CN108791335A - Realize that the both-end of full section of tunnel inspection manipulates railcar - Google Patents
Realize that the both-end of full section of tunnel inspection manipulates railcar Download PDFInfo
- Publication number
- CN108791335A CN108791335A CN201810623562.XA CN201810623562A CN108791335A CN 108791335 A CN108791335 A CN 108791335A CN 201810623562 A CN201810623562 A CN 201810623562A CN 108791335 A CN108791335 A CN 108791335A
- Authority
- CN
- China
- Prior art keywords
- tunnel
- bicycle shed
- car body
- inspection
- diesel engine
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B61—RAILWAYS
- B61D—BODY DETAILS OR KINDS OF RAILWAY VEHICLES
- B61D15/00—Other railway vehicles, e.g. scaffold cars; Adaptations of vehicles for use on railways
- B61D15/08—Railway inspection trolleys
- B61D15/12—Railway inspection trolleys power propelled
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B66—HOISTING; LIFTING; HAULING
- B66F—HOISTING, LIFTING, HAULING OR PUSHING, NOT OTHERWISE PROVIDED FOR, e.g. DEVICES WHICH APPLY A LIFTING OR PUSHING FORCE DIRECTLY TO THE SURFACE OF A LOAD
- B66F11/00—Lifting devices specially adapted for particular uses not otherwise provided for
- B66F11/04—Lifting devices specially adapted for particular uses not otherwise provided for for movable platforms or cabins, e.g. on vehicles, permitting workmen to place themselves in any desired position for carrying out required operations
Abstract
A kind of both-end manipulation railcar for realizing full section of tunnel inspection is provided, including car body, vehicle body upper portion front end is equipped with bicycle shed I, vehicle body upper portion rear end is equipped with bicycle shed II, it is equipped among vehicle body upper portion and between bicycle shed I and bicycle shed II for carrying out inspection of construction to tunnel vault, to tunnel wall disease at railway tunnel escape truck do not get off inspection and the same time in three different location height tunnel wall disease inspection comprehensive apparatus for work, comprehensive apparatus for work lower part is connect by levelling device with car body upper surface, sound-light alarm skate case is equipped with inside bicycle shed I and bicycle shed II.The present invention realize to tunnel vault carry out inspection of construction, to tunnel wall disease at railway tunnel escape truck do not get off check and within the same time three different location different heights tunnel wall disease inspection, can tunneling boring detection be carried out to tunnel very well, so that railway tunnel maintenance conditions is become tighter laborsaving, Tunnel testing ability and working efficiency can be effectively improved.
Description
Technical field
The invention belongs to rail vehicle technical fields, and in particular to a kind of both-end manipulation track for realizing full section of tunnel inspection
Vehicle.
Background technology
The problem of railway tunnel proportion in railway construction is more and more, tunnel pest and disease damage are consequently increased, China
Existing tunnel surface Defect inspection mostly uses scaffold or Ordinary Work vehicle carries personnel and carries out visual, percussion inspection.Wherein, general
The mating job platform of logical Operation Van causes the region of contact line or more that can not reach due to the height limitation by contact line,
Such as contact net, carrier cable, bracket, return wire, high-voltage line area above etc., there are platforms " can not lifting " and operation blind area etc.
Defect, job platform cannot achieve the inspection of not getting off of tunnel wall disease at escape truck, and it is low that there are operating efficiencies, blind area range
The problems such as big, job platform can not achieve the detection of same time different location, can not achieve full section of tunnel detection, therefore have
Necessity proposes to improve.
Invention content
Present invention solves the technical problem that:A kind of both-end manipulation railcar for realizing full section of tunnel inspection, this hair are provided
It is bright realize to tunnel vault carry out inspection of construction, to tunnel wall disease at railway tunnel escape truck do not get off inspection and
The tunnel wall disease inspection of three different location different heights in the same time can carry out tunneling boring detection to tunnel very well, make
Railway tunnel maintenance conditions become more laborsaving, can effectively improve Tunnel testing ability and working efficiency.
The technical solution adopted by the present invention:Realize that the both-end of full section of tunnel inspection manipulates railcar, including car body, it is described
Lower car body front end is equipped with power truck, and the lower car body rear end is equipped with non-powered bogie, among the lower car body
Equipped with the dynamical system that its traveling is connect and driven with power truck, the vehicle body upper portion front end is equipped with bicycle shed I, the car body
Upper rear end is equipped with bicycle shed II, is equipped between the vehicle body upper portion centre and bicycle shed I and bicycle shed II for being carried out to tunnel vault
Inspection of construction, realize railway tunnel escape truck at tunnel wall disease do not get off inspection and the same time in three different locations
The comprehensive apparatus for work of the tunnel wall disease inspection of height, the comprehensive apparatus for work lower part pass through levelling device and car body
The automatic leveling of the apparatus for work under superelevation of outer rail operating mode is realized in upper surface connection, is equipped with inside the bicycle shed I and bicycle shed II
Sound-light alarm skate case.
Wherein, the comprehensive apparatus for work includes the job platform and a rotary operation of two energy horizontal vertical liftings
Platform, the lifting of job platform horizontal vertical apply tunnel vault around contact net, carrier cable, bracket, return wire, high-voltage line
Work inspection, the rotation of rotary operation platform, pitching lifting, three platforms that the job platform and rotary operation platform combine are same
Shi Zuoye can complete different location, different height the inspection of tunnel wall disease and realize at railway tunnel escape truck tunnel wall disease
Harmful inspection of not getting off.
Further, the dynamical system includes the diesel engine and hydraulic transmission box being fixed in the middle part of car body lower face, institute
It states diesel engine output end to connect with hydraulic transmission box input terminal, the axis that the hydraulic transmission box passes through transmission shaft and power truck
Case connects, and the car body lower face of the diesel engine side is equipped with air system and aids in the heat dissipation system of diesel engine heat dissipation
The car body lower face of system, the diesel engine other side is equipped with tool box and the exhaust system being connect with diesel engine and air inlet system
System, the car body lower face middle part are equipped with the transfer case being connect with another output end of diesel engine, two power takings of the transfer case
Hydraulic system and air compressor machine of the promising vehicle hydraulic driving part by power, the car body lower face middle part are separately connected on mouth
It is additionally provided with the accumulator box that electric energy is provided for the diesel fuel tanks and hydraulic oil container of diesel engine and hydraulic system fuel feeding and for vehicle.
Further, I interior forward end of the bicycle shed is equipped with preceding driving position, and sleeping berth, alternating current are additionally provided with inside the bicycle shed I
Device cabinet, three equipment cabinets, the top of the bicycle shed I are equipped with air conditioner indoor unit, the bicycle shed I and II top of bicycle shed be equipped with warning lamp and
Searchlight, the bicycle shed II are internally provided with rear driving position and hand braking, and the car body halfpace is equipped with generating set, bicycle shed
I air-conditioner outdoor unit I and the air-conditioner outdoor unit II of bicycle shed II, car body halfpace edge are equipped with railing.
Further, the car body both ends are equipped with input-output socket, train braking hose, multiple unit socket and hitch,
Car body both ends lower part is equipped with pilot and compound horn.
The present invention compared with prior art the advantages of:
1, in this programme comprehensive apparatus for work include the lifting of two horizontal verticals job platform and a rotary operation
Platform, three job platforms, which combine, can bypass contact net, carrier cable, bracket, return wire, high-voltage line etc., realize to tunnel vault
Inspection of construction is carried out, does not get off to tunnel wall disease at railway tunnel escape truck and inspection and realizes in same time three not
With the tunnel wall disease inspection of position different height, it can realize that full section of tunnel detects well, make railway tunnel maintenance conditions
Become more laborsaving, Tunnel testing ability and working efficiency can be effectively improved;
2, sound-light alarm skate case is equipped in this programme in vehicle bicycle shed, skate is positioned over car convenient for management, if
Operating personnel can be reminded by setting acoustic-optic alarm, meet safe driving demand;
3, this programme is equipped with drivers' cab in the bicycle shed at end face both ends on the car body, makes to form both-end drivers' cab on vehicle,
Meet driver and conductor and manipulates visual field requirement;
4, this programme is soft in reserved input-output socket, the train braking being connect with other vehicle electricals, gas in vehicle both ends
Pipe, multiple unit socket, can preferably adapt to construction of railways field condition.
Description of the drawings
Fig. 1 is the structural front view of the present invention;
Fig. 2 is the structure left view of the present invention;
Fig. 3 is the internal structure schematic diagram of the present invention;
Fig. 4 is the structure upward view of the present invention.
Specific implementation mode
1-4 describes the embodiment of the present invention below in conjunction with the accompanying drawings.
Realize that the both-end of full section of tunnel inspection manipulates railcar, including car body 3, as shown in figure 4,3 lower part of the car body
Front end is equipped with power truck 15, and 3 lower part rear end of the car body is equipped with non-powered bogie 11, and the installation of the car body 3 is supported in
On power truck 15 and non-powered bogie 11.It is equipped among 3 lower part of the car body and connect and drive with power truck 15
The dynamical system 31 of its traveling is moved, specifically, the dynamical system 31 includes the diesel engine 37 being fixed in the middle part of 3 lower face of car body
With hydraulic transmission box 35,37 output end of the diesel engine is connect with 35 input terminal of hydraulic transmission box, and the hydraulic transmission box 35 is logical
It crosses transmission shaft to connect with the axle box of power truck 15,3 lower face of car body of 37 side of the diesel engine is equipped with air system
33 and the cooling system 32 of the heat dissipation of diesel engine 37 is aided in, 3 lower face of car body of 37 other side of the diesel engine is equipped with work
Tool case 36 and the exhaust system 34 and gas handling system 38 being connect with diesel engine 37,3 lower face of car body middle part is equipped with and bavin
The transfer case 30 of 37 another output end of oil machine connection, is separately connected promising vehicle hydraulic on two power taking mouths of the transfer case 30
Driving part provides the hydraulic system 29 and air compressor machine 39 of power, is additionally provided with as 37 He of diesel engine in the middle part of 3 lower face of the car body
The diesel fuel tanks and hydraulic oil container 28 of 29 fuel feeding of hydraulic system and the accumulator box 40 that electric energy is provided for vehicle.
3 top front end of the car body is equipped with bicycle shed I 2, and 3 upper rear end of the car body is equipped with bicycle shed II 8, such as the institutes of Fig. 1 and 3
Show, sound-light alarm skate case 18 is equipped with inside the bicycle shed I 2 and bicycle shed II 8, and skate is positioned over interior convenient for management, setting
Acoustic-optic alarm can remind operating personnel, meet safe driving demand.I 2 interior forward end of the bicycle shed is equipped with preceding driving position 22,
20, three sleeping berth 21, ac electric apparatus cabinet equipment cabinets 23 are additionally provided with inside the bicycle shed I 2, I 2 top of the bicycle shed is equipped with air conditioning chamber
Interior machine 4, the bicycle shed I 2 and II 8 top of bicycle shed are equipped with warning lamp 1 and searchlight 5, and the bicycle shed II 8 is internally provided with rear driving position
17 and hand braking 26.It is equipped with drivers' cab in the bicycle shed at 3 upper surface both ends of car body, makes to form both-end drivers' cab on vehicle, it is full
Sufficient driver and conductor manipulates the visual field and requires.3 halfpace of the car body is equipped with the air-conditioner outdoor unit I of generating set 19, bicycle shed I 2
24 and bicycle shed II 8 air-conditioner outdoor unit II 25,3 halfpace edge of the car body be equipped with railing 6.
It is equipped on 3 top halfpace of the car body and between bicycle shed I 2 and bicycle shed II 8 for being applied to tunnel vault
Work inspection, realize railway tunnel escape truck at tunnel wall disease do not get off inspection and the same time in three different location height
The comprehensive apparatus for work 7 of the tunnel wall disease inspection of degree, as shown in Figure 1, the comprehensive apparatus for work 7 includes two levels
The job platform 701 of vertical lift and a rotary operation platform 702,701 horizontal vertical of job platform lifting around contact net,
Carrier cable, bracket, return wire, high-voltage line carry out inspection of construction to tunnel vault, and the rotation of rotary operation platform 702, pitching liter rise
Three platforms that drop, the job platform 701 and rotary operation platform 702 combine operation simultaneously can complete different location, difference
The tunnel wall disease inspection of height simultaneously realizes at railway tunnel escape truck that tunnel wall disease is not got off inspection, can realize well
Full section of tunnel detects, and so that railway tunnel maintenance conditions is become tighter laborsaving, can effectively improve Tunnel testing ability and work effect
Rate.7 lower part of comprehensive apparatus for work is connect by levelling device 12 with 3 upper surface of car body, is realized in superelevation of outer rail operating mode
The automatic leveling of lower apparatus for work.
As shown in Fig. 2, 3 both ends of the car body are equipped with input-output socket 13, the train braking being connect with other vehicles
Hose 14, multiple unit socket 16 and hitch 9 can preferably adapt to construction of railways field condition.3 both ends lower part of the car body is equipped with
Pilot 10 and compound horn 27.
Above-described embodiment, only presently preferred embodiments of the present invention, is not used for limiting the scope of the present invention, therefore all with this
The equivalence changes that content is done described in invention claim should all be included within scope of the invention as claimed.
Claims (5)
1. realizing that the both-end of full section of tunnel inspection manipulates railcar, including car body (3), car body (3) lower front part are equipped with
Power truck (15), car body (3) the lower part rear end are equipped with non-powered bogie (11), are set among car body (3) lower part
There are the dynamical system (31) for being connect with power truck (15) and driving its traveling, car body (3) the top front end to be equipped with bicycle shed I
(2), car body (3) upper rear end is equipped with bicycle shed II (8), it is characterised in that:Car body (3) the top centre and bicycle shed I (2)
It is equipped between bicycle shed II (8) for carrying out inspection of construction to tunnel vault, realizing tunnel wall disease at railway tunnel escape truck
The comprehensive apparatus for work of the tunnel wall disease inspection of three different location height in harmful do not get off inspection and same time
(7), it is super in outer rail to connect realization by levelling device (12) with car body (3) upper surface for comprehensive apparatus for work (7) lower part
It is equipped with sound-light alarm skate case inside the automatic leveling of apparatus for work under high operating mode, the bicycle shed I (2) and bicycle shed II (8)
(18)。
2. the both-end according to claim 1 for realizing full section of tunnel inspection manipulates railcar, it is characterised in that:It is described complete
Orientation apparatus for work (7) includes the job platform (701) and a rotary operation platform (702) that two horizontal verticals lift, institute
The lifting of job platform (701) horizontal vertical is stated to carry out tunnel vault around contact net, carrier cable, bracket, return wire, high-voltage line
Inspection of construction, rotary operation platform (702) rotation, pitching lifting, three platforms of the comprehensive apparatus for work (7) are same
Shi Zuoye can complete different location, different height the inspection of tunnel wall disease and realize at railway tunnel escape truck tunnel wall disease
Harmful inspection of not getting off.
3. the both-end according to claim 1 for realizing full section of tunnel inspection manipulates railcar, it is characterised in that:It is described dynamic
Force system (31) includes the diesel engine (37) and hydraulic transmission box (35) being fixed in the middle part of car body (3) lower face, the diesel engine
(37) output end is connect with hydraulic transmission box (35) input terminal, and the hydraulic transmission box (35) passes through transmission shaft and power truck
(15) car body (3) lower face of axle box connection, diesel engine (37) side is equipped with air system (33) and aids in
Car body (3) lower face of the cooling system (32) of diesel engine (37) heat dissipation, diesel engine (37) other side is equipped with tool box
(36) and with diesel engine (37) exhaust system (34) and gas handling system (38) connecting, car body (3) the lower face middle part are set
There is the transfer case (30) being connect with diesel engine (37) another output end, is separately connected on two power taking mouths of the transfer case (30)
Promising vehicle hydraulic driving part provides the hydraulic system (29) and air compressor machine (39) of power, car body (3) the lower face middle part
It is additionally provided with as the diesel fuel tanks and hydraulic oil container (28) of diesel engine (37) and hydraulic system (29) fuel feeding and provides electric energy for vehicle
Accumulator box (40).
4. the both-end according to claim 1,2 or 3 for realizing full section of tunnel inspection manipulates railcar, it is characterised in that:
The bicycle shed I (2) interior forward end is equipped with preceding driving position (22), and sleeping berth (21), ac electric apparatus are additionally provided with inside the bicycle shed I (2)
Cabinet (20), three equipment cabinets (23), the bicycle shed I (2) top are equipped with air conditioner indoor unit (4), the bicycle shed I (2) and bicycle shed II
(8) top is equipped with warning lamp (1) and searchlight (5), and the bicycle shed II (8) is internally provided with rear driving position (17) and hand braking
(26), car body (3) halfpace is equipped with generating set (19), the air-conditioner outdoor unit I (24) and bicycle shed II of bicycle shed I (2)
(8) air-conditioner outdoor unit II (25), car body (3) the halfpace edge are equipped with railing (6).
5. the both-end according to claim 4 for realizing full section of tunnel inspection manipulates railcar, it is characterised in that:The vehicle
Body (3) both ends are equipped with input-output socket (13), train braking hose (14), multiple unit socket (16) and hitch (9), the vehicle
Body (3) both ends lower part is equipped with pilot (10) and compound horn (27).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810623562.XA CN108791335A (en) | 2018-06-15 | 2018-06-15 | Realize that the both-end of full section of tunnel inspection manipulates railcar |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810623562.XA CN108791335A (en) | 2018-06-15 | 2018-06-15 | Realize that the both-end of full section of tunnel inspection manipulates railcar |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108791335A true CN108791335A (en) | 2018-11-13 |
Family
ID=64086564
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810623562.XA Pending CN108791335A (en) | 2018-06-15 | 2018-06-15 | Realize that the both-end of full section of tunnel inspection manipulates railcar |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108791335A (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109927610A (en) * | 2019-03-26 | 2019-06-25 | 中国铁建重工集团有限公司 | Existing Railway Line tunnel defect synthetic detection vehicle |
CN110161043A (en) * | 2019-05-10 | 2019-08-23 | 同济大学 | A kind of subway tunnel structure synthetic detection vehicle |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102410030A (en) * | 2011-11-14 | 2012-04-11 | 中铁一局集团有限公司 | Multipurpose tunnel operating vehicle |
CN103909943A (en) * | 2014-03-31 | 2014-07-09 | 宝鸡南车时代工程机械有限公司 | Railway tunnel internal section maintenance vehicle |
CN104960532A (en) * | 2015-06-15 | 2015-10-07 | 宝鸡南车时代工程机械有限公司 | Tunnel detecting vehicle with three work platforms |
CN107499320A (en) * | 2017-09-20 | 2017-12-22 | 宝鸡中车时代工程机械有限公司 | Tunnel based on hybrid power transmission checks railcar |
CN107654245A (en) * | 2017-10-27 | 2018-02-02 | 中铁西南科学研究院有限公司 | A kind of operation tunnel Disease Treatment installs chassis and operation tunnel Disease Treatment steel arch-shelf mechanization installation method with steel arch-shelf |
CN208325221U (en) * | 2018-06-15 | 2019-01-04 | 宝鸡中车时代工程机械有限公司 | Realize that the both-end of full section of tunnel inspection manipulates railcar |
-
2018
- 2018-06-15 CN CN201810623562.XA patent/CN108791335A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN102410030A (en) * | 2011-11-14 | 2012-04-11 | 中铁一局集团有限公司 | Multipurpose tunnel operating vehicle |
CN103909943A (en) * | 2014-03-31 | 2014-07-09 | 宝鸡南车时代工程机械有限公司 | Railway tunnel internal section maintenance vehicle |
CN104960532A (en) * | 2015-06-15 | 2015-10-07 | 宝鸡南车时代工程机械有限公司 | Tunnel detecting vehicle with three work platforms |
CN107499320A (en) * | 2017-09-20 | 2017-12-22 | 宝鸡中车时代工程机械有限公司 | Tunnel based on hybrid power transmission checks railcar |
CN107654245A (en) * | 2017-10-27 | 2018-02-02 | 中铁西南科学研究院有限公司 | A kind of operation tunnel Disease Treatment installs chassis and operation tunnel Disease Treatment steel arch-shelf mechanization installation method with steel arch-shelf |
CN208325221U (en) * | 2018-06-15 | 2019-01-04 | 宝鸡中车时代工程机械有限公司 | Realize that the both-end of full section of tunnel inspection manipulates railcar |
Cited By (3)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109927610A (en) * | 2019-03-26 | 2019-06-25 | 中国铁建重工集团有限公司 | Existing Railway Line tunnel defect synthetic detection vehicle |
CN110161043A (en) * | 2019-05-10 | 2019-08-23 | 同济大学 | A kind of subway tunnel structure synthetic detection vehicle |
CN110161043B (en) * | 2019-05-10 | 2021-03-26 | 同济大学 | Subway tunnel structure comprehensive detection vehicle |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209142124U (en) | The contact net upkeep operation vehicle of internal combustion alternating current drive suitable for long steep grade | |
CN103213525A (en) | Multi-working-face contact network work vehicle | |
CN107499320A (en) | Tunnel based on hybrid power transmission checks railcar | |
CN106274921A (en) | Hydraulic power contact net upkeep operation car | |
CN110406549A (en) | A kind of hybrid power railcar drawn using diesel engine and power accumulator | |
CN108791335A (en) | Realize that the both-end of full section of tunnel inspection manipulates railcar | |
CN108583597A (en) | Tunnel defect based on mixing electric transmission detects vehicle | |
CN109720219A (en) | The explosion-proof flexible transport vehicle of mining supercapacitor mixing accumulator power | |
CN208325221U (en) | Realize that the both-end of full section of tunnel inspection manipulates railcar | |
CN111572572A (en) | Subway overhead contact net overhauls operation car | |
CN109278770A (en) | The contact net upkeep operation vehicle of internal combustion alternating current drive suitable for long steep grade | |
CN107284460A (en) | Contact net based on hybrid power transmission integrates upkeep operation car | |
CN113371003A (en) | Railway maintenance operation vehicle for hydrogen energy power contact network | |
CN206871066U (en) | Contact net synthesis upkeep operation car based on hybrid power transmission | |
CN207225354U (en) | Railway internal combustion electric transmission rescue operation vehicle | |
CN211947737U (en) | Double dynamical source rail car of polishing | |
CN102849081A (en) | Single-unit eight-axle electric transmission shunting diesel locomotive | |
CN112141141A (en) | Multifunctional subway operation vehicle | |
CN211543518U (en) | Hybrid power rail car pulled by diesel engine and power storage battery | |
CN107985099A (en) | A kind of trolleybus | |
CN110203221A (en) | Subway hydraulic power operation vehicle for contact wire | |
CN109278771B (en) | Multi-platform contact net operation vehicle | |
CN207225358U (en) | Tunnel based on hybrid power transmission checks railcar | |
CN105857324A (en) | Official business rail car for narrow gauge railway | |
CN112301938A (en) | Coal absorption vehicle set for railway tunnel sleeper outer track bed and operation method thereof |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20221031 Address after: 721003 Bao Fu Road, Jintai District, Baoji, Shaanxi Province, No. 118 Applicant after: BAOJI CRRC TIMES ENGINEERING MACHINERY Co.,Ltd. Applicant after: China National Railway Group Co.,Ltd. Address before: 721003 No. 118 Baofu Road, Jintai District, Baoji City, Shaanxi Province Applicant before: BAOJI CRRC TIMES ENGINEERING MACHINERY Co.,Ltd. |