CN107526639A - Method, medium, device and the computing device of resource layout - Google Patents
Method, medium, device and the computing device of resource layout Download PDFInfo
- Publication number
- CN107526639A CN107526639A CN201710702299.9A CN201710702299A CN107526639A CN 107526639 A CN107526639 A CN 107526639A CN 201710702299 A CN201710702299 A CN 201710702299A CN 107526639 A CN107526639 A CN 107526639A
- Authority
- CN
- China
- Prior art keywords
- resource
- renewal
- acyclic graph
- summit
- layout
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
- 238000000034 method Methods 0.000 title claims abstract description 47
- 230000008859 change Effects 0.000 claims description 12
- 238000012545 processing Methods 0.000 claims description 6
- 230000005055 memory storage Effects 0.000 claims description 5
- 125000002015 acyclic group Chemical group 0.000 description 6
- 238000012217 deletion Methods 0.000 description 6
- 230000037430 deletion Effects 0.000 description 6
- 230000008569 process Effects 0.000 description 5
- 238000011161 development Methods 0.000 description 4
- 238000010586 diagram Methods 0.000 description 2
- 230000006870 function Effects 0.000 description 2
- 230000005291 magnetic effect Effects 0.000 description 2
- 230000003287 optical effect Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 238000004891 communication Methods 0.000 description 1
- 238000004590 computer program Methods 0.000 description 1
- 230000001419 dependent effect Effects 0.000 description 1
- 230000005611 electricity Effects 0.000 description 1
- 238000005516 engineering process Methods 0.000 description 1
- 230000010354 integration Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 239000013307 optical fiber Substances 0.000 description 1
- 230000000644 propagated effect Effects 0.000 description 1
- 239000004065 semiconductor Substances 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F9/00—Arrangements for program control, e.g. control units
- G06F9/06—Arrangements for program control, e.g. control units using stored programs, i.e. using an internal store of processing equipment to receive or retain programs
- G06F9/46—Multiprogramming arrangements
- G06F9/50—Allocation of resources, e.g. of the central processing unit [CPU]
- G06F9/5061—Partitioning or combining of resources
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06F—ELECTRIC DIGITAL DATA PROCESSING
- G06F16/00—Information retrieval; Database structures therefor; File system structures therefor
- G06F16/90—Details of database functions independent of the retrieved data types
- G06F16/901—Indexing; Data structures therefor; Storage structures
- G06F16/9024—Graphs; Linked lists
Abstract
Embodiments of the present invention provide a kind of method, medium, device and the computing device of resource layout.The method of the resource layout includes:Obtain the description file of resource layout;Based on the description file, it is determined that the dependence between needing each resource of layout;According to the description content that above-mentioned each resource is directed in the dependence between each resource and the description file, each resource is created successively.The technical scheme that embodiment of the present invention provides can improve the efficiency of resource layout, and be easy to be managed each resource.
Description
Technical field
Embodiments of the present invention are related to computer and communication technical field, more specifically, embodiments of the present invention relate to
And method, medium, device and the computing device of resource layout.
Background technology
This part is it is intended that the embodiments of the present invention stated in claims provide background or context.Herein
Description recognizes it is prior art not because not being included in this part.
In large-scale distributed application, availability requirement more and more higher of the Internet enterprises to system architecture, face
The rapid growth of competition and user's request, the issue of application is more and more frequent, it is therefore desirable to shorten from business development to business
The cycle reached the standard grade.
Current business is essentially all to be developed and tested after demand is evaluated, then for the business, therefore is needed
Development environment, test environment, the integration environment are provided and issue environment in advance, while is needed for the corresponding resource of the arranging service,
To be supplied to user to use, and most application deployment is realized dependent on manual operation or the pattern of semi-automation.
The content of the invention
But realized due to need to rely on the pattern of manual operation or semi-automation, therefore current business development
And resource layout efficiency is low.And current resource layout script provide only resource, not describe the relation between resource,
This, which not only results in the application developed, possibly can not normally start, and manageability is not the resource of each arranging service.
Therefore, be highly desirable to a kind of scheme of improved resource layout, to improve the efficiency of resource layout, and it is easy to pair
Each resource is managed.
In the present context, embodiments of the present invention it is expected to provide a kind of method, medium, device and the meter of resource layout
Calculate equipment.
In the first aspect of embodiment of the present invention, there is provided a kind of method of resource layout, including:Resource is obtained to compile
The description file of row;Based on the description file, it is determined that the dependence between needing each resource of layout;According to described each
The description content of above-mentioned each resource is directed in dependence and the description file between individual resource, is created successively described each
Individual resource.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according to the dependence between each resource
The description content of each resource, the step of creating each resource successively, bag are directed in relation and the description file
Include:Each resource is abstracted as summit;According between the dependence generation summit between each resource
Directed edge, to obtain describing the directed acyclic graph of the dependence between each resource;According to the directed acyclic graph and
The description content of each resource, each resource is created successively.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according to the directed acyclic graph and described each
The description content of individual resource, the step of creating each resource successively, including:According to the description content of each resource,
The resource corresponding to the summit for not having forerunner's point in the directed acyclic graph is first created, then successively to resource corresponding to forerunner's point
The resource corresponding to summit created is created.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, create successively each resource it
Afterwards, in addition to:Obtain the description file after resource layout renewal;According to the description file after the renewal, to needing layout
Each resource is adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according to the description file after the renewal,
To the step of needing each resource of layout to be adjusted, including:According to the description file after the renewal, generate after updating
Directed acyclic graph;According to the front and rear directed acyclic graph of renewal and update in front and rear description file in the description of each resource
Hold, generation renewal figure;Based on the description content that each resource is directed in the description file after the renewal figure and renewal, to needing
Each resource of layout is adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according to the front and rear directed acyclic graph of renewal and
The description content of each resource is directed in description file before and after renewal, generates the step of renewal is schemed, including:Before and after renewal
Directed acyclic graph and the front and rear description file of renewal in be directed to the description content of each resource, it is determined that the oriented nothing that renewal is front and rear
The each summit to be changed in ring figure;Based on each summit to be changed in the front and rear directed acyclic graph of renewal, institute is generated
State renewal figure.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according to the front and rear directed acyclic graph of renewal and
The description content of each resource is directed in the front and rear description file of renewal, is changed it is determined that updating in front and rear directed acyclic graph
Each summit the step of, including:According to the front and rear directed acyclic graph of renewal, it is determined that in directed acyclic graph after renewal compared to
Increased first kind summit and the second class summit reduced in directed acyclic graph before renewal, and the directed acyclic that renewal is front and rear
All there is and enter the 3rd class summit that side is changed in figure;Retouched according to the front and rear directed acyclic graph of renewal and renewal are front and rear
The description content that each resource is directed in file is stated, it is determined that all having in the front and rear directed acyclic graph of renewal and corresponding resource
The 4th class summit that description content is changed.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, based in the front and rear directed acyclic graph of renewal
The each summit to change, the step of renewal is schemed is generated, including:According to the dependence described in the description file after renewal
Relation, generate the directed edge between the first kind summit, the 3rd class summit and the 4th class summit;Before renewal
Description file described in dependence, generate the first kind summit, the 3rd class summit and the 4th class summit
Directed edge of the direction between the second class summit after exchanging respectively.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, based on retouching after the renewal figure and renewal
The description content that each resource is directed in file is stated, to the step of needing each resource of layout to be adjusted, including:
If the resource of any vertex correspondence in the renewal figure does not create, and has in the description file after renewal for institute
The description content of the resource of any vertex correspondence is stated, then creates the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and has in the description file after renewal for institute
The description content of the resource of any vertex correspondence is stated, then according to being directed to any summit pair in the description file after the renewal
The description content for the resource answered is updated to the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and is not directed in the description file after renewal
The description content of the resource of any vertex correspondence, then delete the resource of any vertex correspondence.
In certain embodiments of the present invention, also included based on aforementioned schemes, described method:Compiled needing to delete
During the resource of row, according to the resource of the dependence between the resource of the layout, successively layout described in deletion.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, according between the resource of the layout
The step of resource of dependence, successively layout described in deletion, including:Obtain between the resource for describing the layout
Dependence newest directed acyclic graph;Based on the newest directed acyclic graph, the newest oriented nothing is first deleted
There is no the resource corresponding to the summit of follow-up point in ring figure, it is then right to the deleted summit of resource corresponding to follow-up point institute successively
The resource answered is deleted.
In the second aspect of embodiment of the present invention, there is provided a kind of medium, be stored thereon with program, the program is located
Manage the method realized when device performs as described in first aspect in above-mentioned embodiment.
In the third aspect of embodiment of the present invention, there is provided a kind of device of resource layout, including:Acquiring unit,
For obtaining the description file of resource layout;Determining unit, for based on the description file, it is determined that needing each money of layout
Dependence between source;Processing unit, for according in the dependence between each resource and the description file
For the description content of above-mentioned each resource, each resource is created successively.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the processing unit includes:First generation
Unit, for each resource to be abstracted as into summit, and the top is generated according to the dependence between each resource
Directed edge between point, to obtain describing the directed acyclic graph of the dependence between each resource;Creating unit, it is used for
According to the directed acyclic graph and the description content of each resource, each resource is created successively.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the creating unit is configured to:According to institute
The description content of each resource is stated, first creates the resource corresponding to the summit for not having forerunner's point in the directed acyclic graph, then
The resource corresponding to summit created successively to resource corresponding to forerunner's point creates.
In certain embodiments of the present invention, also included based on aforementioned schemes, described device:Adjustment unit;Wherein,
The acquiring unit is additionally operable to obtain the description file after resource layout renewal;After the adjustment unit is used for according to the renewal
Description file, each resource for needing layout is adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the adjustment unit includes:Second generation
Unit, for according to the description file after the renewal, generating the directed acyclic graph after renewal;3rd generation unit, for root
According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, generation renewal
Figure;Execution unit, for being directed to the description content of each resource in the description file after scheming and update based on the renewal, to needing
Each resource of layout is wanted to be adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit is configured to:Root
According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, it is determined that before renewal
The each summit to be changed in directed acyclic graph afterwards;Based on each top to be changed in the front and rear directed acyclic graph of renewal
Point, generate the renewal figure.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit is configured to:Root
According to the front and rear directed acyclic graph of renewal, it is determined that compared to increasing in the directed acyclic graph before renewal in directed acyclic graph after renewal
First kind summit and the second class summit for reducing, and the front and rear directed acyclic graph of renewal in all have and enter side and become
The 3rd class summit changed;According to retouching for each resource in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal
Content is stated, it is determined that all having in the front and rear directed acyclic graph of renewal and the description content of corresponding resource is changed the 4th
Class summit.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit is configured to:Root
According to the dependence described in the description file after renewal, the first kind summit, the 3rd class summit and described the are generated
Directed edge between four class summits;According to before renewal description file described in dependence, generate the first kind summit,
The direction of the 3rd class summit and the 4th class summit respectively between the second class summit is oriented after exchanging
Side.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the execution unit is configured to:
If the resource of any vertex correspondence in the renewal figure does not create, and has in the description file after renewal for institute
The description content of the resource of any vertex correspondence is stated, then creates the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and has in the description file after renewal for institute
The description content of the resource of any vertex correspondence is stated, then according to being directed to any summit pair in the description file after the renewal
The description content for the resource answered is updated to the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and is not directed in the description file after renewal
The description content of the resource of any vertex correspondence, then delete the resource of any vertex correspondence.
In certain embodiments of the present invention, also included based on aforementioned schemes, described device:Unit is deleted, is used for
When needing to delete the resource of layout, according to the dependence between the resource of the layout, compiled successively described in deletion
The resource of row.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the deletion unit is configured to:Obtain and use
The newest directed acyclic graph of dependence between the resource of layout described in description;Based on the newest directed acyclic
Figure, first deletes the resource corresponding to the summit for not having follow-up point in the newest directed acyclic graph, then successively to follow-up point
Resource corresponding to the corresponding deleted summit of resource is deleted.
In the fourth aspect of embodiment of the present invention, there is provided a kind of computing device, including:Processor and memory,
The memory storage has executable instruction, and the processor is used to call the executable instruction of the memory storage to perform such as
Method in above-mentioned embodiment described in first aspect.
According to method, medium, device and the computing device of the resource layout of embodiment of the present invention, by being compiled based on resource
The description file of row determines to need the dependence between each resource of layout, with according to the dependence between each resource
Each resource is created successively with the description content of each resource so that when carrying out resource layout, it is contemplated that each money
Dependence between source, and then the establishment of resource can be realized automatically based on the dependence, not only increase resource layout
Efficiency, and can be easy to be managed each resource.Meanwhile the dependence specified between resource can also ensure out
The application normal operation sent.
Brief description of the drawings
Detailed description below, above-mentioned and other mesh of exemplary embodiment of the invention are read by reference to accompanying drawing
, feature and advantage will become prone to understand.In the accompanying drawings, if showing the present invention's by way of example, and not by way of limitation
Dry embodiment, wherein:
Fig. 1 diagrammatically illustrates the flow chart of the method for the resource layout of first embodiment according to the present invention;
Fig. 2 schematically shows a kind of flow chart of embodiment of the step S14 shown in Fig. 1;
Fig. 3 diagrammatically illustrates the flow chart of the method for the resource layout of second embodiment according to the present invention;
Fig. 4 schematically shows a kind of flow chart of embodiment of the step S32 shown in Fig. 3;
Fig. 5 diagrammatically illustrates the flow chart of the method for the resource layout of the 3rd embodiment according to the present invention;
Fig. 6 diagrammatically illustrates the block diagram of the device of resource layout according to the embodiment of the present invention.
In the accompanying drawings, identical or corresponding label represents identical or corresponding part.
Embodiment
The principle and spirit of the present invention is described below with reference to some illustrative embodiments.It should be appreciated that provide this
A little embodiments are not with any just for the sake of better understood when those skilled in the art and then realize the present invention
Mode limits the scope of the present invention.On the contrary, these embodiments are provided so that the disclosure is more thorough and complete, and energy
It is enough that the scope of the present disclosure is intactly communicated to those skilled in the art.
One skilled in the art will appreciate that embodiments of the present invention can be implemented as a kind of system, device, equipment, method
Or computer program product.Therefore, the disclosure can be implemented as following form, i.e.,:Complete hardware, complete software
(including firmware, resident software, microcode etc.), or the form that hardware and software combines.
According to the embodiment of the present invention, it is proposed that a kind of method, medium, device and the computing device of resource layout.
Herein, it is to be understood that involved term " resource layout " is a kind of according to business needs, with layout
The description to the association attributes of the resource of needs and these resources etc. that the modes such as file are submitted, and then it is automatically performed respective resources
Initialization, finally return that process of the resource to user that a whole set of initialization is completed.
Term " directed acyclic graph " refers to that one can not return to having for the point from some summit by some sides
Xiang Tu.
In addition, any number of elements in accompanying drawing is used to example and unrestricted, and any name is only used for distinguishing,
Without any restrictions implication.
Below with reference to the principle and spirit of some representative embodiments of the present invention, in detail the explaination present invention.
Summary of the invention
The inventors discovered that current resource layout need to rely on manual operation or semi-automatic pattern to realize,
Cause business development and resource layout efficiency low.And current resource layout script provide only resource, not description provides
Relation between source, this, which not only results in the application developed, possibly can not normally start, and manageability is not each business
The resource of layout.
Therefore, embodiments of the present invention provide a kind of scheme of improved resource layout, can improve resource layout
Efficiency, and be easy to be managed each resource.
After the general principle of the present invention is described, lower mask body introduces the various non-limiting embodiment party of the present invention
Formula.
Application scenarios overview
Understand spirit and principles of the present invention it should be noted that following application scenarios are for only for ease of and show, this
The embodiment of invention is unrestricted in this regard.On the contrary, embodiments of the present invention can apply to it is applicable any
Scene.
When user needs to carry out resource layout, it is only necessary to the description file of resource layout is provided, and then according to of the invention real
File acquisition can be described according to this and be closed to the dependence between each resource for needing layout by applying the device of mode or computing device
System, then creates each resource, not only carries successively according to the description content of the dependence between each resource and each resource
The high efficiency of resource layout, and pipe easily can be carried out to each resource of establishment based on the dependence between resource
Reason.
When user needs to be adjusted resource layout, new description file can be provided, and then according to of the invention real
The device or computing device for applying mode can be adjusted based on the new description file to the resource of layout, greatly convenient
The operation of user.
Illustrative methods
With reference to above-mentioned application scenarios, the money according to exemplary embodiment of the invention is described referring to figs. 1 to Fig. 5
The method of source layout.
Fig. 1 diagrammatically illustrates the flow chart of the method for the resource layout of first embodiment according to the present invention.
Reference picture 1, according to the method for the resource layout of first embodiment of the present invention, including:
Step S10, obtain the description file of resource layout.
It should be noted that in embodiments of the present invention, the description file of resource layout, which mainly contains, to be needed to compile
The description content of each resource of row, and need the dependence between each resource of layout.
Step S12, based on the description file, it is determined that the dependence between needing each resource of layout.
Describe five kinds of moneys of A, B, C, D, E
Source, its dependence are that B is had the dependence to B and C, then retouched based on this in the presence of the dependence to A, C in the presence of the dependence to A and D, E
Dependence between resource A, B, C, D, E can be obtained by stating file.
Step S14, above-mentioned each money is directed to according in the dependence between each resource and the description file
The description content in source, each resource is created successively.
According to an illustrative embodiment of the invention, reference picture 2, step S14 include:
Step S142, each resource is abstracted as summit.
Step S144, the directed edge between the summit is generated according to the dependence between each resource, with
To the directed acyclic graph for describing the dependence between each resource.
It should be noted that the directed edge between summit is that summit sensing relies on its money as corresponding to the resource being relied on
Summit corresponding to source.For example there is the dependence to resource A in resource B, then the directed edge between B summits corresponding with A is A pairs
Point to summit corresponding to B in the summit answered.
Step S146, according to the directed acyclic graph and the description content of each resource, create successively described each
Resource.
According to an illustrative embodiment of the invention, step S146 includes:It is first according to the description content of each resource
Create the resource corresponding to the summit for not having forerunner's point in the directed acyclic graph, then successively to resource corresponding to forerunner's point
Resource corresponding to the summit of establishment is created.
In an embodiment of the invention, specifically, it is assumed that resource B depends on resource A, resource C to depend on resource A
Resource B and resource C is depended on resource D, resource E.For purposes of illustration only, it is respectively with the abstract obtained summit of each resource below
A, it is illustrated exemplified by B, C, D, E, can be expressed as based on directed acyclic graph caused by above-mentioned dependence:
G0=(V0, E0)
Wherein, V0={ A, B, C, D, E }, E0=<A,B>,<A,C>,<D,C>,<B,E>,<C,E>}.Behaviour is created performing
When making, because forerunner's point is not present in A and D, therefore can first establishing resource A and resource D.When resource A completes establishment but resource
When D does not complete establishment, because resource corresponding to B forerunner's point A has created, therefore resource B can be also created.When resource D is completed
After establishment, resource (i.e. resource A and resource D) corresponding to C forerunner's point just creates completely, at this moment can perform resource C establishment
Journey.After resource B and resource C are created, resource E establishment process can be just performed.
It can be seen that the resource method of combination of embodiment of the present invention can realize money automatically based on the dependence between resource
The establishment in source, effectively increase the efficiency of resource layout.
Fig. 3 diagrammatically illustrates the flow chart of the method for the resource layout of second embodiment according to the present invention.
Reference picture 3, according to the method for the resource layout of second embodiment of the present invention, in the step shown in Fig. 1
On the basis of S10, S12 and S14, in addition to:
Step S30, obtain the description file after resource layout renewal.
It should be noted that when user needs to be adjusted the resource of layout, after resource layout can be submitted to update
Description file.Certainly, the description file after resource layout renewal also contains the description content of each resource, and each money
Dependence between source.
Step S32, according to the description file after the renewal, each resource for needing layout is adjusted.
Included according to the exemplary embodiment of the present invention, reference picture 4, step S32:
Step S322, according to the description file after the renewal, the directed acyclic graph after generation renewal.
It should be noted that it is also first will according to the process of the directed acyclic graph after the description file generated renewal after renewal
Each resource (each resource described in description file after referred to herein as updating) is abstracted as summit, then according to each money
The directed edge between dependence generation summit between source, and then the directed acyclic graph after being updated.
Wherein, the description file after renewal may include compared to the content of the description document change before renewal:Layout
Resource increase, the resource of layout are reduced, the dependence between resource changes, the description content hair of some or some resources
Change is given birth to.
Step S324, according to the front and rear directed acyclic graph of renewal and update in front and rear description file for each resource
Description content, generation renewal figure.
In an exemplary embodiment of the present invention embodiment, step S324 includes:According to the front and rear directed acyclic graph of renewal and more
The description content of each resource is directed in new front and rear description file, it is determined that updating what is changed in front and rear directed acyclic graph
Each summit;Based on each summit to be changed in the front and rear directed acyclic graph of renewal, the renewal figure is generated.
It should be noted that the change of the directed acyclic graph before and after renewal may include:Summit increase, summit are reduced, top
The description content of the resource of directed edge change, some summit or some vertex correspondences between point is changed.Based on this,
In some embodiments of the present invention, pin in the description file before and after the above-mentioned directed acyclic graph front and rear according to renewal and renewal
To the description content of each resource, it is determined that the step of updating each summit to be changed in front and rear directed acyclic graph, including:
According to front and rear directed acyclic graph is updated, it is determined that compared to the oriented nothing before renewal in the directed acyclic graph after renewal
All have and enter in increased first kind summit and the second class summit reduced in ring figure, and the front and rear directed acyclic graph of renewal
While the 3rd class summit changed;According to the front and rear directed acyclic graph of renewal and update in front and rear description file for each
The description content of individual resource, it is determined that all have in the front and rear directed acyclic graph of renewal and the description content of corresponding resource there occurs
4th class summit of change.
It should be noted that updating in front and rear directed acyclic graph all has and enters the 3rd class summit that side is changed
Summit corresponding to the resource that as dependence is changed.
In certain embodiments of the present invention, changed in the above-mentioned directed acyclic graph front and rear based on renewal each
Individual summit, the step of renewal is schemed is generated, including:According to the dependence described in the description file after renewal, institute is generated
State the directed edge between first kind summit, the 3rd class summit and the 4th class summit;According to the description file before renewal
Described in dependence, generate the first kind summit, the 3rd class summit and the 4th class summit respectively with it is described
Directed edge of the direction after exchanging between second class summit.
Specifically, the directed acyclic graph such as before renewal is the G0=(V0, E0) in above-mentioned example, after resource layout renewal
Description file include:Resource A, B, C, E, F, wherein B have dependence to A, and C has dependence to A, and E has dependence and C and E to B and C
The description content of itself changes, and F has dependence to E, and A and B description content do not change.Based on this, after obtaining renewal
Directed acyclic graph be G1=(V1, E1), wherein, V1={ A, B, C, E, F }, E1=<A,B>,<A,C>,<B,E>,<C,E>,
<E,F>}。
Assuming that renewal figure G'=(V', E'), makes V'=V1-V0={ F } first, it then will enter side and change and belong to V0
∩ V1 point C adds V', and the point E that description content is changed adds V', and now V'={ C, E, F }, wherein F are above-mentioned
First kind summit, C are the 3rd above-mentioned class summit, and E is the 4th above-mentioned class summit.E' connects summit in V' according to E1
E'=<C,E>,<E,F>, i.e., according to the dependence described in the description file after renewal, generation first kind summit, the
Directed edge between three class summits and the 4th class summit.V'=V'+ (V0-V1)={ C, D, E, F } is finally made, wherein, D is
The second above-mentioned class summit, then E' the directed edge after D and C, E, F are exchanged is generated according to E0, obtain E'=<C,E>,<E,F>,
<C,D>}。
With continued reference to Fig. 4, step S32 also includes:
Step S326 is right based on the description content that each resource is directed in the description file after the renewal figure and renewal
Each resource of layout is needed to be adjusted.
According to the exemplary embodiment of the present invention, step S326 includes:
If the resource of any vertex correspondence in the renewal figure does not create, and has in the description file after renewal for institute
The description content of the resource of any vertex correspondence is stated, then creates the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and has in the description file after renewal for institute
The description content of the resource of any vertex correspondence is stated, then according to being directed to any summit pair in the description file after the renewal
The description content for the resource answered is updated to the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and is not directed in the description file after renewal
The description content of the resource of any vertex correspondence, then delete the resource of any vertex correspondence.
Specifically, continue to illustrate with above-mentioned example, based on renewal figure G'=(V', E'), because forerunner is not present in C
Point, therefore first C is operated.For C, because its corresponding resource has created, and there is also therefore root for new description content
Operation is updated to resource C according to new description content.After the completion of resource C renewals, due to resource corresponding to D and E forerunner's point
Complete to update, then D and E have been operated.Wherein, do not deposited in the description file after resource corresponding to D has been created but updated
In the description content to resource D, therefore perform deletion action;Resource corresponding to E created and new description content there is also, because
This is updated operation according to new description content to resource E.After the completion of resource E renewals, resource corresponding to F forerunner's point is complete
Into renewal, because resource corresponding to F is not created, therefore establishment operation is carried out to resource corresponding to F.When aforesaid operations are all complete
Cheng Hou, resource become A, B, C, E, F five, and A and B do not change, and C, E complete renewal according to new description, and D is deleted, and F is created
Build, final result is consistent with new description.
Fig. 5 diagrammatically illustrates the flow chart of the method for the resource layout of the 3rd embodiment according to the present invention.
Reference picture 5, according to the method for the resource layout of the 3rd embodiment of the present invention, including:Step S50, needing
When deleting the resource of layout, according to the dependence between the resource of the layout, successively delete described in layout
Resource.
According to an illustrative embodiment of the invention, step S50 includes:Obtain for the layout is described resource it
Between dependence newest directed acyclic graph;Based on the newest directed acyclic graph, first delete described newest oriented
There is no the resource corresponding to the summit of follow-up point in acyclic figure, then successively to the deleted summit institute of resource corresponding to follow-up point
Corresponding resource is deleted.
It should be noted that in the above-described embodiment, due to according to newest directed acyclic graph, first deleting newest
There is no the resource corresponding to the summit of follow-up point in directed acyclic graph, then successively to the deleted top of resource corresponding to follow-up point
The corresponding resource of point is deleted, enabling is deleted the resource of establishment successively based on the dependence between resource, is protected
Demonstrate,prove resource and deleted the progress that process can be without any confusion, be very easy to the management to resource.
Exemplary media
After the method for exemplary embodiment of the invention is described, next, to exemplary embodiment of the invention
Medium illustrate.
In some possible embodiments, various aspects of the invention are also implemented as a kind of medium, store thereon
There is program code, be used to realize that this specification is above-mentioned " illustrative methods " when computing device of the described program code by equipment
Step in the method for the resource layout according to the various illustrative embodiments of the present invention described in part.
Specifically, it is used to realize following steps during the computing device described program code of the equipment:Resource is obtained to compile
The description file of row;Based on the description file, it is determined that the dependence between needing each resource of layout;According to described each
The description content of above-mentioned each resource is directed in dependence and the description file between individual resource, is created successively described each
Individual resource.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment
Lower step:Each resource is abstracted as summit;According to the dependence between each resource generate the summit it
Between directed edge, to obtain describing the directed acyclic graph of the dependence between each resource;According to the directed acyclic
The description content of figure and each resource, creates each resource successively.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment
Lower step:According to the description content of each resource, first creating does not have the summit institute of forerunner's point right in the directed acyclic graph
The resource answered, the resource corresponding to summit then created successively to resource corresponding to forerunner's point create.
In certain embodiments of the present invention, it is additionally operable to realize during the computing device described program code of the equipment
Following steps:Obtain the description file after resource layout renewal;According to the description file after the renewal, to needing each of layout
Individual resource is adjusted.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment
Lower step:According to the description file after the renewal, the directed acyclic graph after generation renewal;According to the front and rear directed acyclic of renewal
The description content of each resource is directed in description file before and after figure and renewal, generation renewal is schemed;Based on the renewal figure and more
The description content of each resource is directed in description file after new, each resource for needing layout is adjusted.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment
Lower step:The description content that describes in file be directed to each resource front and rear according to front and rear directed acyclic graph and renewal is updated,
It is determined that update each summit to be changed in front and rear directed acyclic graph;Become based on updating in front and rear directed acyclic graph
The each summit changed, generate the renewal figure.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment
Lower step:According to front and rear directed acyclic graph is updated, it is determined that compared to the oriented nothing before renewal in the directed acyclic graph after renewal
All have and enter in increased first kind summit and the second class summit reduced in ring figure, and the front and rear directed acyclic graph of renewal
While the 3rd class summit changed;According to the front and rear directed acyclic graph of renewal and update in front and rear description file for each
The description content of individual resource, it is determined that all have in the front and rear directed acyclic graph of renewal and the description content of corresponding resource there occurs
4th class summit of change.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment
Lower step:According to the dependence described in the description file after renewal, the first kind summit, the 3rd class summit are generated
Directed edge between the 4th class summit;According to the dependence described in the description file before renewal, generation described the
The direction process of a kind of summit, the 3rd class summit and the 4th class summit respectively between the second class summit is exchanged
Directed edge afterwards.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment
Lower step:
If the resource of any vertex correspondence in the renewal figure does not create, and has in the description file after renewal for institute
The description content of the resource of any vertex correspondence is stated, then creates the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and has in the description file after renewal for institute
The description content of the resource of any vertex correspondence is stated, then according to being directed to any summit pair in the description file after the renewal
The description content for the resource answered is updated to the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and is not directed in the description file after renewal
The description content of the resource of any vertex correspondence, then delete the resource of any vertex correspondence.
In certain embodiments of the present invention, it is additionally operable to realize during the computing device described program code of the equipment
Following steps:When needing to delete the resource of layout, according to the dependence between the resource of the layout, delete successively
The resource of the layout.
In certain embodiments of the present invention, it is used to realize such as during the computing device described program code of the equipment
Lower step:Obtain for the layout is described resource between dependence newest directed acyclic graph;Based on described
Newest directed acyclic graph, the resource corresponding to the summit for not having follow-up point in the newest directed acyclic graph is first deleted, so
The resource corresponding to the deleted summit of resource corresponding to follow-up point is deleted successively afterwards.
It should be noted that:Above-mentioned medium can be readable signal medium or readable storage medium storing program for executing.Readable storage medium
Matter can be for example but not limited to:Electricity, magnetic, optical, electromagnetic, system, device or the device of infrared ray or semiconductor, or arbitrarily
Combination above.The more specifically example (non exhaustive list) of readable storage medium storing program for executing includes:With one or more wires
Electrical connection, portable disc, hard disk, random access memory (RAM), read-only storage (ROM), erasable type may be programmed read-only storage
Device (EPROM or flash memory), optical fiber, portable compact disc read only memory (CD-ROM), light storage device, magnetic memory device or
The above-mentioned any appropriate combination of person.
Readable signal medium can be included in a base band or as a part of data-signal propagated of carrier wave, wherein carrying
Readable program code.The data-signal of this propagation can take various forms, and include but is not limited to:Electromagnetic signal, light letter
Number or above-mentioned any appropriate combination.Readable signal medium can also be any computer-readable recording medium beyond readable storage medium storing program for executing,
The computer-readable recording medium can send, propagate and either transmit for being used by instruction execution system, device or device or being tied with it
Close the program used.
The program code included on computer-readable recording medium can be transmitted with any appropriate medium, be included but is not limited to:Wirelessly, have
Line, optical cable, RF etc., or above-mentioned any appropriate combination.
Can being combined to write the program operated for performing the present invention with one or more programming languages
Code, described program design language include object oriented program language-Java, C++ etc., include routine
Procedural programming language-such as " C " language or similar programming language.Program code can be fully in user
Performed on computing device, part performs or remotely counted completely on a remote computing on the user computing device for part
Calculate and performed on equipment or server.In the situation of remote computing device is related to, remote computing device can pass through any kind
Network --- including LAN (LAN) or wide area network (WAN)-be connected to user calculating equipment, or, it may be connected to it is outer
Portion's computing device (such as passing through Internet connection using ISP).
Exemplary means
After the medium of exemplary embodiment of the invention is described, next, exemplary to the present invention with reference to figure 6
The device of the resource layout of embodiment illustrates.
Fig. 6 diagrammatically illustrates the block diagram of the device of resource layout according to the embodiment of the present invention.
Reference picture 6, the device 600 of resource layout according to the embodiment of the present invention, including:Acquiring unit 602, determine
Unit 604 and processing unit 606.
Specifically, acquiring unit 602 is used for the description file for obtaining resource layout;Determining unit 604 is used for based on described
File is described, it is determined that the dependence between needing each resource of layout;Processing unit 606 is used for according to each resource
Between dependence and it is described description file in be directed to above-mentioned each resource description content, create each money successively
Source.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the processing unit 606 includes:First life
Into unit 6062 and creating unit 6064.
Specifically, the first generation unit 6062 is used to each resource being abstracted as summit, and according to each money
Dependence between source generates the directed edge between the summit, to obtain describing the dependence between each resource
Directed acyclic graph;Creating unit 6064 is used for the description content according to the directed acyclic graph and each resource, successively
Create each resource.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the creating unit 6064 is configured to:Root
According to the description content of each resource, the resource corresponding to the summit for not having forerunner's point in the directed acyclic graph is first created,
Then the resource corresponding to summit created successively to resource corresponding to forerunner's point creates.
In certain embodiments of the present invention, also included based on aforementioned schemes, described device 600:Adjustment unit
608;Wherein, the acquiring unit 602 is additionally operable to obtain the description file after resource layout renewal;The adjustment unit 608 is used
Description file after according to the renewal, each resource for needing layout is adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the adjustment unit 608 includes:Second life
Into unit 6082, the 3rd generation unit 6084 and execution unit 6086.
Specifically, the second generation unit 6082, for according to the description file after the renewal, generating oriented after renewal
Acyclic figure;3rd generation unit 6084, for according to pin in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal
To the description content of each resource, generation renewal figure;Execution unit 6086, for based on the description after the renewal figure and renewal
The description content of each resource is directed in file, each resource for needing layout is adjusted.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit 6084 configures
For:According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, it is determined that
The each summit to be changed in the front and rear directed acyclic graph of renewal;Based on what is changed in the front and rear directed acyclic graph of renewal
Each summit, generate the renewal figure.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit 6084 configures
For:According to front and rear directed acyclic graph is updated, it is determined that compared to the directed acyclic graph before renewal in the directed acyclic graph after renewal
In all have in increased first kind summit and the second class summit for reducing, and the front and rear directed acyclic graph of renewal and enter side hair
The 3rd class summit of change is given birth to;Each money is directed to according in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal
The description content in source, it is determined that all having in the front and rear directed acyclic graph of renewal and the description content of corresponding resource is changed
The 4th class summit.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the 3rd generation unit 6084 configures
For:According to the dependence described in the description file after renewal, the first kind summit, the 3rd class summit and institute are generated
State the directed edge between the 4th class summit;According to the dependence described in the description file before renewal, the first kind is generated
Summit, the 3rd class summit and the 4th class summit respectively the direction between the second class summit after exchanging
Directed edge.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the execution unit 6086 is configured to:
If the resource of any vertex correspondence in the renewal figure does not create, and has in the description file after renewal for institute
The description content of the resource of any vertex correspondence is stated, then creates the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and has in the description file after renewal for institute
The description content of the resource of any vertex correspondence is stated, then according to being directed to any summit pair in the description file after the renewal
The description content for the resource answered is updated to the resource of any vertex correspondence;
If the resource of any vertex correspondence in the renewal figure has created, and is not directed in the description file after renewal
The description content of the resource of any vertex correspondence, then delete the resource of any vertex correspondence.
In certain embodiments of the present invention, also included based on aforementioned schemes, described device 600:Delete unit
610, for when needing to delete the resource of layout, according to the dependence between the resource of the layout, deleting successively
The resource of the layout.
In certain embodiments of the present invention, based on aforementioned schemes, wherein, the deletion unit 610 is configured to:Obtain
The newest directed acyclic graph of the dependence between resource for describing the layout;Based on the newest oriented nothing
Ring figure, the resource corresponding to the summit for not having follow-up point in the newest directed acyclic graph is first deleted, then successively to follow-up
Resource corresponding to point corresponding to the deleted summit of resource is deleted.
Exemplary computer device
After method, medium and the device of exemplary embodiment of the invention is described, next, introducing according to this hair
The computing device of bright another exemplary embodiment.
Person of ordinary skill in the field it is understood that various aspects of the invention can be implemented as system, method or
Program product.Therefore, various aspects of the invention can be implemented as following form, i.e.,:It is complete hardware embodiment, complete
The embodiment combined in terms of full Software Implementation (including firmware, microcode etc.), or hardware and software, can unite here
Referred to as " circuit ", " module " or " system ".
In some possible embodiments, at least one can be comprised at least according to the computing device of embodiment of the present invention
Individual processor and at least one memory.Wherein, the memory storage has program code, when described program code is by institute
When stating computing device so that described in above-mentioned " illustrative methods " part of computing device this specification according to this hair
Step in the method for the resource layout of bright various illustrative embodiments.For example, the processor can be performed as in Fig. 1
Shown step S10, obtain the description file of resource layout;Step S12, based on the description file, it is determined that needing layout
Dependence between each resource;Step S14, according in the dependence between each resource and the description file
For the description content of above-mentioned each resource, each resource is created successively.And for example, the processor can also be performed such as figure
2 to shown in Fig. 5 the step of.
It should be noted that although being referred to some units or subelement of the device of resource layout in above-detailed,
But what this division was merely exemplary, it is not enforceable.In fact, according to the embodiment of the present invention, retouch above
Two or more modules or the feature and function of unit stated can embody in a module or unit.Conversely, retouch above
The module or the feature and function of unit stated can be further divided into being embodied by multiple modules or unit.
In addition, although the operation of the inventive method is described with particular order in the accompanying drawings, still, this do not require that or
Hint must perform these operations according to the particular order, or the operation having to carry out shown in whole could realize it is desired
As a result.Additionally or alternatively, it is convenient to omit some steps, multiple steps are merged into a step and performed, and/or by one
Step is decomposed into execution of multiple steps.
Although describe spirit and principles of the present invention by reference to some embodiments, it should be appreciated that, this
Invention is not limited to disclosed embodiment, and the division to each side does not mean that the feature in these aspects can not yet
Combination is to be benefited, and this division is merely to the convenience of statement.It is contemplated that cover appended claims spirit and
In the range of included various modifications and equivalent arrangements.
Claims (10)
1. a kind of method of resource layout, including:
Obtain the description file of resource layout;
Based on the description file, it is determined that the dependence between needing each resource of layout;
According to the dependence between each resource and it is described description file in be directed to above-mentioned each resource description content,
Each resource is created successively.
2. the method according to claim 11, wherein, according to the dependence between each resource and the description text
It is directed to the description content of each resource in part, the step of creating each resource successively, including:
Each resource is abstracted as summit;
Directed edge between the summit is generated according to the dependence between each resource, it is described each to obtain describing
The directed acyclic graph of dependence between resource;
According to the directed acyclic graph and the description content of each resource, each resource is created successively.
3. the method according to claim 11, wherein, according in the description of the directed acyclic graph and each resource
Hold, the step of creating each resource successively, including:
According to the description content of each resource, first create corresponding to the summit for not having forerunner's point in the directed acyclic graph
Resource, the resource corresponding to summit then created successively to resource corresponding to forerunner's point create.
4. the method according to claim 11, wherein, after each resource is created successively, in addition to:
Obtain the description file after resource layout renewal;
According to the description file after the renewal, each resource for needing layout is adjusted.
5. the method according to claim 11, wherein, according to the description file after the renewal, to needing each of layout
The step of resource is adjusted, including:
According to the description file after the renewal, the directed acyclic graph after generation renewal;
According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, generation
Renewal figure;
Based on the description content that each resource is directed in the description file after the renewal figure and renewal, to needing each of layout
Resource is adjusted.
6. according to the method for claim 5, wherein, according to the front and rear directed acyclic graph of renewal and update front and rear description text
The description content of each resource is directed in part, generation updates the step of scheming, including:
According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, it is determined that
The each summit to be changed in the front and rear directed acyclic graph of renewal;
Based on each summit to be changed in the front and rear directed acyclic graph of renewal, the renewal figure is generated.
7. according to the method for claim 6, wherein, according to the front and rear directed acyclic graph of renewal and update front and rear description text
The description content of each resource is directed in part, it is determined that the step on each summit to be changed in the directed acyclic graph before and after renewal
Suddenly, including:
According to front and rear directed acyclic graph is updated, it is determined that compared to the directed acyclic graph before renewal in the directed acyclic graph after renewal
In all have in increased first kind summit and the second class summit for reducing, and the front and rear directed acyclic graph of renewal and enter side hair
The 3rd class summit of change is given birth to;
According to the description content that each resource is directed in the front and rear description file of the front and rear directed acyclic graph of renewal and renewal, it is determined that
All have in the front and rear directed acyclic graph of renewal and the 4th class summit that the description content of corresponding resource is changed.
8. a kind of medium, is stored thereon with program, realized when the program is executed by processor such as any one of claim 1 to 7
Described method.
9. a kind of device of resource layout, including:
Acquiring unit, for obtaining the description file of resource layout;
Determining unit, for based on the description file, it is determined that the dependence between needing each resource of layout;
Processing unit, for being directed to above-mentioned each money according in the dependence between each resource and the description file
The description content in source, each resource is created successively.
10. a kind of computing device, including:Processor and memory, the memory storage have executable instruction, the processor
Executable instruction for calling the memory storage performs the method as any one of claim 1 to 7.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710702299.9A CN107526639B (en) | 2017-08-16 | 2017-08-16 | Resource arrangement method, medium, device and computing equipment |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201710702299.9A CN107526639B (en) | 2017-08-16 | 2017-08-16 | Resource arrangement method, medium, device and computing equipment |
Publications (2)
Publication Number | Publication Date |
---|---|
CN107526639A true CN107526639A (en) | 2017-12-29 |
CN107526639B CN107526639B (en) | 2021-07-09 |
Family
ID=60681370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201710702299.9A Active CN107526639B (en) | 2017-08-16 | 2017-08-16 | Resource arrangement method, medium, device and computing equipment |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN107526639B (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108805527A (en) * | 2018-05-29 | 2018-11-13 | 郑州云海信息技术有限公司 | A kind of project management method and device |
CN109445923A (en) * | 2018-11-01 | 2019-03-08 | 郑州云海信息技术有限公司 | A kind of method and device of micro services task schedule |
CN109471616A (en) * | 2018-10-26 | 2019-03-15 | 数贸科技(北京)有限公司 | Method of combination and device are applied based on application Jar APMB package |
CN109471729A (en) * | 2018-11-15 | 2019-03-15 | 平安科技(深圳)有限公司 | Based on recursive resource method for cleaning and device |
Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101640613A (en) * | 2009-09-11 | 2010-02-03 | 中兴通讯股份有限公司 | Method and device for network resource relating management |
CN102541875A (en) * | 2010-12-16 | 2012-07-04 | 北京大学 | Access method, device and system for relational node data of directed acyclic graph |
CN103262481A (en) * | 2010-12-17 | 2013-08-21 | 思科技术公司 | Dynamic reroute scheduling in a directed acyclic graph (DAG) |
CN105007323A (en) * | 2015-07-22 | 2015-10-28 | 上海斐讯数据通信技术有限公司 | System and method for arranging cloud resources |
CN105824746A (en) * | 2015-01-05 | 2016-08-03 | 中国移动(深圳)有限公司 | Method and device for automatically generating test scheduling based on use case dependencies |
CN106155791A (en) * | 2016-06-30 | 2016-11-23 | 电子科技大学 | A kind of workflow task dispatching method under distributed environment |
CN106250650A (en) * | 2016-08-15 | 2016-12-21 | 北京理工大学 | The resource allocation and optimization method of model in high flux emulation |
US20170109383A1 (en) * | 2015-10-16 | 2017-04-20 | Seven Bridges Genomics Inc. | Biological graph or sequence serialization |
CN106775830A (en) * | 2016-11-25 | 2017-05-31 | 魏熙柠 | A kind of web application page script resource automatic update method and system |
-
2017
- 2017-08-16 CN CN201710702299.9A patent/CN107526639B/en active Active
Patent Citations (9)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101640613A (en) * | 2009-09-11 | 2010-02-03 | 中兴通讯股份有限公司 | Method and device for network resource relating management |
CN102541875A (en) * | 2010-12-16 | 2012-07-04 | 北京大学 | Access method, device and system for relational node data of directed acyclic graph |
CN103262481A (en) * | 2010-12-17 | 2013-08-21 | 思科技术公司 | Dynamic reroute scheduling in a directed acyclic graph (DAG) |
CN105824746A (en) * | 2015-01-05 | 2016-08-03 | 中国移动(深圳)有限公司 | Method and device for automatically generating test scheduling based on use case dependencies |
CN105007323A (en) * | 2015-07-22 | 2015-10-28 | 上海斐讯数据通信技术有限公司 | System and method for arranging cloud resources |
US20170109383A1 (en) * | 2015-10-16 | 2017-04-20 | Seven Bridges Genomics Inc. | Biological graph or sequence serialization |
CN106155791A (en) * | 2016-06-30 | 2016-11-23 | 电子科技大学 | A kind of workflow task dispatching method under distributed environment |
CN106250650A (en) * | 2016-08-15 | 2016-12-21 | 北京理工大学 | The resource allocation and optimization method of model in high flux emulation |
CN106775830A (en) * | 2016-11-25 | 2017-05-31 | 魏熙柠 | A kind of web application page script resource automatic update method and system |
Non-Patent Citations (2)
Title |
---|
天津滨海迅腾科技集团有限公司: "《软件工程》", 31 January 2017 * |
王宇新,等: "兼顾费用与公平的带通信开销的多有向无环图调度", 《计算机应用》 * |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN108805527A (en) * | 2018-05-29 | 2018-11-13 | 郑州云海信息技术有限公司 | A kind of project management method and device |
CN109471616A (en) * | 2018-10-26 | 2019-03-15 | 数贸科技(北京)有限公司 | Method of combination and device are applied based on application Jar APMB package |
CN109445923A (en) * | 2018-11-01 | 2019-03-08 | 郑州云海信息技术有限公司 | A kind of method and device of micro services task schedule |
CN109471729A (en) * | 2018-11-15 | 2019-03-15 | 平安科技(深圳)有限公司 | Based on recursive resource method for cleaning and device |
Also Published As
Publication number | Publication date |
---|---|
CN107526639B (en) | 2021-07-09 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN107526639A (en) | Method, medium, device and the computing device of resource layout | |
US11093216B2 (en) | Automatic discovery of microservices from monolithic applications | |
CN107274186A (en) | The method and apparatus that intelligent contract-defined interface is obtained in block chain | |
CN104346146B (en) | A kind of method of cross-platform transformation applications code and device | |
CN106170764A (en) | Method and apparatus for automatic equipment Program Generating | |
CN105335137A (en) | Method and device used for processing source file | |
CN108829378A (en) | A kind of development approach of application software, device and electronic equipment | |
CN102567172B (en) | For parallel workloads emulation mode and the system of application performance test | |
CN113641591B (en) | Test case generation method and device and test method and device | |
CN109558525A (en) | A kind of generation method of test data set, device, equipment and storage medium | |
CN109614093B (en) | Visual intelligent contract system and intelligent contract processing method | |
US8990058B2 (en) | Generating and evaluating expert networks | |
CN109522010A (en) | Initial code adding method and device, storage medium, electronic equipment | |
CN101872302B (en) | BPEL-based modeling method for control information flow graph | |
US20150100671A1 (en) | Identifying Compatible System Configurations | |
Burton et al. | Complementing metaheuristic search with higher abstraction techniques | |
CN109714652A (en) | Date storage method, system, storage medium and the equipment of ODN management system | |
CN108153745A (en) | A kind of application data calling method and application development system | |
US20140189656A1 (en) | Flow Analysis in Program Execution | |
CN110096543A (en) | Data manipulation method, device, server and the medium of application program | |
Qin et al. | A novel domain oriented approach for scientific grid workflow composition | |
CN109412828A (en) | Method, apparatus and system for the discovering network topology in software defined network | |
CN104657139B (en) | Visualization command stream for direct fault location generates system and method | |
US20130239095A1 (en) | Method and system for transforming interaction models into service definitions | |
Mirković et al. | A model-driven approach to establishment of private blockchain business networks |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CP01 | Change in the name or title of a patent holder |
Address after: 310052 Room 301, Building No. 599, Changhe Street Network Business Road, Binjiang District, Hangzhou City, Zhejiang Province Patentee after: Hangzhou NetEase Shuzhifan Technology Co.,Ltd. Address before: 310052 Room 301, Building No. 599, Changhe Street Network Business Road, Binjiang District, Hangzhou City, Zhejiang Province Patentee before: HANGZHOU LANGHE TECHNOLOGY Ltd. |
|
CP01 | Change in the name or title of a patent holder |