CN108824200A - A kind of Cast-in-place Bent Cap construction method - Google Patents

A kind of Cast-in-place Bent Cap construction method Download PDF

Info

Publication number
CN108824200A
CN108824200A CN201810707838.2A CN201810707838A CN108824200A CN 108824200 A CN108824200 A CN 108824200A CN 201810707838 A CN201810707838 A CN 201810707838A CN 108824200 A CN108824200 A CN 108824200A
Authority
CN
China
Prior art keywords
cavity
slider guide
guide
guide runner
wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Withdrawn
Application number
CN201810707838.2A
Other languages
Chinese (zh)
Inventor
寿金校
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Yongkang Giant Wind Technology Co Ltd
Original Assignee
Yongkang Giant Wind Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Yongkang Giant Wind Technology Co Ltd filed Critical Yongkang Giant Wind Technology Co Ltd
Priority to CN201810707838.2A priority Critical patent/CN108824200A/en
Publication of CN108824200A publication Critical patent/CN108824200A/en
Withdrawn legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Earth Drilling (AREA)

Abstract

The invention discloses a kind of Cast-in-place Bent Cap construction methods, use a kind of automation placing installation, including car body 100 and the first guide runner 113 of 100 inner opening of car body to the right is set, the first slider guide 114 is slidably connected in first guide runner 113, first slider guide, 114 right end stretches out outside 100 right end of car body, first slider guide, 113 screw-internal thread fit is connected with left and right extends first and adjusts threaded rod 131, first adjusting, 131 left end end of threaded rod has been connected by power the first motor 123, first motor, 123 outer surface is embedded in the 113 left end inner wall of the first guide runner and connection fixed thereto.

Description

A kind of Cast-in-place Bent Cap construction method
Technical field
The present invention relates to technical field of building construction, specifically a kind of Cast-in-place Bent Cap construction method.
Background technique
With the reach of science, social progress, Road to Modernization construction is the one of main of current national requirements, and is built It builds in technical field of construction there is a great problem, wherein bent cap is as one of bridge or the main portions of road, master The supporting role wanted, general method are only simply built the general space for pouring plate and surrounding, are then poured, this side Method not only pours that height limitation is larger, and effect is poor, and construction cost is higher, more have very for the ponding in hollow hole ground can not and When exclude to influence construction effect and efficiency, the device of the invention to solve this problem in that.
Summary of the invention
Technical problem to be solved by the invention is to provide a kind of Cast-in-place Bent Cap construction methods, are able to solve above-mentioned present The problems in technology.
The present invention is achieved through the following technical solutions:A kind of Cast-in-place Bent Cap construction method of the invention, uses one Kind automation placing installation, including car body and is arranged in the first guide runner of the car body inner opening to the right, described first leads The first slider guide is slidably connected in sliding slot, the first slider guide right end stretches out outside the car body right end, and described first Slider guide screw-internal thread fit is connected with left and right extends first and adjusts threaded rod, and described first adjusts threaded rod left end end power It is connected with the first motor, first motor outer surface is embedded in the inner wall of first guide runner left end and fixed thereto Connection, the first slider guide right end end are slidably connected with lifter plate, are equipped with opening in the end face of the lifter plate left end To the left and the second guide runner with first slider guide sliding connection, it is rotatably assorted in second guide runner and is connected with The elevating screw thread bar of connection extended up and down, the elevating screw thread bar top end power are threadedly engaged with first slider guide It is connected with the second motor, second motor outer surface is embedded in the second guide runner top inner wall and fixed thereto It connects, is successively arranged the fixed block being equally spaced on lifter plate right end end face from top to bottom, is passed through up and down in the fixed block It is logical to be equipped with holding tank, symmetrical pusher is equipped with before and after the holding tank in inner wall, the pusher is close to the holding tank End has been connected by power arc and has poured clamping plate, and the first slide guide trench bottom is equipped with the first cavity, and sliding is matched in first cavity Conjunction is connected with the second slider guide, and the second cavity is equipped in second slider guide, is embedded in the second cavity top wall body Third motor, the third motor bottom end have been connected by power first pulley, have turned in the second cavity bottom wall body Dynamic to be connected with extension and symmetrical screw rod up and down, the screw tip puts in second cavity and is equipped with second Belt wheel, has been connected by power belt between the first pulley and second belt wheel, the screw rod bottom end is through described the One cavity bottom wall body and it being threadedly engaged connection therewith, the first cavity bottom inner wall quadrangle is equipped with balance foot prop, and described the Third cavity is equipped at the top of one guide runner, the third cavity right end is equipped with discharge pressure chamber, and rotation is matched in the third cavity It closes and is connected with the first rotation axis that front and back extends, first rotation shaft rear end end has been connected by power the 4th motor, described First rotation axis is equipped with flywheel, and first rotation axis is equipped with the cam positioned at the flywheel rear end, the third cavity The third guide runner extended up and down being equipped with positioned at first rotation axis bottom is communicated in the inner wall of rear end, after the third cavity The 4th guide runner for being equipped with and communicating with the third guide runner right end inner wall, sliding in the 4th guide runner are communicated in the inner wall of end It is connected with third slider guide, third slider guide bottom, which presses, is equipped with the first top pressure spring, before the third slider guide End is fixedly connected with the first press sliding block on end face, is slidably connected with the 4th slider guide in the 4th guide runner, described It is fixedly connected in 4th slider guide front end surface to the push plate with the first press sliding block sliding connection, described the Four slider guide bottom end faces are equipped with bullet and connect recovery device, are hingedly connected on the inner wall of third cavity rear end positioned at described first The swing rod of rotation axis right end, the swing rod upper and lower side be equipped with front and back penetrate through and symmetrical sliding rail, swing rod bottom left end with The push plate press is cooperatively connected, and press is equipped with the second press bullet between the swing rod right end and the third cavity right end inner wall Spring is communicated equipped with water inlet pipe in the discharge pressure chamber bottom interior wall, is communicated in the discharge pressure top of chamber inner wall equipped with position Drainpipe above the water inlet pipe penetrates through the water inlet pipe and the drainpipe and symmetrical up and down in the car body respectively Switch slot, be slidably connected with cock plug in the switch slot, slide and match between the switch slot and the third cavity It closes and is connected with the push rod that left and right extends, the push rod right end puts in the switch slot and is fixedly connected with the cock plug, institute Push rod left end is stated to put in the third cavity, two push rod left end ends be equipped with front and back extend and to the sliding rail The pin shaft of sliding connection, the discharge pressure is intracavitary to be slidably connected with pressurization plug, the discharge pressure chamber with it is described Be slidably connected between third cavity left and right extend slide plate, the slide plate right end put in the discharge pressure it is intracavitary and with Pressurization plug is fixedly connected, and slide plate left end end is put in the third cavity, slide plate left end end with it is described Connecting rod is hingedly connected between flywheel front end surface;
Described method includes following steps:
Firstly, first slider guide is put in completely in first guide runner, the first slider guide right end is located at described the Two guide runner bottommosts, at this point, the lifter plate is utmostly lifted, two arcs pour clamping plate and are located remotely from each other, institute It states the second slider guide and is located at the first cavity top, the supporting block is utmostly put in first cavity, at this point, The relay block is far from the first cavity bottom inner wall, and the earth balance block is far from the ground, the cam long section position In first rotation shaft centre line bottom, the third slider guide is located at the third slide guide trench bottom, the push plate press The swing rod inclination, at this point, the drainpipe is open-minded, the water inlet pipe is closed, and the pressurization plug is located at the discharge pressure In the middle part of chamber;
Then, device is moved integrally to the required Coping Construction poured, is then started described in the first motor drive First adjusts threaded rod rotation, so that the arc is poured the ground of the bent cap poured needed for clamping plate alignment, then starts the promotion Device makes the arc pour clamping plate to match well, make the arc to match well pour clamping plate and run up to suitable height, then start institute It states the second motor and drives the elevating screw thread bar rotation, the arc regulated is made to pour clamping plate and ground face contact package steel Muscle cage finally starts the third motor and drives the first pulley rotation, passes through the belt and the second band crop rotation With, the screw rod is rotated, second slider guide moves down, meanwhile, the screw rod can inject ground inner fixing device entirety, prevent Only run-off the straight presses the relay block and moves down, make institute when second slider guide is displaced downwardly to the first cavity bottommost Earth balance block contact ground is stated, the rigid contact with ground is further increased, prevents from subsideing in ground, when pouring low-lying land When, when having ponding and need to extract out in low-lying land, starts the 4th motor and drive the first rotation axis rotation, described the Four rotation axis drive the flywheel and the cam to rotate simultaneously, the work that the flywheel passes through the connecting rod the and described slide plate With, make the pressurization plug in the periodically sliding of the intracavitary left and right of the discharge pressure, meanwhile, the cam passes through the third slide guide Block, the first press sliding block, the 4th slider guide, the push plate, first top pressure spring, second top pressure spring With the effect of the 4th top pressure spring, the swing rod is swung, due to the effect of the push rod, makes the cock plug or so week Phase is mobile and cooperates moving left and right for the pressurization plug, realizes automatic pumping work;
So that the arc is poured clamping plate opening finally, starting the pusher, keeps bent cap exposed, it is electronic then to start described second Machine drives the elevating screw thread bar to rotate backward, and so that the lifter plate and the arc is poured clamping plate and integrally moves up, finally starts The third motor drives the first pulley to rotate backward, and finally rotates backward the screw rod, makes the screw rod from ground It is extracted in face, due to the effect of the third top pressure spring, keeps the relay block, the supporting block and the earth balance block whole Body moves up, and so as to release device balance and stability, can move freely.
It may be preferred that the balance foot prop includes the supporting block that inclination runs through the first cavity side wall body, the branch Relay block is put in first cavity and is fixedly connected at the top of bracer, and the supporting block bottom is stretched out outside the car body and set There is earth balance block, press is equipped with third top pressure spring between the relay block bottom and the first cavity bottom inner wall, real The balance and stability when overall work of existing device.
It may be preferred that it includes communicating the 5th slide guide that the 4th slide guide trench bottom is arranged in that the bullet, which connects recovery device, Slot is slidably connected with the 5th slider guide in the 5th guide runner, in the 5th guide runner press be equipped be located at it is described 4th top pressure spring of the 5th guide runner right end, the 5th slider guide top end surface and the 4th slider guide bottom end face are solid Fixed connection is shut down convenient for the automatic switchover draining of device.
It is equipped with ventilation pipe it may be preferred that communicating in the discharge pressure cavity rear end inner wall, the ventilation pipe rear end end is passed through Wear the body rear end end face, arc described in bottommost, which pours, to be communicated in clamping plate equipped with suction hose, the suction hose other end with The water inlet pipe other end communicates, convenient for the ponding in the automatic depression of discharge in time.
When wherein, due to original state, first slider guide is put in completely in first guide runner, and described first leads Sliding block right end is located at the second guide runner bottommost, at this point, the lifter plate is utmostly lifted, two arcs are poured It builds clamping plate to be located remotely from each other, second slider guide is located at the first cavity top, and the supporting block utmostly puts in institute It states in the first cavity, at this point, the relay block is far from the first cavity bottom inner wall, the earth balance block is far from describedly Face, the cam long section position are located at the third guide runner in first rotation shaft centre line bottom, the third slider guide Bottom, the push plate press the swing rod inclination, at this point, the drainpipe is open-minded, the water inlet pipe is closed, the pressurization plug In the middle part of the discharge pressure chamber, consequently facilitating device maintenance and movement.
When the work is required, device is moved integrally to the required Coping Construction poured, then starts first electricity Motivation drives described first to adjust threaded rod rotation, so that the arc is poured the ground of the bent cap poured needed for clamping plate alignment, then Start the pusher arc is made to pour clamping plate and matches well, so that the arc to match well is poured clamping plate and run up to suitable height Then degree starts second motor and drives the elevating screw thread bar rotation, make the arc regulated pour clamping plate with Ground face contact wraps up steel reinforcement cage, finally starts the third motor and drives the first pulley rotation, by the belt and The second belt wheel effect, rotates the screw rod, and second slider guide moves down, meanwhile, the screw rod can inject in ground Fixed device is whole, prevents to tilt, when second slider guide is displaced downwardly to the first cavity bottommost, described in press Relay block moves down, and makes earth balance block contact ground, further increases the rigid contact with ground, prevent from subsideing ground It is interior, when having ponding when pouring low-lying land, in low-lying land and needing to extract out, starts the 4th motor and drive described first turn Moving axis rotation, the 4th rotation axis drive the flywheel and the cam to rotate simultaneously, and the flywheel passes through the connecting rod And the slide plate effect, make the pressurization plug in the periodically sliding of the intracavitary left and right of the discharge pressure, meanwhile, the cam By the third slider guide, it is described first press sliding block, the 4th slider guide, the push plate, first top pressure spring, The effect of second top pressure spring and the 4th top pressure spring swings the swing rod, due to the effect of the push rod, makes The cock plug or so the period is mobile and cooperates moving left and right for the pressurization plug, automatic pumping work is realized, to improve lid Beam pours effect and efficiency.
When completing to need to store, starting the pusher makes the arc pour clamping plate opening, keeps bent cap exposed, then Starting second motor drives the elevating screw thread bar to rotate backward, and so that the lifter plate and the arc is poured clamping plate whole Body moves up, and finally starts the third motor and the first pulley is driven to rotate backward, finally rotate backward the screw rod, It extracts the screw rod out of ground, due to the effect of the third top pressure spring, makes the relay block, the supporting block and institute It states earth balance block integrally to move up, so as to release device balance and stability, can move freely, to improve device practicability Energy.
The configuration of the present invention is simple, it is easy to operate, by using can the stable moving body of autobalance, and set on the car body Clamping plate mechanism can be poured matching well automatically for maximum magnitude and height adjustment by setting, and realize the bent cap that pours of stability and high efficiency, mobile convenience, Storage is convenient, can now build the bent cap of different height, and is equipped with automatic depression water plug, greatly promotes and pours convenience and effect Fruit.
Detailed description of the invention
The present invention is described in detail by following specific embodiments and drawings for ease of explanation,.
Fig. 1 is overall structure diagram inside a kind of Cast-in-place Bent Cap construction method of the invention;
Fig. 2 is the schematic cross-section of A in Fig. 1;
Fig. 3 is the local mechanism enlarged diagram of B in Fig. 1.
Specific embodiment
As shown in Figure 1, Figure 2 and Figure 3, a kind of Cast-in-place Bent Cap construction method of the invention is poured using a kind of automation and is set It is standby, including car body 100 and the first guide runner 113 of 100 inner opening of car body to the right, first guide runner are set The first slider guide 114 is slidably connected in 113,114 right end of the first slider guide stretches out outside 100 right end of car body, First slider guide, 113 screw-internal thread fit is connected with left and right extends first and adjusts threaded rod 131, and described first adjusts screw thread 131 left end end of bar has been connected by power the first motor 123, and 123 outer surface of the first motor is embedded at described first and leads In 113 left end inner wall of sliding slot and connection fixed thereto, the 113 right end end of the first slider guide is slidably connected with lifter plate 135, opening is equipped in the 135 left end end face of lifter plate to the left and the with first slider guide 114 sliding connection Two guide runners 133, being rotatably assorted to be connected with to be threadedly engaged with first slider guide 114 in second guide runner 133 connect The elevating screw thread bar 132 extended up and down, 132 top end of elevating screw thread bar has been connected by power the second motor 134, institute It states 134 outer surface of the second motor to be embedded in 133 top inner wall of the second guide runner and connection fixed thereto, the lifting The fixed block 136 being equally spaced is successively arranged on 135 right end end face of plate from top to bottom, is set up and down in the fixed block 136 There is holding tank 139, is equipped with symmetrical pusher 140 in the 139 front and back inner wall of holding tank, the pusher 140 is close to institute It states 139 end of holding tank and has been connected by power arc and pour clamping plate 137,113 bottom of the first guide runner is equipped with the first cavity 104, It is slidably connected with the second slider guide 111 in first cavity 104, is equipped with the second cavity in second slider guide 111 112, third motor 109 is embedded in the 112 top wall body of the second cavity, 109 bottom end of third motor is dynamic Power is connected with first pulley 110, is rotatably assorted in the 112 base wall body of the second cavity and is connected with extension up and down and bilateral symmetry Screw rod 106, put at the top of the screw rod 106 in second cavity 112 and be equipped with the second belt wheel 107, the first pulley Belt 108 is connected by power between 110 and second belt wheel 107,106 bottom end of screw rod runs through first cavity 104 bottom wall bodies and it being threadedly engaged connection therewith, the 104 bottom interior wall quadrangle of the first cavity is equipped with balance foot prop, and described the Third cavity 142 is equipped at the top of one guide runner 113,142 right end of third cavity is equipped with discharge pressure chamber 116, the third It is rotatably assorted in cavity 142 and is connected with the first rotation axis 144 that front and back extends, the 144 rear end end power of the first rotation axis It is connected with the 4th motor, first rotation axis 144 is equipped with flywheel 143, and first rotation axis 144, which is equipped with, is located at institute The cam 145 of flywheel rear end is stated, communicates and is equipped with positioned at 144 bottom of the first rotation axis in the 142 rear end inner wall of third cavity The third guide runner 152 extended up and down in portion is communicated in the 142 rear end inner wall of third cavity and is equipped with and the third guide runner The 4th guide runner 159 that 152 right end inner walls communicate is slidably connected with third slider guide in the 4th guide runner 152 150,150 bottom of third slider guide, which presses, is equipped with the first top pressure spring 153, in 150 front end surface of third slider guide It is fixedly connected with the first press sliding block 151, is slidably connected with the 4th slider guide 156 in the 4th guide runner 159, it is described The push plate to be slidably connected with the first press sliding block 151 is fixedly connected in 4th slider guide, 156 front end surface 155,156 bottom end face of the 4th slider guide is equipped with bullet and connects recovery device, hingedly connects on the 142 rear end inner wall of third cavity It is connected to the swing rod 149 positioned at 144 right end of the first rotation axis, 149 upper and lower side of swing rod is equipped with front and back and penetrates through and symmetrical Sliding rail 147, the 149 bottom left end of swing rod and the push plate 155 press be cooperatively connected, 149 right end of swing rod with it is described Press is equipped with the second top pressure spring 161 between 142 right end inner wall of third cavity, communicates in 116 bottom interior wall of discharge pressure chamber Equipped with water inlet pipe 115, the draining for being equipped with and being located at 115 top of water inlet pipe is communicated in 116 top inner wall of discharge pressure chamber Pipe 119 penetrates through the water inlet pipe 115 and the drainpipe 119 in the car body 100 and switch slot symmetrical up and down respectively 118, cock plug 160 is slidably connected in the switch slot 118, between the switch slot 118 and the third cavity 142 It is slidably connected with the push rod 121 that left and right extends, 121 right end of push rod puts in the switch slot 118 and opens with described It closes plug 160 to be fixedly connected, 121 left end of push rod is put in the third cavity 142, two 121 left end ends of push rod Equipped with front and back extension and the pin shaft 148 to be slidably connected with the sliding rail 147, sliding in the discharge pressure chamber 116 It is connected with pressurization plug 120, left and right is slidably connected between the discharge pressure chamber 116 and the third cavity 142 The slide plate 117 of extension, 117 right end of slide plate put in the discharge pressure chamber 116 and fill in 120 fixed companies with the pressurization It connects, the 117 left end end of slide plate is put in the third cavity 142, the 117 left end end of slide plate and the flywheel 143 Connecting rod 146 is hingedly connected between front end surface.
Valuably, the balance foot prop includes the supporting block 102 that inclination runs through the 104 side wall body of the first cavity, institute It states and is put at the top of supporting block 102 in first cavity 104 and be fixedly connected with relay block 103,102 bottom of supporting block is stretched The car body 100 is outer out and is equipped with earth balance block 101,103 bottom of relay block and 104 bottom interior wall of the first cavity Between press be equipped with third top pressure spring 105, the balance and stability when overall work of realization device.
Valuably, it includes communicating the 5th slide guide that 159 bottom of the 4th guide runner is arranged in that the bullet, which connects recovery device, Slot 154 is slidably connected with the 5th slider guide 158, press in the 5th guide runner 154 in the 5th guide runner 154 Equipped with the 4th top pressure spring 157 for being located at 158 right end of the 5th guide runner, 158 top end surface of the 5th slider guide and institute It states 156 bottom end face of the 4th slider guide to be fixedly connected, be shut down convenient for the automatic switchover draining of device.
Valuably, it is communicated in the 116 rear end inner wall of discharge pressure chamber and is equipped with ventilation pipe 122,122 rear end of ventilation pipe 100 rear end face of car body is run through in end, and arc described in bottommost, which pours, to be communicated in clamping plate 137 equipped with suction hose 141, described 141 other end of suction hose is communicated with 115 other end of water inlet pipe, convenient for the ponding in the automatic depression of discharge in time.
Described method includes following steps:
Firstly, first slider guide 114 is put in completely in first guide runner 113, the 114 right end position of the first slider guide In 133 bottommost of the second guide runner, at this point, the lifter plate 135 is utmostly lifted, two arcs pour folder Plate 137 is located remotely from each other, and second slider guide 111 is located at 104 top of the first cavity, 102 maximum journey of supporting block Degree is put in first cavity 104, at this point, the relay block 103 is far from 104 bottom interior wall of the first cavity, it is described to connect Ground balance weight 101 is far from the ground, and 145 long section position of cam is in the 144 center line bottom of the first rotation axis, and described Three slider guides 150 are located at 152 bottom of third guide runner, and the push plate 155 presses the swing rod 149 and tilts, at this point, described Drainpipe 119 is open-minded, and the water inlet pipe 115 is closed, and the pressurization plug 120 is located at 116 middle part of discharge pressure chamber;
Then, device is moved integrally to the required Coping Construction poured, then starts first motor 123 and drives institute The rotation of the first adjusting threaded rod 131 is stated, so that the arc is poured the ground of the bent cap poured needed for clamping plate 137 is aligned, then starts The pusher 140 makes the arc pour clamping plate 137 to match well, make the arc to match well pour clamping plate 137 and run up to properly Height, then start second motor 134 and the elevating screw thread bar 132 driven to rotate, make the arc regulated Clamping plate 137 and ground face contact package steel reinforcement cage are poured, finally starts the third motor 109 and drives the first pulley 110 Rotation is acted on by the belt 108 and second belt wheel 107, rotates the screw rod 106, second slider guide 111 It moves down, meanwhile, the screw rod 106 can inject ground inner fixing device entirety, prevent to tilt, when second slider guide 111 when being displaced downwardly to 104 bottommost of the first cavity, presses the relay block 103 and moves down, connects the earth balance block 101 Tread surface further increases the rigid contact with ground, prevents from subsideing in ground, when pouring low-lying land, there is product in low-lying land Water and when needing to extract out, starts the 4th motor and first rotation axis 144 is driven to rotate, the 4th rotation axis 144 It drives the flywheel 143 and the cam 145 while rotating, the flywheel 143 passes through the connecting rod 146 the and described slide plate 117 effect makes the pressurization plug 120 left and right periodically sliding in the discharge pressure chamber 116, meanwhile, the cam 145 By the third slider guide 150, the first press sliding block 151, the 4th slider guide 156, the push plate 155, described The effect of first top pressure spring 153, second top pressure spring 161 and the 4th top pressure spring 157 makes the swing rod 149 It swings, due to the effect of the push rod 121, keeps 160 or so the period of cock plug mobile and cooperate a left side for the pressurization plug 120 It moves right, realizes automatic pumping work;
So that the arc is poured the opening of clamping plate 137 finally, starting the pusher 140, keeps bent cap exposed, then start described the Two motor 134 drive the elevating screw thread bar 132 to rotate backward, and the lifter plate 135 and the arc is made to pour clamping plate 137 Entirety moves up, and finally starts the third motor 109 and the first pulley 110 is driven to rotate backward, finally make the screw rod 106 rotate backward, and extract the screw rod 106 out of ground, due to the effect of the third top pressure spring 105, make described connect Power block 103, the supporting block 102 and 101 entirety of the earth balance block move up, can so as to release device balance and stability It moves freely.
When wherein, due to original state, first slider guide is put in completely in first guide runner, and described first leads Sliding block right end is located at the second guide runner bottommost, at this point, the lifter plate is utmostly lifted, two arcs are poured It builds clamping plate to be located remotely from each other, second slider guide is located at the first cavity top, and the supporting block utmostly puts in institute It states in the first cavity, at this point, the relay block is far from the first cavity bottom inner wall, the earth balance block is far from describedly Face, the cam long section position are located at the third guide runner in first rotation shaft centre line bottom, the third slider guide Bottom, the push plate press the swing rod inclination, at this point, the drainpipe is open-minded, the water inlet pipe is closed, the pressurization plug In the middle part of the discharge pressure chamber, consequently facilitating device maintenance and movement.
When the work is required, device is moved integrally to the required Coping Construction poured, then starts first electricity Motivation drives described first to adjust threaded rod rotation, so that the arc is poured the ground of the bent cap poured needed for clamping plate alignment, then Start the pusher arc is made to pour clamping plate and matches well, so that the arc to match well is poured clamping plate and run up to suitable height Then degree starts second motor and drives the elevating screw thread bar rotation, make the arc regulated pour clamping plate with Ground face contact wraps up steel reinforcement cage, finally starts the third motor and drives the first pulley rotation, by the belt and The second belt wheel effect, rotates the screw rod, and second slider guide moves down, meanwhile, the screw rod can inject in ground Fixed device is whole, prevents to tilt, when second slider guide is displaced downwardly to the first cavity bottommost, described in press Relay block moves down, and makes earth balance block contact ground, further increases the rigid contact with ground, prevent from subsideing ground It is interior, when having ponding when pouring low-lying land, in low-lying land and needing to extract out, starts the 4th motor and drive described first turn Moving axis rotation, the 4th rotation axis drive the flywheel and the cam to rotate simultaneously, and the flywheel passes through the connecting rod And the slide plate effect, make the pressurization plug in the periodically sliding of the intracavitary left and right of the discharge pressure, meanwhile, the cam By the third slider guide, it is described first press sliding block, the 4th slider guide, the push plate, first top pressure spring, The effect of second top pressure spring and the 4th top pressure spring swings the swing rod, due to the effect of the push rod, makes The cock plug or so the period is mobile and cooperates moving left and right for the pressurization plug, automatic pumping work is realized, to improve lid Beam pours effect and efficiency.
When completing to need to store, starting the pusher makes the arc pour clamping plate opening, keeps bent cap exposed, then Starting second motor drives the elevating screw thread bar to rotate backward, and so that the lifter plate and the arc is poured clamping plate whole Body moves up, and finally starts the third motor and the first pulley is driven to rotate backward, finally rotate backward the screw rod, It extracts the screw rod out of ground, due to the effect of the third top pressure spring, makes the relay block, the supporting block and institute It states earth balance block integrally to move up, so as to release device balance and stability, can move freely, to improve device practicability Energy.
The configuration of the present invention is simple, it is easy to operate, by using can the stable moving body of autobalance, and set on the car body Clamping plate mechanism can be poured matching well automatically for maximum magnitude and height adjustment by setting, and realize the bent cap that pours of stability and high efficiency, mobile convenience, Storage is convenient, can now build the bent cap of different height, and is equipped with automatic depression water plug, greatly promotes and pours convenience and effect Fruit.
The above description is merely a specific embodiment, but scope of protection of the present invention is not limited thereto, any The change or replacement expected without creative work, should be covered by the protection scope of the present invention.Therefore, of the invention Protection scope should be determined by the scope of protection defined in the claims.

Claims (4)

1. a kind of Cast-in-place Bent Cap construction method, using a kind of automation placing installation, including car body 100 and setting are in the vehicle The first guide runner 113 of 100 inner opening of body to the right is slidably connected with the first slider guide in first guide runner 113 114,114 right end of the first slider guide stretches out outside 100 right end of car body, and 113 screw-internal thread fit of the first slider guide connects It is connected to left and right extends first and adjusts threaded rod 131, first adjusting, 131 left end end of threaded rod has been connected by power the first electricity Motivation 123,123 outer surface of the first motor is embedded in the 113 left end inner wall of the first guide runner and company fixed thereto It connects, the 113 right end end of the first slider guide is slidably connected with lifter plate 135, sets in the 135 left end end face of lifter plate There is opening to the left and the second guide runner 133 with first slider guide 114 sliding connection, second guide runner 133 Inside be rotatably assorted the elevating screw thread bar 132 extended up and down for being connected with and being threadedly engaged connection with first slider guide 114, described 132 top end of elevating screw thread bar has been connected by power the second motor 134, and 134 outer surface of the second motor is embedded at institute It states in 133 top inner wall of the second guide runner and connection fixed thereto, is successively set from top to bottom on the 135 right end end face of lifter plate There is the fixed block 136 being equally spaced, is equipped with holding tank 139,139 front and back of holding tank in the fixed block 136 up and down Symmetrical pusher 140 is equipped in inner wall, the pusher 140 has been connected by power arc close to 139 end of holding tank and has poured Clamping plate 137 is built, 113 bottom of the first guide runner is equipped with the first cavity 104, sliding connection in first cavity 104 There is the second slider guide 111, be equipped with the second cavity 112 in second slider guide 111, in the 112 top wall body of the second cavity It is embedded with third motor 109,109 bottom end of third motor has been connected by power first pulley 110, and described second is empty It is rotatably assorted in 112 base wall body of chamber and is connected with extension and symmetrical screw rod 106 up and down, put at the top of the screw rod 106 In second cavity 112 and it is equipped with the second belt wheel 107, power connects between the first pulley 110 and second belt wheel 107 It is connected to belt 108,106 bottom end of screw rod is through the 104 bottom wall body of the first cavity and is threadedly engaged connection therewith, First cavity, the 104 bottom interior wall quadrangle is equipped with balance foot prop, is equipped with third cavity 142 at the top of first guide runner 113, 142 right end of third cavity is equipped with discharge pressure chamber 116, is rotatably assorted in the third cavity 142 and is connected with front and back extension The first rotation axis 144, the 144 rear end end of the first rotation axis has been connected by power the 4th motor, first rotation axis 144 are equipped with flywheel 143, and first rotation axis 144 is equipped with the cam 145 positioned at the flywheel rear end, and the third is empty The third guide runner 152 extended up and down being equipped with positioned at 144 bottom of the first rotation axis, institute are communicated in 142 rear end inner wall of chamber State the 4th guide runner for communicating in 142 rear end inner wall of third cavity and being equipped with and communicating with the 152 right end inner wall of third guide runner 159, third slider guide 150,150 bottom of the third slider guide press are slidably connected in the 4th guide runner 152 Equipped with the first top pressure spring 153, the first press sliding block 151 is fixedly connected in 150 front end surface of third slider guide, it is described The 4th slider guide 156, fixed company in 156 front end surface of the 4th slider guide are slidably connected in 4th guide runner 159 It is connected to the push plate 155 to be slidably connected with the first press sliding block 151,156 bottom end face of the 4th slider guide Recovery device is connect equipped with bullet, is hingedly connected on the 142 rear end inner wall of third cavity positioned at 144 right end of the first rotation axis Swing rod 149,149 upper and lower side of swing rod be equipped with front and back penetrate through and symmetrical sliding rail 147, the 149 bottom left end of swing rod It presses and is cooperatively connected with the push plate 155, press and be equipped between 142 right end inner wall of 149 right end of swing rod and the third cavity Second top pressure spring 161 is communicated equipped with water inlet pipe 115, the discharge pressure chamber in 116 bottom interior wall of discharge pressure chamber The drainpipe 119 for being equipped with and being located at 115 top of water inlet pipe is communicated in 116 top inner walls, penetrates through institute respectively in the car body 100 State water inlet pipe 115 and the drainpipe 119 and switch slot 118 symmetrical up and down, sliding connection in the switch slot 118 There is cock plug 160, the push rod that left and right extends is slidably connected between the switch slot 118 and the third cavity 142 121,121 right end of push rod puts in the switch slot 118 and is fixedly connected with the cock plug 160, and the push rod 121 is left End is put in the third cavity 142, two 121 left end ends of push rod be equipped with front and back extend and to the sliding rail The pin shafts 148 of 147 sliding connections are slidably connected with pressurization plug 120, the draining in the discharge pressure chamber 116 The slide plate 117 that left and right extends, 117 right end of slide plate are slidably connected between pressure chamber 116 and the third cavity 142 It puts in the discharge pressure chamber 116 and is fixedly connected with pressurization plug 120, the 117 left end end of slide plate puts in described In third cavity 142, connecting rod is hingedly connected between the 117 left end end of slide plate and 143 front end surface of the flywheel 146;
Described method includes following steps:
Firstly, first slider guide 114 is put in completely in first guide runner 113, the 114 right end position of the first slider guide In 133 bottommost of the second guide runner, at this point, the lifter plate 135 is utmostly lifted, two arcs pour folder Plate 137 is located remotely from each other, and second slider guide 111 is located at 104 top of the first cavity, 102 maximum journey of supporting block Degree is put in first cavity 104, at this point, the relay block 103 is far from 104 bottom interior wall of the first cavity, it is described to connect Ground balance weight 101 is far from the ground, and 145 long section position of cam is in the 144 center line bottom of the first rotation axis, and described Three slider guides 150 are located at 152 bottom of third guide runner, and the push plate 155 presses the swing rod 149 and tilts, at this point, described Drainpipe 119 is open-minded, and the water inlet pipe 115 is closed, and the pressurization plug 120 is located at 116 middle part of discharge pressure chamber;
Then, device is moved integrally to the required Coping Construction poured, then starts first motor 123 and drives institute The rotation of the first adjusting threaded rod 131 is stated, so that the arc is poured the ground of the bent cap poured needed for clamping plate 137 is aligned, then starts The pusher 140 makes the arc pour clamping plate 137 to match well, make the arc to match well pour clamping plate 137 and run up to properly Height, then start second motor 134 and the elevating screw thread bar 132 driven to rotate, make the arc regulated Clamping plate 137 and ground face contact package steel reinforcement cage are poured, finally starts the third motor 109 and drives the first pulley 110 Rotation is acted on by the belt 108 and second belt wheel 107, rotates the screw rod 106, second slider guide 111 It moves down, meanwhile, the screw rod 106 can inject ground inner fixing device entirety, prevent to tilt, when second slider guide 111 when being displaced downwardly to 104 bottommost of the first cavity, presses the relay block 103 and moves down, connects the earth balance block 101 Tread surface further increases the rigid contact with ground, prevents from subsideing in ground, when pouring low-lying land, there is product in low-lying land Water and when needing to extract out, starts the 4th motor and first rotation axis 144 is driven to rotate, the 4th rotation axis 144 It drives the flywheel 143 and the cam 145 while rotating, the flywheel 143 passes through the connecting rod 146 the and described slide plate 117 effect makes the pressurization plug 120 left and right periodically sliding in the discharge pressure chamber 116, meanwhile, the cam 145 By the third slider guide 150, the first press sliding block 151, the 4th slider guide 156, the push plate 155, described The effect of first top pressure spring 153, second top pressure spring 161 and the 4th top pressure spring 157 makes the swing rod 149 It swings, due to the effect of the push rod 121, keeps 160 or so the period of cock plug mobile and cooperate a left side for the pressurization plug 120 It moves right, realizes automatic pumping work;
So that the arc is poured the opening of clamping plate 137 finally, starting the pusher 140, keeps bent cap exposed, then start described the Two motor 134 drive the elevating screw thread bar 132 to rotate backward, and the lifter plate 135 and the arc is made to pour clamping plate 137 Entirety moves up, and finally starts the third motor 109 and the first pulley 110 is driven to rotate backward, finally make the screw rod 106 rotate backward, and extract the screw rod 106 out of ground, due to the effect of the third top pressure spring 105, make described connect Power block 103, the supporting block 102 and 101 entirety of the earth balance block move up, can so as to release device balance and stability It moves freely.
2. a kind of Cast-in-place Bent Cap construction method according to claim 1, wherein:The balance foot prop includes that inclination runs through institute The supporting block 102 of 104 side wall body of the first cavity is stated, is put at the top of the supporting block 102 in first cavity 104 and fixed It is connected with relay block 103, earth balance block 101 is stretched out outside the car body 100 and be equipped in 102 bottom of supporting block, described to connect Press is equipped with third top pressure spring 105 between 103 bottom of power block and 104 bottom interior wall of the first cavity.
3. a kind of Cast-in-place Bent Cap construction method according to claim 1, wherein:It includes communicating to set that the bullet, which connects recovery device, The 5th guide runner 154 in 159 bottom of the 4th guide runner is set, is slidably connected in the 5th guide runner 154 Five slider guides 158, the interior press of the 5th guide runner 154 are equipped with the 4th press bullet positioned at 158 right end of the 5th guide runner Spring 157,158 top end surface of the 5th slider guide are fixedly connected with 156 bottom end face of the 4th slider guide.
4. a kind of Cast-in-place Bent Cap construction method according to claim 1, wherein:The 116 rear end inner wall of discharge pressure chamber It inside communicates and is equipped with ventilation pipe 122,100 rear end face of car body, arc described in bottommost are run through in the 122 rear end end of ventilation pipe Shape, which pours, to be communicated in clamping plate 137 equipped with suction hose 141,141 other end of suction hose and 115 other end phase of water inlet pipe It is logical.
CN201810707838.2A 2018-07-02 2018-07-02 A kind of Cast-in-place Bent Cap construction method Withdrawn CN108824200A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810707838.2A CN108824200A (en) 2018-07-02 2018-07-02 A kind of Cast-in-place Bent Cap construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810707838.2A CN108824200A (en) 2018-07-02 2018-07-02 A kind of Cast-in-place Bent Cap construction method

Publications (1)

Publication Number Publication Date
CN108824200A true CN108824200A (en) 2018-11-16

Family

ID=64134162

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810707838.2A Withdrawn CN108824200A (en) 2018-07-02 2018-07-02 A kind of Cast-in-place Bent Cap construction method

Country Status (1)

Country Link
CN (1) CN108824200A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112725180A (en) * 2021-03-01 2021-04-30 桂林医学院 Liver cell culture device

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112725180A (en) * 2021-03-01 2021-04-30 桂林医学院 Liver cell culture device

Similar Documents

Publication Publication Date Title
CN107816017A (en) A kind of valve system for hydraulic engineering
CN108824200A (en) A kind of Cast-in-place Bent Cap construction method
CN106869087A (en) A kind of rainbow gate
CN107604895A (en) A kind of compacting prosthetic device of water conservancy side slope
CN108842626A (en) A kind of informationization Cast-in-place Bent Cap construction method
CN212832756U (en) Drinking water filling machine capable of controlling flow
CN107780403A (en) A kind of automatic tamping unit in slope
CN107700319B (en) A kind of tamping unit of hydraulic regulation
CN107630411B (en) A kind of repair apparatus of portable bridge road
CN108221579A (en) A kind of pavement of road tamping unit of hydraulic regulation
CN107761702A (en) A kind of compacting constructing device for water conservancy side slope
CN207314282U (en) Channel intelligence valve system
CN108221582A (en) A kind of tamping unit of town road first-aid repair construction
CN208762997U (en) A kind of embedded pad rammed earth device of municipal pipeline
CN106836335B (en) Excavator with level land auxiliary system
CN107476280B (en) A kind of smooth tamping unit of town road
CN112960412A (en) Adjustable feeding device for water conservancy and hydropower construction and use method
CN112628643A (en) Intelligent lighting system for constructional engineering
CN102121216A (en) Hydraulic track lifting and lining device with variable lifting-lining ratio
CN205918404U (en) Two eccentric wear prevention chain drive pumping unit that step down
CN108222027A (en) A kind of tamping unit of road construction
CN107761704A (en) A kind of tamping unit of road rapid repair
CN109132586A (en) A kind of rice drying fast-collection device
CN213709424U (en) Gate for hydraulic engineering
CN107859025A (en) A kind of tamping unit of Municipal Engineering Construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WW01 Invention patent application withdrawn after publication

Application publication date: 20181116

WW01 Invention patent application withdrawn after publication