A kind of body-building puller system
Technical field
The invention belongs to body-building equipment technical fields, and in particular to a kind of body-building puller system.
Background technology
Constantly improving with the development of science and technology, people's lives are horizontal, people no longer content just to the demand on substance,
The health on cultural life and body is constantly even more being pursued, on taking exercises, most common mode is often taken exercise
Pulling force, and in existing technology, tension equipment is fairly simple, can not easily adjust required exercise weight, or even meeting
Because operation error damages oneself, there is prodigious security risk, is not easy to use for a long time.
Invention content
According to the above-mentioned deficiencies of the prior art, the technical problem to be solved by the present invention is to propose a kind of body-building pulling force dress
It sets, solves in existing technology, tension equipment is fairly simple, can not easily adjust required exercise weight, or even meeting
The problem of because operation error damages oneself, there is prodigious security risk, being not easy to use for a long time, has easy to use, side
Just adjustment tempers weight and installs the high effect of degree.
In order to solve the above-mentioned technical problem, the technical solution adopted by the present invention is:A kind of body-building puller system, structure packet
Including rack, puller system, pull rod, Weight box, magnesium powder box and clothes hanger, the upper end that the puller system is fixedly mounted on rack are right
Side, pull rod are movably connected in the right hand external of puller system, and Weight box is mounted on the bottom of rack, and through rack and pulling force
Device is flexibly connected, and magnesium powder box is fixedly mounted on the left side of rack, and clothes hanger is installed on the right side of magnesium powder box.
Further, the puller system includes pushing meanss, power take-off mechanism, transmission device, mobile mechanism, second
Transmission device, synchronous shift pendulous device and lifting clamp device, the pushing meanss are installed on the right side of puller system and pass through
Promotion is threadedly coupled with power take-off mechanism, and power take-off mechanism is installed in pushing meanss upper and lower side and gear connection respectively, passes
Dynamic device connection power take-off mechanism in left side and is flexibly connected, and mobile mechanism is set to transmission device lower part and gear connection, the
Two transmission devices are set to transmission device and synchronous shift pendulous device left end and are flexibly connected, and synchronous shift pendulous device passes through shifting
Motivation structure, the second transmission device connects with lifting clamp device angle tooth, and lifting clamp device connection mobile mechanism is in lower part and together
Moved further.
Further, the pushing meanss include screw thread catch bar, limited block, hinge seat, connection framework, squeeze spring and
Limiting slot, the screw thread catch bar are set in the middle part of connection framework and are threadedly coupled with power take-off mechanism by pushing, limited block
It is sheathed on the right side of screw thread catch bar and is pushed with hinge seat and connected, hinge seat upper and lower side is connected and is set to connection framework respectively
On the left of limited block, connection framework is installed in the middle part of fine tuning clamp device and upper and lower side is fixedly connected with inner wall, squeezes spring and is set to
In the middle part of hinge seat and by limited block hinge connection, limiting slot is embedded at hinge seat middle-end and runs through connection with screw thread catch bar,
Screw thread catch bar is fixedly connected with pull rod.
Further, the power take-off mechanism includes rolling bearing, driving belt, pinion gear and gear connecting rod, institute
It states rolling bearing and is installed in screw thread catch bar upper and lower side and gear connection respectively, driving belt is sheathed on rolling bearing, pinion gear
Between and be sequentially connected, pinion gear, which is installed on the outside of connection framework, to be set to and is rotated synchronously with rolling bearing, and gear connecting rod connects
Connect rolling bearing on transmission device and push connection.
Further, the transmission device include gear link, power output wheel, pressure catch bar, gear rotating group,
Second driving belt, second gear rotating group and second gear link, the gear link are fixed on the left of connection framework
And be connected with power output wheel, power output wheel is pushed by the way that upper right side, pressure are rotatablely connected and be set to gear rotating group
Bar is set to power output wheel, gear rotating group upper surface is pushed and connected by gear connecting rod and power output wheel, gear rotating group
It connecing, gear rotating group is set to power output wheel lower left quarter and is sequentially connected by power output wheel and the second driving belt, and second
Driving belt is sheathed between gear rotating group, second gear rotating group and is rotatablely connected, second gear rotating group connection second
Driving belt in left side and with mobile mechanism be rotatablely connected, second gear link connect second gear rotating group on inner wall simultaneously
It is fixedly connected.
Further, the mobile mechanism is made of rotate gear, mobile tooth row, limit buckle, limit shifting chute, described turn
Moving gear is installed in second gear rotating group lower left and is rotatablely connected, and the mobile tooth row is set to rotate gear lower part and passes through
Rotate gear and limit shifting chute mobile connection, the mobile tooth row of limit buckle connection on limit shifting chute and limiting connection,
The limit shifting chute is embedded on fine tuning clamp device inner wall and is set to limit buckle rear end.
Further, second transmission device include second gear connecting rod, rotating pulley, third driving belt,
Second rotating pulley and elastic traction band, second gear connecting rod connection second gear rotating group rear end is in rotating belt
Wheel upper surface simultaneously pushes connection, rotating pulley to be installed in second gear rotating group upper left quarter and rotate synchronously, and third is driven skin
Band is sheathed between rotating pulley, the second rotating pulley and is sequentially connected, the second rotating pulley and rotating pulley phase
Mutually it is parallel and be set to lower part, the second rotating pulley of elastic traction band connection is on synchronous shift pendulous device.
Further, the synchronous shift pendulous device includes being connected iron block, oscillating rod, mobile runner, the second elastic force to lead
Leader tape, third rotating pulley, swing tooth fan bar, the second limit shifting chute and bar slot, the linking iron block are fixed on mobile tooth
Row front end and synchronizing moving, on mobile runner, swing tooth fan bar, mobile runner is led oscillating rod connection linking iron block by elastic force
Leader tape and the second rotating pulley rotate synchronously and by oscillating rods and mobile tooth row synchronizing moving, and the second elastic traction band is arranged
Between mobile runner, third rotating pulley, third rotating pulley is set to mobile runner lower part and synchronous rotation, swings tooth
Fan bar is installed in third rotating pulley set on third rotating pulley front end and by oscillating rod and lifting clamp device angle tooth
Connection, the second limit shifting chute are embedded on fine tuning clamp device inner wall and are flexibly connected with mobile runner, and bar slot is embedded at pendulum
It is flexibly connected in the middle part of lever and with mobile runner and is set to front end.
Further, the lifting clamp device includes connection framework, lifting braces, slides rail, fixed link and link slot,
Bottom is welded and be mutually perpendicular to the connection framework with mobile tooth row, and lifting braces is installed on inside connection framework and passes through pendulum
Moving teeth is fanned bar and is connected with sliding rail lifting, and sliding rail is that rectangular parallelepiped structure is welded on connection framework inner wall, and fixed link connection rises
Braces drops in the middle part of connection framework, and link slot is installed on bottom of fixed and is fixedly connected with Weight box.
Present invention has the advantages that:
1, apparatus of the present invention are equipped with pull rod and Weight box, and user can add suitable counterweight according to their needs, with
Weight when conveniently adapting to take exercise, avoids that tension equipment is too simple, cannot the exercise that brings of appropriate regulating weight it is inconvenient,
It cannot temper and be easy for a long time injured problem.
2, apparatus of the present invention are equipped with magnesium powder box and clothes hanger, and user can according to their needs take carry-on clothing before use
It on clothes hanger, is then taken in the hand that appropriate magnesium powder is uniformly smeared from magnesium powder box, then perform physical exercise, avoids user and taking exercise
In the process because error, rubber sleeve etc. are detached from equipment, leads to injured problem, increase the safety of user.
Description of the drawings
The content expressed by this specification attached drawing and the label in figure are briefly described below:
Fig. 1 is a kind of structural schematic diagram of body-building puller system of the present invention.
Fig. 2 is the structural plan figure of puller system of the present invention.
Fig. 3 is the detailed construction schematic diagram of puller system of the present invention.
Fig. 4 is the working state figure of puller system of the present invention.
Label in attached drawing be:Rack 1, puller system 2, pull rod 3, Weight box 4, magnesium powder box 5, clothes hanger 6, pushing meanss-
20, power take-off mechanism -21, transmission device -22, mobile mechanism -23, the second transmission device -24, synchronous shift pendulous device -
25, it lifts clamp device -26, screw thread catch bar -2001, limited block -2002, hinge seat -2003, connection framework -2004, squeeze
Spring -2005, limiting slot -2006, rolling bearing -2101, driving belt -2102, pinion gear -2103, gear connecting rod -
2104, gear link -2201, power output wheel -2202, pressure catch bar -2203, gear rotating group -2204, second are driven
Belt -2205, second gear rotating group -2206, second gear link -2207, rotate gear -2301, mobile tooth row -
2302, limit buckle -2303, limit shifting chute -2304, second gear connecting rod -2401, rotating pulley -2402, third transmission
Belt -2403, the second rotating pulley -2404, elastic traction band -2405, linking iron block -2501, oscillating rod -2502, movement
Runner -2503, third rotating pulley -2505, swings tooth fan bar -2506, the second limit shifting at second elastic traction band -2504
Dynamic slot -2507, bar slot -2508, connection framework -2601, lifting braces -2602, sliding rail -2603, fixed link -2604, connection
Slot -2605.
Specific implementation mode
Below by the description to embodiment, the shape of for example involved each component of specific implementation mode of the invention, structure
It makes, the mutual alignment between each section and connection relation, the effect of each section and operation principle, manufacturing process and the side of operating with
Method etc., is described in further detail, completeer to help those skilled in the art to have the inventive concept of the present invention, technical solution
Whole, accurate and deep understanding.
As shown, the present invention provides a kind of technical solution of body-building puller system:Its structure includes rack 1, pulling force dress
2, pull rod 3, Weight box 4, magnesium powder box 5 and clothes hanger 6 are set, the puller system 2 is fixedly mounted on the right side of the upper end of rack 1, pull rod 3
It is movably connected in the right hand external of puller system 2, Weight box 4 is mounted on the bottom of rack 1, and is filled through rack 1 and pulling force
2 flexible connections are set, magnesium powder box 5 is fixedly mounted on the left side of rack 1, and 5 right side of magnesium powder box is installed with clothes hanger 6.
Further, the puller system 2 includes pushing meanss 20, power take-off mechanism 21, transmission device 22, moving machine
Structure 23, the second transmission device 24, synchronous shift pendulous device 25 and lifting clamp device 26, the pushing meanss 20 are installed on drawing
It is threadedly coupled with power take-off mechanism 21 on the right side of power apparatus 2 and by pushing, power take-off mechanism 21 is installed in promotion dress respectively
It sets 20 upper and lower sides and gear connection, transmission device 22 connects power take-off mechanism 21 and in left side and be flexibly connected, mobile mechanism 23
Set on 22 lower part of transmission device and gear connection, the second transmission device 24 is set on transmission device 22 and synchronous shift pendulous device 25
Left end is simultaneously flexibly connected, and synchronous shift pendulous device 25 passes through mobile mechanism 23, the second transmission device 24 and lifting clamp device
26 jiaos of tooth connections, lifting clamp device 26 connect mobile mechanism 23 in lower part and synchronizing moving.
Further, the pushing meanss 20 include screw thread catch bar 2001, limited block 2002, hinge seat 2003, connection
Frame 2004 squeezes spring 2005 and limiting slot 2006, and the screw thread catch bar 2001 is set to 2004 middle part of connection framework and leads to
It crosses promotion to be threadedly coupled with power take-off mechanism 21, limited block 2002 is sheathed on 2001 right side of screw thread catch bar and and hinge seat
2003 push connection, 2003 upper and lower side of hinge seat to be connected respectively with connection framework 2004 and set on 2002 left side of limited block, even
It connects that frame 2004 is installed on fine tuning clamp device 2 middle part and upper and lower side is fixedly connected with inner wall, squeezes spring 2005 set on hinge
In the middle part of seat 2003 and by 2002 hinge connection of limited block, limiting slot 2006 is embedded at 2003 middle-end of hinge seat and is pushed with screw thread
Bar 2001 is fixedly connected through connection, screw thread catch bar 2001 with pull rod 3.
Further, the power take-off mechanism 21 includes rolling bearing 2101, driving belt 2102,2103 and of pinion gear
Gear connecting rod 2104, the rolling bearing 2101 are installed in 2001 upper and lower side of screw thread catch bar and gear connection, transmission respectively
Belt 2102 is sheathed between rolling bearing 2101, pinion gear 2103 and is sequentially connected, and pinion gear 2103 is installed on connection framework
2004 outsides are set to and are rotated synchronously with rolling bearing 2101, and gear connecting rod 2104 connects rolling bearing 2101 in transmission device
On 22 and push connection.
Further, the transmission device 22 includes gear link 2201, power output wheel 2202, pressure catch bar
2203, gear rotating group 2204, the second driving belt 2205, second gear rotating group 2206 and second gear link 2207,
The gear link 2201 is fixed on 2004 left side of connection framework and is connected with power output wheel 2202, power output wheel
2202 with gear rotating group 2204 by being rotatablely connected and being set to upper right side, and pressure catch bar 2203 is set to power output wheel
2202,2204 upper surface of gear rotating group is pushed away by gear connecting rod 2104 and power output wheel 2202, gear rotating group 2204
Dynamic connection, gear rotating group 2204 are set to 2202 lower left quarter of power output wheel and are driven skin by power output wheel 2202 and second
Band 2205 be sequentially connected, the second driving belt 2205 be sheathed between gear rotating group 2204, second gear rotating group 2206 and
Rotation connection, second gear rotating group 2206 connect the second driving belt 2205 and are rotatablely connected in left side and with mobile mechanism 23,
Second gear link 2207 connects second gear rotating group 2206 on inner wall and being fixedly connected.
Further, the mobile mechanism 23 is moved by rotate gear 2301, mobile tooth row 2302, limit buckle 2303, limit
Dynamic slot 2304 forms, and the rotate gear 2301 is installed in 2206 lower left of second gear rotating group and is rotatablely connected, the shifting
Moving teeth row 2302 is set to 2301 lower part of rotate gear and by rotate gear 2301 and limit 2304 mobile connection of shifting chute, described
The connection movement of limit buckle 2303 tooth row 2302 in limiting on shifting chute 2304 and limiting connection, inlay by the limit shifting chute 2304
In on fine tuning 2 inner wall of clamp device and set on 2303 rear end of limit buckle.
Further, second transmission device 24 includes second gear connecting rod 2401, rotating pulley 2402, third
Driving belt 2403, the second rotating pulley 2404 and elastic traction band 2405, the second gear connecting rod 2401 connection the
Two gear rotating groups, 2206 rear end is in 2402 upper surface of rotating pulley and pushes connection, and rotating pulley 2402 is installed in second
2206 upper left quarter of gear rotating group simultaneously rotates synchronously, and third driving belt 2403 is sheathed on the rotation of rotating pulley 2402, second
It between belt pulley 2404 and is sequentially connected, the second rotating pulley 2404 is mutually parallel and is set to down with rotating pulley 2402
Portion, elastic traction band 2405 connect the second rotating pulley 2404 on synchronous shift pendulous device 25.
Further, the synchronous shift pendulous device 25 includes linking iron block 2501, oscillating rod 2502, mobile runner
2503, the second elastic traction band 2504, third rotating pulley 2505, swing tooth fan bar 2506, second limit shifting chute 2507
With bar slot 2508, the linking iron block 2501 is fixed on 2302 front end of mobile tooth row and synchronizing moving, the connection rank of oscillating rod 2502
Connect iron block 2501 in mobile runner 2503, swing on tooth fan bar 2506, mobile runner 2503 passes through elastic traction band 2405 and the
Two rotating pulleys 2404 rotate synchronously and by oscillating rod 2502 and 2302 synchronizing moving of mobile tooth row, the second elastic traction bands
2504 are sheathed between mobile runner 2503, third rotating pulley 2505, and third rotating pulley 2505 is set to mobile runner
2503 lower parts and synchronous rotation swing tooth fan bar 2506 and are installed in third rotating pulley 2505 set on third rotating pulley
2505 front ends are simultaneously connect by oscillating rod 2502 with lifting 26 jiaos of teeth of clamp device, and the second limit shifting chute 2507 is embedded at fine tuning
Be flexibly connected on 2 inner wall of clamp device and with mobile runner 2503, bar slot 2508 be embedded in the middle part of oscillating rod 2502 and with movement
Runner 2503 is flexibly connected and is set to front end.
Further, the lifting clamp device 26 include connection framework 2601, lifting braces 2602, sliding rail 2603,
Fixed link 2604 and link slot 2605, the connection framework 2601 weld with mobile tooth row 2302 and are mutually perpendicular to bottom, rise
Drop braces 2602 is installed on 2601 inside of connection framework and is connected with the sliding lifting of rail 2603 by swinging tooth fan bar 2506, slides
Rail 2603 is that rectangular parallelepiped structure is welded on 2601 inner wall of connection framework, and the connection of fixed link 2604 lifting braces 2602 is in connection frame
2601 middle part of frame, link slot 2605 are installed on 2604 bottom of fixed link and are fixedly connected with Weight box 4.
A kind of body-building puller system of the present invention, its working principle is that:Before user uses the device, according to itself
It takes exercise and needs, the counterweight of appropriate weight is added on Weight box, the clothes hanger 6 that then carry-on clothing or towel can be hung
On, then from magnesium powder box 5, appropriate magnesium powder is taken uniformly to be applied in the palm of the hand, it is ready for taking exercise, user pushes away pull rod 3
It is dynamic, and then push screw thread catch bar 2001 that 2101 gear of rolling bearing of promotion upper and lower side is made to rotate and connect power by gear
Extension bar 2104 is transmitted on pressure catch bar 2203, since pressure pushes the power for being connected to 2203 both ends of pressure catch bar defeated
Go out wheel 2202 to rotate with 2204 gear of gear rotating group and be sheathed on 2205 band of the second driving belt in gear rotating group 2204
Dynamic second gear rotating group 2206 makes gear rotating group 2204, second gear rotating group 2206 rotate synchronously, when second gear turns
Simultaneously rotate gear 2301 and mobile tooth row are rotated when moving 2206 rotation of group with 2301 gear of rotate gear for being installed on lower left quarter
2302 are meshed and move tooth row 2302 moves being connected for 2302 front end of tooth row by limit buckle 2303 with limit shifting chute 2304
Iron block 2501 connects 2502 synchronizing moving of oscillating rod and mobile runner 2503 and second is driven to limit 2507 mobile connection of shifting chute,
Second gear connecting rod 2401 connects second gear rotating group 2206 on rotating pulley 2402 and rotating synchronously rotating belt
Wheel 2402 drives the rotation of the second rotating pulley 2404, elastic traction band 2405 to be set to second turn by third driving belt 2403
Make mobile runner 2503 connect third rotating pulley 250 between dynamic belt pulley 2404 and mobile runner 2503 to rotate, works as swing
When bar 2502 moves, the swing tooth fan bar 2506 for being connected to bottom is moved right and by pulling by third rotating pulley
2505 are meshed with lifting braces 2602, and lifting braces 2602 is slidably connected and declines with sliding rail 2603, is fixed on lifting tooth
Fixed link 2604 on frame 2602 drives link slot 2605 to decline and releases connection framework 2601, makes link slot 2605 and Weight box 4
It simultaneously declines, and the movement adjustment of 2601 synchronizing moving tooth row 2302 of connection framework, opposite stretching pull rod 3,2605 band of link slot
Dynamic Weight box 4 rises simultaneously, and and so on, user can carry out pulling force exercise.
The present invention is exemplarily described above, it is clear that present invention specific implementation is not subject to the restrictions described above,
As long as using the improvement of the various unsubstantialities of inventive concept and technical scheme of the present invention progress, or not improved this is sent out
Bright design and technical solution directly applies to other occasions, within protection scope of the present invention.The protection of the present invention
Range should be determined by the scope of protection defined in the claims.