CN108805527A - A kind of project management method and device - Google Patents
A kind of project management method and device Download PDFInfo
- Publication number
- CN108805527A CN108805527A CN201810531775.XA CN201810531775A CN108805527A CN 108805527 A CN108805527 A CN 108805527A CN 201810531775 A CN201810531775 A CN 201810531775A CN 108805527 A CN108805527 A CN 108805527A
- Authority
- CN
- China
- Prior art keywords
- project
- resource
- deleted
- permission
- created
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000007726 management method Methods 0.000 title claims abstract description 40
- 238000012217 deletion Methods 0.000 claims abstract description 50
- 230000037430 deletion Effects 0.000 claims abstract description 50
- 238000000034 method Methods 0.000 claims description 23
- 238000003860 storage Methods 0.000 claims description 16
- 230000008569 process Effects 0.000 description 9
- 238000004140 cleaning Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 238000000429 assembly Methods 0.000 description 3
- 230000000712 assembly Effects 0.000 description 3
- 238000004891 communication Methods 0.000 description 2
- 238000012790 confirmation Methods 0.000 description 2
- 238000009826 distribution Methods 0.000 description 2
- 238000005516 engineering process Methods 0.000 description 2
- 230000002045 lasting effect Effects 0.000 description 2
- 238000012545 processing Methods 0.000 description 2
- 238000004064 recycling Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000000151 deposition Methods 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 230000014759 maintenance of location Effects 0.000 description 1
- 230000007246 mechanism Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 230000003287 optical effect Effects 0.000 description 1
- 238000012216 screening Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/10—Office automation; Time management
- G06Q10/103—Workflow collaboration or project management
Abstract
The invention discloses a kind of project management method and devices, wherein the project management method includes:Obtain item request;When item request is deletion project, the resource that project to be deleted is included is determined;It is divided according to the dependence of each resource and deletes level;To the resource that project to be deleted is included, successively deleted according to level is deleted.Project management method and device disclosed by the invention can avoid the occurrence of resource and be generated without the case where ownership, and improve the convenience that user uses.
Description
Technical field
The present invention relates to computer realm, espespecially a kind of project management method and device.
Background technology
Openstack provides the operating platform or tool set of a deployment cloud.It is intended to help cloud service provider structure
The cloud of virtual computing service and storage service is provided, no matter public cloud or private clound, also no matter great Yun or cloudling can
Expansible, flexible cloud computing service is provided using this tool.
The user of Openstack refers to the natural person for possessing the accounts such as user name, password and mailbox, Openstack
Project be that can be understood as a tenant, team or tissue, must specify a corresponding project just can be with after creating user
Apply for Openstack services.
Under Openstack frames, the management of project includes mainly establishment of item and deletion of items, currently, deletion of items
When only delete log-on message without being recycled to the resource under project.If however, only deleting project log-on message without to item
Now resource is recycled, and the residual of resource is just will appear, and is on the one hand led to the waste of physical resource, is on the other hand provided
Scene of the source without ownership.Once there is resource without ownership, for resource with regard to uncontrolled, resource may occur as soon as the serious of lasting residue
Problem.
Invention content
In order to solve the above technical problem, the present invention provides a kind of project management method and devices, can avoid the occurrence of
Resource is generated without the case where ownership, and improves the convenience that user uses.
In order to reach the object of the invention, in a first aspect, the present invention provides a kind of project management methods, including:
Obtain item request;
When the item request is deletion project, the resource that project to be deleted is included is determined;
It is divided according to the dependence of each resource and deletes level;
To the resource that project to be deleted is included, successively deleted according to the deletion level.
Second aspect, the present invention provides a kind of project management devices, including:
Acquisition module, for obtaining item request;
Determining module, for when the item request is deletion project, determining the resource that project to be deleted is included;
Division module deletes level for being divided according to the dependence of each resource;
Removing module, the resource for being included to project to be deleted are successively deleted according to the deletion level.
The third aspect, the present invention provides a kind of project management device, including memory and processor, memory is for depositing
Storage executes instruction;Processor executes instruction described in calling, for executing the project management method as described in first aspect embodiment.
Fourth aspect, the present invention provides a kind of computer readable storage mediums, are stored thereon with computer instruction, special
The step of sign is, the method described in first aspect embodiment is realized when described instruction is executed by processor.
Project management method and device provided by the invention provide establishment project and deletion project two operations:It is creating
When project, the order information of establishment project is obtained first;Then from order information in parse the resource quota of project application
And permission;Project is finally created according to resource quota and permission, realization provides the project according to the order information of the project
Source allocation of quota and permission control, avoid the situation that resource quota is inconsistent with permission order and order information obtained by project from going out
Existing, compared with existing establishment project, the present invention uses the method for being automatically imported project configuration according to order information, is effectively improved
User uses the ease for use and convenience of process.In the project of deletion, first confirms that the ID for the project that needs are deleted, then confirm
The resource that project is included divides resource then according to Resource Dependence relationship and deletes level, finally according to deletion level to money
Source is orderly recycled, and is realized in the project of deletion, and not only deletion includes the cleaning of project log-on message, also supports affiliated project
The release of resource avoids the occurrence of resource and is generated without the case where ownership.With existing deletion project ratio, the present invention uses deletion project
Together by the resource under project in such a way that level sequentially recycles while log-on message, user can be effectively improved and use process
Ease for use and convenience.
Other features and advantages of the present invention will be illustrated in the following description, also, partly becomes from specification
It obtains it is clear that understand through the implementation of the invention.The purpose of the present invention and other advantages can be by specification, rights
Specifically noted structure is realized and is obtained in claim and attached drawing.
Description of the drawings
Attached drawing is used for providing further understanding technical solution of the present invention, and a part for constitution instruction, with this
The embodiment of application technical solution for explaining the present invention together, does not constitute the limitation to technical solution of the present invention.
Fig. 1 is the flow chart for the project management method that the embodiment of the present invention one provides;
Fig. 2 is the flow chart of project management method provided by Embodiment 2 of the present invention;
Fig. 3 is the structural schematic diagram for the project management device that the embodiment of the present invention one provides;
Fig. 4 is the structural schematic diagram of project management device provided by Embodiment 2 of the present invention.
Specific implementation mode
To make the objectives, technical solutions, and advantages of the present invention clearer, below in conjunction with attached drawing to the present invention
Embodiment be described in detail.It should be noted that in the absence of conflict, in the embodiment and embodiment in the application
Feature mutually can arbitrarily combine.
Step shown in the flowchart of the accompanying drawings can be in the computer system of such as a group of computer-executable instructions
It executes.Also, although logical order is shown in flow charts, and it in some cases, can be with suitable different from herein
Sequence executes shown or described step.
Currently, in project management, there are following two problems:First, when needing deletion project, project registration is only deleted
Information is without recycling the resource under project, it may appear that on the one hand the residual of resource leads to the waste of physical resource, another
There is scene of the resource without ownership in aspect.Once there is resource without ownership, with regard to uncontrolled, resource may occur as soon as permanently resource
Remaining serious problems.Second is that when needing establishment project, project has first been created, then has determined that the project created answers the money of gained
Source quota and permission so that resource quota and the permission for creating allocation of items are unreasonable.Therefore, it is provided after how avoiding deletion project
Source lasting residue and the resource quota and the unreasonable problem of permission for creating allocation of items, realize with project automatic management at
It is urgently solved the problems, such as a needs.
To solve the above problems, the present invention proposes a kind of project management method, first, administrator delete project when
It waits, not only includes the cleaning of project log-on message, also support the release of affiliated project resource, avoid the occurrence of feelings of the resource without ownership
Condition generates;Second, when administrator creates project, quota and permission to resource are arranged automatically, are believed according to order
Breath is introduced directly into resource quota and authority credentials, while also supporting manual modification, avoids the resource quota and power that create allocation of items
Limit it is unreasonable, and, avoid resource quota and permission order obtained by project from occurring with the inconsistent situation of order information.
Fig. 1 is the flow chart for the project management method that the embodiment of the present invention one provides, as shown in Figure 1, the embodiment of the present invention
The project management method of offer, including:
S101:Obtain item request.
Specifically, the embodiment of the present invention in project management, can obtain item request automatically, which is used to indicate
Some or certain projects are managed, for example, the project of deletion or establishment project.Administrator, which determines, when the item request of acquisition needs
It is sent after the project to be deleted, for example, under Openstack frames, when administrator needs to delete or create project, sends and use
In the item request that instruction is managed project.
S102:When item request is deletion project, the resource that project to be deleted is included is determined.
Specifically, the embodiment of the present invention in the project of deletion, is inquired has at present for which resource under the project, to confirm item
All resource informations that mesh is included so that together delete the resource under project while deleting project log-on message
It removes, avoids only deleting project registration and the case where resource is without ownership occur.
It should be noted that in the embodiment of the present invention, all resources are all to belong to some project, only allow to use
Family, such as administrator are created, operated and are deleted to a certain project resource under specific project.
Optionally, when item request is deletion project, item request includes the ID of project to be deleted;
Determine the resource that project to be deleted is included, including:The institute under the project is filtered out by the ID of project to be deleted
There is resource.
Specifically, in the embodiment of the present invention, the resource information that confirmation project is included can be based on the ID of project to be deleted, base
In the ID of project to be deleted, all resources that project under the ID of searching includes.Wherein, in the project of deletion, administrator, which confirms, to be needed
The ID (ID of project to be deleted) of project is deleted, and the ID of determining project to be deleted is carried in item request.
S103:It is divided according to the dependence of each resource and deletes level.
Specifically, all resources under project to be deleted are carried out distinguishing hierarchy, is deleted by the level divided, will wait deleting
Except the resource under project is sequentially recycled by level, the convenience that user uses is greatly improved.It, can be by when dividing level
Deletion level is divided according to the dependence of resource, and the deletion level of division is ranked up by dependence, level will be deleted
It is deleted according to sequence.Wherein, the embodiment of the present invention can with it is not limited to by resource dependence divide, can also
It is divided according to the network etc. belonging to the group or resource belonging to the attribute of resource, resource.
It should be noted that the dependence of resource refers to thering is association between resource in the embodiment of the present invention, for example,
Have between resource and overlap element, or belong to affiliation etc..For example, resource includes cloud hard disk snapshot and cloud hard disk,
Only cloud hard disk snapshot deletes, and cloud hard disk could be deleted, at this point, can be using cloud hard disk snapshot as the first layer deleted, cloud is hard
Disk is as the second layer deleted.
It should be noted that the embodiment of the present invention when carrying out deletion distinguishing hierarchy according to Resource Dependence relationship, can incite somebody to action
There is no the resource of dependence or project log-on message, random division is in any deletion layer divided according to Resource Dependence relationship
In secondary, it can also individually be placed on one and delete in level.
It should be noted that be different cloud host, cloud host that user creates under the same project fast for project resource
According to, resource specification, cloud physics machine, cloud hard disk, cloud hard disk snapshot, cloud backup, file storage, object storage, mirror image, flexible clothes
Business, service orchestration, container, workflow, charging, examination & approval, work order, network and project log-on message etc..
S104:To the resource that project to be deleted is included, successively deleted according to level is deleted.
Specifically, in the embodiment of the present invention, according to the deletion level of above-mentioned division, deleting for each resource information is directly invoked
Except interface, the recycling of resource is carried out, while deleting project log-on message, is together sequentially returned the resource under project by level
It receives, greatly improves the convenience that user uses.Wherein, the embodiment of the present invention is successively deleted according to deletion level
When, after only last layer time is deleted, then carry out the deletion of next level.
Project management method provided in an embodiment of the present invention first confirms that in the project of deletion and needs project to be deleted, so
The resource that the project to be deleted is included is confirmed afterwards, and deletion level is divided to resource then according to the dependence of each resource,
Finally resource is orderly recycled according to deletion level, is realized in the project of deletion, it includes project log-on message not only to delete
Cleaning, also support belonging to project resource release, avoid the occurrence of resource without ownership the case where generate, and, delete project
The resource under project is sequentially recycled together by level while log-on message, greatly improves the convenience that user uses.
Further, in the above-described embodiments, project management method provided in an embodiment of the present invention further includes:
When item request is establishment project, the resource quota and permission of project application to be created are determined;Matched according to resource
Volume and permission create project.
Specifically, the embodiment of the present invention in the project of establishment, carries out the quota of the resource of project application to be created automatic
Setting requires to provide default value according to demand, reasonable with the resource quota and permission that ensure establishment allocation of items.
Further, in the above-described embodiments, when item request is establishment project, item request includes project to be created
Order information;
Determine the resource quota and permission of project to be created, including:Project application to be created is parsed from order information
Resource quota and permission.
Specifically, when the project of establishment, quota and permission to resource are arranged automatically, direct according to order information
Resource quota and authority credentials are imported, relative to existing establishment project, the present invention is the resource quota and permission letter in user's order
Breath is introduced directly into system and carries out the establishment of project, can avoid the resource quota for creating allocation of items and permission is unreasonable, and,
Resource quota obtained by project is avoided to occur with the inconsistent situation of permission order and order information.
It should be noted that in the embodiment of the present invention project to be created order information, be that administrator confirms and needs to create
It when project, has been added according to project actual demand, which includes the resource quota and permission needed for the project;Together
When, administrator carries the order information for the project to be created added in item request.
Project management method provided in an embodiment of the present invention obtains the order letter of establishment project first in the project of establishment
Breath, then parses the resource quota and permission of project application to be created, finally according to resource quota and power from order information
Establishment project is limited, realizes that the order information according to the project carries out resource quota distribution to the project and permission controls, avoids creating
Resource quota and the permission for building allocation of items are unreasonable, and, avoid resource quota obtained by project from believing with permission order and order
It ceases inconsistent situation to occur, compared with existing establishment project, the present invention matches using being automatically imported project according to order information
The method set is effectively improved ease for use and convenience that user uses process.
Fig. 2 is the flow chart of project management method provided by Embodiment 2 of the present invention, as shown in Fig. 2, the embodiment of the present invention
The project management method of offer, including:
S201:It creates item request and still deletes item request;If creating item request, then 202 are executed;If so,
Execute S205;If not being, terminate.
S202:Obtain the order information of project to be created.
S203:The resource quota and authority information of project application are parsed in order information.
S204:Project is created according to resource quota and authority information;Terminate.
S205:Confirm the ID for the project for needing to delete.
S206:The resource information that confirmation project is included.
Specifically, carrying out screening the resource information under the project by item id:Cloud host, cloud host snapshot, resource rule
Lattice, cloud physics machine, cloud hard disk, cloud hard disk snapshot, cloud backup, file storage, object storage, mirror image, flexible service, service are compiled
Row, container, workflow, charging, examination & approval, work order, network and project log-on message etc..
S207:It divides and deletes level.
Level is deleted specifically, being divided to resource according to each Resource Dependence relationship, for example, first layer:Cloud host snapshot,
Cloud hard disk snapshot and cloud backup;The second layer:Cloud host, cloud physics machine, cloud hard disk, file storage, object storage, flexible service,
Service orchestration, container, workflow, charging, examination & approval and work order;Third layer:Resource specification, mirror image and network etc.;4th layer:Project
Log-on message in system administration.
S208:Delete first layer resource;If success, executes S209;Otherwise, it reports an error and termination process to user.
S209:Delete second layer resource;If success, executes S210;Otherwise, it reports an error and termination process to user.
S210:Delete third layer resource;If success, executes S211;Otherwise, it reports an error and termination process to user.
S211:Delete the 4th layer of resource;If success, terminates;Otherwise, it reports an error and termination process to user.
The present invention relates to a kind of method that project resource manages automatically in Openstack technical fields, the present invention provides wound
Build two operations of project and deletion project:In the project of establishment, the order information of establishment project is obtained first;Then from order
The resource quota and permission of project application are parsed in information;Project is finally created according to resource quota and permission, realizes basis
The order information of the project carries out resource quota distribution to the project and permission controls, and avoids resource quota and permission obtained by project
Order and the inconsistent situation of order information occur, compared with existing establishment project, the present invention use according to order information from
The method of dynamic lead-in item configuration, is effectively improved ease for use and convenience that user uses process.In the project of deletion, first really
Recognize the ID for the project for needing to delete, then confirms the resource that project is included, resource is divided then according to Resource Dependence relationship
Level is deleted, finally resource is orderly recycled according to deletion level, is realized in the project of deletion, it includes project not only to delete
The release of affiliated project resource is also supported in the cleaning of log-on message, is avoided the occurrence of resource and is generated without the case where ownership.With it is existing
Deletion project ratio is together sequentially recycled the resource under project by level while the present invention is using deletion project log-on message
Mode can be effectively improved ease for use and convenience that user uses process.
Fig. 3 is the structural schematic diagram for the project management device that the embodiment of the present invention one provides, as shown in figure 3, the present invention is real
The project management device of example offer is provided, including:Acquisition module 31, determining module 32, division module 33 and removing module 34.
Acquisition module 31, for obtaining item request;
Determining module 32, for when the item request is deletion project, determining the resource that project to be deleted is included;
Division module 33 deletes level for being divided according to the dependence of each resource;
Removing module 34, the resource for being included to project to be deleted are successively deleted according to the deletion level.
Project management device provided in an embodiment of the present invention is used to execute the technical solution of embodiment of the method shown in Fig. 1,
Realization principle is similar with effect is realized, details are not described herein again.
Further, in the above-described embodiments, when the item request is deletion project, the item request includes
The ID of project to be deleted;
Determining module 32 determines the resource that project to be deleted is included, including:
All resources under the project are filtered out by the ID of project to be deleted.
Further, in the above-described embodiments, determining module 32 is additionally operable to:
When the item request is establishment project, the resource quota and permission of project application to be created are determined.
Project management device provided in an embodiment of the present invention further includes:Creation module 35;
Creation module 35, for creating project according to the resource quota and the permission.
Further, in the above-described embodiments, when the item request is establishment project, the item request includes
The order information of project to be created;
Determining module 32 determines the resource quota and permission of project to be created, including:
The resource quota and permission of project application to be created are parsed from the order information.
Fig. 4 is the structural schematic diagram of project management device provided by Embodiment 2 of the present invention, as shown in figure 4, the present invention is real
The project management device of example offer is provided, including:Memory 41 and processor 42.
Memory 41 is executed instruction for storing, and processor 42 can be a central processing unit (Central
Processing Unit, abbreviation CPU) or specific integrated circuit (Application Specific Integrated
Circuit, abbreviation ASIC), or complete to implement one or more integrated circuits of the embodiment of the present invention.When project management device
It when operation, is communicated between processor 42 and memory 41,42 call executive instruction of processor, for performing the following operations:
Obtain item request;
When the item request is deletion project, the resource that project to be deleted is included is determined;
It is divided according to the dependence of each resource and deletes level;
To the resource that project to be deleted is included, successively deleted according to the deletion level.
Further, when the item request is deletion project, the item request includes the ID of project to be deleted;
Processor 42 determines the resource that project to be deleted is included, including:
All resources under the project are filtered out by the ID of project to be deleted.
Further, processor 42 is additionally operable to:
When the item request is establishment project, the resource quota and permission of project application to be created are determined;According to institute
It states resource quota and the permission creates project.
Further, when the item request is establishment project, the item request includes ordering for project to be created
Single information;
Processor 42 determines the resource quota and permission of project to be created, including:It parses and waits for from the order information
Create the resource quota and permission of project application.
The embodiment of the present invention also provides a kind of computer readable storage medium, is stored thereon with computer instruction, the finger
The step of order realizes the project management method described in any of the above-described embodiment when being executed by processor.
It will appreciated by the skilled person that whole or certain steps in method disclosed hereinabove, system, dress
Function module/unit in setting may be implemented as software, firmware, hardware and its combination appropriate.In hardware embodiment,
Division between the function module/unit referred in the above description not necessarily corresponds to the division of physical assemblies;For example, one
Physical assemblies can have multiple functions or a function or step that can be executed by several physical assemblies cooperations.Certain groups
Part or all components may be implemented as by processor, such as the software that digital signal processor or microprocessor execute, or by
It is embodied as hardware, or is implemented as integrated circuit, such as application-specific integrated circuit.Such software can be distributed in computer-readable
On medium, computer-readable medium may include computer storage media (or non-transitory medium) and communication media (or temporarily
Property medium).As known to a person of ordinary skill in the art, term computer storage medium is included in for storing information (such as
Computer-readable instruction, data structure, program module or other data) any method or technique in the volatibility implemented and non-
Volatibility, removable and nonremovable medium.Computer storage media include but not limited to RAM, ROM, EEPROM, flash memory or its
His memory technology, CD-ROM, digital versatile disc (DVD) or other optical disc storages, magnetic holder, tape, disk storage or other
Magnetic memory apparatus or any other medium that can be used for storing desired information and can be accessed by a computer.This
Outside, known to a person of ordinary skill in the art to be, communication media generally comprises computer-readable instruction, data structure, program mould
Other data in the modulated data signal of block or such as carrier wave or other transmission mechanisms etc, and may include any information
Delivery media.
Claims (10)
1. a kind of project management method, including:
Obtain item request;
When the item request is deletion project, the resource that project to be deleted is included is determined;
It is divided according to the dependence of each resource and deletes level;
To the resource that project to be deleted is included, successively deleted according to the deletion level.
2. according to the method described in claim 1, it is characterized in that, the item request be deletion project when, the project
Request includes the ID of project to be deleted;
The resource that the determination project to be deleted is included, including:
All resources under the project are filtered out by the ID of project to be deleted.
3. method according to claim 1 or 2, which is characterized in that the method further includes:
When the item request is establishment project, the resource quota and permission of project application to be created are determined;
Project is created according to the resource quota and permission.
4. according to the method described in claim 3, it is characterized in that, the item request be establishment project when, the project
Request includes the order information of project to be created;
The resource quota and permission of the determination project to be created, including:
The resource quota and permission of project application to be created are parsed from the order information.
5. a kind of project management device, which is characterized in that including:
Acquisition module, for obtaining item request;
Determining module, for when the item request is deletion project, determining the resource that project to be deleted is included;
Division module deletes level for being divided according to the dependence of each resource;
Removing module, the resource for being included to project to be deleted are successively deleted according to the deletion level.
6. device according to claim 5, which is characterized in that when the item request is deletion project, the project
Request includes the ID of project to be deleted;
The determining module determines the resource that project to be deleted is included, including:
All resources under the project are filtered out by the ID of project to be deleted.
7. device according to claim 5 or 6, which is characterized in that the determining module is additionally operable to:
When the item request is establishment project, the resource quota and permission of project application to be created are determined;
Described device further includes:
Creation module, for creating project according to the resource quota and permission.
8. device according to claim 7, which is characterized in that when the item request is establishment project, the project
Request includes the order information of project to be created;
The determining module determines the resource quota and permission of project to be created, including:
The resource quota and permission of project application to be created are parsed from the order information.
9. a kind of project management device, which is characterized in that including memory and processor, memory is executed instruction for storing;
Processor executes instruction described in calling, for executing project management method according to any one of claims 1-4.
10. a kind of computer readable storage medium, is stored thereon with computer instruction, which is characterized in that described instruction is handled
The step of claim 1-4 any one of them methods are realized when device executes.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810531775.XA CN108805527A (en) | 2018-05-29 | 2018-05-29 | A kind of project management method and device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810531775.XA CN108805527A (en) | 2018-05-29 | 2018-05-29 | A kind of project management method and device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108805527A true CN108805527A (en) | 2018-11-13 |
Family
ID=64090785
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810531775.XA Pending CN108805527A (en) | 2018-05-29 | 2018-05-29 | A kind of project management method and device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108805527A (en) |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109471729A (en) * | 2018-11-15 | 2019-03-15 | 平安科技(深圳)有限公司 | Based on recursive resource method for cleaning and device |
CN111866190A (en) * | 2020-09-23 | 2020-10-30 | 联通(浙江)产业互联网有限公司 | Multi-tenant management method, device and system based on project hierarchical management |
WO2021155529A1 (en) * | 2020-02-06 | 2021-08-12 | Oppo广东移动通信有限公司 | Resource deletion method, apparatus, and device, and storage medium |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1545048A (en) * | 2003-11-17 | 2004-11-10 | 中兴通讯股份有限公司 | Method for implementing tree storage and access by two-dimensional table |
CN104866510A (en) * | 2014-02-26 | 2015-08-26 | 北京金山安全软件有限公司 | Method and device for removing residual file and method and device for establishing feature library of residual file |
CN105471959A (en) * | 2015-08-03 | 2016-04-06 | 汉柏科技有限公司 | Starting method and device of virtual machine in cluster network |
CN107040479A (en) * | 2016-02-04 | 2017-08-11 | 华为软件技术有限公司 | A kind of method and apparatus of cloud computing resources regulation |
CN107526639A (en) * | 2017-08-16 | 2017-12-29 | 杭州朗和科技有限公司 | Method, medium, device and the computing device of resource layout |
CN107797766A (en) * | 2017-09-27 | 2018-03-13 | 郑州云海信息技术有限公司 | A kind of method and apparatus for creating volume |
-
2018
- 2018-05-29 CN CN201810531775.XA patent/CN108805527A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1545048A (en) * | 2003-11-17 | 2004-11-10 | 中兴通讯股份有限公司 | Method for implementing tree storage and access by two-dimensional table |
CN104866510A (en) * | 2014-02-26 | 2015-08-26 | 北京金山安全软件有限公司 | Method and device for removing residual file and method and device for establishing feature library of residual file |
CN105471959A (en) * | 2015-08-03 | 2016-04-06 | 汉柏科技有限公司 | Starting method and device of virtual machine in cluster network |
CN107040479A (en) * | 2016-02-04 | 2017-08-11 | 华为软件技术有限公司 | A kind of method and apparatus of cloud computing resources regulation |
CN107526639A (en) * | 2017-08-16 | 2017-12-29 | 杭州朗和科技有限公司 | Method, medium, device and the computing device of resource layout |
CN107797766A (en) * | 2017-09-27 | 2018-03-13 | 郑州云海信息技术有限公司 | A kind of method and apparatus for creating volume |
Non-Patent Citations (1)
Title |
---|
COOPERLII: ""二·Openstack 管理项目与用户"", 《CSDN》 * |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109471729A (en) * | 2018-11-15 | 2019-03-15 | 平安科技(深圳)有限公司 | Based on recursive resource method for cleaning and device |
WO2021155529A1 (en) * | 2020-02-06 | 2021-08-12 | Oppo广东移动通信有限公司 | Resource deletion method, apparatus, and device, and storage medium |
CN111866190A (en) * | 2020-09-23 | 2020-10-30 | 联通(浙江)产业互联网有限公司 | Multi-tenant management method, device and system based on project hierarchical management |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104461744B (en) | A kind of resource allocation methods and device | |
CN108076156B (en) | Mixed cloud system based on Chinese cloud product | |
EP3668009A1 (en) | Life cycle management method and device for network service | |
CN106201661A (en) | Method and apparatus for elastic telescopic cluster virtual machine | |
CN104601680B (en) | A kind of method for managing resource and device | |
CN108805527A (en) | A kind of project management method and device | |
CN109344006A (en) | A kind of mirror image management method and mirror image management module | |
CN112583625B (en) | Network resource management method, system, network device and readable storage medium | |
WO2020011214A1 (en) | Method and device for managing virtualized resource | |
CN111835679B (en) | Tenant resource management method and device under multi-tenant scene | |
US10713215B2 (en) | Allocating non-conflicting inode numbers | |
CN106856438B (en) | Network service instantiation method, device and NFV system | |
CN110286997B (en) | Multi-container application creation method, device, computer equipment and storage medium | |
CN108390956A (en) | A kind of method and system for virtual machine configuration internet protocol address | |
CN111726241B (en) | Network resource management method, system, network device and readable storage medium | |
CN109951548B (en) | Resource management method of cloud platform and cloud management platform | |
CN105354090B (en) | The management method and device of virtual unit | |
CN111416727A (en) | VNF uploading instantiation method and device | |
CN113377499B (en) | Virtual machine management method, device, equipment and readable storage medium | |
CN107943423A (en) | The management method and computer-readable recording medium of storage resource in cloud system | |
CN110673787A (en) | Volume configuration method and device | |
CN108574718A (en) | A kind of cloud host creation method and device | |
CN114691355A (en) | Cloud platform construction method, electronic equipment and computer readable storage medium | |
CN108924186A (en) | The creation method and system of file storage in a kind of cloud pipe platform | |
EP3462672B1 (en) | Management method and apparatus for management function object |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181113 |