CN108797348A - Combined type single wall steel bushing case apparatus and its construction method - Google Patents

Combined type single wall steel bushing case apparatus and its construction method Download PDF

Info

Publication number
CN108797348A
CN108797348A CN201810387102.1A CN201810387102A CN108797348A CN 108797348 A CN108797348 A CN 108797348A CN 201810387102 A CN201810387102 A CN 201810387102A CN 108797348 A CN108797348 A CN 108797348A
Authority
CN
China
Prior art keywords
steel
pipe pile
jacket box
group
waling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810387102.1A
Other languages
Chinese (zh)
Inventor
钱申春
彭申凯
孙学军
杜海峰
刘要武
任杰
刘晓晗
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Road and Bridge Engineering Co Ltd
Original Assignee
Anhui Road and Bridge Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Road and Bridge Engineering Co Ltd filed Critical Anhui Road and Bridge Engineering Co Ltd
Priority to CN201810387102.1A priority Critical patent/CN108797348A/en
Publication of CN108797348A publication Critical patent/CN108797348A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D23/00Caissons; Construction or placing of caissons
    • E02D23/08Lowering or sinking caissons

Landscapes

  • Engineering & Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • General Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Revetment (AREA)

Abstract

Combined type single wall steel bushing case apparatus, including hoisting platform system and assembling layered system, assembling layered system are wrapped in outside hoisting platform system;The hoisting platform system includes connecting plate and steel-pipe pile group, and the both sides of connecting plate are equipped with the first steel-pipe pile group, and the middle part of connecting plate is equipped with the second steel-pipe pile group;First steel-pipe pile group is equipped with triangle splice, and steel-pipe pile and the triangle splice of the first steel-pipe pile are spliced into triangle;Second steel-pipe pile group is equipped with rectangle splice, and steel-pipe pile and rectangle the splice splicing of the second steel-pipe pile group are rectangular;If assembling layered system includes steel jacket box and arterial highway waling, if steel jacket box and arterial highway waling are located at outside hoisting platform system;Compared with prior art, it carries out itself carrying weight structure using gusseted steel pipe, the absolute altitude of steel jacket box can be accurately positioned, avoid using large lifting equipment, it is cost-effective, while the setting of triangle steel pipe has good stability, loading resistance power of improving the standard.

Description

Combined type single wall steel bushing case apparatus and its construction method
Technical field
The present invention relates to a kind of methods of steel bushing case apparatus, more particularly to combined type single wall steel bushing case apparatus and its construction party Method.
Background technology
With the fast development of bridge construction, in science of bridge building, need to be constructed in deep water as worked as bridge pier, platform When basis is located at tidal bulge drop larger water area condition, provisional building enclosure need to be built.How to avoid the water of depths to engineering Interference, become deep water construction research an important topic.Bridge deepwater construction technology is constantly improving, at present deep water Construction generally uses sinking steel jacket box, then constructs in steel jacket box.Because steel jacket box has reliable globality and good Water proofing property, safe and operability, therefore it obtains wide application in science of bridge building.The construction of steel jacket box Journey stability is complicated and changeable due to geological conditions, it is difficult to which effectively control, it is comparatively safe to mostly use global formation for steel jacket box at present Conservative method.However need to carry it using argosy machine equipment in this method work progress, cause certain journey The economic waste of degree;Secondly general at present using double-walled steel jacket box is used, building for it needs to utilize more materials, and not Conducive to the lifting of steel jacket box;In addition molding in integral is built long in time limit, is unfavorable for the quick progress of duration, or even can be delayed work Phase.
Therefore, at present there is an urgent need for seek one kind can rapid construction, save material and can build without argosy machine equipment Steel bushing case apparatus and operating method seem particularly significant.
Invention content
The present invention is to overcome above-mentioned defect in the prior art, provides a kind of in-site installation, piecemeal makes, it is whole to be layered The combined type of body decentralization.
In order to reach object above, the technical solution adopted in the present invention is:Combined type single wall steel bushing case apparatus, including rise Platform system and assembling layered system are hung, assembling layered system is wrapped in outside hoisting platform system;The hoisting platform system Including connecting plate and steel-pipe pile group, the both sides of connecting plate are equipped with the first steel-pipe pile group, and the middle part of connecting plate is equipped with the second steel-pipe pile Group;The first steel-pipe pile group is equipped with triangle splice, and steel-pipe pile and the triangle splice of the first steel-pipe pile are spliced into triangle Shape;The second steel-pipe pile group is equipped with rectangle splice, and steel-pipe pile and the rectangle splice of the second steel-pipe pile group are spliced into square Shape;If the assembling layered system includes steel jacket box and arterial highway waling, if steel jacket box and arterial highway waling are located at hoisting platform system Outside.
As a preferred embodiment of the present invention, the bridging of oblique pull setting is equipped between the different steel-pipe pile group.
As a preferred embodiment of the present invention, the connecting plate is located at the first steel-pipe pile group and the second steel-pipe pile group top Portion, and crossbeam is placed on adjacent connection plates.
As a preferred embodiment of the present invention, it is equipped with side fixed plate between the connecting plate and crossbeam and top is fixed Plate.
As a preferred embodiment of the present invention, the connecting plate is equipped with shellfish thunder steelframe, and shellfish thunder steelframe is equipped with volume Raise machine.
As a preferred embodiment of the present invention, the steel bushing box body is made of several small panels, and small panel surrounding Equipped with angle cleat.
As a preferred embodiment of the present invention, the adjacent angle cleat is equipped with corresponding connecting hole, connecting hole It is interior to be equipped with bolt, it is bolted adjacent facet plate, and rubber skin is filled in connecting hole hole.
As a preferred embodiment of the present invention, the steel jacket box bottom is equipped with cutting shoe.
As a preferred embodiment of the present invention, if the steel jacket box is divided into dried layer, using waling as line of demarcation.
The construction method of combined type single wall steel bushing case apparatus, described in any claim in the claims 2-9, Include the following steps:
Step A:Hoisting platform is set up.Pre-buried steel pile pile is combined into hoisting platform, in pre-buried 4 group of first steel of steel jacket box surrounding Pile pile group.Each group is composed of three steel-pipe piles.In the pre-buried 2 group of second steel-pipe pile group in steel jacket box center, every group by two Steel-pipe pile is composed.Part is connected with steel tube with group steel-pipe pile to link together, and is connected by bridging between different pile foundations;
Step B:In steel-pipe pile setting crossbeam suitable for reading, longitudinally disposed shellfish thunder steelframe wherein shellfish thunder steelframe is arranged on crossbeam Side.And 6 hoist engines are fixed on longitudinal shellfish thunder steelframe;
Step C:Be combined into a rectangular frame using channel steel in hoisting platform periphery, on the frame there are longitudinal rib with it is horizontal Small panel is welded on rectangular frame by rib, is combined into steel jacket box outer panels.Panel joint angle wherein is set in small panel surrounding Steel, and connected panel angle cleat using bolt, so that adjacent facet plate is linked together.Adjacent panels joint angle Hole between steel is filled using rubber skin;
Step D:I-steel is welded on the inside of rectangular frame, vertical rib is formed, is then welded on the vertical rib of formation I-steel forms waling, in the steel jacket box, is provided with 3 walings altogether, and steel jacket box is divided into 4 layers using waling;
Step E:Weld the inside supporting steel pile pile of Cis bridges, end and I-shaped steel waling firm welding.Then in casing quadrangle Diagonal brace is arranged using I-steel and waling firm welding;
Step F:After all inner supports and waling processing, then all dead angles, edge joint position are checked, to lacking weldering The place connect carries out repair welding, ensures casing overall stability;
Step G:Six hoist engines suspend in midair simultaneously.It is hung on the big hook of crane using hoist engine connecting steel wire ropes, under big hook End is caught on another strand steel wire rope, and downside steel wire rope is fixed with casing, and casing lifting is adjusted in rotation upside steel wire rope;
Step H:High-pressure hydraulic pump 2 is configured, air sand sucker 2, high-pressure hydraulic pipe-line and low pressure sediment outflow pipe are penetrated in waterpower punching Giant is fixed on mouth under conduit by road, and to be more advantageous to pumping sand, giant is worked at the same time with air compressor machine;
Step I:Using lifting machine, by steel bushing caisson sinking.Steel jacket box sinking construction should be by " back, layering are symmetrically taken out in elder generation The principle of sand, from low to high, in time correction " is operated, and steel jacket box must assure that inside and outside water level is consistent during taking out sand, casing Casing angle is adjusted with hoist engine in due course during lower, it is made vertically to transfer.Tracking measurement is carried out in steel jacket box sinking watching, Measure record steel jacket box cutting shoe bottom absolute altitude at any time, height difference inside and outside center deviation, water level, layer of sand situation of change in steel jacket box, etc. have Pass data, correction in time of pinpointing the problems.Suction sand carried out to interior outside around steel jacket box using air compressor machine, sand to be inhaled is to certain When position, whole decentralization is carried out to steel jacket box;
Step J:When steel jacket box is transferred to design height, steel jacket box surrounding bottom is surrounded with sandbag, prevent sandstone and Sundries is flowed into when pouring bottom concrete on the inside of casing;
Step K:Steel jacket box back cover is gone down concreting by concrete pouring hole, achievees the purpose that back cover;
Step L:It is excavated to levels junction using digging machine, the channel steel of levels reinforcing is cut off, bolt is laid down, to casing Mouth under inside drawing water to second layer waling removes second layer inner support and waling, steel jacket box is hung out using crane piecemeal.
The beneficial effects of the invention are as follows:Compared with prior art, it carries out itself carrying weight structure, energy using gusseted steel pipe It is enough accurately positioned the absolute altitude of steel jacket box, avoids using large lifting equipment, it is cost-effective, while the setting of triangle steel pipe has very Good stability, the loading resistance power present invention that improves the standard are bottomless steel jacket box, interfered in sinking construction it is small, not by pile foundation shadow It rings, and the structure simple structure of the present invention, bottom concrete are directly contacted with riverbed, casing bearing load is small, and siding repeats profit With rate height.
Description of the drawings
Fig. 1 is the vertical view of the present invention;
Fig. 2 is the structural schematic diagram of hoisting platform system;
Fig. 3 is the connection diagram between different groups of steel-pipe pile groups;
Fig. 4 is the connection diagram of steel jacket box and hoisting platform system;
Fig. 5 is the structural schematic diagram of steel jacket box;
Fig. 6 is the structural schematic diagram of steel bushing box body
Fig. 7 is the connection diagram between adjacent angle cleat;
Fig. 8 is the partial enlarged view at Fig. 6 A;
Fig. 9 is the structural schematic diagram of cutting shoe;
Reference numeral in figure:Hoisting platform system 1, cross rib 2, vertical rib 3, steel-pipe pile 4, concrete pouring hole 5, steel pipe connecting Fitting 6, diagonal brace 7, inner support 8, waling 9, crossbeam 10, shellfish thunder steelframe 11, hoist engine 12, concrete 13, steel jacket box 14, joint angle Steel 15, bolt 16, nut 17, rubber skin 18, connection panel 19, reinforcement angle steel 20, small panel 21, connecting plate 22, connecting plate 23, Bridging 24, longitudinal rib 25, steel-pipe pile rectangle splice 26, pile framing 27, triangle splice 28, side fixed plate 29, top is solid Fixed board 30, cutting shoe 31 reinforce steel plate 32, and cutting shoe indulges muscle 33, cutting shoe stirrup 34, cutting shoe metal outer mold 35.
Specific implementation mode
It elaborates below in conjunction with the accompanying drawings to the embodiment of the present invention.
As shown in figs 1-9, combined type single wall steel bushing case apparatus, including hoisting platform system 1 and assembling layered system, assembling Layered system is wrapped in outside hoisting platform system 1;Hoisting platform system 1 includes connecting plate 23 and steel-pipe pile group, connecting plate 23 Both sides be equipped with the first steel-pipe pile group, the middle part of connecting plate 23 is equipped with the second steel-pipe pile group;First steel-pipe pile group is equipped with triangle Splice 28, steel-pipe pile 4 and the triangle splice 28 of the first steel-pipe pile are spliced into triangle;Second steel-pipe pile group is equipped with rectangle Splice 26, steel-pipe pile 4 and the rectangle splice 26 of the second steel-pipe pile group splice rectangular;It includes steel jacket box to assemble layered system If 14 and arterial highway waling 9, steel jacket box 14 and 3 walings 9 are located at outside hoisting platform system 1, are equipped between different steel-pipe pile groups The bridging 24 of oblique pull setting.
The triangle splicing that the first steel-pipe pile group at 23 both ends of connecting plate has 3 steel-pipe piles 4 and is connected on 3 steel-pipe piles 4 Part 28 is spliced, and forms a triangle, so that the first steel-pipe pile group has better stability, so that connection Plate 23 has better stability, and the second steel-pipe pile group is spliced by 2 steel-pipe piles 4 and the rectangle being connected on 2 steel-pipe piles 4 Part 26 forms, and the bridging 24 of oblique pull setting is equipped between different steel-pipe pile groups so that have between different steel-pipe pile groups Better stability.
Connecting plate 23 is located at the top of the first steel-pipe pile group and the second steel-pipe pile group, and is placed with crossbeam on adjacent connection plates 23 10, side fixed plate 29 and top tie plate 30 are equipped between connecting plate 23 and crossbeam 10, connecting plate 23 is equipped with shellfish thunder steelframe 11, and shellfish thunder steelframe 11 is equipped with hoist engine 12,14 babinet of steel jacket box is made of numerous small panels 21, and 21 surrounding of small panel is set There is angle cleat 15.
Side fixed plate 29 is used to connecting plate 23 being fixedly connected with crossbeam 10 with top tie plate 30 so that adjacent connection It is fixedly connected between plate 23, hoist engine 12 is used for connecting steel wire ropes, and steel wire rope connects crane, to realize that steel wire rope drives elevator Machine 12, to drive the lifting of steel jacket box 14.
Adjacent angle cleat 15 is equipped with corresponding connecting hole, is equipped with bolt 16 and nut 17 in connecting hole, passes through spiral shell The connection of bolt 16 and nut 17 so that adjacent facet plate 21 is attached, and rubber skin 18 is filled in connecting hole hole, passes through crowd Multi-facet plate 21 forms the babinet of steel jacket box 14 so that and steel jacket box 14 can carry out the splicing of different size according to actual needs, To realize the independent assortment of small panel 21, rubber skin 18 is for so that the connection between adjacent facet plate 21 is more stablized.
14 bottom of steel jacket box is equipped with cutting shoe 31, and cutting shoe 31 includes reinforcing steel plate 32, and cutting shoe indulges muscle 33, cutting shoe stirrup 34 and sword Foot metal outer mold 35 adjusts the position of steel jacket box 14 by measuring and remembering the bottom absolute altitude of bottom cutting shoe 31 in steel jacket box 14 Section.
It is 4 layers that steel jacket box 14, which divides, is line of demarcation with waling 9, inner support 8 is transversely provided in steel jacket box 14, for steel bushing The overall structure of case 14 is stablized, waling 9 be equipped with connection panel 19, for by waling 9 it is more stable be fixed on steel jacket box On 14.
In actual use, it is necessary first to hoisting platform be set up, it is flat that pre-buried steel pile pile 4 is combined into lifting Platform, in the pre-buried 4 group of first steel-pipe pile group of 14 surrounding of steel jacket box.Each group is composed of three steel-pipe piles 4.In steel jacket box 14 Pre-buried 2 group of second steel-pipe pile group is entreated, every group is composed of two steel-pipe piles 4.The connection of part 6 is connected with steel tube with group steel-pipe pile 4 Together, it is connected by bridging 24 between different pile foundations.
In 4 setting crossbeam 10 suitable for reading of steel-pipe pile, the wherein shellfish thunder steelframe 11 of longitudinally disposed shellfish thunder steelframe 11 is arranged in crossbeam 10 Top.And 6 hoist engines 12 are fixed on longitudinal shellfish thunder steelframe 11, in hoisting platform periphery a square is combined into using channel steel Shape frame, there are longitudinal ribs 25 and cross rib 2 on the frame, and small panel 21 is welded on rectangular frame, is combined into outside steel jacket box 14 Panel.Wherein in 21 surrounding of small panel setting panel angle cleat 15, and panel angle cleat 15 is connected using bolt 16 Come, adjacent facet plate 21 is finally made to link together.Hole between adjacent panels angle cleat 15 is filled using rubber skin 18.
I-steel is welded on the inside of rectangular frame, vertical rib 3 is formed, then welds I-shaped on the vertical rib 3 of formation Steel forms waling 9, in the steel jacket box 14, is provided with 3 walings 9 altogether, and steel jacket box 14 is divided into 4 layers using waling 9;
Weld the inside supporting steel pile pile 4 of Cis bridges, end and 9 firm welding of I-shaped steel waling.Then it is used in casing quadrangle Diagonal brace 7 is arranged with 9 firm welding of waling in I-steel.
After all inner supports and waling 9 are processed, then all dead angles, edge joint position are checked, to lacking welding Place carries out repair welding, ensures casing overall stability.
Six hoist engines 12 suspend in midair simultaneously.It is hung on the big hook of crane using 12 connecting steel wire ropes of hoist engine, hooks lower end greatly It is caught on another strand steel wire rope, downside steel wire rope is fixed with casing, and casing lifting is adjusted in rotation upside steel wire rope.
High-pressure hydraulic pump 2 is configured, air sand sucker 2, high-pressure hydraulic pipe-line and low pressure sediment outflow pipeline are penetrated in waterpower punching, will be high Pressure hydraulic giant is fixed on mouth under conduit, and to be more advantageous to pumping sand, giant is worked at the same time with air compressor machine.
Using lifting machine, steel jacket box 14 is sunk, 14 sinking construction of steel jacket box should by " back in elder generation, layering be symmetrical take out sand, The principle of from low to high, in time correction " is operated, and steel jacket box 14 must assure that inside and outside water level is consistent during taking out sand, casing Casing angle is adjusted with hoist engine 12 in due course during lower, it is made vertically to transfer.It is surveyed into line trace in 14 sinking watching of steel jacket box Amount, measure 31 bottom absolute altitude of record steel jacket box 14 cutting shoe at any time, and height difference inside and outside center deviation, water level, layer of sand becomes in steel jacket box 14 Change situation, etc. relevant informations, pinpoint the problems in time in time correction.Interior outside around steel jacket box 14 is inhaled using air compressor machine Sand carries out whole decentralization when inhaling sand to certain position to steel jacket box 14.
When steel jacket box 14 is transferred to design height, 14 surrounding bottom of steel jacket box is surrounded with sandbag, prevents sandstone and miscellaneous Object is flowed into when pouring bottom concrete on the inside of casing.
Concrete 13 is poured down by concrete pouring hole 5, achievees the purpose that back cover by 14 back cover of steel jacket box.It utilizes Digging machine is excavated to levels junction, cuts off the channel steel of levels reinforcing, lays down bolt 16, draw water to the second layer and enclose into casing 9 times mouths of jail remove second layer inner support and waling 9, steel jacket box 14 are hung out using crane piecemeal.
Wherein each group of the first steel-pipe pile group is composed of three steel-pipe piles 4, and adjacent center spacing is respectively 1m.Three A steel-pipe pile 4 is linked together with triangle splice 28, and in the 14 pre-buried two group of second steel-pipe pile group in center of steel jacket box, every group by two Root steel-pipe pile 4 is composed, and adjacent center spacing is respectively 1m.The adjacent steel-pipe pile I20 I-steel lateral connections with group, it is different The steel-pipe pile 4 of group uses channel steel to be connected as bridging 24.To ensure pre-buried depth and not influencing broken pile head construction, 6 groups of pile foundation concretes When construction, concrete is risen is no less than 2 meters in stake top, the high cushion cap bottom elevation 30cm of the pre-buried Bottom Altitude of supporting steel pile pile;Steel pipe stake top Elevation is 43.434mm.
Steel-pipe pile 4 is suitable for reading to do crossbeam 10 with 4 40 type I-steel of spelling respectively, and bridge is indulged to placement four row's shellfish thunder steelframe of single layer in upper layer 11 spacing 45cm.And 6 25t hoist engines 12 are fixed in longitudinal Bailey beam, horizontal spacing is respectively 12m, and longitudinal pitch is 16m.
14 planar dimension of steel jacket box:30 × 16 × 12m, 14 high 12m of steel jacket box, steel jacket box 14 are single wall steel jacket box 14, steel 14 exterior sheathing work point of casing is four layers, every 3 meters one layer, and template uses δ=8mm steel plates, horizontal, longitudinal rib use channel steel arrange spacing for 50cm, every piece of template size is 3m × 3.5m, and 140 × 140 × 10 angle steel of panel surrounding She ∟ is connect with adjacent panels, connects spiral shell Bolt trepanning Ф 22mm, pitch-row 200mm is single, bolt M 20*65mm, and pads with the rubber skin of 4mm thickness, prevents leak, and upper and lower two Layer casing junction is used in combination 1.5m long channel steels to be welded with transverse channel steels in addition to being bolted, and reinforces junction stiffness, and suspension centre is located at Immediately below hoist engine 12.
The foregoing description of the disclosed embodiments enables those skilled in the art to implement or use the present invention. Various modifications to these embodiments will be apparent to those skilled in the art, as defined herein General Principle can be realized in other embodiments without departing from the spirit or scope of the present invention;Therefore, of the invention It is not intended to be limited to the embodiments shown herein, and is to fit to and the principles and novel features disclosed herein phase one The widest range caused.
Although reference numeral in figure is used more herein:Hoisting platform system 1, cross rib 2, vertical rib 3, steel-pipe pile 4, Concrete pouring hole 5, connector of steel tube 6, diagonal brace 7, inner support 8, waling 9, crossbeam 10, shellfish thunder steelframe 11, hoist engine 12, coagulation Soil 13, steel jacket box 14, angle cleat 15, bolt 16, nut 17, rubber skin 18 connect panel 19, reinforce angle steel 20, small panel 21, connecting plate 22, connecting plate 23, bridging 24, longitudinal rib 25, steel-pipe pile rectangle splice 26, pile framing 27, triangle splice 28, side fixed plate 29, top tie plate 30, cutting shoe 31 reinforces steel plate 32, and cutting shoe indulges muscle 33, cutting shoe stirrup 34, cutting shoe metal The terms such as external mold 35, but it does not preclude the possibility of using other terms;The use of these items is only for more easily retouch State and explain the essence of the present invention;Any one of the additional limitations is construed as all to disagree with spirit of that invention.

Claims (10)

1. combined type single wall steel bushing case apparatus, which is characterized in that including hoisting platform system (1) and assembling layered system, assembling It is external that layered system is wrapped in hoisting platform system (1);The hoisting platform system (1) includes connecting plate (23) and steel-pipe pile The both sides of group, connecting plate (23) are equipped with the first steel-pipe pile group, and the middle part of connecting plate (23) is equipped with the second steel-pipe pile group;Described first Steel-pipe pile group is equipped with triangle splice (28), and steel-pipe pile (4) and the triangle splice (28) of the first steel-pipe pile are spliced into triangle Shape;The second steel-pipe pile group is equipped with rectangle splice (26), steel-pipe pile (4) and the rectangle splice of the second steel-pipe pile group (26) splice rectangular;The assembling layered system include steel jacket box (14) and if arterial highway waling (9), steel jacket box (14) and several Road waling (9) is located at hoisting platform system (1) outside.
2. combined type single wall steel bushing case apparatus according to claim 1, which is characterized in that the different steel-pipe pile group it Between be equipped with oblique pull setting bridging (24).
3. combined type single wall steel bushing case apparatus according to claim 1, which is characterized in that the connecting plate (23) is located at the At the top of one steel-pipe pile group and the second steel-pipe pile group, and crossbeam (10) is placed on adjacent connection plates (23).
4. combined type single wall steel bushing case apparatus according to claim 3, which is characterized in that the connecting plate (23) and crossbeam (10) side fixed plate (29) and top tie plate (30) are equipped between.
5. combined type single wall steel bushing case apparatus according to claim 4, which is characterized in that the connecting plate (23) is equipped with Shellfish thunder steelframe (11), and shellfish thunder steelframe (11) is equipped with hoist engine (12).
6. combined type single wall steel bushing case apparatus according to claim 1, which is characterized in that steel jacket box (14) babinet by Several small panel (21) compositions, and small panel (21) is surrounded by angle cleat (15).
7. combined type single wall steel bushing case apparatus according to claim 6, which is characterized in that the adjacent angle cleat (15) It is equipped with corresponding connecting hole, bolt (16) is equipped in connecting hole, bolt (16) connects adjacent facet plate (21), and connecting hole Rubber skin (18) is filled in hole.
8. combined type single wall steel bushing case apparatus according to claim 6, which is characterized in that steel jacket box (14) bottom is set There is cutting shoe (31).
9. combined type single wall steel bushing case apparatus according to claim 8, which is characterized in that the steel jacket box (14) is if be divided into Dried layer, with waling (9) for line of demarcation.
10. the construction method of combined type single wall steel bushing case apparatus, described in any claim in the claims 2-9, Include the following steps:
Step A:Hoisting platform is set up.Pre-buried steel pile pile (4) is combined into hoisting platform, pre-buried 4 group in steel jacket box (14) surrounding One steel-pipe pile group.Each group is composed of three steel-pipe piles (4).In the pre-buried 2 group of second steel-pipe pile group in steel jacket box (14) center, Every group is composed of two steel-pipe piles (4).Connect with steel tube part (6) with group steel-pipe pile (4) and link together, different pile foundations it Between pass through bridging (24) connect;
Step B:In steel-pipe pile (4) setting crossbeam (10) suitable for reading, longitudinally disposed shellfish thunder steelframe (11) wherein shellfish thunder steelframe (11) is set It sets above crossbeam (10).And 6 hoist engines (12) are fixed on longitudinal shellfish thunder steelframe (11);
Step C:A rectangular frame is combined into using channel steel, there are longitudinal rib (25) and cross ribs on the frame in hoisting platform periphery (2), small panel (21) is welded on rectangular frame, is combined into steel jacket box (14) outer panels.Wherein in small panel (21) surrounding Panel angle cleat (15) is set, and is connected panel angle cleat (15) using bolt (16), finally makes adjacent facet Plate (21) links together.Hole between adjacent panels angle cleat (15) is filled using rubber skin (18);
Step D:I-steel is welded on the inside of rectangular frame, vertical rib (3) is formed, is then welded on the vertical rib (3) of formation I-steel is connect, waling (9) is formed, in the steel jacket box (14), is provided with 3 walings (9) altogether, and utilize waling (9) by steel bushing Case (14) is divided into 4 layers;
Step E:Weld the inside supporting steel pile pile (4) of Cis bridges, end and I-shaped steel waling (9) firm welding.Then in casing four Diagonal brace (7) is arranged using I-steel and waling (9) firm welding in angle;
Step F:After all inner supports and waling (9) processing, then all dead angles, edge joint position are checked, to lacking weldering The place connect carries out repair welding, ensures casing overall stability;
Step G:Six hoist engines (12) are suspended in midair simultaneously.It is hung on the big hook of crane using hoist engine (12) connecting steel wire ropes, greatly It hooks lower end to catch on another strand steel wire rope, downside steel wire rope is fixed with casing, and casing lifting is adjusted in rotation upside steel wire rope;
Step H:High-pressure hydraulic pump 2 is configured, air sand sucker 2, high-pressure hydraulic pipe-line and low pressure sediment outflow pipeline are penetrated in waterpower punching, will Giant is fixed on mouth under conduit, and to be more advantageous to pumping sand, giant is worked at the same time with air compressor machine;
Step I:Using lifting machine, steel jacket box (14) are sunk.Steel jacket box (14) sinking construction should be by " back, layering pair in elder generation The principle of title pumping sand, from low to high, in time correction " is operated, and steel jacket box (14) takes out sand and must assure that inside and outside water level in the process Unanimously, casing angle is adjusted with hoist engine (12) in due course in the process under casing, it is made vertically to transfer.Steel jacket box (14) sinking watching Middle carry out tracking measurement will measure record steel jacket box (14) cutting shoe (31) bottom absolute altitude at any time, height difference inside and outside center deviation, water level, The interior layer of sand situation of change of steel jacket box (14), etc. relevant informations, pinpoint the problems in time in time correction.Using air compressor machine to steel jacket box (14) outside carries out suction sand in around, and when inhaling sand to certain position, whole decentralization is carried out to steel jacket box (14);
Step J:When steel jacket box (14) is transferred to design height, steel jacket box (14) surrounding bottom is surrounded with sandbag, prevents sand Stone and sundries are flowed into when pouring bottom concrete on the inside of casing;
Step K:Concrete (13) is poured down by concrete pouring hole (5), reaches back cover by steel jacket box (14) back cover Purpose;
Step L:It is excavated to levels junction using digging machine, the channel steel of levels reinforcing is cut off, bolt (16) is laid down, to casing Mouth under inside drawing water to second layer waling (9) removes second layer inner support and waling (9), steel jacket box is hung out using crane piecemeal (14)。
CN201810387102.1A 2018-04-26 2018-04-26 Combined type single wall steel bushing case apparatus and its construction method Pending CN108797348A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810387102.1A CN108797348A (en) 2018-04-26 2018-04-26 Combined type single wall steel bushing case apparatus and its construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810387102.1A CN108797348A (en) 2018-04-26 2018-04-26 Combined type single wall steel bushing case apparatus and its construction method

Publications (1)

Publication Number Publication Date
CN108797348A true CN108797348A (en) 2018-11-13

Family

ID=64093937

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810387102.1A Pending CN108797348A (en) 2018-04-26 2018-04-26 Combined type single wall steel bushing case apparatus and its construction method

Country Status (1)

Country Link
CN (1) CN108797348A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115110538A (en) * 2022-06-01 2022-09-27 中国一冶集团有限公司 Light well point and steel sleeve box combined dewatering support construction method

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080065207A (en) * 2007-01-08 2008-07-11 (주)평화엔지니어링 A direct base construction method of underwater concrete using a hollow cylindrical steel mold having a buoyancy
CN101225663A (en) * 2008-01-31 2008-07-23 山东省路桥集团有限公司 Steel boxed cofferdam and recovery method thereof
KR20110002998A (en) * 2009-07-03 2011-01-11 부림산업(주) Pier basis caisson structure using a pulling oil jack system
CN102433888A (en) * 2011-08-25 2012-05-02 中交二航局第三工程有限公司 Assembled steel bushing box
CN202359566U (en) * 2011-12-13 2012-08-01 中交第二公路工程局有限公司 Cofferdam for deep-water soft soil foundation construction of bridge
CN205224049U (en) * 2015-11-20 2016-05-11 中铁三局集团有限公司 Large -scale steel cofferdam hoisting device in aquatic
CN208455485U (en) * 2018-04-26 2019-02-01 安徽省公路桥梁工程有限公司 Combined type single wall steel bushing case apparatus

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
KR20080065207A (en) * 2007-01-08 2008-07-11 (주)평화엔지니어링 A direct base construction method of underwater concrete using a hollow cylindrical steel mold having a buoyancy
CN101225663A (en) * 2008-01-31 2008-07-23 山东省路桥集团有限公司 Steel boxed cofferdam and recovery method thereof
KR20110002998A (en) * 2009-07-03 2011-01-11 부림산업(주) Pier basis caisson structure using a pulling oil jack system
CN102433888A (en) * 2011-08-25 2012-05-02 中交二航局第三工程有限公司 Assembled steel bushing box
CN202359566U (en) * 2011-12-13 2012-08-01 中交第二公路工程局有限公司 Cofferdam for deep-water soft soil foundation construction of bridge
CN205224049U (en) * 2015-11-20 2016-05-11 中铁三局集团有限公司 Large -scale steel cofferdam hoisting device in aquatic
CN208455485U (en) * 2018-04-26 2019-02-01 安徽省公路桥梁工程有限公司 Combined type single wall steel bushing case apparatus

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115110538A (en) * 2022-06-01 2022-09-27 中国一冶集团有限公司 Light well point and steel sleeve box combined dewatering support construction method

Similar Documents

Publication Publication Date Title
US9605401B2 (en) Gravity-based foundation system for the installation of offshore wind turbines and method for the installation of an offshore wind turbine foundation system
CN102587387B (en) Construction method for foundation pit in Larson steel sheet pile retaining and protecting river
CN107299643A (en) Steel lattice column combined type tower crane foundation structure in foundation pit and construction method
CN106948353B (en) A kind of deep water combined steel plate pile cofferdam construction method
CN105133627A (en) Construction method for single-wall steel sheet pile cofferdam in running water state
CN103741657A (en) Construction method of large multifunctional over-water construction platform
CN102677592B (en) Method for erecting deepwater steel trestle and platform on exposed bedrock in shallow sea
CN106812144A (en) Double-wall steel cofferdam construction method
CN108867672A (en) A kind of Double-Wall Steel Boxed Cofferdam joining method
CN104563119A (en) Rotating type floating pile driving guide frame
CN110344335B (en) Method for constructing steel trestle, initial platform and cofferdam in bridge construction process
CN108179735A (en) A kind of boulder bed large-sized deep water foundation construction platform and method
CN106223355A (en) A kind of high bearing platform supported on piles in deep water Hold Hoop method has device and the construction method of end steel jacket box
CN107882055A (en) A kind of construction method of blower fan cushion cap
CN107905245A (en) Ultra-deep-water cofferdam fore shaft steel pipe pile construction method
CN110607797A (en) Underwater construction method for water taking head
CN105350526A (en) Method for setting up steel platform
CN109707002B (en) Device and method for accurately positioning, sinking and installing large water intake head
CN110939148A (en) Construction method of double-wall steel suspension box cofferdam serving as drilling platform
CN107142954A (en) The steel lifted trunk Lift-on/Lift-off System and its hanging method of a kind of integral hoisting
CN110055984A (en) Lowering construction method for double-wall deformed steel cofferdam
CN208455485U (en) Combined type single wall steel bushing case apparatus
CN108797348A (en) Combined type single wall steel bushing case apparatus and its construction method
CN202969333U (en) Steel truss rock-socketed wharf structure
CN204510221U (en) Rotary marine piling saddle

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination