CN108803507A - A kind of production line feeding management method and system - Google Patents

A kind of production line feeding management method and system Download PDF

Info

Publication number
CN108803507A
CN108803507A CN201810516641.0A CN201810516641A CN108803507A CN 108803507 A CN108803507 A CN 108803507A CN 201810516641 A CN201810516641 A CN 201810516641A CN 108803507 A CN108803507 A CN 108803507A
Authority
CN
China
Prior art keywords
agv trolleies
production line
agv
trolleies
control command
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810516641.0A
Other languages
Chinese (zh)
Other versions
CN108803507B (en
Inventor
吴志坤
胡迪
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
HANGZHOU IPLUS TECH CO.,LTD.
Original Assignee
Hangzhou Ltd Co Of Nan Jiang Robot
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hangzhou Ltd Co Of Nan Jiang Robot filed Critical Hangzhou Ltd Co Of Nan Jiang Robot
Priority to CN201810516641.0A priority Critical patent/CN108803507B/en
Publication of CN108803507A publication Critical patent/CN108803507A/en
Application granted granted Critical
Publication of CN108803507B publication Critical patent/CN108803507B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B19/00Programme-control systems
    • G05B19/02Programme-control systems electric
    • G05B19/418Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM]
    • G05B19/4189Total factory control, i.e. centrally controlling a plurality of machines, e.g. direct or distributed numerical control [DNC], flexible manufacturing systems [FMS], integrated manufacturing systems [IMS], computer integrated manufacturing [CIM] characterised by the transport system
    • GPHYSICS
    • G05CONTROLLING; REGULATING
    • G05BCONTROL OR REGULATING SYSTEMS IN GENERAL; FUNCTIONAL ELEMENTS OF SUCH SYSTEMS; MONITORING OR TESTING ARRANGEMENTS FOR SUCH SYSTEMS OR ELEMENTS
    • G05B2219/00Program-control systems
    • G05B2219/30Nc systems
    • G05B2219/32Operator till task planning
    • G05B2219/32388Autonomous flexible system, cells and agv autonomous
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/02Total factory control, e.g. smart factories, flexible manufacturing systems [FMS] or integrated manufacturing systems [IMS]
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02PCLIMATE CHANGE MITIGATION TECHNOLOGIES IN THE PRODUCTION OR PROCESSING OF GOODS
    • Y02P90/00Enabling technologies with a potential contribution to greenhouse gas [GHG] emissions mitigation
    • Y02P90/60Electric or hybrid propulsion means for production processes

Abstract

The invention discloses a kind of production line feeding management methods, include the following steps:Step S100:According to the quantity of surplus material on production line, the scheduled time of consumption surplus material is calculated;Step S110:When the scheduled time reaching for the first default remaining time, the AGV trolleies of an idle state are selected, send the first control command to AGV trolleies, control AGV trolleies to material storage area carrying material are to caching Accreditation Waiting Area;Step S120:When the scheduled time reaching for the second default remaining time, an AGV trolley for being mounted with production line material for being located at caching Accreditation Waiting Area is selected, the second control command is sent to AGV trolleies, controls selected AGV trolleies and material is transported on the production line.The invention also discloses a kind of production line feedings to manage system.Production line feeding provided by the invention manages method and system, so that supplies consumption time and AGV trolley feeding times is matched, to improve production efficiency.

Description

A kind of production line feeding management method and system
Technical field
The present invention relates to plant produced wire management technical fields, more particularly to produce the feeding management method of line material and be System.
Background technology
AGV trolleies, i.e. Automated Guided Vehicle, automated guided vehicle refer to being equipped with electricity magnetically or optically Etc. homing guidances device, it can be travelled along defined guide path, the fortune with safeguard protection and various delivery functions Defeated vehicle.AGV trolleies generally bear roller and material are loaded on the roller of trolley when AGV trolleies are to big material storage area, small After vehicle reaches production line, material is sent on production line by roller.Therefore, AGV trolleies, which are widely used in various production lines, carries out object Material transports.
In the actual production process, due to uncertain factors such as supplies consumption time, AGV trolleies current locations, object is produced It is difficult accurately to match that material consumption and AGV trolleies, which are moved to a feeding,.The scheme that the prior art provides is to take preset life Flow is produced, i.e. AGV trolleies have the workflow of setting, are at a time moved to a certain point and complete a certain task, then It is moved to the point set in flow in subsequent time and continues the next item down task.Such production procedure can cause supplies consumption complete Trolley does not have the case where feeding is just left after not having timely feeding or trolley to be moved to feeding point afterwards, to influence to produce Efficiency.
Invention content
The problem of for existing line management, the embodiment of the present invention provide a kind of production line feeding manager Method, it is flexible to adjust AGV trolley feeding times according to practical supplies consumption time and the small truck positions AGV, make the supplies consumption time It is matched with AGV trolley feeding times, to improve production efficiency.
A kind of production line feeding management method provided in an embodiment of the present invention, includes the following steps:
Step S100:According to the quantity of surplus material on production line, the scheduled time of consumption surplus material is calculated;
Step S110:When the scheduled time reaching for the first default remaining time, the AGV trolleies of an idle state are selected, The first control command is sent to AGV trolleies, control AGV trolleies to material storage area carrying material are to caching Accreditation Waiting Area;
Step S120:When the scheduled time reaching for the second default remaining time, a dress for being located at caching Accreditation Waiting Area is selected The AGV trolleies of production line material are loaded with, the second control command is sent to AGV trolleies, controls selected AGV trolleies and transport material It is sent on the production line.
Production line feeding management method provided in an embodiment of the present invention, by precalculating supplies consumption remaining time, When remaining time is preset in arrival supplies consumption first, the AGV trolleies of an idle state are pre-selected, controls the trolley and in advance will Material is transported to caching Accreditation Waiting Area, when material is about to the second default remaining time run out of, selects one to be waited in caching The AGV trolleies of material needed for production line are carried in area, material is transported on production line by control AGV trolleies, and life is replenished in time Material in producing line.By calculating rationally the first default remaining time of setting and the second default remaining time, AGV trolleies can be made The time match of feeding and production line spent material gets up, i.e., AGV trolleies will not be made to be in idle condition or slow for a long time Accreditation Waiting Area waiting is deposited, improves the utilization rate of AGV trolleies, while it is also ensured that the material on production line can be supplemented in time, Production efficiency is not interfered with.
Wherein, the first control command include the AGV trolleies ID number of selected idle state, material label needed for production line And need the caching Accreditation Waiting Area reached.Second control command includes being mounted with the production AGV trolleies ID number of line material and described Production line ID number.Fixed ID number can be worked out to production line, AGV trolleies by numbering in advance or other modes, it such as can be with According to the purposes and serial number of production, unique identifier of production line, the i.e. ID number of production line are worked out.It similarly, can also be to AGV Trolley works out unique ID number.Such as unique ID number can be worked out by the physical address for the processing module being arranged on AGV trolleies, The ID number of trolley can be artificially worked out by the purposes and sequence number of trolley, and its ID number input system is subjected to unified management. Material storage area can similarly be numbered.It can pair article or machine being managed collectively related with production line Device, equipment, corollary equipment etc. are all encoded, its unique identification number are assigned, to facilitate system to be managed collectively.
Preferably, step S110 includes the following steps:
Step S111:When the scheduled time reaching for the first default remaining time, the AGV trolleies of an idle state are selected, The first control command is sent to AGV trolleies;
Step S112:The first feedback signal of AGV trolleies feedback is received, and AGV trolley status modifiers are transported for material;
Step S113:AGV trolleies carry material to caching Accreditation Waiting Area to material storage area;
Step S114:The second feedback signal of AGV trolleies feedback is received, and is wait state by AGV trolley status modifiers.
Through the above steps, the working condition that can be in time in trolley carries out feedback update, is chosen with convenient processor Select the AGV trolleies being in idle condition and the AGV trolleies in caching Accreditation Waiting Area.
Preferably, step S100 includes the following steps:
Step S101:According to the quantity of surplus material on production line, the scheduled time for consuming the surplus material is calculated;
Step S102:Detect the position of all AGV trolleies being in idle condition;
Step S111 is specially:When the scheduled time reaching for the first default remaining time, select position from material storage area The AGV trolleies of nearest idle state send the first control command to AGV trolleies.
Preferably, step S120 includes the following steps:
Step S121:Detect the position of all AGV trolleies for being mounted with production line material for being located at caching Accreditation Waiting Area;
Step S122:When reaching for the second default remaining time to the scheduled time, the loading nearest from production line position is selected There are the AGV trolleies of production line material, and sends the second control command to AGV trolleies;
Step S123:Material is transported on the production line by AGV trolleies.
By the optimization of the above method, the idle AGV trolley nearest from material storage area can be picked out and from production line The AGV trolleies in caching Accreditation Waiting Area of the nearest material for carrying production line needs, with save AGV trolley travellings when Between, improve production efficiency.
The embodiment of the present invention also provides a kind of computer readable storage medium, and meter is stored in computer readable storage medium Calculation machine program, wherein can be realized when computer program is run such as above-mentioned production line feeding management method.
On the other hand, the embodiment of the present invention also provides a kind of production line feeding management system, including processor, the first signal Transceiver module, AGV trolleies, the material detection of the second signal transceiver module being mounted on AGV trolleies and installation in the production line Device;
Material detection device:For detecting the material volume residual on production line, and the material volume residual that will be detected Data are sent to processor;
Processor:For the quantity according to surplus material on production line, the scheduled time for consuming the surplus material is calculated; And when the scheduled time reaching for the first default remaining time, the AGV trolleies of an idle state are selected, and receive by the first signal It sends out module and sends the first control command to AGV trolleies;And when the scheduled time reaching for the second default remaining time, one is selected Positioned at the AGV trolleies for being mounted with production line material for caching Accreditation Waiting Area and pass through the first signal transmitting and receiving module transmission the second control life It enables to the AGV trolleies;
AGV trolleies:For receiving the first control command and the second control command by second signal transceiver module, receiving When to the first control command, material is carried to Accreditation Waiting Area is cached, when receiving the second control command, by object to material storage area Material is transported on production line.
Production line feeding provided in an embodiment of the present invention manages system, by precalculating supplies consumption remaining time, When remaining time is preset in arrival supplies consumption first, the AGV trolleies of an idle state are pre-selected, controls the trolley and in advance will Material is transported to caching Accreditation Waiting Area, when material is about to the second default remaining time run out of, selects one to be waited in caching The AGV trolleies of material needed for production line are carried in area, material is transported on production line by control AGV trolleies, and life is replenished in time Material in producing line.By calculating rationally the first default remaining time of setting and the second default remaining time, AGV trolleies can be made The time match of feeding and production line spent material gets up, i.e., AGV trolleies will not be made to be in idle condition or slow for a long time Accreditation Waiting Area waiting is deposited, improves the utilization rate of AGV trolleies, while it is also ensured that the material on production line can be supplemented in time, Production efficiency is not interfered with.
Preferably, production line feeding provided by the invention manages system, further includes server, and processor is arranged in server Interior, server signal connects the material detection device of all production lines, and server also signal connects all AGV trolleies;
Server is for managing all production lines and AGV trolleies;
All production lines of server admin include:It preserves the ID number of all production lines, the material label that is consumed, disappeared Consume speed, the production line run time of material;
All AGV trolleies of server admin include:Preserve all AGV trolleies ID numbers, update and the work for preserving AGV trolleies Make state to be idle, carry material or the label of waiting, AGV trolleies carrying material.
By the way that server is arranged, it may be convenient to realize to all production lines and AGV trolleies, material storage area, delay It deposits the operation working condition of Accreditation Waiting Area and production line, working condition of AGV trolleies etc. and carries out unified management, it can be effective The dispatching efficiency of raising system makes AGV trolleies and production line realize preferably matching, provides production efficiency.
Preferably, AGV trolleies further include position locating module, and the server is additionally operable to detect the position of the AGV trolleies It sets, and preserves the position of the AGV trolleies.When selecting the trolley of idle state, select from material storage area with a distance from recently Idle trolley is selected when selection is located at the AGV trolleies for being mounted with the production line material of the caching Accreditation Waiting Area from described Production line is apart from nearest AGV trolleies.
By the optimization of the above method, the idle AGV trolley nearest from material storage area can be picked out and from production line The AGV trolleies in caching Accreditation Waiting Area of the nearest material for carrying production line needs, with save AGV trolley travellings when Between, improve production efficiency.
Description of the drawings
Fig. 1 is the flow diagram of 1 production line feeding management method of the embodiment of the present invention;
Fig. 2 is the structural schematic diagram that 2 production line feeding of the embodiment of the present invention manages system.
In attached drawing:10, server;11, processor;12, the first signal transmitting and receiving module;20, AGV trolleies;21, second signal Transceiver module;30, material detection device.
Specific implementation mode
In the following, in conjunction with attached drawing and specific implementation mode, the present invention is described further, it should be noted that not Under the premise of conflicting, new implementation can be formed between various embodiments described below or between each technical characteristic in any combination Example.
Embodiment 1:
As shown in Figure 1, a kind of production line feeding management method provided in an embodiment of the present invention, includes the following steps:
Step S100:According to the quantity of surplus material on production line, the scheduled time of consumption surplus material is calculated;
It, can there are ways to calculate the time of consumption surplus material according to the quantity of the surplus material on production line. A kind of mode is that the material that each AGV trolley transports is transported by standard, such as by certain quantity transport, or is pressed Certain weight is transported, i.e., under continuous duty, the material time that production line consumes each AGV trolley is fixed, is led to The time for crossing statistics supplies consumption can calculate the scheduled time of consumption surplus material.Another way is setting residue Expect detection module, detect the amount of surplus material on production line in real time, such as the quantity or weight of surplus material, according to the unit interval The amount of interior spent material can also calculate the scheduled time of consumption surplus material.
Step S110:When the scheduled time reaching for the first default remaining time, the AGV trolleies of an idle state are selected, The first control command is sent to AGV trolleies, control AGV trolleies to material storage area carrying material are to caching Accreditation Waiting Area;
Wherein, the first control command include the AGV trolleies ID number of selected idle state, material label needed for production line And need the caching Accreditation Waiting Area reached.Production line, AGV trolleies can be worked out solid by numbering in advance or other modes Fixed ID number such as can work out unique identifier of production line, the i.e. ID number of production line according to the purposes and serial number of production. Similarly, unique ID number can also be worked out to AGV trolleies.It such as can be by the physical address for the processing module being arranged on AGV trolleies Unique ID number is worked out, the ID number for working out trolley can also be thought by the purposes and sequence number of trolley, and its ID number is inputted and is System carries out unified management.Material storage area can similarly be numbered.It pair related with production line can unite Article or machine, equipment, corollary equipment of one management etc. are all encoded, its unique identification number are assigned, with side Just system is managed collectively.
Step S110 specifically includes following steps:
Step S111:When the scheduled time reaching for the first default remaining time, the AGV trolleies of an idle state are selected, The first control command is sent to AGV trolleies;
Step S112:The first feedback signal of AGV trolleies feedback is received, and AGV trolley status modifiers are transported for material;
Step S113:AGV trolleies carry material to caching Accreditation Waiting Area to material storage area;
Step S114:The second feedback signal of AGV trolleies feedback is received, and is wait state by AGV trolley status modifiers.
Through the above steps, the working condition that can be in time in trolley carries out feedback update, is chosen with convenient processor Select the AGV trolleies being in idle condition and the AGV trolleies in caching Accreditation Waiting Area.
Wherein, the first default remaining time can be rationally arranged according to the needs of actual production, such as production line or storage With a distance from material memory block farther out, then the default remaining time of long first can be arranged, instead in the AGV trolleies of idle state It, then can be arranged a default remaining time of shorter first, so that AGV trolleies can be arrived before the second default remaining time Up to caching Accreditation Waiting Area.Also to control for the first default remaining time simultaneously should not be too long, if the time of setting is too long, AGV is small Vehicle will be waited in caching Accreditation Waiting Area for a long time, affect the service efficiency of AGV trolleies.
The states of AGV trolleies needs advance real-time statistics simultaneously to record, state include mainly idle state, material transport or Person's wait state, idle state correspond to trolley and load any material not yet, are also not received by control command and need tote Material, material transport corresponding trolley and need loaded material to the shape for reaching caching this period of time of Accreditation Waiting Area from control command is received State, and wait state corresponds to state when trolley is in Accreditation Waiting Area.
When selecting AGV trolleies, all AGV trolleies being in idle condition are selected first, then it can be carried out Sequence, can such as sort by the smooth degree of AGV trolley advance routes, to preferentially select route most smoothly AGV trolleies, and It sends the first control command and gives the trolley, control AGV trolleies to material storage area carrying material are to caching Accreditation Waiting Area.First control Order includes the AGV trolleies ID number, material label needed for production line and needs the caching Accreditation Waiting Area reached.AGV trolleies exist After receiving the first control command, the first feedback signal will be sent, the state of the AGV trolleies will be registered as material and transport shape State.AGV trolleies will be according to the label of material to corresponding material storage area loaded material simultaneously.Material storage area has special set The standby amount by standard places material to AGV trolleies.AGV trolleies are after detecting that material loads, for example pass through weight sensor Detect the weight of material, it might even be possible to detect that the particular number of material or material are loaded in hopper, each hopper dress The material quantity of load is certain, and AGV trolleies will leave material storage area and go to caching Accreditation Waiting Area.And after reaching caching Accreditation Waiting Area The second feedback signal is sent, which will be registered as wait state.
Step S120:When the scheduled time reaching for the second default remaining time, a dress for being located at caching Accreditation Waiting Area is selected The AGV trolleies of production line material are loaded with, the second control command is sent to AGV trolleies, controls selected AGV trolleies and transport material It is sent on the production line.
Wherein, the second control command includes the AGV trolleies ID number for being mounted with production line material and the production line ID number.The Two default remaining times can also be rationally arranged according to the needs of actual production, as production line is small from the AGV in caching Accreditation Waiting Area Farther out, then the default remaining time of long second can be arranged, conversely, can then be arranged one shorter second in vehicle distance Default remaining time, so that material can be sent to production line by AGV trolleies before supplies consumption is complete.It is pre- that second is also controlled simultaneously If remaining time is unsuitable too long, if the time of setting is too long, AGV trolleies will will also fall into a long wait after reaching production line Supplies consumption on production line also influences the matching of production line and AGV trolleies, affects the service efficiency of AGV trolleies.Such as one kind In embodiment, production line when the first default remaining time was 9 minutes, select one it is nearest by material storage zone position AGV trolleies simultaneously send the first control command to the AGV trolleies, and selection is positioned at slow when the second default remaining time was 1 minute An AGV trolley nearest with a distance from production line for being mounted with material needed for production line in Accreditation Waiting Area is deposited, and sends the second control It orders to the AGV trolleies.
Production line feeding management method provided in an embodiment of the present invention, by precalculating the consumption surplus material time, When remaining time is preset in arrival supplies consumption first, the AGV trolleies of an idle state are pre-selected, controls the trolley and in advance will Material is transported to caching Accreditation Waiting Area, when material is about to the second default remaining time run out of, selects one to be waited in caching The AGV trolleies of material needed for production line are carried in area, material is transported on production line by control AGV trolleies, and life is replenished in time Material in producing line.By calculating rationally the first default remaining time of setting and the second default remaining time, AGV trolleies can be made The time match of feeding and production line spent material gets up, i.e., AGV trolleies will not be made to be in idle condition or slow for a long time Accreditation Waiting Area waiting is deposited, improves the utilization rate of AGV trolleies, while it is also ensured that the material on production line can be supplemented in time, Production efficiency is not interfered with.
The embodiment of the present invention provides a kind of preferred embodiment of selection free time AGV trolleies, by being arranged on AGV trolleies Position locating module.Position locating module can have different settings according to the working environment of AGV trolleies, as it is operated in outdoor Environment, or can receive very well in the environment of satellite-signal, it could be provided as GPS module or Beidou positioning module.It is right In indoor environment, SLAM (simultaneous localization and mapping, immediately positioning and ground can also be passed through Figure structure) technology, either realized by some position indicators or position detecting module.Its realization principle mostly uses multipoint positioning, I.e. by the positioning signal on 1 points of acquisition AGV trolleies, and calculate the position of the trolley.
Then the preferred realization method is as follows, and step S100 includes the following steps:
Step S101:According to the quantity of surplus material on production line, the scheduled time for consuming the surplus material is calculated;
Step S102:Detect the position of all AGV trolleies being in idle condition;
Step S111 is specially:When the scheduled time reaching for the first default remaining time, select position from material storage area The AGV trolleies of nearest idle state send the first control command to AGV trolleies.
Step S120 includes the following steps:
Step S121:Detect the position of all AGV trolleies for being mounted with production line material for being located at caching Accreditation Waiting Area;
Step S122:When reaching for the second default remaining time to the scheduled time, the loading nearest from production line position is selected There are the AGV trolleies of production line material, and sends the second control command to AGV trolleies;
Step S123:Material is transported to the production line by AGV trolleies.
When production line selective loading has the AGV trolleies of material needed for production line, can also such as it be selected by another mode It selects and reaches caching Accreditation Waiting Area at first, and be mounted with the AGV trolleies of material needed for production line, or selection sends the first control command AGV trolleies, and send the second control command and control the trolley material is sent on production line.That is production line selective loading material AGV trolleies when, might not can only select the AGV trolleies for having sent the first control command, but can select caching etc. Wait for any one AGV trolley for being mounted with material needed for the production line in area.For a factory or workshop, it is possible to There is a plurality of production line, the AGV trolleies that idle state is controlled by front remove running material, it can be ensured that right in Accreditation Waiting Area caching Should every production line there is an AGV trolley to have been prepared for material.And by each AGV trolleies of rational allocation, front can be made AGV trolleies release material as early as possible and leave at once caching Accreditation Waiting Area, to improve production efficiency.
When having two production lines while sending the second control command to same AGV trolley, AGV trolleies will transport material It is sent on the production line that it is responded at first, when another production line there is no the response of AGV trolleies within the default stand-by period, It will select the AGV trolleies of next priority and send the second control command to the trolley.And for needing the production of different material Line, then production line only select material needed for oneself production line AGV trolleies and send the second control command.By rationally controlling, It can then make that AGV trolleies pass through the label of material and production line is mapped.
By the optimization of the above method, the idle AGV trolley nearest from material storage area can be picked out and from production line The AGV trolleies in caching Accreditation Waiting Area of the nearest material for carrying production line needs, with save AGV trolley travellings when Between, improve production efficiency.
Embodiment 2:
The embodiment of the present invention 2 provides a kind of production line feeding management system, as shown in Fig. 2, believing including processor 11, first Number transceiver module 12, AGV trolleies 20, the second signal transceiver module 21 being mounted on AGV trolleies and installation are in the production line Material detection device 30;
Material detection device 30:For detecting the material volume residual on production line, and the material remainder that will be detected Amount data are sent to processor 11;
Processor 11:For the quantity according to surplus material on production line, the pre- timing for consuming the surplus material is calculated Between;And when the scheduled time reaching for the first default remaining time, the AGV trolleies 20 of an idle state are selected, and pass through first Signal transmitting and receiving module 12 sends the first control command to AGV trolleies 20;And reached for the second default remaining time in the scheduled time When, select an AGV trolley 20 for being mounted with production line material for being located at caching Accreditation Waiting Area and by the first signal transmitting and receiving module 12 send the second control command to the AGV trolleies 20;
AGV trolleies 20:For receiving the first control command and the second control command by second signal transceiver module 21, When receiving the first control command, material is carried to caching Accreditation Waiting Area to material storage area, when receiving the second control command, Material is transported on production line.
Production line feeding provided in an embodiment of the present invention manages system, by precalculating supplies consumption remaining time, When remaining time is preset in arrival supplies consumption first, the AGV trolleies 20 of an idle state are pre-selected, controls the trolley and shifts to an earlier date Material is transported to caching Accreditation Waiting Area, when material is about to the second default remaining time run out of, selection one is in caching etc. Wait for carrying that material is transported on production line by the AGV trolleies 20 of material needed for production line, control AGV trolleies 20 in area, in time Supplement the material on production line.By calculating rationally the first default remaining time of setting and the second default remaining time, can make The time match of 20 feeding of AGV trolleies and production line spent material gets up, i.e., AGV trolleies 20 will not be made to be in idle shape for a long time State is waited in caching Accreditation Waiting Area, improves the utilization rate of AGV trolleies 20, while it is also ensured that material energy on production line and When supplemented, do not interfere with production efficiency.
Preferably, production line feeding provided by the invention manages system, further includes server 10, and the setting of processor 11 is taking It is engaged in device 10, the first signal transmitting and receiving module 12 is also disposed in server 10.10 signal of server connects the object of all production lines Expect that detection device 30, server 10 go back signal connection AGV trolleies 20;
Server 10 is for managing all production lines and AGV trolleies 20;
Server 10 manages all production lines:Preserve the ID number of all production lines, the material label that is consumed, institute Speed, the production line run time of spent material;
Server 10 manages all AGV trolleies 20:It is small to preserve all AGV trolleies 20ID, update and preservation AGV The working condition of vehicle 20 is idle, carries material or the category of waiting, the carrying material of AGV trolleies 20.
By the way that server 10 is arranged, it may be convenient to realize and be stored to all production lines and AGV trolleies 20, material Area, the operation working condition of caching Accreditation Waiting Area and production line, working condition of AGV trolleies 20 etc. carry out unified management, can Effectively to improve the dispatching efficiency of system, so that AGV trolleies and production line is realized preferably matching, improve production efficiency.
Preferably, AGV trolleies 20 further include position locating module, and the server 10 is additionally operable to detect the AGV trolleies 20 position, and preserve the position of the AGV trolleies 20.Select idle state trolley when, select from material storage area away from From nearest idle trolley, when selection is located at the AGV trolleies 20 for being mounted with the production line material of the caching Accreditation Waiting Area, Select nearest AGV trolleies 20 with a distance from the production line.
By the optimization of the above method, the idle AGV trolley 20 nearest from material storage area can be picked out and from production The AGV trolleies 20 in caching Accreditation Waiting Area of the nearest material for carrying production line needs of line, to save the operation of AGV trolleies 20 Time, improve production efficiency.
The production line feeding management method provided in embodiment 1 may be implemented in system provided in this embodiment.Itself and implementation 1 same section of example, it will not be described here.
Embodiment 3:
The embodiment of the present invention 3 also provides a kind of computer readable storage medium, is stored in computer readable storage medium Computer program, wherein the production line feeding management method such as embodiment 1 can be realized when computer program is run.Itself and reality Applying 1 same section of example, it will not go into details.
The above embodiment is only the preferred embodiment of the present invention, and the scope of protection of the present invention is not limited thereto, The variation and replacement for any unsubstantiality that those skilled in the art is done on the basis of the present invention belong to institute of the present invention Claimed range.

Claims (10)

1. a kind of production line feeding management method, which is characterized in that include the following steps:
Step S100:According to the quantity of surplus material on production line, the scheduled time for consuming the surplus material is calculated;
Step S110:When the scheduled time reaching for the first default remaining time, the AGV trolleies of an idle state are selected, The first control command is sent to the AGV trolleies, the AGV trolleies is controlled and carries material to material storage area and wait for caching Area;
Step S120:When the scheduled time reaching for the second default remaining time, one is selected to be located at the caching Accreditation Waiting Area Be mounted with it is described production line material AGV trolleies, send the second control command to the AGV trolleies, control selected institute It states AGV trolleies and material is transported to the production line.
2. the method as described in claim 1, which is characterized in that first control command includes the selected idle shape Material label needed for the AGV trolleies ID number of state, production line and need the caching Accreditation Waiting Area reached;
Second control command includes the AGV trolleies ID number for being mounted with the production line material and the production line ID number.
3. method as claimed in claim 2, which is characterized in that step S110 includes the following steps:
Step S111:When the scheduled time reaching for the first default remaining time, the AGV trolleies of an idle state are selected, The first control command is sent to the AGV trolleies;
Step S112:The first feedback signal of the AGV trolleies feedback is received, and is material by the AGV trolleies status modifier It transports;
Step S113:The AGV trolleies carry material to caching Accreditation Waiting Area to material storage area;
Step S114:The second feedback signal of the AGV trolleies feedback is received, and is to wait for by the AGV trolleies status modifier State.
4. method as claimed in claim 3, which is characterized in that the step S100 includes the following steps:
Step S101:According to the quantity of surplus material on production line, the scheduled time for consuming the surplus material is calculated;
Step S102:Detect the position of all AGV trolleies being in idle condition;
The step S111 is specially:When the scheduled time reaching for the first default remaining time, position is selected to be deposited from material The AGV trolleies of the nearest idle state in area are put, send the first control command to the AGV trolleies.
5. method as claimed in claim 3, which is characterized in that the step S120 includes the following steps:
Step S121:Detect the position of all AGV trolleies for being mounted with the production line material positioned at the caching Accreditation Waiting Area;
Step S122:When reaching for the second default remaining time to the scheduled time, select nearest from the production line position The AGV trolleies of the production line material are mounted with, and send the second control command to the AGV trolleies;
Step S123:Material is transported on the production line by the AGV trolleies.
6. a kind of computer readable storage medium, which is characterized in that be stored with computer in the computer readable storage medium Program, wherein the production line feeding as described in claim 1 to 5 any one can be realized when the computer program is run Management method.
7. a kind of production line feeding manages system, which is characterized in that including processor, the first signal transmitting and receiving module, AGV trolleies, The material detection device of second signal transceiver module and installation in the production line on the AGV trolleies;
Material detection device:For detecting the material volume residual on production line, and the material volume residual that will be detected Data are sent to the processor;
Processor:For the quantity according to surplus material on production line, the scheduled time for consuming the surplus material is calculated;And When the scheduled time reached for the first default remaining time, the AGV trolleies of an idle state are selected, and receive by the first signal It sends out module and sends the first control command to the AGV trolleies;And when the scheduled time reaching for the second default remaining time, Selection one is located at the AGV trolleies for being mounted with the production line material of caching Accreditation Waiting Area and by the first signal transmitting and receiving mould Block sends the second control command to the AGV trolleies;
AGV trolleies:For receiving the first control command and the second control command by the second signal transceiver module, receiving When to first control command, material is carried to Accreditation Waiting Area is cached to material storage area, is receiving the second control life When enabling, material is transported on the production line.
8. system as claimed in claim 7, which is characterized in that further include server, the processor is arranged in the service In device, the server signal connects the material detection device of all production lines, and it is small that the server also signal connects all AGV Vehicle;
The server is for managing all production lines and AGV trolleies;
All production lines of the server admin include:It preserves the ID number of all production lines, the material label that is consumed, disappeared Consume speed, the production line run time of material;
All AGV trolleies of the server admin include:Preserve all AGV trolleies ID numbers, update and the work for preserving AGV trolleies Make state to be idle, carry material or the label of waiting, AGV trolleies carrying material.
9. system as claimed in claim 8, which is characterized in that the AGV trolleies further include position locating module, the service Device is additionally operable to detect the position of the AGV trolleies, and preserves the position of the AGV trolleies.
10. system as claimed in claim 9, which is characterized in that the processor is additionally operable to:In the trolley of selection idle state When, nearest idle trolley with a distance from material storage area is selected, the life is mounted with positioned at the caching Accreditation Waiting Area in selection When the AGV trolleies of producing line material, nearest AGV trolleies with a distance from the production line are selected.
CN201810516641.0A 2018-05-25 2018-05-25 Production line feeding management method and system Active CN108803507B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810516641.0A CN108803507B (en) 2018-05-25 2018-05-25 Production line feeding management method and system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810516641.0A CN108803507B (en) 2018-05-25 2018-05-25 Production line feeding management method and system

Publications (2)

Publication Number Publication Date
CN108803507A true CN108803507A (en) 2018-11-13
CN108803507B CN108803507B (en) 2020-11-24

Family

ID=64089072

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810516641.0A Active CN108803507B (en) 2018-05-25 2018-05-25 Production line feeding management method and system

Country Status (1)

Country Link
CN (1) CN108803507B (en)

Cited By (12)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110580029A (en) * 2019-09-27 2019-12-17 四川长虹智能制造技术有限公司 RGV (traffic light volume group) carrying control method and RGV carrying control system
CN111123870A (en) * 2019-12-23 2020-05-08 广东利元亨智能装备股份有限公司 System control method and device and electronic equipment
CN111580410A (en) * 2020-04-22 2020-08-25 东风柳州汽车有限公司 Logistics analysis method and device with timely intervention
CN112907044A (en) * 2021-02-01 2021-06-04 广东利元亨智能装备股份有限公司 Logistics line scheduling method and system
CN113387101A (en) * 2021-07-22 2021-09-14 江阴市欧莱特彩印有限公司 Printing workshop feeding control method, system and equipment
CN113485259A (en) * 2021-06-11 2021-10-08 广汽本田汽车有限公司 Control method, system and device for battery assembly production line and storage medium
CN113580762A (en) * 2021-07-22 2021-11-02 江阴市欧莱特彩印有限公司 Printing workshop production process parameter early warning method, system and equipment
CN114132720A (en) * 2021-12-23 2022-03-04 苏州慧工云信息科技有限公司 Tray inflow control method, system and device
CN114275486A (en) * 2021-12-23 2022-04-05 苏州慧工云信息科技有限公司 Material tray circulation control method and equipment
CN114371673A (en) * 2021-12-21 2022-04-19 华域汽车车身零件(上海)有限公司 Sound and picture guiding method for manual feeding production line
CN115629587A (en) * 2022-11-18 2023-01-20 湖北凯乐仕通达科技有限公司 Dispatching method and device for rail carrying trolley
CN114132720B (en) * 2021-12-23 2024-04-23 苏州慧工云信息科技有限公司 Pallet inflow control method, system and device

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1393809A (en) * 2001-06-29 2003-01-29 神达电脑股份有限公司 In-situ production management and storage system
CN103473669A (en) * 2013-09-30 2013-12-25 上海交通大学 System and method for supplying materials for mixed assembling production line based on RFID
CN107450489A (en) * 2017-07-21 2017-12-08 上海斐讯数据通信技术有限公司 Scarce material method for early warning, device and the computer-processing equipment of production equipment
CN107683085A (en) * 2017-10-27 2018-02-09 上海斐讯数据通信技术有限公司 One kind lacks material detecting system and method
CN107844108A (en) * 2017-11-10 2018-03-27 郑州云海信息技术有限公司 A kind of kanban methodology of the material Auto-matching feeding based on MES

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN1393809A (en) * 2001-06-29 2003-01-29 神达电脑股份有限公司 In-situ production management and storage system
CN103473669A (en) * 2013-09-30 2013-12-25 上海交通大学 System and method for supplying materials for mixed assembling production line based on RFID
CN107450489A (en) * 2017-07-21 2017-12-08 上海斐讯数据通信技术有限公司 Scarce material method for early warning, device and the computer-processing equipment of production equipment
CN107683085A (en) * 2017-10-27 2018-02-09 上海斐讯数据通信技术有限公司 One kind lacks material detecting system and method
CN107844108A (en) * 2017-11-10 2018-03-27 郑州云海信息技术有限公司 A kind of kanban methodology of the material Auto-matching feeding based on MES

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110580029B (en) * 2019-09-27 2021-01-22 四川长虹智能制造技术有限公司 RGV (traffic light volume group) carrying control method and RGV carrying control system
CN110580029A (en) * 2019-09-27 2019-12-17 四川长虹智能制造技术有限公司 RGV (traffic light volume group) carrying control method and RGV carrying control system
CN111123870A (en) * 2019-12-23 2020-05-08 广东利元亨智能装备股份有限公司 System control method and device and electronic equipment
CN111123870B (en) * 2019-12-23 2023-06-30 广东利元亨智能装备股份有限公司 System control method and device and electronic equipment
CN111580410A (en) * 2020-04-22 2020-08-25 东风柳州汽车有限公司 Logistics analysis method and device with timely intervention
CN112907044A (en) * 2021-02-01 2021-06-04 广东利元亨智能装备股份有限公司 Logistics line scheduling method and system
CN113485259B (en) * 2021-06-11 2022-05-06 广汽本田汽车有限公司 Control method, system and device for battery assembly production line and storage medium
CN113485259A (en) * 2021-06-11 2021-10-08 广汽本田汽车有限公司 Control method, system and device for battery assembly production line and storage medium
CN113387101A (en) * 2021-07-22 2021-09-14 江阴市欧莱特彩印有限公司 Printing workshop feeding control method, system and equipment
CN113580762A (en) * 2021-07-22 2021-11-02 江阴市欧莱特彩印有限公司 Printing workshop production process parameter early warning method, system and equipment
CN114371673A (en) * 2021-12-21 2022-04-19 华域汽车车身零件(上海)有限公司 Sound and picture guiding method for manual feeding production line
CN114132720A (en) * 2021-12-23 2022-03-04 苏州慧工云信息科技有限公司 Tray inflow control method, system and device
CN114275486A (en) * 2021-12-23 2022-04-05 苏州慧工云信息科技有限公司 Material tray circulation control method and equipment
CN114132720B (en) * 2021-12-23 2024-04-23 苏州慧工云信息科技有限公司 Pallet inflow control method, system and device
CN115629587A (en) * 2022-11-18 2023-01-20 湖北凯乐仕通达科技有限公司 Dispatching method and device for rail carrying trolley
CN115629587B (en) * 2022-11-18 2023-11-17 湖北凯乐仕通达科技有限公司 Scheduling method and device for rail transport trolley

Also Published As

Publication number Publication date
CN108803507B (en) 2020-11-24

Similar Documents

Publication Publication Date Title
CN108803507A (en) A kind of production line feeding management method and system
CN108502435B (en) Warehouse-out distribution method and warehouse-out distribution device
KR102440421B1 (en) Order processing method and device, server, and storage medium
CN108891838B (en) Order processing method, apparatus, electronic equipment and computer readable storage medium
CN109190840A (en) A kind of freezer shuttle dispatching management information system and dispatching method
CN104657835B (en) A kind of engineering shop's scheduling and monitoring system and method
CN102567871A (en) Real-time warehousing monitoring system based on Internet of things and monitoring method thereof
CN110092122A (en) Sow wall, body feed tank, the method and device for dispatching storting apparatus in warehouse
CN107590625A (en) Intelligent management system and method
CN109165707A (en) A kind of intelligent warehousing system based on electronic label identification
CN103268539A (en) Open-cast mining GPS truck intelligent dispatching system
CN109968353B (en) Artificial intelligent robot and system for community cruise assistance
CN112200523A (en) E-commerce commodity logistics storage center intelligent management platform based on big data analysis
CN110135782A (en) Cargo managing method, apparatus and system
CN105913212A (en) Method and system for power material distribution management
CN107705073A (en) A kind of intelligent storage logistic management system and equipment based on 4G platform of internet of things
CN108341202A (en) A kind of cold chain transportation scheduling center system and method
CN112488606A (en) Intelligent optimization and automatic scheduling system for production logistics
CN109146358A (en) A kind of warehouse dispatching system
CN107577211B (en) Internet of things technology-based pulling control system and method for material in process
CN115115194A (en) Operation task scheduling method and system for automatic stereoscopic warehouse
CN104392326B (en) Iron-contained solid waste circulation utilization monitoring method for iron and steel enterprise
CN115981263A (en) Production control system that intelligence was made
CN116224926A (en) Dynamic scheduling optimization method and device for single-piece small-batch flexible manufacturing workshops
CN113919555A (en) Full-automatic intelligent feeding method and system based on big data

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20220318

Address after: Room 101-110, 1st floor, building 8, Jinsheng Industrial Park, 611 Dongguan Road, Binjiang District, Hangzhou, Zhejiang 310000

Patentee after: HANGZHOU IPLUS TECH CO.,LTD.

Address before: 310000 three, 3, 66, 68, 70, Dongxin Avenue, Binjiang District, Hangzhou, Zhejiang.

Patentee before: HANGZHOU NANJIANG ROBOTICS Co.,Ltd.

TR01 Transfer of patent right