CN107526639A CN201710702299.9A CN201710702299A CN107526639A CN 107526639 A CN107526639 A CN 107526639A CN 201710702299 A CN201710702299 A CN 201710702299A CN 107526639 A CN107526639 A CN 107526639A
Authority
CN
China
Prior art keywords
resource
renewal
acyclic graph
summit
layout
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710702299.9A
Other languages
Chinese (zh)
Other versions
CN107526639B (en
Inventor
朱凌墨
冯常健
尧飘海
陈谔
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hangzhou Netease Shuzhifan Technology Co ltd
Original Assignee
Hangzhou Langhe Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Langhe Technology Co Ltd filed Critical Hangzhou Langhe Technology Co Ltd
Priority to CN201710702299.9A priority Critical patent/CN107526639B/en
Publication of CN107526639A publication Critical patent/CN107526639A/en
Application granted granted Critical
Publication of CN107526639B publication Critical patent/CN107526639B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F9/00Arrangements for program control, e.g. control units
    • G06F9/06Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
    • G06F9/46Multiprogramming arrangements
    • G06F9/50Allocation of resources, e.g. of the central processing unit [CPU]
    • G06F9/5061Partitioning or combining of resources
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F16/00Information retrieval; Database structures therefor; File system structures therefor
    • G06F16/90Details of database functions independent of the retrieved data types
    • G06F16/901Indexing; Data structures therefor; Storage structures
    • G06F16/9024Graphs; Linked lists

Abstract

Embodiments of the present invention provide a kind of method, medium, device and the computing device of resource layout.The method of the resource layout includes:Obtain the description file of resource layout;Based on the description file, it is determined that the dependence between needing each resource of layout;According to the description content that above-mentioned each resource is directed in the dependence between each resource and the description file, each resource is created successively.The technical scheme that embodiment of the present invention provides can improve the efficiency of resource layout, and be easy to be managed each resource.

Description

Method, medium, device and the computing device of resource layout
Technical field
Embodiments of the present invention are related to computer and communication technical field, more specifically, embodiments of the present invention relate to And method, medium, device and the computing device of resource layout.
Background technology
This part is it is intended that the embodiments of the present invention stated in claims provide background or context.Herein Description recognizes it is prior art not because not being included in this part.
In large-scale distributed application, availability requirement more and more higher of the Internet enterprises to system architecture, face The rapid growth of competition and user's request, the issue of application is more and more frequent, it is therefore desirable to shorten from business development to business The cycle reached the standard grade.
Current business is essentially all to be developed and tested after demand is evaluated, then for the business, therefore is needed Development environment, test environment, the integration environment are provided and issue environment in advance, while is needed for the corresponding resource of the arranging service, To be supplied to user to use, and most application deployment is realized dependent on manual operation or the pattern of semi-automation.
The content of the invention
But realized due to need to rely on the pattern of manual operation or semi-automation, therefore current business development And resource layout efficiency is low.And current resource layout script provide only resource, not describe the relation between resource, This, which not only results in the application developed, possibly can not normally start, and manageability is not the resource of each arranging service.
Therefore, be highly desirable to a kind of scheme of improved resource layout, to improve the efficiency of resource layout, and it is easy to pair Each resource is managed.
In the present context, embodiments of the present invention it is expected to provide a kind of method, medium, device and the meter of resource layout Calculate equipment.
In the first aspect of embodiment of the present invention, there is provided a kind of method of resource layout, including:Resource is obtained to compile The description file of row;Based on the description file, it is determined that the dependence between needing each resource of layout;According to described each The description content of above-mentioned each resource is directed in dependence and the description file between individual resource, is created successively described each Individual resource.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according to the dependence between each resource The description content of each resource, the step of creating each resource successively, bag are directed in relation and the description file Include:Each resource is abstracted as summit;According between the dependence generation summit between each resource Directed edge, to obtain describing the directed acyclic graph of the dependence between each resource;According to the directed acyclic graph and The description content of each resource, each resource is created successively.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according to the directed acyclic graph and described each The description content of individual resource, the step of creating each resource successively, including:According to the description content of each resource, The resource corresponding to the summit for not having forerunner's point in the directed acyclic graph is first created, then successively to resource corresponding to forerunner's point The resource corresponding to summit created is created.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, create successively each resource it Afterwards, in addition to:Obtain the description file after resource layout renewal;According to the description file after the renewal, to needing layout Each resource is adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according to the description file after the renewal, To the step of needing each resource of layout to be adjusted, including:According to the description file after the renewal, generate after updating Directed acyclic graph;According to the front and rear directed acyclic graph of renewal and update in front and rear description file in the description of each resource Hold, generation renewal figure;Based on the description content that each resource is directed in the description file after the renewal figure and renewal, to needing Each resource of layout is adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according to the front and rear directed acyclic graph of renewal and The description content of each resource is directed in description file before and after renewal, generates the step of renewal is schemed, including:Before and after renewal Directed acyclic graph and the front and rear description file of renewal in be directed to the description content of each resource, it is determined that the oriented nothing that renewal is front and rear The each summit to be changed in ring figure;Based on each summit to be changed in the front and rear directed acyclic graph of renewal, institute is generated State renewal figure.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according to the front and rear directed acyclic graph of renewal and The description content of each resource is directed in the front and rear description file of renewal, is changed it is determined that updating in front and rear directed acyclic graph Each summit the step of, including:According to the front and rear directed acyclic graph of renewal, it is determined that in directed acyclic graph after renewal compared to Increased first kind summit and the second class summit reduced in directed acyclic graph before renewal, and the directed acyclic that renewal is front and rear All there is and enter the 3rd class summit that side is changed in figure;Retouched according to the front and rear directed acyclic graph of renewal and renewal are front and rear The description content that each resource is directed in file is stated, it is determined that all having in the front and rear directed acyclic graph of renewal and corresponding resource The 4th class summit that description content is changed.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, based in the front and rear directed acyclic graph of renewal The each summit to change, the step of renewal is schemed is generated, including:According to the dependence described in the description file after renewal Relation, generate the directed edge between the first kind summit, the 3rd class summit and the 4th class summit;Before renewal Description file described in dependence, generate the first kind summit, the 3rd class summit and the 4th class summit Directed edge of the direction between the second class summit after exchanging respectively.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, based on retouching after the renewal figure and renewal The description content that each resource is directed in file is stated, to the step of needing each resource of layout to be adjusted, including:
If the resource of any vertex correspondence in the renewal figure does not create, and has in the description file after renewal for institute The description content of the resource of any vertex correspondence is stated, then creates the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and has in the description file after renewal for institute The description content of the resource of any vertex correspondence is stated, then according to being directed to any summit pair in the description file after the renewal The description content for the resource answered is updated to the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and is not directed in the description file after renewal The description content of the resource of any vertex correspondence, then delete the resource of any vertex correspondence.
In certain embodiments of the present invention, also included based on aforementioned schemes, described method:Compiled needing to delete During the resource of row, according to the resource of the dependence between the resource of the layout, successively layout described in deletion.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according between the resource of the layout The step of resource of dependence, successively layout described in deletion, including:Obtain between the resource for describing the layout Dependence newest directed acyclic graph;Based on the newest directed acyclic graph, the newest oriented nothing is first deleted There is no the resource corresponding to the summit of follow-up point in ring figure, it is then right to the deleted summit of resource corresponding to follow-up point institute successively The resource answered is deleted.
In the second aspect of embodiment of the present invention, there is provided a kind of medium, be stored thereon with program, the program is located Manage the method realized when device performs as described in first aspect in above-mentioned embodiment.
In the third aspect of embodiment of the present invention, there is provided a kind of device of resource layout, including:Acquiring unit, For obtaining the description file of resource layout;Determining unit, for based on the description file, it is determined that needing each money of layout Dependence between source;Processing unit, for according in the dependence between each resource and the description file For the description content of above-mentioned each resource, each resource is created successively.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the processing unit includes:First generation Unit, for each resource to be abstracted as into summit, and the top is generated according to the dependence between each resource Directed edge between point, to obtain describing the directed acyclic graph of the dependence between each resource;Creating unit, it is used for According to the directed acyclic graph and the description content of each resource, each resource is created successively.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the creating unit is configured to:According to institute The description content of each resource is stated, first creates the resource corresponding to the summit for not having forerunner's point in the directed acyclic graph, then The resource corresponding to summit created successively to resource corresponding to forerunner's point creates.
In certain embodiments of the present invention, also included based on aforementioned schemes, described device:Adjustment unit;Wherein, The acquiring unit is additionally operable to obtain the description file after resource layout renewal;After the adjustment unit is used for according to the renewal Description file, each resource for needing layout is adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the adjustment unit includes:Second generation Unit, for according to the description file after the renewal, generating the directed acyclic graph after renewal;3rd generation unit, for root According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, generation renewal Figure;Execution unit, for being directed to the description content of each resource in the description file after scheming and update based on the renewal, to needing Each resource of layout is wanted to be adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit is configured to:Root According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, it is determined that before renewal The each summit to be changed in directed acyclic graph afterwards;Based on each top to be changed in the front and rear directed acyclic graph of renewal Point, generate the renewal figure.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit is configured to:Root According to the front and rear directed acyclic graph of renewal, it is determined that compared to increasing in the directed acyclic graph before renewal in directed acyclic graph after renewal First kind summit and the second class summit for reducing, and the front and rear directed acyclic graph of renewal in all have and enter side and become The 3rd class summit changed;According to retouching for each resource in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal Content is stated, it is determined that all having in the front and rear directed acyclic graph of renewal and the description content of corresponding resource is changed the 4th Class summit.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit is configured to:Root According to the dependence described in the description file after renewal, the first kind summit, the 3rd class summit and described the are generated Directed edge between four class summits;According to before renewal description file described in dependence, generate the first kind summit, The direction of the 3rd class summit and the 4th class summit respectively between the second class summit is oriented after exchanging Side.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the execution unit is configured to:
If the resource of any vertex correspondence in the renewal figure does not create, and has in the description file after renewal for institute The description content of the resource of any vertex correspondence is stated, then creates the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and has in the description file after renewal for institute The description content of the resource of any vertex correspondence is stated, then according to being directed to any summit pair in the description file after the renewal The description content for the resource answered is updated to the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and is not directed in the description file after renewal The description content of the resource of any vertex correspondence, then delete the resource of any vertex correspondence.
In certain embodiments of the present invention, also included based on aforementioned schemes, described device:Unit is deleted, is used for When needing to delete the resource of layout, according to the dependence between the resource of the layout, compiled successively described in deletion The resource of row.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the deletion unit is configured to:Obtain and use The newest directed acyclic graph of dependence between the resource of layout described in description;Based on the newest directed acyclic Figure, first deletes the resource corresponding to the summit for not having follow-up point in the newest directed acyclic graph, then successively to follow-up point Resource corresponding to the corresponding deleted summit of resource is deleted.
In the fourth aspect of embodiment of the present invention, there is provided a kind of computing device, including:Processor and memory, The memory storage has executable instruction, and the processor is used to call the executable instruction of the memory storage to perform such as Method in above-mentioned embodiment described in first aspect.
According to method, medium, device and the computing device of the resource layout of embodiment of the present invention, by being compiled based on resource The description file of row determines to need the dependence between each resource of layout, with according to the dependence between each resource Each resource is created successively with the description content of each resource so that when carrying out resource layout, it is contemplated that each money Dependence between source, and then the establishment of resource can be realized automatically based on the dependence, not only increase resource layout Efficiency, and can be easy to be managed each resource.Meanwhile the dependence specified between resource can also ensure out The application normal operation sent.
Brief description of the drawings
Detailed description below, above-mentioned and other mesh of exemplary embodiment of the invention are read by reference to accompanying drawing , feature and advantage will become prone to understand.In the accompanying drawings, if showing the present invention's by way of example, and not by way of limitation Dry embodiment, wherein:
Fig. 1 diagrammatically illustrates the flow chart of the method for the resource layout of first embodiment according to the present invention;
Fig. 2 schematically shows a kind of flow chart of embodiment of the step S14 shown in Fig. 1;
Fig. 3 diagrammatically illustrates the flow chart of the method for the resource layout of second embodiment according to the present invention;
Fig. 4 schematically shows a kind of flow chart of embodiment of the step S32 shown in Fig. 3;
Fig. 5 diagrammatically illustrates the flow chart of the method for the resource layout of the 3rd embodiment according to the present invention;
Fig. 6 diagrammatically illustrates the block diagram of the device of resource layout according to the embodiment of the present invention.
In the accompanying drawings, identical or corresponding label represents identical or corresponding part.
Embodiment
The principle and spirit of the present invention is described below with reference to some illustrative embodiments.It should be appreciated that provide this A little embodiments are not with any just for the sake of better understood when those skilled in the art and then realize the present invention Mode limits the scope of the present invention.On the contrary, these embodiments are provided so that the disclosure is more thorough and complete, and energy It is enough that the scope of the present disclosure is intactly communicated to those skilled in the art.
One skilled in the art will appreciate that embodiments of the present invention can be implemented as a kind of system, device, equipment, method Or computer program product.Therefore, the disclosure can be implemented as following form, i.e.,:Complete hardware, complete software (including firmware, resident software, microcode etc.), or the form that hardware and software combines.
According to the embodiment of the present invention, it is proposed that a kind of method, medium, device and the computing device of resource layout.
Herein, it is to be understood that involved term " resource layout " is a kind of according to business needs, with layout The description to the association attributes of the resource of needs and these resources etc. that the modes such as file are submitted, and then it is automatically performed respective resources Initialization, finally return that process of the resource to user that a whole set of initialization is completed.
Term " directed acyclic graph " refers to that one can not return to having for the point from some summit by some sides Xiang Tu.
In addition, any number of elements in accompanying drawing is used to example and unrestricted, and any name is only used for distinguishing, Without any restrictions implication.
Below with reference to the principle and spirit of some representative embodiments of the present invention, in detail the explaination present invention.
Summary of the invention
The inventors discovered that current resource layout need to rely on manual operation or semi-automatic pattern to realize, Cause business development and resource layout efficiency low.And current resource layout script provide only resource, not description provides Relation between source, this, which not only results in the application developed, possibly can not normally start, and manageability is not each business The resource of layout.
Therefore, embodiments of the present invention provide a kind of scheme of improved resource layout, can improve resource layout Efficiency, and be easy to be managed each resource.
After the general principle of the present invention is described, lower mask body introduces the various non-limiting embodiment party of the present invention Formula.
Application scenarios overview
Understand spirit and principles of the present invention it should be noted that following application scenarios are for only for ease of and show, this The embodiment of invention is unrestricted in this regard.On the contrary, embodiments of the present invention can apply to it is applicable any Scene.
When user needs to carry out resource layout, it is only necessary to the description file of resource layout is provided, and then according to of the invention real File acquisition can be described according to this and be closed to the dependence between each resource for needing layout by applying the device of mode or computing device System, then creates each resource, not only carries successively according to the description content of the dependence between each resource and each resource The high efficiency of resource layout, and pipe easily can be carried out to each resource of establishment based on the dependence between resource Reason.
When user needs to be adjusted resource layout, new description file can be provided, and then according to of the invention real The device or computing device for applying mode can be adjusted based on the new description file to the resource of layout, greatly convenient The operation of user.
Illustrative methods
With reference to above-mentioned application scenarios, the money according to exemplary embodiment of the invention is described referring to figs. 1 to Fig. 5 The method of source layout.
Fig. 1 diagrammatically illustrates the flow chart of the method for the resource layout of first embodiment according to the present invention.
Reference picture 1, according to the method for the resource layout of first embodiment of the present invention, including:
Step S10, obtain the description file of resource layout.
It should be noted that in embodiments of the present invention, the description file of resource layout, which mainly contains, to be needed to compile The description content of each resource of row, and need the dependence between each resource of layout.
Step S12, based on the description file, it is determined that the dependence between needing each resource of layout.
Describe five kinds of moneys of A, B, C, D, E Source, its dependence are that B is had the dependence to B and C, then retouched based on this in the presence of the dependence to A, C in the presence of the dependence to A and D, E Dependence between resource A, B, C, D, E can be obtained by stating file.
Step S14, above-mentioned each money is directed to according in the dependence between each resource and the description file The description content in source, each resource is created successively.
According to an illustrative embodiment of the invention, reference picture 2, step S14 include:
Step S142, each resource is abstracted as summit.
Step S144, the directed edge between the summit is generated according to the dependence between each resource, with To the directed acyclic graph for describing the dependence between each resource.
It should be noted that the directed edge between summit is that summit sensing relies on its money as corresponding to the resource being relied on Summit corresponding to source.For example there is the dependence to resource A in resource B, then the directed edge between B summits corresponding with A is A pairs Point to summit corresponding to B in the summit answered.
Step S146, according to the directed acyclic graph and the description content of each resource, create successively described each Resource.
According to an illustrative embodiment of the invention, step S146 includes:It is first according to the description content of each resource Create the resource corresponding to the summit for not having forerunner's point in the directed acyclic graph, then successively to resource corresponding to forerunner's point Resource corresponding to the summit of establishment is created.
In an embodiment of the invention, specifically, it is assumed that resource B depends on resource A, resource C to depend on resource A Resource B and resource C is depended on resource D, resource E.For purposes of illustration only, it is respectively with the abstract obtained summit of each resource below A, it is illustrated exemplified by B, C, D, E, can be expressed as based on directed acyclic graph caused by above-mentioned dependence:
G0=(V0, E0)
Wherein, V0={ A, B, C, D, E }, E0=<A,B>,<A,C>,<D,C>,<B,E>,<C,E>}.Behaviour is created performing When making, because forerunner's point is not present in A and D, therefore can first establishing resource A and resource D.When resource A completes establishment but resource When D does not complete establishment, because resource corresponding to B forerunner's point A has created, therefore resource B can be also created.When resource D is completed After establishment, resource (i.e. resource A and resource D) corresponding to C forerunner's point just creates completely, at this moment can perform resource C establishment Journey.After resource B and resource C are created, resource E establishment process can be just performed.
It can be seen that the resource method of combination of embodiment of the present invention can realize money automatically based on the dependence between resource The establishment in source, effectively increase the efficiency of resource layout.
Fig. 3 diagrammatically illustrates the flow chart of the method for the resource layout of second embodiment according to the present invention.
Reference picture 3, according to the method for the resource layout of second embodiment of the present invention, in the step shown in Fig. 1 On the basis of S10, S12 and S14, in addition to:
Step S30, obtain the description file after resource layout renewal.
It should be noted that when user needs to be adjusted the resource of layout, after resource layout can be submitted to update Description file.Certainly, the description file after resource layout renewal also contains the description content of each resource, and each money Dependence between source.
Step S32, according to the description file after the renewal, each resource for needing layout is adjusted.
Included according to the exemplary embodiment of the present invention, reference picture 4, step S32:
Step S322, according to the description file after the renewal, the directed acyclic graph after generation renewal.
It should be noted that it is also first will according to the process of the directed acyclic graph after the description file generated renewal after renewal Each resource (each resource described in description file after referred to herein as updating) is abstracted as summit, then according to each money The directed edge between dependence generation summit between source, and then the directed acyclic graph after being updated.
Wherein, the description file after renewal may include compared to the content of the description document change before renewal:Layout Resource increase, the resource of layout are reduced, the dependence between resource changes, the description content hair of some or some resources Change is given birth to.
Step S324, according to the front and rear directed acyclic graph of renewal and update in front and rear description file for each resource Description content, generation renewal figure.
In an exemplary embodiment of the present invention embodiment, step S324 includes:According to the front and rear directed acyclic graph of renewal and more The description content of each resource is directed in new front and rear description file, it is determined that updating what is changed in front and rear directed acyclic graph Each summit;Based on each summit to be changed in the front and rear directed acyclic graph of renewal, the renewal figure is generated.
It should be noted that the change of the directed acyclic graph before and after renewal may include:Summit increase, summit are reduced, top The description content of the resource of directed edge change, some summit or some vertex correspondences between point is changed.Based on this, In some embodiments of the present invention, pin in the description file before and after the above-mentioned directed acyclic graph front and rear according to renewal and renewal To the description content of each resource, it is determined that the step of updating each summit to be changed in front and rear directed acyclic graph, including:
According to front and rear directed acyclic graph is updated, it is determined that compared to the oriented nothing before renewal in the directed acyclic graph after renewal All have and enter in increased first kind summit and the second class summit reduced in ring figure, and the front and rear directed acyclic graph of renewal While the 3rd class summit changed;According to the front and rear directed acyclic graph of renewal and update in front and rear description file for each The description content of individual resource, it is determined that all have in the front and rear directed acyclic graph of renewal and the description content of corresponding resource there occurs 4th class summit of change.
It should be noted that updating in front and rear directed acyclic graph all has and enters the 3rd class summit that side is changed Summit corresponding to the resource that as dependence is changed.
In certain embodiments of the present invention, changed in the above-mentioned directed acyclic graph front and rear based on renewal each Individual summit, the step of renewal is schemed is generated, including:According to the dependence described in the description file after renewal, institute is generated State the directed edge between first kind summit, the 3rd class summit and the 4th class summit;According to the description file before renewal Described in dependence, generate the first kind summit, the 3rd class summit and the 4th class summit respectively with it is described Directed edge of the direction after exchanging between second class summit.
Specifically, the directed acyclic graph such as before renewal is the G0=(V0, E0) in above-mentioned example, after resource layout renewal Description file include:Resource A, B, C, E, F, wherein B have dependence to A, and C has dependence to A, and E has dependence and C and E to B and C The description content of itself changes, and F has dependence to E, and A and B description content do not change.Based on this, after obtaining renewal Directed acyclic graph be G1=(V1, E1), wherein, V1={ A, B, C, E, F }, E1=<A,B>,<A,C>,<B,E>,<C,E>, <E,F>}。
Assuming that renewal figure G'=(V', E'), makes V'=V1-V0={ F } first, it then will enter side and change and belong to V0 ∩ V1 point C adds V', and the point E that description content is changed adds V', and now V'={ C, E, F }, wherein F are above-mentioned First kind summit, C are the 3rd above-mentioned class summit, and E is the 4th above-mentioned class summit.E' connects summit in V' according to E1 E'=<C,E>,<E,F>, i.e., according to the dependence described in the description file after renewal, generation first kind summit, the Directed edge between three class summits and the 4th class summit.V'=V'+ (V0-V1)={ C, D, E, F } is finally made, wherein, D is The second above-mentioned class summit, then E' the directed edge after D and C, E, F are exchanged is generated according to E0, obtain E'=<C,E>,<E,F>, <C,D>}。
With continued reference to Fig. 4, step S32 also includes:
Step S326 is right based on the description content that each resource is directed in the description file after the renewal figure and renewal Each resource of layout is needed to be adjusted.
According to the exemplary embodiment of the present invention, step S326 includes:
If the resource of any vertex correspondence in the renewal figure does not create, and has in the description file after renewal for institute The description content of the resource of any vertex correspondence is stated, then creates the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and has in the description file after renewal for institute The description content of the resource of any vertex correspondence is stated, then according to being directed to any summit pair in the description file after the renewal The description content for the resource answered is updated to the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and is not directed in the description file after renewal The description content of the resource of any vertex correspondence, then delete the resource of any vertex correspondence.
Specifically, continue to illustrate with above-mentioned example, based on renewal figure G'=(V', E'), because forerunner is not present in C Point, therefore first C is operated.For C, because its corresponding resource has created, and there is also therefore root for new description content Operation is updated to resource C according to new description content.After the completion of resource C renewals, due to resource corresponding to D and E forerunner's point Complete to update, then D and E have been operated.Wherein, do not deposited in the description file after resource corresponding to D has been created but updated In the description content to resource D, therefore perform deletion action;Resource corresponding to E created and new description content there is also, because This is updated operation according to new description content to resource E.After the completion of resource E renewals, resource corresponding to F forerunner's point is complete Into renewal, because resource corresponding to F is not created, therefore establishment operation is carried out to resource corresponding to F.When aforesaid operations are all complete Cheng Hou, resource become A, B, C, E, F five, and A and B do not change, and C, E complete renewal according to new description, and D is deleted, and F is created Build, final result is consistent with new description.
Fig. 5 diagrammatically illustrates the flow chart of the method for the resource layout of the 3rd embodiment according to the present invention.
Reference picture 5, according to the method for the resource layout of the 3rd embodiment of the present invention, including:Step S50, needing When deleting the resource of layout, according to the dependence between the resource of the layout, successively delete described in layout Resource.
According to an illustrative embodiment of the invention, step S50 includes:Obtain for the layout is described resource it Between dependence newest directed acyclic graph;Based on the newest directed acyclic graph, first delete described newest oriented There is no the resource corresponding to the summit of follow-up point in acyclic figure, then successively to the deleted summit institute of resource corresponding to follow-up point Corresponding resource is deleted.
It should be noted that in the above-described embodiment, due to according to newest directed acyclic graph, first deleting newest There is no the resource corresponding to the summit of follow-up point in directed acyclic graph, then successively to the deleted top of resource corresponding to follow-up point The corresponding resource of point is deleted, enabling is deleted the resource of establishment successively based on the dependence between resource, is protected Demonstrate,prove resource and deleted the progress that process can be without any confusion, be very easy to the management to resource.
Exemplary media
After the method for exemplary embodiment of the invention is described, next, to exemplary embodiment of the invention Medium illustrate.
In some possible embodiments, various aspects of the invention are also implemented as a kind of medium, store thereon There is program code, be used to realize that this specification is above-mentioned " illustrative methods " when computing device of the described program code by equipment Step in the method for the resource layout according to the various illustrative embodiments of the present invention described in part.
Specifically, it is used to realize following steps during the computing device described program code of the equipment:Resource is obtained to compile The description file of row;Based on the description file, it is determined that the dependence between needing each resource of layout;According to described each The description content of above-mentioned each resource is directed in dependence and the description file between individual resource, is created successively described each Individual resource.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment Lower step:Each resource is abstracted as summit;According to the dependence between each resource generate the summit it Between directed edge, to obtain describing the directed acyclic graph of the dependence between each resource;According to the directed acyclic The description content of figure and each resource, creates each resource successively.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment Lower step:According to the description content of each resource, first creating does not have the summit institute of forerunner's point right in the directed acyclic graph The resource answered, the resource corresponding to summit then created successively to resource corresponding to forerunner's point create.
In certain embodiments of the present invention, it is additionally operable to realize during the computing device described program code of the equipment Following steps:Obtain the description file after resource layout renewal;According to the description file after the renewal, to needing each of layout Individual resource is adjusted.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment Lower step:According to the description file after the renewal, the directed acyclic graph after generation renewal;According to the front and rear directed acyclic of renewal The description content of each resource is directed in description file before and after figure and renewal, generation renewal is schemed;Based on the renewal figure and more The description content of each resource is directed in description file after new, each resource for needing layout is adjusted.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment Lower step:The description content that describes in file be directed to each resource front and rear according to front and rear directed acyclic graph and renewal is updated, It is determined that update each summit to be changed in front and rear directed acyclic graph;Become based on updating in front and rear directed acyclic graph The each summit changed, generate the renewal figure.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment Lower step:According to front and rear directed acyclic graph is updated, it is determined that compared to the oriented nothing before renewal in the directed acyclic graph after renewal All have and enter in increased first kind summit and the second class summit reduced in ring figure, and the front and rear directed acyclic graph of renewal While the 3rd class summit changed;According to the front and rear directed acyclic graph of renewal and update in front and rear description file for each The description content of individual resource, it is determined that all have in the front and rear directed acyclic graph of renewal and the description content of corresponding resource there occurs 4th class summit of change.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment Lower step:According to the dependence described in the description file after renewal, the first kind summit, the 3rd class summit are generated Directed edge between the 4th class summit;According to the dependence described in the description file before renewal, generation described the The direction process of a kind of summit, the 3rd class summit and the 4th class summit respectively between the second class summit is exchanged Directed edge afterwards.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment Lower step:
If the resource of any vertex correspondence in the renewal figure does not create, and has in the description file after renewal for institute The description content of the resource of any vertex correspondence is stated, then creates the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and has in the description file after renewal for institute The description content of the resource of any vertex correspondence is stated, then according to being directed to any summit pair in the description file after the renewal The description content for the resource answered is updated to the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and is not directed in the description file after renewal The description content of the resource of any vertex correspondence, then delete the resource of any vertex correspondence.
In certain embodiments of the present invention, it is additionally operable to realize during the computing device described program code of the equipment Following steps:When needing to delete the resource of layout, according to the dependence between the resource of the layout, delete successively The resource of the layout.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment Lower step:Obtain for the layout is described resource between dependence newest directed acyclic graph;Based on described Newest directed acyclic graph, the resource corresponding to the summit for not having follow-up point in the newest directed acyclic graph is first deleted, so The resource corresponding to the deleted summit of resource corresponding to follow-up point is deleted successively afterwards.
It should be noted that:Above-mentioned medium can be readable signal medium or readable storage medium storing program for executing.Readable storage medium Matter can be for example but not limited to:Electricity, magnetic, optical, electromagnetic, system, device or the device of infrared ray or semiconductor, or arbitrarily Combination above.The more specifically example (non exhaustive list) of readable storage medium storing program for executing includes:With one or more wires Electrical connection, portable disc, hard disk, random access memory (RAM), read-only storage (ROM), erasable type may be programmed read-only storage Device (EPROM or flash memory), optical fiber, portable compact disc read only memory (CD-ROM), light storage device, magnetic memory device or The above-mentioned any appropriate combination of person.
Readable signal medium can be included in a base band or as a part of data-signal propagated of carrier wave, wherein carrying Readable program code.The data-signal of this propagation can take various forms, and include but is not limited to:Electromagnetic signal, light letter Number or above-mentioned any appropriate combination.Readable signal medium can also be any computer-readable recording medium beyond readable storage medium storing program for executing, The computer-readable recording medium can send, propagate and either transmit for being used by instruction execution system, device or device or being tied with it Close the program used.
The program code included on computer-readable recording medium can be transmitted with any appropriate medium, be included but is not limited to:Wirelessly, have Line, optical cable, RF etc., or above-mentioned any appropriate combination.
Can being combined to write the program operated for performing the present invention with one or more programming languages Code, described program design language include object oriented program language-Java, C++ etc., include routine Procedural programming language-such as " C " language or similar programming language.Program code can be fully in user Performed on computing device, part performs or remotely counted completely on a remote computing on the user computing device for part Calculate and performed on equipment or server.In the situation of remote computing device is related to, remote computing device can pass through any kind Network --- including LAN (LAN) or wide area network (WAN)-be connected to user calculating equipment, or, it may be connected to it is outer Portion's computing device (such as passing through Internet connection using ISP).
Exemplary means
After the medium of exemplary embodiment of the invention is described, next, exemplary to the present invention with reference to figure 6 The device of the resource layout of embodiment illustrates.
Fig. 6 diagrammatically illustrates the block diagram of the device of resource layout according to the embodiment of the present invention.
Reference picture 6, the device 600 of resource layout according to the embodiment of the present invention, including:Acquiring unit 602, determine Unit 604 and processing unit 606.
Specifically, acquiring unit 602 is used for the description file for obtaining resource layout;Determining unit 604 is used for based on described File is described, it is determined that the dependence between needing each resource of layout;Processing unit 606 is used for according to each resource Between dependence and it is described description file in be directed to above-mentioned each resource description content, create each money successively Source.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the processing unit 606 includes:First life Into unit 6062 and creating unit 6064.
Specifically, the first generation unit 6062 is used to each resource being abstracted as summit, and according to each money Dependence between source generates the directed edge between the summit, to obtain describing the dependence between each resource Directed acyclic graph;Creating unit 6064 is used for the description content according to the directed acyclic graph and each resource, successively Create each resource.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the creating unit 6064 is configured to:Root According to the description content of each resource, the resource corresponding to the summit for not having forerunner's point in the directed acyclic graph is first created, Then the resource corresponding to summit created successively to resource corresponding to forerunner's point creates.
In certain embodiments of the present invention, also included based on aforementioned schemes, described device 600:Adjustment unit 608;Wherein, the acquiring unit 602 is additionally operable to obtain the description file after resource layout renewal;The adjustment unit 608 is used Description file after according to the renewal, each resource for needing layout is adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the adjustment unit 608 includes:Second life Into unit 6082, the 3rd generation unit 6084 and execution unit 6086.
Specifically, the second generation unit 6082, for according to the description file after the renewal, generating oriented after renewal Acyclic figure;3rd generation unit 6084, for according to pin in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal To the description content of each resource, generation renewal figure;Execution unit 6086, for based on the description after the renewal figure and renewal The description content of each resource is directed in file, each resource for needing layout is adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit 6084 configures For:According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, it is determined that The each summit to be changed in the front and rear directed acyclic graph of renewal;Based on what is changed in the front and rear directed acyclic graph of renewal Each summit, generate the renewal figure.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit 6084 configures For:According to front and rear directed acyclic graph is updated, it is determined that compared to the directed acyclic graph before renewal in the directed acyclic graph after renewal In all have in increased first kind summit and the second class summit for reducing, and the front and rear directed acyclic graph of renewal and enter side hair The 3rd class summit of change is given birth to;Each money is directed to according in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal The description content in source, it is determined that all having in the front and rear directed acyclic graph of renewal and the description content of corresponding resource is changed The 4th class summit.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit 6084 configures For:According to the dependence described in the description file after renewal, the first kind summit, the 3rd class summit and institute are generated State the directed edge between the 4th class summit;According to the dependence described in the description file before renewal, the first kind is generated Summit, the 3rd class summit and the 4th class summit respectively the direction between the second class summit after exchanging Directed edge.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the execution unit 6086 is configured to:
If the resource of any vertex correspondence in the renewal figure does not create, and has in the description file after renewal for institute The description content of the resource of any vertex correspondence is stated, then creates the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and has in the description file after renewal for institute The description content of the resource of any vertex correspondence is stated, then according to being directed to any summit pair in the description file after the renewal The description content for the resource answered is updated to the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and is not directed in the description file after renewal The description content of the resource of any vertex correspondence, then delete the resource of any vertex correspondence.
In certain embodiments of the present invention, also included based on aforementioned schemes, described device 600:Delete unit 610, for when needing to delete the resource of layout, according to the dependence between the resource of the layout, deleting successively The resource of the layout.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the deletion unit 610 is configured to:Obtain The newest directed acyclic graph of the dependence between resource for describing the layout;Based on the newest oriented nothing Ring figure, the resource corresponding to the summit for not having follow-up point in the newest directed acyclic graph is first deleted, then successively to follow-up Resource corresponding to point corresponding to the deleted summit of resource is deleted.
Exemplary computer device
After method, medium and the device of exemplary embodiment of the invention is described, next, introducing according to this hair The computing device of bright another exemplary embodiment.
Person of ordinary skill in the field it is understood that various aspects of the invention can be implemented as system, method or Program product.Therefore, various aspects of the invention can be implemented as following form, i.e.,:It is complete hardware embodiment, complete The embodiment combined in terms of full Software Implementation (including firmware, microcode etc.), or hardware and software, can unite here Referred to as " circuit ", " module " or " system ".
In some possible embodiments, at least one can be comprised at least according to the computing device of embodiment of the present invention Individual processor and at least one memory.Wherein, the memory storage has program code, when described program code is by institute When stating computing device so that described in above-mentioned " illustrative methods " part of computing device this specification according to this hair Step in the method for the resource layout of bright various illustrative embodiments.For example, the processor can be performed as in Fig. 1 Shown step S10, obtain the description file of resource layout;Step S12, based on the description file, it is determined that needing layout Dependence between each resource;Step S14, according in the dependence between each resource and the description file For the description content of above-mentioned each resource, each resource is created successively.And for example, the processor can also be performed such as figure 2 to shown in Fig. 5 the step of.
It should be noted that although being referred to some units or subelement of the device of resource layout in above-detailed, But what this division was merely exemplary, it is not enforceable.In fact, according to the embodiment of the present invention, retouch above Two or more modules or the feature and function of unit stated can embody in a module or unit.Conversely, retouch above The module or the feature and function of unit stated can be further divided into being embodied by multiple modules or unit.
In addition, although the operation of the inventive method is described with particular order in the accompanying drawings, still, this do not require that or Hint must perform these operations according to the particular order, or the operation having to carry out shown in whole could realize it is desired As a result.Additionally or alternatively, it is convenient to omit some steps, multiple steps are merged into a step and performed, and/or by one Step is decomposed into execution of multiple steps.
Although describe spirit and principles of the present invention by reference to some embodiments, it should be appreciated that, this Invention is not limited to disclosed embodiment, and the division to each side does not mean that the feature in these aspects can not yet Combination is to be benefited, and this division is merely to the convenience of statement.It is contemplated that cover appended claims spirit and In the range of included various modifications and equivalent arrangements.

Claims (10)

1. a kind of method of resource layout, including:
Obtain the description file of resource layout;
Based on the description file, it is determined that the dependence between needing each resource of layout;
According to the dependence between each resource and it is described description file in be directed to above-mentioned each resource description content, Each resource is created successively.
2. the method according to claim 11, wherein, according to the dependence between each resource and the description text It is directed to the description content of each resource in part, the step of creating each resource successively, including:
Each resource is abstracted as summit;
Directed edge between the summit is generated according to the dependence between each resource, it is described each to obtain describing The directed acyclic graph of dependence between resource;
According to the directed acyclic graph and the description content of each resource, each resource is created successively.
3. the method according to claim 11, wherein, according in the description of the directed acyclic graph and each resource Hold, the step of creating each resource successively, including:
According to the description content of each resource, first create corresponding to the summit for not having forerunner's point in the directed acyclic graph Resource, the resource corresponding to summit then created successively to resource corresponding to forerunner's point create.
4. the method according to claim 11, wherein, after each resource is created successively, in addition to:
Obtain the description file after resource layout renewal;
According to the description file after the renewal, each resource for needing layout is adjusted.
5. the method according to claim 11, wherein, according to the description file after the renewal, to needing each of layout The step of resource is adjusted, including:
According to the description file after the renewal, the directed acyclic graph after generation renewal;
According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, generation Renewal figure;
Based on the description content that each resource is directed in the description file after the renewal figure and renewal, to needing each of layout Resource is adjusted.
6. according to the method for claim 5, wherein, according to the front and rear directed acyclic graph of renewal and update front and rear description text The description content of each resource is directed in part, generation updates the step of scheming, including:
According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, it is determined that The each summit to be changed in the front and rear directed acyclic graph of renewal;
Based on each summit to be changed in the front and rear directed acyclic graph of renewal, the renewal figure is generated.
7. according to the method for claim 6, wherein, according to the front and rear directed acyclic graph of renewal and update front and rear description text The description content of each resource is directed in part, it is determined that the step on each summit to be changed in the directed acyclic graph before and after renewal Suddenly, including:
According to front and rear directed acyclic graph is updated, it is determined that compared to the directed acyclic graph before renewal in the directed acyclic graph after renewal In all have in increased first kind summit and the second class summit for reducing, and the front and rear directed acyclic graph of renewal and enter side hair The 3rd class summit of change is given birth to;
According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, it is determined that All have in the front and rear directed acyclic graph of renewal and the 4th class summit that the description content of corresponding resource is changed.
8. a kind of medium, is stored thereon with program, realized when the program is executed by processor such as any one of claim 1 to 7 Described method.
9. a kind of device of resource layout, including:
Acquiring unit, for obtaining the description file of resource layout;
Determining unit, for based on the description file, it is determined that the dependence between needing each resource of layout;
Processing unit, for being directed to above-mentioned each money according in the dependence between each resource and the description file The description content in source, each resource is created successively.
10. a kind of computing device, including:Processor and memory, the memory storage have executable instruction, the processor Executable instruction for calling the memory storage performs the method as any one of claim 1 to 7.
CN201710702299.9A 2017-08-16 2017-08-16 Resource arrangement method, medium, device and computing equipment Active CN107526639B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710702299.9A CN107526639B (en) 2017-08-16 2017-08-16 Resource arrangement method, medium, device and computing equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710702299.9A CN107526639B (en) 2017-08-16 2017-08-16 Resource arrangement method, medium, device and computing equipment

Publications (2)

Publication Number Publication Date
CN107526639A true CN107526639A (en) 2017-12-29
CN107526639B CN107526639B (en) 2021-07-09

Family

ID=60681370

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710702299.9A Active CN107526639B (en) 2017-08-16 2017-08-16 Resource arrangement method, medium, device and computing equipment

Country Status (1)

Country Link
CN (1) CN107526639B (en)

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108805527A (en) * 2018-05-29 2018-11-13 郑州云海信息技术有限公司 A kind of project management method and device
CN109445923A (en) * 2018-11-01 2019-03-08 郑州云海信息技术有限公司 A kind of method and device of micro services task schedule
CN109471616A (en) * 2018-10-26 2019-03-15 数贸科技(北京)有限公司 Method of combination and device are applied based on application Jar APMB package
CN109471729A (en) * 2018-11-15 2019-03-15 平安科技(深圳)有限公司 Based on recursive resource method for cleaning and device

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101640613A (en) * 2009-09-11 2010-02-03 中兴通讯股份有限公司 Method and device for network resource relating management
CN102541875A (en) * 2010-12-16 2012-07-04 北京大学 Access method, device and system for relational node data of directed acyclic graph
CN103262481A (en) * 2010-12-17 2013-08-21 思科技术公司 Dynamic reroute scheduling in a directed acyclic graph (DAG)
CN105007323A (en) * 2015-07-22 2015-10-28 上海斐讯数据通信技术有限公司 System and method for arranging cloud resources
CN105824746A (en) * 2015-01-05 2016-08-03 中国移动(深圳)有限公司 Method and device for automatically generating test scheduling based on use case dependencies
CN106155791A (en) * 2016-06-30 2016-11-23 电子科技大学 A kind of workflow task dispatching method under distributed environment
CN106250650A (en) * 2016-08-15 2016-12-21 北京理工大学 The resource allocation and optimization method of model in high flux emulation
US20170109383A1 (en) * 2015-10-16 2017-04-20 Seven Bridges Genomics Inc. Biological graph or sequence serialization
CN106775830A (en) * 2016-11-25 2017-05-31 魏熙柠 A kind of web application page script resource automatic update method and system

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101640613A (en) * 2009-09-11 2010-02-03 中兴通讯股份有限公司 Method and device for network resource relating management
CN102541875A (en) * 2010-12-16 2012-07-04 北京大学 Access method, device and system for relational node data of directed acyclic graph
CN103262481A (en) * 2010-12-17 2013-08-21 思科技术公司 Dynamic reroute scheduling in a directed acyclic graph (DAG)
CN105824746A (en) * 2015-01-05 2016-08-03 中国移动(深圳)有限公司 Method and device for automatically generating test scheduling based on use case dependencies
CN105007323A (en) * 2015-07-22 2015-10-28 上海斐讯数据通信技术有限公司 System and method for arranging cloud resources
US20170109383A1 (en) * 2015-10-16 2017-04-20 Seven Bridges Genomics Inc. Biological graph or sequence serialization
CN106155791A (en) * 2016-06-30 2016-11-23 电子科技大学 A kind of workflow task dispatching method under distributed environment
CN106250650A (en) * 2016-08-15 2016-12-21 北京理工大学 The resource allocation and optimization method of model in high flux emulation
CN106775830A (en) * 2016-11-25 2017-05-31 魏熙柠 A kind of web application page script resource automatic update method and system

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
天津滨海迅腾科技集团有限公司: "《软件工程》", 31 January 2017 *
王宇新,等: "兼顾费用与公平的带通信开销的多有向无环图调度", 《计算机应用》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108805527A (en) * 2018-05-29 2018-11-13 郑州云海信息技术有限公司 A kind of project management method and device
CN109471616A (en) * 2018-10-26 2019-03-15 数贸科技(北京)有限公司 Method of combination and device are applied based on application Jar APMB package
CN109445923A (en) * 2018-11-01 2019-03-08 郑州云海信息技术有限公司 A kind of method and device of micro services task schedule
CN109471729A (en) * 2018-11-15 2019-03-15 平安科技(深圳)有限公司 Based on recursive resource method for cleaning and device

Also Published As

Publication number Publication date
CN107526639B (en) 2021-07-09

Similar Documents

Publication Publication Date Title
CN107526639A (en) Method, medium, device and the computing device of resource layout
US11093216B2 (en) Automatic discovery of microservices from monolithic applications
CN107274186A (en) The method and apparatus that intelligent contract-defined interface is obtained in block chain
CN104346146B (en) A kind of method of cross-platform transformation applications code and device
CN106170764A (en) Method and apparatus for automatic equipment Program Generating
CN105335137A (en) Method and device used for processing source file
CN108829378A (en) A kind of development approach of application software, device and electronic equipment
CN102567172B (en) For parallel workloads emulation mode and the system of application performance test
CN113641591B (en) Test case generation method and device and test method and device
CN109558525A (en) A kind of generation method of test data set, device, equipment and storage medium
CN109614093B (en) Visual intelligent contract system and intelligent contract processing method
US8990058B2 (en) Generating and evaluating expert networks
CN109522010A (en) Initial code adding method and device, storage medium, electronic equipment
CN101872302B (en) BPEL-based modeling method for control information flow graph
US20150100671A1 (en) Identifying Compatible System Configurations
Burton et al. Complementing metaheuristic search with higher abstraction techniques
CN109714652A (en) Date storage method, system, storage medium and the equipment of ODN management system
CN108153745A (en) A kind of application data calling method and application development system
US20140189656A1 (en) Flow Analysis in Program Execution
CN110096543A (en) Data manipulation method, device, server and the medium of application program
Qin et al. A novel domain oriented approach for scientific grid workflow composition
CN109412828A (en) Method, apparatus and system for the discovering network topology in software defined network
CN104657139B (en) Visualization command stream for direct fault location generates system and method
US20130239095A1 (en) Method and system for transforming interaction models into service definitions
Mirković et al. A model-driven approach to establishment of private blockchain business networks

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 310052 Room 301, Building No. 599, Changhe Street Network Business Road, Binjiang District, Hangzhou City, Zhejiang Province

Patentee after: Hangzhou NetEase Shuzhifan Technology Co.,Ltd.

Address before: 310052 Room 301, Building No. 599, Changhe Street Network Business Road, Binjiang District, Hangzhou City, Zhejiang Province

Patentee before: HANGZHOU LANGHE TECHNOLOGY Ltd.

CP01 Change in the name or title of a patent holder