decline of stirring-head in the prior art, suffered resistance is larger in the process, decrease speed Slower problem, and a kind of hydraulic engineering desilting equipment stirring-head proposed.
To achieve the goals above, present invention employs following technical solutions:
A kind of hydraulic engineering desilting equipment stirring-head, including stirring seat, it is equidistant in the stirring seat to offer multiple placing grooves Group, and each placing groove group is made of symmetrically arranged multiple placing grooves, passes through circle on the inner wall of each placing groove Pin is rotatably connected to stirring rod, equidistant in the stirring seat to offer multiple groups mounting groove, and every group of mounting groove is by symmetrical Two mounting grooves being arranged form, equidistant in the stirring seat to offer multiple equipment chamber, erect in each mounting groove It is directly equipped with limited post, sliding block is arranged on each limited post, is fixed jointly on corresponding two sliding blocks in position It is connected with sleeve, the first threaded rod is threaded on each sliding block, the upper end of first threaded rod extends to position It sets in corresponding equipment cavity and is arranged with first bevel gear, be symmetrically installed in each equipment cavity there are two fixing seat, Rotating bar is inserted in each fixing seat, one end of the rotating bar is equipped with second bevel gear, and second bevel gear It is engaged with first bevel gear, the other end of the rotating bar is equipped with third hand tap gear, and the first sky is offered in the stirring seat Chamber, is equipped with first motor in first cavity, and the driving end of the first motor is equipped with shaft, equidistant in the shaft From being equipped with multiple 4th bevel gears, and each 4th bevel gear is respectively positioned in equipment cavity, and two be located in same equipment cavity A third hand tap gear is engaged with the 4th bevel gear simultaneously;
The upper end of the stirring seat is fixedly connected with mounting base, is inserted with attachment base in the mounting base, the attachment base it is upper End is fixedly connected with placement rack, and the upper end of the placement rack is fixedly connected with connecting rod, and the second sky is offered in the mounting base Chamber offers third cavity in the attachment base, symmetrically offers multiple grooves on the attachment base, and each groove is with Three cavitys are connected to, and are rotatably connected to triangle card, and the upper surface of triangle card and second on the inner wall of each groove The inner roof wall of cavity offsets, and the first support is fixedly connected in each triangle card, and is offered in the placement rack Four cavitys, the second motor is equipped in the 4th cavity, and the driving end of second motor extends in third cavity and pacifies Equipped with lifting device, it is arranged with sliding sleeve on the lifting device, multiple second are symmetrically fixedly connected on the sliding sleeve Seat, common rotation is connected with pull lever between each second support the first support corresponding with position, and described second is empty Multiple brute springs are uniformly installed, the upper end of the brute spring is equipped with follow block jointly, and follow block is upper on the inner wall of chamber Surface and the lower surface of attachment base offset.
Preferably, the lifting device is made of the second threaded rod and two arc-shaped limit bars, is erected in the third cavity Second threaded rod is directly installed, and the upper end of the second threaded rod extends in the 4th cavity and connect with the second motor, and second Threaded rod is threadedly coupled with sliding sleeve, is symmetrically opened up on the sliding sleeve there are two arc-shaped through-hole, in each arc-shaped through-hole It is mounted on arc-shaped limit bar, and the upper and lower ends of arc-shaped limit bar are fixedly connected on the inner wall of third cavity.
Preferably, the lifting device is made of the second threaded rod and two round gag lever posts, is erected in the third cavity Second threaded rod is directly installed, and the upper end of the second threaded rod extends in the 4th cavity and connect with the second motor, and second Threaded rod is threadedly coupled with sliding sleeve, is symmetrically opened up on the sliding sleeve there are two circular through hole, in each circular through hole It is mounted on round gag lever post, and the upper and lower ends of round gag lever post are fixedly connected on the inner wall of third cavity.
Preferably, arc-shaped slot is offered on the inner wall of each placing groove, is welded on the every stirring rod There is arc fixture block.
Preferably, multiple limit sliding chutes are symmetrically offered on the inner wall of second cavity, and follow block is slidably connected at limit In the sliding slot of position.
The screw thread line of two first threaded rods in mounting groove described in being preferably located at same group is to opposite.
Preferably, the lower end of the shaft and between the lowermost equipment cavity wall pass through needle bearing connect.
Preferably, the height of the groove is slightly larger than the length of triangle card longest side wall.
In the present invention, moving up and down for sliding sleeve is driven by the second motor and lifting device, triangle card is driven with this Rotation, realize the installation and removal between attachment base and mounting base, if that is, in use stirring seat, stirring rod occur therefore Barrier does not need the i.e. replaceable stirring seat of dismounting couplers, saves the time, reduces stirring seat, the shadow that stirring rod failure works to dredging It rings;Gag lever post of different shapes meets the needs of different simultaneously, and the contact area of arc-shaped limit bar and sliding sleeve is larger, limits and makees It makes good use of, cylinder gag lever post cost of manufacture is lower, simple production process;By first motor, shaft, the 4th bevel gear, rotating bar, Third hand tap gear, second bevel gear and first bevel gear drive the rotation of the first threaded rod, then are threadedly coupled with the first threaded rod Sliding block band moving sleeve moves in the vertical direction, stirring rod rotation is driven by sleeve, so that arc fixture block is fastened on arc card In slot, reduces the resistance of the present invention in water, improve decrease speed, when the inner sidewall of sleeve does not offset with the side wall of stirring rod, Drive present invention rotation by desilting equipment, stirring rod rotation driven by centrifugal force, the upper surface of sleeve and placing groove it is interior The side wall of side wall and stirring rod offsets, and guarantees that stirring rod and stirring seat are in plumbness, enhances the efficiency removed to water plant.
Detailed description of the invention
Fig. 1 is a kind of structural schematic diagram of hydraulic engineering desilting equipment stirring-head proposed by the present invention;
Fig. 2 is a kind of hydraulic engineering desilting equipment stirring-head stirring rod proposed by the present invention and the structural representation of stirring seat plumbness Figure;
Fig. 3 is the second chamber portion schematic enlarged-scale view in a kind of hydraulic engineering desilting equipment stirring-head proposed by the present invention;
Fig. 4 is equipment cavity part-structure enlarged drawing in a kind of hydraulic engineering desilting equipment stirring-head proposed by the present invention;
Fig. 5 is lifting device part-structure enlarged drawing in a kind of hydraulic engineering desilting equipment stirring-head proposed by the present invention;
Fig. 6 is sliding sleeve part-structure enlarged drawing in a kind of hydraulic engineering desilting equipment stirring-head proposed by the present invention;
Fig. 7 is arc-shaped limit bar part schematic enlarged-scale view in a kind of hydraulic engineering desilting equipment stirring-head proposed by the present invention;
Fig. 8 is a kind of lifting device part knot of hydraulic engineering desilting equipment stirring-head another embodiment proposed by the present invention Structure enlarged drawing;
Fig. 9 is a kind of sliding sleeve part-structure of hydraulic engineering desilting equipment stirring-head another embodiment proposed by the present invention Enlarged drawing.
In figure:1 stirring seat, 2 arc-shaped slots, 3 second cavitys, 4 second motors, 5 connecting rods, 6 placement racks, 7 attachment bases, 8 Mounting base, 9 first motors, 10 stirring rods, 11 arc fixture blocks, 12 shafts, 13 equipment cavities, 14 sleeves, 15 third hand tap gears, 16 Four bevel gears, 17 second bevel gears, 18 limited posts, 19 first threaded rods, 20 fixing seats, 21 first bevel gears, 22 arc-shaped limits Bar, 23 sliding sleeves, 24 third cavitys, 25 brute springs, 26 pull lever, 27 limit sliding chutes, 28 follow blocks, 29 triangle cards, 30 One support, 31 grooves, 32 second threaded rods, 33 second supports, 34 arc-shaped through-holes, 35 circular through holes, 36 round gag lever posts, 37 are put Set slot.
Specific embodiment
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation description, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.
In the description of the present invention, it is to be understood that, term " on ", "lower", "front", "rear", "left", "right", "top", The orientation or positional relationship of the instructions such as "bottom", "inner", "outside" is to be based on the orientation or positional relationship shown in the drawings, merely to just In description the present invention and simplify description, rather than the device or element of indication or suggestion meaning must have a particular orientation, with Specific orientation construction and operation, therefore be not considered as limiting the invention.
Referring to Fig.1-9, a kind of hydraulic engineering desilting equipment stirring-head, it is equidistant in stirring seat 1 to offer multiple placing grooves Group, and each placing groove group is made of symmetrically arranged multiple placing grooves 37, passes through circle on the inner wall of each placing groove 37 Pin is rotatably connected to stirring rod 10, offers arc-shaped slot 2 on the inner wall of each placing groove 37, on every stirring rod 10 It is welded with arc fixture block 11.
It is equidistant in stirring seat 1 to offer multiple groups mounting groove, and every group of mounting groove is by symmetrically arranged two mounting grooves It forms, it is equidistant in stirring seat 1 to offer multiple equipment chamber 13, it is equipped with limited post 18, each limit vertically in each mounting groove It is arranged with sliding block on the column 18 of position, is fixedly connected with sleeve 14 on corresponding two sliding blocks in position jointly, on each sliding block It is threaded with the first threaded rod 19, the screw thread line of two first threaded rods 19 in same group of mounting groove is on the contrary, protect It demonstrate,proves identical as the moving direction of sliding block that the first threaded rod 19 is threadedly coupled.
The upper end of first threaded rod 19 extends in the corresponding equipment cavity 13 in position and is arranged with first bevel gear 21, often It is symmetrically installed in a equipment cavity 13 there are two fixing seat 20, is inserted with rotating bar in each fixing seat 20, the one of rotating bar End is equipped with second bevel gear 17, and second bevel gear 17 is engaged with first bevel gear 21, and the other end of rotating bar is equipped with the Third hand tap gear 15 offers the first cavity in stirring seat 1, first motor 9, the driving of first motor 9 is equipped in the first cavity End is equipped with shaft 12, the lower end of shaft 12 and positioned at 13 inner wall of the lowermost equipment cavity between by needle bearing connection, roll Needle bearing is compact-sized small in size, and running accuracy is high, can bear certain axial load while bearing very high radial load, It is easily installed, it is equidistant in shaft 12 that multiple 4th bevel gears 16 are installed, and each 4th bevel gear 16 is respectively positioned on equipment cavity In 13, and two third hand tap gears 15 being located in same equipment cavity 13 are engaged with the 4th bevel gear 16 simultaneously.
The upper end of stirring seat 1 is fixedly connected with mounting base 8, and attachment base 7 is inserted in mounting base 8, and the upper end of attachment base 7 is solid Surely it is connected with placement rack 6, the upper end of placement rack 6 is fixedly connected with connecting rod 5, and the second cavity 3 is offered in mounting base 8, connects Offer third cavity 24 in seat 7, symmetrically offer multiple grooves 31 on attachment base 7, and each groove 31 with third cavity 24 are connected to, and triangle card 29, and the upper surface of triangle card 29 and the second sky are rotatably connected on the inner wall of each groove 31 The inner roof wall of chamber 3 offsets, and the height of groove 31 is slightly larger than the length of 29 longest side wall of triangle card, guarantees that triangle card 29 rotates When can be fixedly connected to the first support 30 in each triangle card 29 by groove 31.
The 4th cavity is offered in placement rack 6, the second motor 4 is installed in the 4th cavity, and the driving end of the second motor 4 is prolonged It extends in third cavity 24 and lifting device is installed, sliding sleeve 23 is arranged on lifting device, lifting device is by the second screw thread Bar 32 and two arc-shaped limit bars 22 form, vertically-mounted in third cavity 24 to have the second threaded rod 32, and the second threaded rod 32 Upper end extend in the 4th cavity and connect with the second motor 4, and the second threaded rod 32 is threadedly coupled with sliding sleeve 23, is slided Arc-shaped through-hole 34 there are two symmetrically opening up on 23 is covered, arc-shaped limit bar 22 is mounted in each arc-shaped through-hole 34, and arc limits The upper and lower ends of position bar 22 are fixedly connected on the inner wall of third cavity 24.
Lifting device another embodiment is made of the second threaded rod 32 and two round gag lever posts 36, third cavity 24 It is interior it is vertically-mounted have the second threaded rod 32, and the upper end of the second threaded rod 32 extends in the 4th cavity and connects with the second motor 4 It connects, and the second threaded rod 32 is threadedly coupled with sliding sleeve 23, is symmetrically opened up on sliding sleeve 23 there are two circular through hole 35, Mei Geyuan Round gag lever post 36 is mounted in shape through-hole 35, and the upper and lower ends of round gag lever post 36 are fixedly connected in third cavity 24 Inner wall on.
Multiple second supports 33, each second support 33 corresponding with position are symmetrically fixedly connected on sliding sleeve 23 Common rotation is connected with pull lever 26 between one support 30, and multiple brute springs 25 are uniformly equipped on the inner wall of the second cavity 3, The upper end of brute spring 25 is equipped with follow block 28 jointly, and multiple limit sliding chutes 27 are symmetrically offered on the inner wall of the second cavity 3, and Follow block 28 is slidably connected in limit sliding chutes 27, and the upper surface of follow block 28 and the lower surface of attachment base 7 offset.
In the use of the present invention, opening the second motor 4, the second motor 4 drives the second threaded rod 32 being attached thereto positive Rotation, the sliding sleeve 23 being threadedly coupled with the second threaded rod 32 upward sliding on arc-shaped limit bar 22 or round gag lever post 36, Sliding sleeve 23 drives triangle card 29 to rotate into third cavity 24 by the second support 33, pull lever 26 and the first support 30, The second motor 4 is closed when the side wall of 29 longest edge side wall of triangle card and attachment base 7 is generally aligned in the same plane, then by attachment base In the second cavity 3 in 7 insertion mounting bases 8, the lower end of attachment base 7 and the upper surface of follow block 28 offset, and brute spring 25 is downward Then compression, the slide downward in limit sliding chutes 27 of follow block 28 are again turned on the second motor 4, the drive of the second motor 4 is attached thereto The second threaded rod rotate backward, the sliding sleeve 23 being threadedly coupled with the second threaded rod 32 is in arc-shaped limit bar 22 or round limit Slide downward on bar 36, sliding sleeve 23 are remote by the second support 33, pull lever 26 and the drive of the first support 30 triangle card 29 casees Direction rotation from third cavity 24, then unclamps attachment base 7, and brute spring 25 restores former length, is driven and is connected by follow block 28 Seat 7 moves upwards, until the side wall of the side wall and third cavity 24 of triangle card 29 offsets.
Then the present invention is fixedly mounted on desilting equipment by shaft coupling, the present invention is controlled by desilting equipment, it will The present invention is put into bottom of river channel, then opens first motor 9, first motor 9 drives shaft 12 to rotate, then multiple in shaft 12 4th bevel gear 16 rotates simultaneously, and the third hand tap gear 15 that engages with the 4th bevel gear 16 rotates, and rotating bar rotates and drives the The rotation of two bevel gears 17, the then first bevel gear 21 that engage with second bevel gear 17 rotate, and the first threaded rod 19 rotates, then with the The sliding block that one threaded rod 19 is threadedly coupled slides on limited post 18;Due to two thirds engaged with same 4th bevel gear 16 15 rotation direction of bevel gear is on the contrary, then the steering of two second bevel gears 17 in same equipment cavity 13 is on the contrary, be located at same Two first bevel gears 21 in one equipment cavity 13 turn on the contrary, two first threaded rods 19 being located in same group of mounting groove exist Rotation direction is conversely, because the line of screw thread is on the contrary, then two on two first threaded rods 19 being located in same group of mounting groove First threaded rod, 19 top shoe moving direction on limited post 18 is identical;Multiple sleeves 14 fortune downwards is controlled by first motor 9 It is dynamic, so that side wall of the inner sidewall of sleeve 14 not with stirring rod 10 is offseted, when driving present invention rotation by mood equipment, by from The effect of mental and physical efforts drives the arc fixture block 11 on stirring rod 10 to rotate far from arc-shaped slot 2, inner sidewall and the position phase of placing groove The upper surface of corresponding sleeve 14 and the side wall of stirring rod 10 offset, and guarantee that stirring rod 10 keeps the state vertical with stirring seat 1.
Present invention rotation is driven by desilting equipment, stirring rod 10 rotates, and stirring rod 10, which twines, sets water plant, then passes through dredging Equipment takes the present invention out of river, will twine the water plant set and takes out from stirring rod 10;First motor 9 and the second motor 4 are It can be the technology of existing maturation by wireless control, relevant specific structure and Principle of Communication, not described here any more.
The foregoing is only a preferred embodiment of the present invention, but scope of protection of the present invention is not limited thereto, Anyone skilled in the art in the technical scope disclosed by the present invention, according to the technique and scheme of the present invention and its Inventive concept is subject to equivalent substitution or change, should be covered by the protection scope of the present invention.

Claims (9)

1. a kind of hydraulic engineering desilting equipment stirring-head, including stirring seat(1), it is characterised in that:The stirring seat(1)It is upper equidistant It leaves and is equipped with multiple placing groove groups, and each placing groove group is by symmetrically arranged multiple placing grooves(37)Composition, it is each described Placing groove(37)Inner wall on stirring rod is rotatably connected to by straight pin(10), the stirring seat(1)It is above equidistant to open up There is multiple groups mounting groove, and every group of mounting groove is made of symmetrically arranged two mounting grooves, the stirring seat(1)It is above equidistant to open Equipped with multiple equipment chamber(13), limited post is equipped in each mounting groove vertically(18), each limited post(18)On It is arranged with sliding block, is fixedly connected with sleeve jointly on corresponding two sliding blocks in position(14), on each sliding block It is threaded with the first threaded rod(19), first threaded rod(19)Upper end extend to the corresponding equipment cavity in position (13)It is interior and be arranged with first bevel gear(21), each equipment cavity(13)Fixing seat there are two being inside symmetrically installed(20), Each fixing seat(20)On be inserted with rotating bar, one end of the rotating bar is equipped with second bevel gear(17), and the Two bevel gears(17)With first bevel gear(21)Engagement, the other end of the rotating bar are equipped with third hand tap gear(15), described Stirring seat(1)The first cavity is inside offered, first motor is installed in first cavity(9), the first motor(9)Drive Moved end is equipped with shaft(12), the shaft(12)It is above equidistant that multiple 4th bevel gears are installed(16), and each 4th cone Gear(16)It is respectively positioned on equipment cavity(13)It is interior, and it is located at same equipment cavity(13)Two interior third hand tap gears(15)Simultaneously with the Four bevel gears(16)Engagement.
2. a kind of hydraulic engineering desilting equipment stirring-head according to claim 1, it is characterised in that:The stirring seat(1) Upper end be fixedly connected with mounting base(8), the mounting base(8)Inside it is inserted with attachment base(7), the attachment base(7)Upper end It is fixedly connected with placement rack(6), the placement rack(6)Upper end be fixedly connected with connecting rod(5), the mounting base(8)Inside open Equipped with the second cavity(3), the attachment base(7)Inside offer third cavity(24), the attachment base(7)On symmetrically offer it is more A groove(31), and each groove(31)With third cavity(24)Connection, each groove(31)Inner wall on rotate It is connected with triangle card(29), and triangle card(29)Upper surface and the second cavity(3)Inner roof wall offset, each described three Angle fixture block(29)On be fixedly connected to the first support(30), the placement rack(6)The 4th cavity is inside offered, the described 4th is empty It is intracavitary that second motor is installed(4), second motor(4)Driving end extend to third cavity(24)It is interior and promotion is installed Device is arranged with sliding sleeve on the lifting device(23), the sliding sleeve(23)On be symmetrically fixedly connected with multiple second Seat(33), each second support(33)The first support corresponding with position(30)Between common rotation be connected with pull lever (26), second cavity(3)Inner wall on multiple brute springs are uniformly installed(25), the brute spring(25)Upper end Follow block is installed jointly(28), and follow block(28)Upper surface and attachment base(7)Lower surface offset.
3. a kind of hydraulic engineering desilting equipment stirring-head according to claim 2, it is characterised in that:The lifting device by Second threaded rod(32)With two arc-shaped limit bars(22)Composition, the third cavity(24)Interior vertically-mounted have the second threaded rod (32), and the second threaded rod(32)Upper end extend in the 4th cavity and with the second motor(4)Connection, and the second threaded rod (32)With sliding sleeve(23)It is threadedly coupled, the sliding sleeve(23)On symmetrically open up there are two arc-shaped through-hole(34), each described Arc-shaped through-hole(34)Inside it is mounted on arc-shaped limit bar(22), and arc-shaped limit bar(22)Upper and lower ends be fixedly connected with Three cavitys(24)Inner wall on.
4. a kind of hydraulic engineering desilting equipment stirring-head according to claim 2, it is characterised in that:The lifting device by Second threaded rod(32)With two round gag lever posts(36)Composition, the third cavity(24)Interior vertically-mounted have the second threaded rod (32), and the second threaded rod(32)Upper end extend in the 4th cavity and with the second motor(4)Connection, and the second threaded rod (32)With sliding sleeve(23)It is threadedly coupled, the sliding sleeve(23)On symmetrically open up there are two circular through hole(35), each described Circular through hole(35)Inside it is mounted on round gag lever post(36), and round gag lever post(36)Upper and lower ends be fixedly connected with Three cavitys(24)Inner wall on.
5. a kind of hydraulic engineering desilting equipment stirring-head according to claim 1, it is characterised in that:Each placing groove (37)Inner wall on offer arc-shaped slot(2), the every stirring rod(10)On be welded with arc fixture block(11).
6. a kind of hydraulic engineering desilting equipment stirring-head according to claim 2, it is characterised in that:Second cavity (3)Inner wall on symmetrically offer multiple limit sliding chutes(27), and follow block(28)It is slidably connected at limit sliding chutes(27)It is interior.
7. a kind of hydraulic engineering desilting equipment stirring-head according to claim 1, it is characterised in that:Described in same group Two first threaded rods in mounting groove(19)Screw thread line to opposite.
8. a kind of hydraulic engineering desilting equipment stirring-head according to claim 1, it is characterised in that:The shaft(12)'s Lower end be located at the lowermost equipment cavity(13)It is connected between inner wall by needle bearing.
9. a kind of hydraulic engineering desilting equipment stirring-head according to claim 2, it is characterised in that:The groove(31)'s Height is slightly larger than triangle card(29)The length of longest side wall.
CN201810722517.XA 2018-07-04 2018-07-04 Hydraulic engineering desilting equipment stirring head Active CN108824529B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810722517.XA CN108824529B (en) 2018-07-04 2018-07-04 Hydraulic engineering desilting equipment stirring head

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810722517.XA CN108824529B (en) 2018-07-04 2018-07-04 Hydraulic engineering desilting equipment stirring head

Publications (2)

Publication Number Publication Date
CN108824529A true CN108824529A (en) 2018-11-16
CN108824529B CN108824529B (en) 2020-10-27

Family

ID=64134404

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810722517.XA Active CN108824529B (en) 2018-07-04 2018-07-04 Hydraulic engineering desilting equipment stirring head

Country Status (1)

Country Link
CN (1) CN108824529B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605522A (en) * 2021-08-06 2021-11-05 浙大城市学院 Stirring power mechanism of pipeline dredging robot

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007245130A (en) * 2006-03-13 2007-09-27 Tsutomu Kohiyama Stirring device
CN105828924A (en) * 2013-12-17 2016-08-03 拜耳作物科学有限合伙公司 Mixing systems, methods, and devices with extendible impellers
CN206168264U (en) * 2016-09-21 2017-05-17 鳄鱼制漆(上海)有限公司 Ton folding agitator of guaranteeing serviceability
CN107476367A (en) * 2017-08-09 2017-12-15 公臣 A kind of row's silt device for hydraulic engineering
CN107724451A (en) * 2017-11-27 2018-02-23 徐州华显凯星信息科技有限公司 A kind of hydraulic engineering desilting equipment stirring-head

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2007245130A (en) * 2006-03-13 2007-09-27 Tsutomu Kohiyama Stirring device
CN105828924A (en) * 2013-12-17 2016-08-03 拜耳作物科学有限合伙公司 Mixing systems, methods, and devices with extendible impellers
CN206168264U (en) * 2016-09-21 2017-05-17 鳄鱼制漆(上海)有限公司 Ton folding agitator of guaranteeing serviceability
CN107476367A (en) * 2017-08-09 2017-12-15 公臣 A kind of row's silt device for hydraulic engineering
CN107724451A (en) * 2017-11-27 2018-02-23 徐州华显凯星信息科技有限公司 A kind of hydraulic engineering desilting equipment stirring-head

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113605522A (en) * 2021-08-06 2021-11-05 浙大城市学院 Stirring power mechanism of pipeline dredging robot

Also Published As

Publication number Publication date
CN108824529B (en) 2020-10-27

Similar Documents

Publication Publication Date Title
CN202117556U (en) Auger driller for moulding concrete piles with different depth and shapes
CN109469140A (en) A kind of hydraulic engineering river bottom silt cleaning device
CN206581324U (en) Bucket is grabbed in a kind of well cleaning
CN108824529A (en) A kind of hydraulic engineering desilting equipment stirring-head
CN107882512A (en) Mud remover for spiral drill rod
CN214130418U (en) Floating sludge collector settling tank device based on river channel
CN108560550A (en) A kind of square pile former of municipal administration
CN108757436B (en) Conveniently-installed pump station
CN114263181B (en) Main bridge pile foundation concrete super-casting height accurate control device and use method thereof
CN217608546U (en) Torrent type river submerged plant solid planting structure
CN102155157B (en) Spiral drilling machine for forming concrete piles of different depths and shapes
CN109704418A (en) Full-automatic environment water process Enteromorpha reclaimer
CN209277918U (en) A kind of novel anchor rod spiral time quarter drilling tool
CN209302979U (en) Oil remover
CN217691689U (en) Electric power grounding stake easy to assemble and demolish
CN108547578B (en) Electric power cable construction line bar Digging machine
CN215482697U (en) Hydraulic engineering construction breakwater device
CN212508111U (en) Clear hole device of pile foundation construction
CN217204570U (en) Sewer anti-seepage device
CN217439133U (en) Road drainage well cover for municipal water supply and drainage
CN212975481U (en) Sand screening and washing integrated machine
CN105145283B (en) A kind of native delver of hemispherical nursery stock band
CN214463939U (en) Special drill rod for single-shaft double-pipe high-spraying stirring composite pile
CN109156117A (en) A kind of field planting of pear tree thrown with anti-soil splash open pit device
CN217831017U (en) Cleaning device for tea production

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right

Effective date of registration: 20200914

Address after: No.1, 4th floor, building a, No.88, Beijing East Road, Taicang Development Zone, Suzhou City, Jiangsu Province

Applicant after: SUZHOU MULTITECH AUTOMATION EQUIPMENT Co.,Ltd.

Address before: 230000 Jinxiu Avenue, Jingkai District, Hefei City, Anhui Province, No. 99, 35 Building 734, Hefei College

Applicant before: Zhu Hongbing

TA01 Transfer of patent application right
GR01 Patent grant
GR01 Patent grant