CN108775083A - The assembly concrete frame structure and construction method connected outside precast beam plastic hinge region - Google Patents

The assembly concrete frame structure and construction method connected outside precast beam plastic hinge region Download PDF

Info

Publication number
CN108775083A
CN108775083A CN201810742473.7A CN201810742473A CN108775083A CN 108775083 A CN108775083 A CN 108775083A CN 201810742473 A CN201810742473 A CN 201810742473A CN 108775083 A CN108775083 A CN 108775083A
Authority
CN
China
Prior art keywords
prefabricated
precast beam
reinforcing bar
prefabricated post
concrete
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810742473.7A
Other languages
Chinese (zh)
Inventor
吴刚
范家俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Southeast University
Original Assignee
Southeast University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Southeast University filed Critical Southeast University
Priority to CN201810742473.7A priority Critical patent/CN108775083A/en
Publication of CN108775083A publication Critical patent/CN108775083A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/38Connections for building structures in general
    • E04B1/58Connections for building structures in general of bar-shaped building elements
    • E04B1/5825Connections for building structures in general of bar-shaped building elements with a closed cross-section
    • E04B1/5831Connections for building structures in general of bar-shaped building elements with a closed cross-section of substantially rectangular form
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/02Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces
    • E04C3/20Joists; Girders, trusses, or trusslike structures, e.g. prefabricated; Lintels; Transoms; Braces of concrete or other stone-like material, e.g. with reinforcements or tensioning members
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

The assembly concrete frame structure connected outside a kind of precast beam plastic hinge region of the present invention, including prefabricated post and precast beam, prefabricated post are multilayer prefabricated post, and the joint core region of prefabricated post is provided with cantilever beam;The U-shaped reinforcing bar close ring that prefabricated post upper cantilever beam end is stretched out, prefabricated beam end has corresponding U-shaped reinforcing bar close ring, the U-shaped reinforcing bar close ring of prefabricated post upper cantilever beam end and the U-shaped reinforcing bar close ring of prefabricated beam end intersect, the two is that overlap joint or interval are evenly arranged, arrangement encryption stirrup at this, and poured concrete.Connecting portion of the present invention avoids beam-ends areas of plasticity hinge and bean column node position, the stress smaller part in beam is arranged in join domain, influence when can reduce prefabricated concrete structure interior joint connecting portion performance deficiency to integrality performance of the structure, increase the safety coefficient of prefabricated concrete structure, this kind of prefabricated concrete structure design and node connecting portion construction method are simple and effective, and construction quality is easy to get guarantee.

Description

The assembly concrete frame structure and construction method connected outside precast beam plastic hinge region
Technical field
The present invention relates to brick or concrete duct field, the assembly concrete frame of connection outside specifically a kind of precast beam plastic hinge region Frame structure and construction method.
Background technology
Commonly the method for designing and constructing is beam column component to assembly concrete frame structure is respectively prefabricated unit, is then led to The connection that pouring concrete or other measures after the bar splicing in bean column node region carry out prefabricated unit is crossed, using this type The structure of connection type is commonly referred to as assembled integral concrete frame structure, and assembled integral bean column node performance is to reach Etc. it is cast-in-place be target, therefore, the cast-in-place bean column node such as also known as.But in practical applications, this kind of connection type there is also Many deficiencies:Beam column node core area domain longitudinal reinforcement beam-column and stirrup are complicated, the connection of reinforcing bar and overlap joint difficulty is larger and quality is difficult To ensure;It vibrates when pouring concrete behind construction site difficulty;Pouring concrete and precast concrete interface performance deficiency etc. afterwards, it is prefabricated The component quality better performances concrete quality that still construction site pours is poor, therefore, Practical Project interior joint connecting portion It is extremely difficult to the cast-in-place performance such as required.Meanwhile under normal use and geological process, beam-ends and beam column node core area domain need Larger moment of flexure and shearing are undertaken, and pouring concrete region will appear plastic hinge, therefore, this kind under geological process after beam-ends If the connection type connecting node performance of type such as is not achieved at the cast-in-place performance, it is easy to go out under normal use and geological process Existing serious damage and destruction, and damage easily primarily occur ins the key position in beam column node core area domain.
Invention content
Goal of the invention:In order to overcome the deficiencies in the prior art, the present invention is provided outside a kind of precast beam plastic hinge region The assembly concrete frame structure and construction method of connection.
Technical solution:In order to solve the above technical problems, the assembled connected outside a kind of precast beam plastic hinge region of the present invention Concrete frame structure, including prefabricated post and precast beam, prefabricated post are multilayer prefabricated post, are set in the joint core region of prefabricated post It is equipped with cantilever beam;The U-shaped reinforcing bar close ring that prefabricated post upper cantilever beam end is stretched out, prefabricated beam end have corresponding U-shaped reinforcing bar to close Cyclization, the U-shaped reinforcing bar close ring of prefabricated post upper cantilever beam end intersect with the U-shaped reinforcing bar close ring of prefabricated beam end, and two Person is that overlap joint or interval are evenly arranged, arrangement encryption stirrup at this, and has poured concrete.
Wherein, the cantilever beam length of prefabricated post is not less than the length of beam-ends plastic hinge.
Wherein, the reinforcing bar length of each U-shaped steel muscle close ring bending is not less than max (200,0.5h0,10d).
Wherein, 1 uniform intervals of U-shaped steel muscle close ring of the U-shaped steel muscle close ring of cantilever beam and precast beam are arranged or interlock Bar splicing is arranged.
Wherein, the U-shaped reinforcing bar close ring of prefabricated beam-ends stretching is exposed or is wrapped in the keyway for being set to prefabricated beam-ends, The length that the length of keyway pours node region with after is consistent, and the thickness of keyway is not less than 50mm, and the concrete surface inside keyway is Rough surface is not less than 6mm when the roughness of rough surface is measured using heap micromicrofarad.
Wherein, the end of cantilever beam is all encrypted by stirrup, and the stirrup encryption length of prefabricated beam-ends is not less than one times Higher value in prefabricated deck-molding and 500mm the two, the U-shaped reinforcing bar close ring that region is poured after connecting portion make stirrup encryption, three The sum of the length in hoop reinforcement domain is no less than 1/3 prefabricated beam length.When precast beam top connects cast-in-situ floor or prefabricated When superimposed sheet, precast beam is composite beam form, and the stirrup of precast beam uses the form of U-stirrups.
The present invention also provides a kind of assembly concrete frame construction methods connected outside precast beam plastic hinge region, including with Lower step:
Step 1:The lifting construction of multilayer prefabricated post is carried out first, and the multilayer prefabricated post number of plies is layer 2-3, the connection of prefabricated post It is connected using column bottom grout sleeve, except the connecting portion of the multilayer prefabricated post of bottom column is arranged at the inflection point of column, to reduce The stress of prefabricated post connecting portion reduces the risk of the damage failure of weak part in structure, is set after the completion of prefabricated post construction Set temporary support;
Step 2:After waiting for prefabricated post installation, start the lifting of precast beam, precast beam is to lift from top to bottom, in advance After beam processed lifting is in place, check whether the positioning in tri- directions precast beam XYZ is accurate, including prefabricated soffit, side and pre- Whether the position of beam end processed is accurate, meanwhile, check the U-shaped reinforcing bar close ring and prefabricated beam-ends for ensuring that prefabricated post cantilever beam stretches out Portion's U-shaped reinforcing bar close ring crossover location is accurate, and the lap of splice meets the requirement of regulation and bearing capacity, while the two reinforcing bar phase interconnection It connects, after precast beam lifting is in place, the distance of cantilever beam keyway and precast beam end cross-sectional is not more than 30mm;
Step 3:After the completion of waiting for precast beam lifting construction, stirrup is arranged at the overlap joint U-shaped reinforcing bar close ring of connecting portion, Stirrup encryption is carried out, if U-stirrups, should be arranged in prefabricated cantilever beam-ends by the end band keyway of the cantilever beam of prefabricated post In the keyway side wall in portion;
Step 4:After the completion of the stirrup construction of construction site, if prefabricated post cantilever beam beam-ends is needed without keyway in interconnecting piece Position carries out formwork casting concrete, if prefabricated post cantilever beam end can be poured directly abutment joint when carrying keyway after being handled Concrete is built, the concrete poured uses the pea gravel concreten of a grade grade higher than precast concrete intensity, and pours mixed Solidifying soil uses ungauged regions or the concrete of microdilatancy, ensures not disturb reinforcing bar when casting concrete vibrates, casting concrete vibrates Closely knit, the Concrete Filled of seam areas is closely knit;When precast beam is designed as composite beam, rear pouring concrete height and concrete Native deck-molding is consistent;
Step 5:After the completion of waiting for precast beam construction, floor slab construction is carried out, floor uses prefabricated superimposed sheet or cast-in-situ floor, complete At the construction of assembly concrete frame.
Advantageous effect:The assembly concrete frame structure connected outside a kind of precast beam plastic hinge region of the present invention and construction Method has the advantages that:
The connecting portion of the present invention avoids beam-ends areas of plasticity hinge and bean column node position, and join domain is arranged in beam Stress smaller part, to the shadow of integrality performance of the structure when can reduce prefabricated concrete structure interior joint connecting portion performance deficiency It rings, increases the safety coefficient of prefabricated concrete structure, meanwhile, this kind of prefabricated concrete structure design and node connecting portion Construction method is simple and effective, and construction quality is easy to get guarantee.
Description of the drawings
Fig. 1 is precast beam of the present invention and prefabricated post connecting portion structural map;
Fig. 2 is the outer connecting portion structural map of plastic hinge of the present invention;
Fig. 3 is precast beam lifting construction plan view;
Fig. 4 is that precast beam connects plan view with prefabricated post;
Fig. 5 is precast beam lifting construction three-dimensional schematic elevation view;
Fig. 6 is precast beam lifting construction three-dimensional schematic side view;
Fig. 7 is that precast beam connects three-dimensional schematic elevation view with prefabricated post;
Fig. 8 is that precast beam connects three-dimensional schematic side view with prefabricated post;
The precast column unit schematic three dimensional views of the keyed slot of Fig. 9 cantilever beam ends.
Wherein:1- prefabricated posts, 2- precast beams, 3- cantilever beams, 4- shear keies, 5- shear keies, 6- prefabricated components join domains, 7-U shape reinforcing bar close rings, 8-U shape reinforcing bar close rings, 9- keyways, 10- precast beam overlapping layers, 11- connecting portion stirrups, 12- are pre- Beam lifting construction processed direction.
Specific implementation mode
The invention will be further described below in conjunction with the accompanying drawings.
As shown in Figs 1-4, the assembly concrete frame structure connected outside a kind of precast beam plastic hinge region of the invention, packet Prefabricated post 1 and precast beam 2 are included, prefabricated post 1 is multilayer prefabricated post 1, and the joint core region of prefabricated post 1 is provided with cantilever beam 3; There are corresponding U-shaped reinforcing bar close ring 7 in the U-shaped reinforcing bar close ring 8 that 1 upper cantilever beam of prefabricated post, 3 end is stretched out, 2 end of precast beam, in advance Component join domain 6 processed is by the way of wet connection.The U-shaped reinforcing bar close ring 8 of 1 upper cantilever beam of prefabricated post, 3 end and precast beam 2 The U-shaped reinforcing bar close ring 7 of end intersects, and the two is that overlap joint or interval are evenly arranged, arrangement encryption stirrup at this, and is poured There are concrete, 3 length of cantilever beam of prefabricated post 1 to be not less than the length of beam-ends plastic hinge.The connecting portion of each prefabricated components is located at The stress smaller part of cantilever beam and precast beam, only under the effect of gravity, beam moment of flexure herein is zero, meanwhile, avoid beam-ends modeling Property hinge position.By the precast assembly technical method of this kind of mode, assembled integral concrete frame can be effectively improved The overall performance of structure such as reaches at the cast-in-place purpose of design.Further, 3 length of cantilever beam of stretching is no less than beam-ends modeling Property hinge length can be according to different engineerings since Plastic hinge length is influenced by factors such as beam cross-section sizes and shear span ratio Actual conditions value also can do near-sighted value according to for max (h0,500mm), should be analyzed according to calculating when beam is deep beam structure Determine the length that 1 component upper cantilever beam 3 of prefabricated post stretches out.U-shaped steel muscle close ring can be closed with whole reinforcing bar bending, or outstanding Binding or welded closed after the vertical muscle bending in the top and the bottom of arm beam and precast beam, it is desirable that curved when using binding closure or welded closed The reinforcing bar length of folding is not less than max (200,0.5h0,10d), while the bending overlap joint of reinforcing bar should meet present GB 50010-2010 Etc. technical specifications requirement, the U-shaped steel muscle close ring 8 of cantilever beam 3 and 7 uniform intervals of U-shaped steel muscle close ring of precast beam 2 are arranged Or staggeredly bar splicing is arranged.
As shown in figure 9, the U-shaped reinforcing bar close ring that 2 end of precast beam is stretched out is exposed or is wrapped in and is set to 2 end of precast beam In keyway 9, the length of keyway 9 pours that the length of node region is consistent with after, avoids the coagulation for pouring node region at the construction field (site) Soil needs template construction, greatly improves speed of application and construction quality.The thickness of keyway 9 is not less than 50mm, mixed inside keyway 9 Solidifying soil face is rough surface, and 6mm is not less than when the roughness of rough surface is measured using heap micromicrofarad.
The end of cantilever beam 3 is all encrypted by stirrup, and the stirrup encryption length at 2 end of precast beam is prefabricated not less than one times The height of beam 2 and the higher value in 500mm the two, the U-shaped reinforcing bar close ring that region is poured after connecting portion are encrypted by stirrup 11, and three The precast beam 2 that the sum of the length in a hoop reinforcement domain is no less than 1/3 is grown.When 2 top of precast beam connect cast-in-situ floor or When prefabricated superimposed sheet, precast beam 2 is composite beam form, and the stirrup of precast beam 2 uses the form of U-stirrups.
When according to actual design requirement, 2 top and the bottom of precast beam need to configure more beam when indulging muscle, i.e. about 2 precast beam When portion's reinforcing bar is the double-deck arrangement of reinforcement, the vertical muscle of beam closure that the cantilever beam 3 of 1 beam column nucleus of 2 end of precast beam and prefabricated post stretches out can Using rebuilding, still, the length that U-shaped reinforcing bar close ring is stretched out presses inner ring, that is, smaller U-shaped is closed and indulges muscle length gauge It calculates.
The rear pouring concrete of the join domain of prefabricated components preferably uses pea gravel concreten, and the strength grade of concrete should compare The strength grade of concrete of prefabricated components is high, answers vibration compacting in the construction process.3 beam-ends of the cantilever beam setting of prefabricated post 1 is anti- Cut key 4,2 end set anti-shear concrete key 5 of precast beam, the setting of shear key should meet the current arts such as JGJ-2014 specification and The requirement of regulation.It is preferably preferential when needing to configure more beam top and the bottom and indulging muscle when 2 section of precast beam is larger or span is larger The forms such as boundling arrangement of reinforcement are considered as, preferably use high tensile reinforcement, and beam top and bottom arrangement of reinforcement should suitably adjust steel bar arrangement position, with Ensure between prefabricated components bar connecting (overlap joint) is easy for construction and reliable in quality.
As shown in figures 5-9, the prefabricated components of above-mentioned assembly concrete frame structure are after prefabricated components complete, fortune It is defeated to construction site carry out lifting and assembling construction, concrete construction method be:
Step 1:The lifting construction of multilayer prefabricated post 1 is carried out first, and 1 number of plies of multilayer prefabricated post is advisable with layer 2-3, prefabricated post The grout sleeve connection of column bottom can be used in 1 connection, except the connecting portion of the multilayer prefabricated post 1 of bottom column may be provided at the recurvation of column At point, to reduce the stress of 1 connecting portion of prefabricated post, reduce the risk of the damage failure of weak part in structure, when prefabricated post 1 Reliable temporary support should be set after the completion of construction, can by prefabricated post 1 embedded fixing component use type steel support, meet The requirement of construction loads when hoisting prefabricated beam 2 and floor slab construction ensures that prefabricated post 1 is not damaged when construction;
Step 2:After waiting for 1 installation of prefabricated post, check whether the construction quality of prefabricated post 1 and positioning are accurate, wait for Prefabricated post 1 connects the lifting that grouting material intensity in grout sleeve reaches beginning precast beam 2 after requirement, the lifting construction of precast beam 2 Direction 12 is top-down lifting mode as shown in Fig. 3, Fig. 5, Fig. 6, should be conscientious when lifting in place when precast beam 2 lifts 2 end of U-shaped reinforcing bar close ring 8 and precast beam that whether positioning is accurate, and the cantilever beam 3 of prefabricated post 1 stretches out in hoisting process checked U-shaped reinforcing bar close ring 7 should avoid collision, if there is collision when answer advance correction or by mechanical measure adjustment stretch out it is prefabricated The reinforcement location of component should check whether positioning of the precast beam 2 in tri- directions XYZ be accurate after precast beam 2 lifts in place, wrap Whether the position for including 2 end of 2 bottom surface of precast beam, side and precast beam is accurate, meanwhile, should especially go through ensures prefabricated post The U-shaped steel muscle close ring and 2 end U-shaped reinforcing bar close ring crossover location of precast beam that 1 cantilever beam 3 stretches out are accurate, the lap of splice Meet the requirement of regulation and bearing capacity, while 1 cantilever beam 3 of the two prefabricated post should be overlapped mutually, if due to design and construction etc. because When element was occurred without the case where overlap joint, it is uniform that the two prefabricated post 1 cantilever beam, 3 spacing distances should be protected;If the cantilever beam of 1 band of prefabricated post The 3 prefabricated keyways of end band, without breakage when should ensure that keyway in lifting construction in construction, after precast beam 2 lifts in place, cantilever beam The distance of 2 end cross-sectional of 3 keyways and precast beam is not more than 30mm;
Step 3:After the completion of waiting for 2 lifting construction of precast beam, hoop is arranged at the overlap joint U-shaped reinforcing bar close ring of connecting portion Muscle should carry out stirrup encryption herein, if stirrup encryption is not required here according to current art regulatory requirements, it is still necessary to Stirrup encryption is being done according to design requirement, is considering that site operation is convenient, U-stirrups, U-stirrups shape and ruler should be used The very little requirement that should meet current specifications;If U-stirrups, should be arranged in pre- by the end band keyway of the cantilever beam 3 of prefabricated post 1 In 9 side wall of keyway of 3 end of cantilever beam processed;
Step 4:After the completion of the stirrup construction of construction site, if 3 beam-ends of cantilever beam of prefabricated post 1 without keyway, is needed even Socket part position carries out formwork casting concrete, if 3 end of cantilever beam of prefabricated post 1 can directly abutment joint carry out when carrying keyway After-pouring concrete is handled, the coagulation local product poured uses the pea gravel concreten of a grade grade higher than precast concrete intensity, And the concrete poured should use ungauged regions or the concrete of microdilatancy, should ensure that when casting concrete vibrates and do not disturb reinforcing bar, Casting concrete vibration compacting, the Concrete Filled for paying special attention to seam areas are closely knit.When precast beam 2 is designed as composite beam, Pouring concrete height is consistent with precast concrete deck-molding afterwards;
Step 5:After the completion of waiting for that precast beam 2 is constructed, floor slab construction can be carried out, prefabricated superimposed sheet or cast-in-place building can be used in floor Plate completes the construction of assembly concrete frame.
The above is only a preferred embodiment of the present invention, it should be pointed out that:For the ordinary skill people of the art For member, various improvements and modifications may be made without departing from the principle of the present invention, these improvements and modifications are also answered It is considered as protection scope of the present invention.

Claims (7)

1. the assembly concrete frame structure connected outside a kind of precast beam plastic hinge region, it is characterised in that:Including prefabricated post and Precast beam, prefabricated post are multilayer prefabricated post, and the joint core region of prefabricated post is provided with cantilever beam;Prefabricated post upper cantilever beam-ends The U-shaped reinforcing bar close ring that portion is stretched out, prefabricated beam end have corresponding U-shaped reinforcing bar close ring, the U-shaped of prefabricated post upper cantilever beam end Reinforcing bar close ring and the U-shaped reinforcing bar close ring of prefabricated beam end intersect, and the two is that overlap joint or interval are evenly arranged, cloth at this Encryption stirrup is set, and has poured concrete.
2. the assembly concrete frame structure connected outside precast beam plastic hinge region according to claim 1, feature exist In:Wherein, the cantilever beam length of prefabricated post is not less than the length of beam-ends plastic hinge.
3. the assembly concrete frame structure connected outside precast beam plastic hinge region according to claim 1, feature exist In:Wherein, the reinforcing bar length of each U-shaped steel muscle close ring bending is not less than max (200,0.5h0,10d).
4. the assembly concrete frame structure connected outside precast beam plastic hinge region according to claim 1, feature exist In:Wherein, 1 uniform intervals of U-shaped steel muscle close ring of the U-shaped steel muscle close ring of cantilever beam and precast beam are arranged or staggeredly reinforcing bar is taken Connect arrangement.
5. the assembly concrete frame structure connected outside precast beam plastic hinge region according to claim 1, feature exist In:Wherein, the U-shaped reinforcing bar close ring that prefabricated beam-ends stretches out is exposed or is wrapped in the keyway for being set to prefabricated beam-ends, keyway Length pour that the length of node region is consistent with after, the thickness of keyway is not less than 50mm, and the concrete surface inside keyway is coarse Face is not less than 6mm when the roughness of rough surface is measured using heap micromicrofarad.
6. the assembly concrete frame structure connected outside precast beam plastic hinge region according to claim 1, feature exist In:Wherein, the end of cantilever beam is all encrypted by stirrup, and the stirrup encryption length of prefabricated beam-ends is not less than one times of precast beam The high higher value with 500mm the two, the U-shaped reinforcing bar close ring that region is poured after connecting portion make stirrup encryption, and three stirrups add The sum of the length in close region is no less than 1/3 prefabricated beam length.When precast beam top connects cast-in-situ floor or prefabricated superimposed sheet When, precast beam is composite beam form, and the stirrup of precast beam uses the form of U-stirrups.
7. a kind of assembly concrete frame construction method connected outside precast beam plastic hinge region, which is characterized in that including following Step:
Step 1:The lifting construction of multilayer prefabricated post is carried out first, and the multilayer prefabricated post number of plies is layer 2-3, and the connection of prefabricated post uses The grout sleeve connection of column bottom, it is prefabricated to reduce except the connecting portion of the multilayer prefabricated post of bottom column is arranged at the inflection point of column The stress of column connecting portion reduces the risk of the damage failure of weak part in structure, when setting is faced after the completion for prefabricated post construction When support;
Step 2:After waiting for prefabricated post installation, start the lifting of precast beam, precast beam is to lift from top to bottom, precast beam After lifting is in place, check whether the positioning in tri- directions precast beam XYZ is accurate, including prefabricated soffit, side and precast beam Whether the position of end is accurate, meanwhile, check the U-shaped reinforcing bar close ring and prefabricated beam end U for ensuring that prefabricated post cantilever beam stretches out Shape reinforcing bar close ring crossover location is accurate, and the lap of splice meets the requirement of regulation and bearing capacity, while the two reinforcing bar mutually overlaps, After precast beam lifting is in place, the distance of cantilever beam keyway and precast beam end cross-sectional is not more than 30mm;
Step 3:After the completion of waiting for precast beam lifting construction, stirrup is arranged at the overlap joint U-shaped reinforcing bar close ring of connecting portion, is carried out Stirrup encryption, if U-stirrups, should be arranged in prefabricated cantilever beam end by the end band keyway of the cantilever beam of prefabricated post In keyway side wall;
Step 4:After the completion of the construction of construction site stirrup, if prefabricated post cantilever beam beam-ends without keyway, need connecting portion into Row formwork casting concrete, if prefabricated post cantilever beam end can directly to carry out processing after-pouring mixed for abutment joint when carrying keyway Solidifying soil, the concrete poured use the pea gravel concreten of a grade grade higher than precast concrete intensity, and the concrete poured Ensure not disturb reinforcing bar using ungauged regions or the concrete of microdilatancy, when casting concrete vibrates, casting concrete vibration compacting, The Concrete Filled of seam areas is closely knit;When precast beam is designed as composite beam, rear pouring concrete height and precast concrete beam It is high consistent;
Step 5:After the completion of waiting for precast beam construction, floor slab construction is carried out, floor uses prefabricated superimposed sheet or cast-in-situ floor, completes dress Construction with formula concrete frame.
CN201810742473.7A 2018-07-09 2018-07-09 The assembly concrete frame structure and construction method connected outside precast beam plastic hinge region Pending CN108775083A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810742473.7A CN108775083A (en) 2018-07-09 2018-07-09 The assembly concrete frame structure and construction method connected outside precast beam plastic hinge region

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810742473.7A CN108775083A (en) 2018-07-09 2018-07-09 The assembly concrete frame structure and construction method connected outside precast beam plastic hinge region

Publications (1)

Publication Number Publication Date
CN108775083A true CN108775083A (en) 2018-11-09

Family

ID=64031351

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810742473.7A Pending CN108775083A (en) 2018-07-09 2018-07-09 The assembly concrete frame structure and construction method connected outside precast beam plastic hinge region

Country Status (1)

Country Link
CN (1) CN108775083A (en)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518802A (en) * 2018-12-03 2019-03-26 上海建工二建集团有限公司 Assembled beam-column structure and construction method thereof
CN111335458A (en) * 2018-12-18 2020-06-26 南京百西思建筑科技有限公司 Prefabricated assembly double-hinged frame system
CN112411608A (en) * 2020-10-29 2021-02-26 上海宝冶冶金工程有限公司 Construction method of assembled blast furnace
CN113136946A (en) * 2021-03-30 2021-07-20 东南大学 Self-supporting assembly type seawater sea sand concrete frame structure and construction method
CN113882590A (en) * 2021-09-27 2022-01-04 深圳市市政工程总公司 Prefabricated post and prefabricated beam full-assembly type rigid connection structure
CN114457957A (en) * 2020-11-10 2022-05-10 内蒙古中朵远大建筑工业有限公司 Prefabricated frame post and prefabricated building
CN114809086A (en) * 2022-06-08 2022-07-29 青岛中科坤泰装配建筑科技有限公司 Integral subway station structure of assembly of annular reinforcing bar overlap joint
CN114855876A (en) * 2022-06-08 2022-08-05 青岛中科坤泰装配建筑科技有限公司 Prefabricated double-layer integrated column for underground structure and construction method thereof

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0355356A1 (en) * 1988-08-24 1990-02-28 Arbed S.A. Earth quake-proof metal building construction
JP2010037911A (en) * 2008-08-08 2010-02-18 Shimizu Corp Joint structure of concrete member end
CN203213282U (en) * 2013-04-03 2013-09-25 中铁建设集团有限公司 Fabricated reinforced concrete frame structure system
CN106437031A (en) * 2016-10-21 2017-02-22 季氏预制装配建筑设计常州有限公司 One-step formed multi-layer prefabricated column with bracket as well as manufacturing method and construction method thereof
CN106592759A (en) * 2016-12-02 2017-04-26 上海理工大学 Assembly type reinforced concrete frame beam column joint and preparation method
CN106759878A (en) * 2016-11-30 2017-05-31 上海建工二建集团有限公司 Assembled beam-column node structure and its building method
CN208884727U (en) * 2018-07-09 2019-05-21 东南大学 The assembly concrete frame structure connected outside precast beam plastic hinge region

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
EP0355356A1 (en) * 1988-08-24 1990-02-28 Arbed S.A. Earth quake-proof metal building construction
JP2010037911A (en) * 2008-08-08 2010-02-18 Shimizu Corp Joint structure of concrete member end
CN203213282U (en) * 2013-04-03 2013-09-25 中铁建设集团有限公司 Fabricated reinforced concrete frame structure system
CN106437031A (en) * 2016-10-21 2017-02-22 季氏预制装配建筑设计常州有限公司 One-step formed multi-layer prefabricated column with bracket as well as manufacturing method and construction method thereof
CN106759878A (en) * 2016-11-30 2017-05-31 上海建工二建集团有限公司 Assembled beam-column node structure and its building method
CN106592759A (en) * 2016-12-02 2017-04-26 上海理工大学 Assembly type reinforced concrete frame beam column joint and preparation method
CN208884727U (en) * 2018-07-09 2019-05-21 东南大学 The assembly concrete frame structure connected outside precast beam plastic hinge region

Non-Patent Citations (1)

* Cited by examiner, † Cited by third party
Title
国振喜 等: "《实用钢筋混凝土结构设计手册》", 31 May 1990, 辽宁科学技术出版社, pages: 714 - 715 *

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109518802A (en) * 2018-12-03 2019-03-26 上海建工二建集团有限公司 Assembled beam-column structure and construction method thereof
CN111335458A (en) * 2018-12-18 2020-06-26 南京百西思建筑科技有限公司 Prefabricated assembly double-hinged frame system
CN112411608A (en) * 2020-10-29 2021-02-26 上海宝冶冶金工程有限公司 Construction method of assembled blast furnace
CN114457957A (en) * 2020-11-10 2022-05-10 内蒙古中朵远大建筑工业有限公司 Prefabricated frame post and prefabricated building
CN113136946A (en) * 2021-03-30 2021-07-20 东南大学 Self-supporting assembly type seawater sea sand concrete frame structure and construction method
CN113882590A (en) * 2021-09-27 2022-01-04 深圳市市政工程总公司 Prefabricated post and prefabricated beam full-assembly type rigid connection structure
CN114809086A (en) * 2022-06-08 2022-07-29 青岛中科坤泰装配建筑科技有限公司 Integral subway station structure of assembly of annular reinforcing bar overlap joint
CN114855876A (en) * 2022-06-08 2022-08-05 青岛中科坤泰装配建筑科技有限公司 Prefabricated double-layer integrated column for underground structure and construction method thereof

Similar Documents

Publication Publication Date Title
CN108775083A (en) The assembly concrete frame structure and construction method connected outside precast beam plastic hinge region
CN105569224B (en) Concrete filled steel tube edge constraint overlaps monoblock type shear wall and preparation and installation method
CN106592426B (en) The construction method of transverse prestress overall with reinforced concrete bridge deck plate prefab-form system
CN208586936U (en) A kind of control protects brick mixed building joist and demolishes walls constructing device
CN109811878A (en) The shell integrated structure of the cast-in-place coinsiding die of assembled architecture and construction method
CN103114669A (en) Ribbed steel bar truss concrete superimposed sheet and construction method thereof
CN206707124U (en) Prefabricated assembling type reinforced concrete component with joint of steel structure
CN108797638A (en) Integrated assembled piping lane based on composite bottom board and its construction method
CN109779114B (en) Integral superimposed sheet combination beam
CN106968381A (en) With the prefabricated shear wall and overlapping plate node of Combined grouting sleeve connection
CN108487630A (en) Coagulation earth steps platform prefabrication and assembly construction construction method
CN103603359A (en) Deep foundation pit diagonal bracing support structure demolition method
CN114892552B (en) Box girder type bridge reconstruction construction method
CN114150766B (en) Prefabricated reinforced concrete column connecting node and construction method thereof
CN108678220A (en) A kind of concrete shear force wall of steel bar template integrative installation technology
CN208884727U (en) The assembly concrete frame structure connected outside precast beam plastic hinge region
CN209653108U (en) Prefabricated reinforced concrete column connection structure
CN208763208U (en) Additional closure connection reinforcing bar without support assembled integral beam-column node structure
CN108775085A (en) The assembled integral concrete frame structure and its construction method of beam-ends connection
EP1881111A2 (en) A bridge and a method for the construction of a bridge
CN110374012A (en) A kind of prefabricated engineering method of T beam original position Support Method
CN107246094A (en) A kind of overlapping reinforced concrete slab structure and preparation method for bearing heavy duty
CN105951986B (en) A kind of the mid-side node connection structure and its method of prefabricated integral frame column beam
CN108775086A (en) The additional assembled integral beam-column node structure and construction method for being closed connection reinforcing bar
CN106320585A (en) Novel fully-fabricated floor slab

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination