CN108805462A - The method and device of distribution Risk-warning, storage medium, processor - Google Patents
The method and device of distribution Risk-warning, storage medium, processor Download PDFInfo
- Publication number
- CN108805462A CN108805462A CN201810653894.2A CN201810653894A CN108805462A CN 108805462 A CN108805462 A CN 108805462A CN 201810653894 A CN201810653894 A CN 201810653894A CN 108805462 A CN108805462 A CN 108805462A
- Authority
- CN
- China
- Prior art keywords
- distribution
- accident
- risk
- database
- history
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009826 distribution Methods 0.000 title claims abstract description 187
- 238000000034 method Methods 0.000 title claims abstract description 46
- 238000003860 storage Methods 0.000 title claims abstract description 29
- 230000007613 environmental effect Effects 0.000 claims abstract description 20
- 208000027418 Wounds and injury Diseases 0.000 claims abstract description 9
- 230000006378 damage Effects 0.000 claims abstract description 9
- 208000014674 injury Diseases 0.000 claims abstract description 9
- 238000012545 processing Methods 0.000 claims description 42
- 238000013528 artificial neural network Methods 0.000 claims description 16
- 238000001514 detection method Methods 0.000 claims description 13
- 238000005516 engineering process Methods 0.000 abstract description 12
- 230000008569 process Effects 0.000 description 8
- 238000007405 data analysis Methods 0.000 description 7
- 238000010586 diagram Methods 0.000 description 6
- 230000000694 effects Effects 0.000 description 6
- 238000004519 manufacturing process Methods 0.000 description 6
- 230000007547 defect Effects 0.000 description 4
- 238000011156 evaluation Methods 0.000 description 4
- 230000006870 function Effects 0.000 description 4
- 230000001276 controlling effect Effects 0.000 description 3
- 238000010168 coupling process Methods 0.000 description 3
- 238000005859 coupling reaction Methods 0.000 description 3
- 238000013459 approach Methods 0.000 description 2
- 238000013473 artificial intelligence Methods 0.000 description 2
- 238000004891 communication Methods 0.000 description 2
- 230000008878 coupling Effects 0.000 description 2
- 238000003780 insertion Methods 0.000 description 2
- 230000037431 insertion Effects 0.000 description 2
- 238000007726 management method Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 230000001105 regulatory effect Effects 0.000 description 2
- 230000004044 response Effects 0.000 description 2
- 230000009471 action Effects 0.000 description 1
- 230000006978 adaptation Effects 0.000 description 1
- 230000006399 behavior Effects 0.000 description 1
- 230000008901 benefit Effects 0.000 description 1
- 230000005540 biological transmission Effects 0.000 description 1
- 238000005094 computer simulation Methods 0.000 description 1
- 238000011161 development Methods 0.000 description 1
- 239000006185 dispersion Substances 0.000 description 1
- 239000004744 fabric Substances 0.000 description 1
- 238000002955 isolation Methods 0.000 description 1
- 238000012423 maintenance Methods 0.000 description 1
- 238000003672 processing method Methods 0.000 description 1
- 238000011160 research Methods 0.000 description 1
- 238000012827 research and development Methods 0.000 description 1
- 239000004575 stone Substances 0.000 description 1
- 238000010408 sweeping Methods 0.000 description 1
- 238000012360 testing method Methods 0.000 description 1
- 238000012549 training Methods 0.000 description 1
- 230000009466 transformation Effects 0.000 description 1
Classifications
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q10/00—Administration; Management
- G06Q10/06—Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
- G06Q10/063—Operations research, analysis or management
- G06Q10/0635—Risk analysis of enterprise or organisation activities
-
- G—PHYSICS
- G06—COMPUTING; CALCULATING OR COUNTING
- G06Q—INFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
- G06Q50/00—Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
- G06Q50/06—Energy or water supply
Landscapes
- Business, Economics & Management (AREA)
- Human Resources & Organizations (AREA)
- Engineering & Computer Science (AREA)
- Economics (AREA)
- Strategic Management (AREA)
- Theoretical Computer Science (AREA)
- Entrepreneurship & Innovation (AREA)
- Health & Medical Sciences (AREA)
- Marketing (AREA)
- General Physics & Mathematics (AREA)
- General Business, Economics & Management (AREA)
- Tourism & Hospitality (AREA)
- Physics & Mathematics (AREA)
- Public Health (AREA)
- Primary Health Care (AREA)
- Water Supply & Treatment (AREA)
- Development Economics (AREA)
- Educational Administration (AREA)
- General Health & Medical Sciences (AREA)
- Game Theory and Decision Science (AREA)
- Operations Research (AREA)
- Quality & Reliability (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The invention discloses a kind of method and device of distribution Risk-warning, storage medium, processors.Wherein, this method includes:Create database, wherein database is at least used to store history distribution accident information, and history distribution accident information includes at least following one:Distribution traffic injury time, distribution accident occurrence cause;The distribution, which is detected, based on history distribution accident information and the environmental parameter of distribution whether there is risk;Detecting distribution there are in the case of risk, Risk-warning is carried out.The present invention solves the relevant technologies and carries out distribution Risk-warning, the technical problem for causing Risk-warning result precision relatively low only in accordance with weather data.
Description
Technical field
The present invention relates to the field of distribution network in power grid, in particular to a kind of method and dress of distribution Risk-warning
It sets, storage medium, processor.
Background technology
Distribution accident kind is various, and reason is complicated, and processing method needs adaptation to local conditions, must not make sweeping generalizations, in regulation and control profession
Accident, the process of defect processing often ununified record and location mode, cause to search inconvenient, functional not strong.Therefore,
Distribution accident treatment is most crucial in regulation and control profession and is most difficult to the skill grasped, and has that training is difficult, early warning effect is poor, processing stream
The features such as journey is complicated.
Currently, power grid accident bulletin is only recorded in certain terminal systems, on excel documents in isolation, checks inconvenience, do not have
Effective incident database is formed, it is functional not strong, effective reference can not be provided for dispatcher's process accident.Regulation and control personnel exist
Required data source dispersion when process accident, and storage place is indefinite, searches inconvenient, influence accident treatment efficiency, in the past
Incident processing procedure in, regulation and control personnel need take a lot of time a large amount of processing reference informations obtained from each approach.And
Accident histories data are not subjected to big data application, guidance is formed to Electric Power Network Planning and production.It is previous accident early warning, emergent
Start only only in accordance with future weather data, early warning effect is bad.For the relevant technologies distribution risk is carried out only in accordance with weather data
Early warning, the problem for causing Risk-warning result precision relatively low, currently no effective solution has been proposed.
Invention content
An embodiment of the present invention provides a kind of method and device of distribution Risk-warning, storage medium, processors, at least
It solves the relevant technologies and carries out distribution Risk-warning only in accordance with weather data, the lower technology of Risk-warning result precision is caused to be asked
Topic.
One side according to the ... of the embodiment of the present invention provides a kind of distribution method for prewarning risk, including:Create data
Library, wherein database is at least used to store history distribution accident information, and history distribution accident information includes at least following one:
Distribution traffic injury time, distribution accident occurrence cause;It is detected based on history distribution accident information and the environmental parameter of distribution
Distribution whether there is risk;Detecting distribution there are in the case of risk, Risk-warning is carried out.
Further, risk packet whether there is based on history distribution accident information and the detection distribution of the environmental parameter of distribution
It includes:It whether there is based on history distribution accident information and the detection distribution of the environmental parameter of distribution using trained neural network
Risk, wherein when detecting the distribution with the presence or absence of risk using trained neural network, trained neural network
Input parameter is the environmental parameter of history distribution accident information and distribution, and the output result of trained neural network is for referring to
Show that distribution whether there is risk.
Further, database is at least additionally operable to the processing mode of storage distribution accident, in the feelings for stating distribution and occurring accident
Under condition, method further includes:The history distribution accident pair being consistent with the type of the distribution accident currently occurred is searched from database
The history processing mode answered;The distribution accident currently occurred is handled according to history processing mode.
Further, after creating database, the method further includes:Receive inquiry request, wherein inquiry request is used
Target information is searched from database in request, inquiry request includes keyword;It is searched and keyword phase from database
The target information matched.
Further, database is at least additionally operable to storage telephone number information, from the database lookup and keyword
The target information to match includes:The telephone number information to match with keyword is searched from database;It is finding
In the case of telephone number information, the touch-control behaviour that account number corresponding with telephone number information is conversed is used to indicate if getting
Make, then establishes the call connection between account number corresponding with telephone number information.
Another aspect according to the ... of the embodiment of the present invention additionally provides a kind of distribution Risk-warning device, including:Create mould
Block, for creating database, wherein database is at least used to store history distribution accident information, and history distribution accident information is extremely
Include following one less:Distribution traffic injury time, distribution accident occurrence cause;Detection module, for being based on history distribution thing
Therefore information and the detection distribution of the environmental parameter of distribution whether there is risk;Warning module, for there are wind detecting distribution
In the case of danger, Risk-warning is carried out.
Further, database is at least additionally operable to the processing mode of storage distribution accident, and described device further includes:First looks into
Module is looked for, in the case of distribution generation accident, the type phase with the distribution accident currently occurred to be searched from database
The corresponding history processing mode of history distribution accident of symbol;Processing module, for according to history processing mode to currently occurring
Distribution accident is handled.
Further, after creating database, described device further includes:Receiving module, in the establishment data
After library, inquiry request is received, wherein inquiry request searches target information for asking from database, is wrapped in inquiry request
Include keyword;Second searching module, for searching the target information to match with keyword from database.
Another aspect according to the ... of the embodiment of the present invention, additionally provides a kind of storage medium, and the storage medium includes storage
Program, wherein described program run when execute distribution method for prewarning risk described in any one of the above embodiments.
Another aspect according to the ... of the embodiment of the present invention additionally provides a kind of processor, and the processor is used to run program,
Wherein, distribution method for prewarning risk described in any one of the above embodiments is executed when described program is run.
In embodiments of the present invention, using establishment database, wherein database is at least used to store history distribution accident letter
Breath, history distribution accident information include at least following one:The mode of distribution traffic injury time, distribution accident occurrence cause,
Distribution is detected by the environmental parameter based on history distribution accident information and distribution and whether there is risk, has been reached and has been detected
In the case that distribution is there are risk, the purpose of Risk-warning is carried out, to realize the accuracy for improving distribution Risk-warning
Technique effect, and then solve the relevant technologies and carry out distribution Risk-warning only in accordance with weather data, cause Risk-warning result accurate
The relatively low technical problem of exactness.
Description of the drawings
Attached drawing described herein is used to provide further understanding of the present invention, and is constituted part of this application, this hair
Bright illustrative embodiments and their description are not constituted improper limitations of the present invention for explaining the present invention.In the accompanying drawings:
Fig. 1 is the flow chart of distribution method for prewarning risk according to the ... of the embodiment of the present invention;
Fig. 2 is a kind of schematic diagram of optional distribution Risk-warning device according to the ... of the embodiment of the present invention;
Fig. 3 is the schematic diagram of another optional distribution Risk-warning device according to the ... of the embodiment of the present invention;
Fig. 4 is the schematic diagram of another optional distribution Risk-warning device according to the ... of the embodiment of the present invention.
Specific implementation mode
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention
Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described, it is clear that described embodiment is only
The embodiment of a part of the invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill people
The every other embodiment that member is obtained without making creative work should all belong to the model that the present invention protects
It encloses.
It should be noted that term " first " in description and claims of this specification and above-mentioned attached drawing, "
Two " etc. be for distinguishing similar object, without being used to describe specific sequence or precedence.It should be appreciated that using in this way
Data can be interchanged in the appropriate case, so as to the embodiment of the present invention described herein can in addition to illustrating herein or
Sequence other than those of description is implemented.In addition, term " comprising " and " having " and their any deformation, it is intended that cover
It includes to be not necessarily limited to for example, containing the process of series of steps or unit, method, system, product or equipment to cover non-exclusive
Those of clearly list step or unit, but may include not listing clearly or for these processes, method, product
Or the other steps or unit that equipment is intrinsic.
According to embodiments of the present invention, a kind of embodiment of the method for distribution Risk-warning is provided, it should be noted that attached
The step of flow of figure illustrates can execute in the computer system of such as a group of computer-executable instructions, though also,
So logical order is shown in flow charts, but in some cases, it can be with different from shown by sequence execution herein
Or the step of description.
The distribution method for prewarning risk of the embodiment of the present invention will be described in detail below.
Fig. 1 is the flow chart of distribution method for prewarning risk according to the ... of the embodiment of the present invention, as shown in Figure 1, this method includes
Following steps:
Step S102 creates database, wherein database is at least used to store history distribution accident information, history distribution
Accident information includes at least following one:Distribution traffic injury time, distribution accident occurrence cause;
In step s 102, database can be also used for connection situation in the data information of weather, power distribution network, field
The information such as station name.
Step S104 whether there is risk based on history distribution accident information and the detection distribution of the environmental parameter of distribution;
It should be noted that in step S104, distribution environmental parameter may include:The humidity of environment, the temperature of environment
Etc. specific parameter.It can be by inputting the environmental parameter of history distribution accident information and distribution in neural network by information
And data are trained to obtain testing result.
Step S106 carries out Risk-warning detecting distribution there are in the case of risk.
By step S106, the mode for the Risk-warning that can be known is:Short message prompt, the display of indicator light, alarm bell are rung
It should wait.
Through the above steps, using establishment database, wherein database is at least used to store history distribution accident information,
History distribution accident information includes at least following one:The mode of distribution traffic injury time, distribution accident occurrence cause, passes through
It whether there is risk based on history distribution accident information and the detection distribution of the environmental parameter of distribution, reached and detected distribution
In the case of there are risk, the purpose of Risk-warning is carried out, to realize the technique effect of distribution Risk-warning, and then is solved
The relevant technologies carry out distribution Risk-warning only in accordance with weather data, cause the lower technology of Risk-warning result precision to ask
The accuracy for improving Risk-warning may be implemented in topic.
Optionally, risk packet whether there is based on history distribution accident information and the detection distribution of the environmental parameter of distribution
It includes:It whether there is based on history distribution accident information and the detection distribution of the environmental parameter of distribution using trained neural network
Risk, wherein when detecting the distribution with the presence or absence of risk using trained neural network, trained neural network
Input parameter is the environmental parameter of history distribution accident information and distribution, and the output result of trained neural network is for referring to
Show that distribution whether there is risk.
By the embodiment, the accuracy of the prediction to risk can be improved.
As a kind of optional embodiment, database is at least additionally operable to the processing mode of storage distribution accident, is sent out in distribution
It makes trouble in the case of event, method further includes:The history being consistent with the type of the distribution accident currently occurred is searched from database
The corresponding history processing mode of distribution accident;The distribution accident currently occurred is handled according to history processing mode.
In the scheme that the embodiment provides, data information can be based on and matched, the processing of distribution accident is carried out, it can also
According to the prompt after early warning, the processing to accident is carried out, so as to improve the efficiency of accident treatment.
It should be noted that after executing above-mentioned steps S102, in the case of distribution generation accident, can carry out from
History processing mode corresponding with the history distribution accident that the type of the distribution accident currently occurred is consistent is searched in database;It presses
The distribution accident currently occurred is handled according to history processing mode, wherein database is at least additionally operable to storage distribution accident
Processing mode.
In addition, can also carry out searching the type with the distribution accident currently occurred from database after step s 106
The corresponding history processing mode of history distribution accident being consistent;The distribution accident currently occurred is carried out according to history processing mode
Processing, wherein database is at least additionally operable to the processing mode of storage distribution accident.
Operation i.e. in said program can be applied according to actual demand, be not limited to the priority of step.
As a kind of optional embodiment, after creating database, the method further includes:Inquiry request is received,
In, inquiry request searches target information for asking from database, and inquiry request includes keyword;It is searched from database
The target information to match with keyword.
As a kind of optional embodiment, database is at least additionally operable to storage telephone number information, from the database
It searches with the target information that keyword matches and includes:The telephone number to match with keyword is searched from database to believe
Breath;In the case where finding telephone number information, carried out if getting and being used to indicate account number corresponding with telephone number information
The touch control operation of call then establishes the call connection between account number corresponding with telephone number information.
In the scheme that the embodiment provides, regulation and control personnel can be in bulky and updating decision phone information data
It is accurate to search phone information, and then the case where accidentally dialling can be reduced in intensive work environment, it improves work efficiency.
It should be noted that in the scheme of the embodiment, when establishing database, can according to actual conditions, with
Shi Jinhang receives inquiry request, wherein inquiry request searches target information for asking from database, and inquiry request includes
Keyword;The target information to match with keyword is searched from database, and then can be conveniently at any time as needed by demand
Inform that related personnel carries out relevant operation.
The present invention also provides a kind of preferred embodiment, the preferred embodiment provides a kind of matching based on big data analysis
Net accident early warning module (is equivalent to the early warning processing in above-described embodiment).Its process description is as follows:
1, distribution accident treatment database is built
Background:The process of accident treatment and data often ununified record and location mode, cause in regulation and control profession
Data search is inconvenient, historian data record is not strong, influences accident treatment efficiency.
Content:By regulating and controlling the arrangement of basic data over the years, by with the relevant information of distribution accident and defect with unified
Format records, and builds that information is complete, searches convenient, feature-rich database, (time of origin of such as accident, station title,
Cause of accident classification etc.), it lays the first stone for the research and development of platform.
2, the distribution accident early warning module based on big data analysis
Background:Previous accident early warning, emergency starting do not consider area power grid hidden danger point only only in accordance with future weather data
Cloth and history casualty data, early warning effect are bad.And not by accident histories data carry out big data application, to Electric Power Network Planning with
Production forms guidance.
Content:It relies on accident histories database, become the power grids factors such as platform operating mode, line conditions, distribution transformation, in conjunction with future
The meteorologic factors such as weather, humidity, with LSTM- neural networks (the trained neural network of utilization being equivalent in embodiment) structure
Power grid risk evaluation and state estimations model are built, it is comprehensively fixed to carry out point (equipment), line (circuit), the risk of face (power grid) to power grid
Grade relatively accurately predicts the generation of accident and defect, accident treatment mode is become actively preventing from traditional response formula, and one
Determine to instruct Electric Power Network Planning and production in degree.
3, the accident treatment intelligent decision supporting module based on big data analysis
Background:1) in previous incident processing procedure, regulation and control personnel need to take a lot of time to obtain from each approach
A large amount of processing reference informations (such as atlas, phone information, accident prediction).
2) experience tends to play the role of speed up processing, but can not form system, comprehensive system, and effect is because of people
And different (such as accident treatment specification flow, earthing searching, accident point location).
Content:Based on database, by accident and defect processing related data (historical failure bulletin, historical failure record
Wave record, adjusts rule, accident treatment prediction scheme, overhead transmission line figure, current policies file etc. at safety) combine in the unified platform.For regulation and control person
Process accident provides integrated information reference, easy-to-look-up, and the experience of old dispatchers and knowwhy are changed into based on big
The intelligent decision of data analysis, improve the speed of accident default processing, accuracy with it is normative, while receive accident point location,
Ground connection draws the functions such as road tagmeme.
4, the insertion of one-touch scheduling smart phone
Background:1) regulation and control personnel need that phone is commonly used, and phone information data volume is big, and updating decision.
2) it is inconvenient to search phone, and hand dials the number and is easy accidentally to dial under intensive work environment, influences working efficiency.
Content:Establish company's production, management, operation maintenance personnel phone information database (database and the number in embodiment
It is blended according to library).Based on database, personnel's phone information is carried out with traffic control content by modeling by software development and is associated with,
Input service content relevant field can show related personnel's information on software, and the mode that mouse can be used to click carries out one
Keyed is dialed.Meanwhile added on phone conducive to the device of dispatcher's hearing, improve dispatcher's hearing situation.
The preferred embodiment relies on big data analysis and artificial intelligence technology, the core link in regulating and controlling with distribution -- accident
Processing is starting point, and the conception of integral intelligent accident treatment platform is proposed from three accident early warning, intelligent decision levels.It is logical
It crosses and builds complete clearly accident information database, establish power grid risk evaluation and state estimations model, research and develop accident early warning mould
Block and intelligent decision supporting module incorporate intelligent micro-grid element, make information foot, the integral intelligent that function is strong, link is complete is put down
Platform.To give full play to regulation and control as the advantage of electric network data center, reinforce guidance of the accident big data to Electric Power Network Planning and production,
Accident treatment intelligent level is promoted, reduces and repeats manual labor, production efficiency is improved, meets intelligent micro-grid new development trend,
To reach the target of " keeping accident treatment more intelligent, accident management and control more wisdom ".
1, electric network state evaluation and state estimations model are proposed
Based on LSTM- neural networks, carries out evaluation of running status with three equipment, circuit, power grid levels and risk is defined the level.
In conjunction with future weather, early warning is carried out to power grid risk and accident, accident treatment mode is become actively preventing from " response formula ".
2, the accident treatment intelligent decision supporting module based on big data analysis
The complete data information that integrated accident treatment needs establishes that specification is complete, strong functional database in the unified platform.
Integrated information is provided by using reasonable algorithm with artificial intelligence technologys such as computer modelings for regulation and control personnel's accident treatment to join
It examines, artificial experience and knowwhy is changed into intelligent decision (accident default processing strategy, accident based on big data analysis
Point location), improve dispatcher's accident treatment efficiency.
3, one-touch intelligent scheduling phone
Establish regulation and control action and the associated database of personal information, the scheduling that insertion one-touch can dial in platform
Smart phone reduces original phone volume, increases its function, improves regulation and control working efficiency.
According to embodiments of the present invention, a kind of distribution Risk-warning device embodiment is additionally provided, it should be noted that this is matched
Net Risk-warning device can be used for executing in distribution method for prewarning risk namely the embodiment of the present invention in the embodiment of the present invention
Distribution method for prewarning risk can be executed in the distribution Risk-warning device.
Fig. 2 is a kind of schematic diagram of optional distribution Risk-warning device according to the ... of the embodiment of the present invention, as shown in Fig. 2,
The device may include:
Creation module 20, for creating database, wherein database is at least used to store history distribution accident information, goes through
History distribution accident information includes at least following one:Distribution traffic injury time, distribution accident occurrence cause;Detection module 22,
It whether there is risk for the environmental parameter detection distribution based on history distribution accident information and distribution;Warning module 24 is used
In detecting distribution there are in the case of risk, Risk-warning is carried out.
It should be noted that the creation module 20 in the embodiment can be used for executing the step in the embodiment of the present invention
S102, the detection module 22 in the embodiment can be used for executing the step S104 in the embodiment of the present invention, in the embodiment
Warning module 24 can be used for executing the step S106 in the embodiment of the present invention.Above-mentioned module is shown with what corresponding step was realized
Example is identical with application scenarios, but is not limited to the above embodiments disclosure of that.
Fig. 3 is the schematic diagram of another optional distribution Risk-warning device according to the ... of the embodiment of the present invention, such as Fig. 3 institutes
Show, which includes outer creation module 20, the first searching module 26 and processing module 28, wherein
Optionally, database is at least additionally operable to the processing mode of storage distribution accident, in the case of distribution generation accident,
Described device further includes:First searching module 26, for searching the type phase with the distribution accident currently occurred from database
The corresponding history processing mode of history distribution accident of symbol;Processing module 28, for according to history processing mode to currently occurring
Distribution accident handled.
Fig. 4 is the schematic diagram of another optional distribution Risk-warning device according to the ... of the embodiment of the present invention, such as Fig. 4 institutes
Show, which includes creation module 20, receiving module 210 and the second searching module 212, wherein
Optionally, after creating database, described device further includes:Receiving module 210, for receiving inquiry request,
Wherein, inquiry request searches target information for asking from database, and inquiry request includes keyword;Second searching module
212, for searching the target information to match with keyword from database.
To achieve the goals above, according to another aspect of the present invention, the embodiment of the present invention additionally provides a kind of storage Jie
Matter, the storage medium include the program of storage, wherein equipment where controlling the storage medium when described program is run is held
Row distribution method for prewarning risk described above.
To achieve the goals above, according to another aspect of the present invention, the embodiment of the present invention additionally provides a kind of processor,
The processor is for running program, wherein described program executes distribution method for prewarning risk described above when running.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
In the above embodiment of the present invention, all emphasizes particularly on different fields to the description of each embodiment, do not have in some embodiment
The part of detailed description may refer to the associated description of other embodiment.
In several embodiments provided herein, it should be understood that disclosed technology contents can pass through others
Mode is realized.Wherein, the apparatus embodiments described above are merely exemplary, for example, the unit division, Ke Yiwei
A kind of division of logic function, formula that in actual implementation, there may be another division manner, such as multiple units or component can combine or
Person is desirably integrated into another system, or some features can be ignored or not executed.Another point, shown or discussed is mutual
Between coupling, direct-coupling or communication connection can be INDIRECT COUPLING or communication link by some interfaces, unit or module
It connects, can be electrical or other forms.
The unit illustrated as separating component may or may not be physically separated, aobvious as unit
The component shown may or may not be physical unit, you can be located at a place, or may be distributed over multiple
On unit.Some or all of unit therein can be selected according to the actual needs to achieve the purpose of the solution of this embodiment.
In addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it can also
It is that each unit physically exists alone, it can also be during two or more units be integrated in one unit.Above-mentioned integrated list
The form that hardware had both may be used in member is realized, can also be realized in the form of SFU software functional unit.
If the integrated unit is realized in the form of SFU software functional unit and sells or use as independent product
When, it can be stored in a computer read/write memory medium.Based on this understanding, technical scheme of the present invention is substantially
The all or part of the part that contributes to existing technology or the technical solution can be in the form of software products in other words
It embodies, which is stored in a storage medium, including some instructions are used so that a computer
Equipment (can be personal computer, server or network equipment etc.) execute each embodiment the method for the present invention whole or
Part steps.And storage medium above-mentioned includes:USB flash disk, read-only memory (ROM, Read-Only Memory), arbitrary access are deposited
Reservoir (RAM, Random Access Memory), mobile hard disk, magnetic disc or CD etc. are various can to store program code
Medium.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art
For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered
It is considered as protection scope of the present invention.
Claims (10)
1. a kind of distribution method for prewarning risk, which is characterized in that including:
Create database, wherein the database is at least used to store history distribution accident information, the history distribution accident letter
Breath includes at least following one:Distribution traffic injury time, distribution accident occurrence cause;
The distribution, which is detected, based on the history distribution accident information and the environmental parameter of distribution whether there is risk;
Detecting the distribution there are in the case of risk, Risk-warning is carried out.
2. according to the method described in claim 1, it is characterized in that, described be based on the history distribution accident information and distribution
Environmental parameter detect the distribution and include with the presence or absence of risk:
Using trained neural network based on the history distribution accident information and the environmental parameter of distribution detection described in match
Net whether there is risk, wherein described when detecting the distribution with the presence or absence of risk using the trained neural network
The input parameter of trained neural network is the environmental parameter of the history distribution accident information and the distribution, the instruction
The output result for the neural network perfected is used to indicate the distribution and whether there is risk.
3. according to the method described in claim 1, it is characterized in that, the database is at least additionally operable to the place of storage distribution accident
Reason mode, in the case of the distribution generation accident, the method further includes:
History corresponding with the history distribution accident that the type of the distribution accident currently occurred is consistent is searched from the database
Processing mode;
The distribution accident currently occurred is handled according to the history processing mode.
4. according to the method in any one of claims 1 to 3, which is characterized in that described after the establishment database
Method further includes:
Receive inquiry request, wherein the inquiry request searches target information, the inquiry request for asking from database
It include keyword;
The target information to match with the keyword is searched from the database.
5. according to the method described in claim 4, it is characterized in that, the database is at least additionally operable to storage telephone number letter
Breath, described search from the database with the target information that the keyword matches include:
The telephone number information to match with the keyword is searched from the database;
In the case where finding the telephone number information, if get be used to indicate it is corresponding with the telephone number information
The touch control operation that account number is conversed then establishes the call connection between account number corresponding with the telephone number information.
6. a kind of device of distribution Risk-warning, which is characterized in that including:
Creation module, for creating database, wherein the database is at least used to store history distribution accident information, described
History distribution accident information includes at least following one:Distribution traffic injury time, distribution accident occurrence cause;
Detection module detects whether the distribution deposits for the environmental parameter based on the history distribution accident information and distribution
In risk;
Warning module, for detecting the distribution there are in the case of risk, carrying out Risk-warning.
7. device according to claim 6, which is characterized in that the database is at least additionally operable to the place of storage distribution accident
Reason mode, wherein described device further includes:
First searching module, in the case of the distribution generation accident, searching occur with current from the database
Distribution accident the corresponding history processing mode of history distribution accident that is consistent of type;
Processing module, for being handled the distribution accident currently occurred according to the history processing mode.
8. the device described according to claim 6 or 7, which is characterized in that described device further includes:
Receiving module, for after the establishment database, receiving inquiry request, wherein the inquiry request is for asking
Target information is searched from database, the inquiry request includes keyword;
Second searching module, for searching the target information to match with the keyword from the database.
9. a kind of storage medium, which is characterized in that the storage medium includes the program of storage, wherein run in described program
When control the storage medium where equipment perform claim require method described in any one of 1 to 5.
10. a kind of processor, which is characterized in that the processor is for running program, wherein right of execution when described program is run
Profit requires the method described in any one of 1 to 5.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810653894.2A CN108805462A (en) | 2018-06-22 | 2018-06-22 | The method and device of distribution Risk-warning, storage medium, processor |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810653894.2A CN108805462A (en) | 2018-06-22 | 2018-06-22 | The method and device of distribution Risk-warning, storage medium, processor |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108805462A true CN108805462A (en) | 2018-11-13 |
Family
ID=64084757
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810653894.2A Pending CN108805462A (en) | 2018-06-22 | 2018-06-22 | The method and device of distribution Risk-warning, storage medium, processor |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108805462A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111027402A (en) * | 2019-11-15 | 2020-04-17 | 国网江西省电力有限公司电力科学研究院 | Intelligent detection and evaluation method for natural disaster risks and application |
CN111626483A (en) * | 2020-05-09 | 2020-09-04 | 国网上海市电力公司 | Accident processing flow management and optimization system |
-
2018
- 2018-06-22 CN CN201810653894.2A patent/CN108805462A/en active Pending
Non-Patent Citations (3)
Title |
---|
上海申通地铁集团有限公司轨道交通培训中心: "《城市轨道交通设备调度》", 31 December 2012 * |
张印扇: "《城市应急联动系统构建运行与城市突发事件应急管理及预警机制建设应用全书 中》", 31 December 2008 * |
王昊宇: "太原地区电网风险防控及故障处理系统研究设计", 《中国优秀硕士学位论文全文数据库工程科技Ⅱ辑》 * |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN111027402A (en) * | 2019-11-15 | 2020-04-17 | 国网江西省电力有限公司电力科学研究院 | Intelligent detection and evaluation method for natural disaster risks and application |
CN111626483A (en) * | 2020-05-09 | 2020-09-04 | 国网上海市电力公司 | Accident processing flow management and optimization system |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN102947801B (en) | malicious attack detection and analysis | |
CN105511727B (en) | A kind of message treatment method and device | |
CN108737182A (en) | The processing method and system of system exception | |
CN113627566B (en) | Phishing early warning method and device and computer equipment | |
CN110891283A (en) | Small base station monitoring device and method based on edge calculation model | |
CN113516244B (en) | Intelligent operation and maintenance method and device, electronic equipment and storage medium | |
CN107707392A (en) | Passage restorative procedure and device, terminal | |
CN114091610A (en) | Intelligent decision method and device | |
CN108805462A (en) | The method and device of distribution Risk-warning, storage medium, processor | |
CN116094174A (en) | Knowledge graph-based power grid operation and maintenance monitoring method, system, equipment and medium | |
CN109040489A (en) | The distribution method and device of telecommunications customer service | |
CN114726740A (en) | Method and system for identifying platform area topology and intelligent fusion terminal | |
CN106910075A (en) | Intelligent processing system and method that client mobile communication is complained | |
CN112769620B (en) | Network deployment method, equipment and computer readable storage medium | |
CN106126011A (en) | The resource occupation method for information display of a kind of application program and mobile terminal | |
CN112448919B (en) | Network anomaly detection method, device and system and computer readable storage medium | |
Feng et al. | Research of Deep Learning and Adaptive Threshold Based Signaling Storm Prediction and Top Cause Tracking | |
CN108879661B (en) | Method and equipment for checking switching operation through correlation history ticket | |
CN106355539A (en) | Police resource real-time state information display method and system | |
CN109687592A (en) | Substation information display control method, device and electronic equipment | |
CN106815772A (en) | Electric power data report method and device | |
CN109683942A (en) | Script management method, device, medium and electronic equipment | |
CN114157020A (en) | System and method for realizing networked command issuing of scheduling instructions across security partitions | |
CN110110961A (en) | Power quality data monitoring method, device and terminal device | |
CN116739223B (en) | Enterprise pollution discharge real-time supervision method and device, storage medium and electronic equipment |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181113 |
|
RJ01 | Rejection of invention patent application after publication |