CN108772506A - A kind of full-automatic prestress wire blanking volume bundle device - Google Patents

A kind of full-automatic prestress wire blanking volume bundle device Download PDF

Info

Publication number
CN108772506A
CN108772506A CN201810746618.0A CN201810746618A CN108772506A CN 108772506 A CN108772506 A CN 108772506A CN 201810746618 A CN201810746618 A CN 201810746618A CN 108772506 A CN108772506 A CN 108772506A
Authority
CN
China
Prior art keywords
steel strand
strand wires
shu
yuanpan
volume
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810746618.0A
Other languages
Chinese (zh)
Inventor
罗伟
汤心红
龙峰
陈贵全
吴远林
唐培贤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guizhou Xinlian Blasting Engineering Group Co Ltd
Original Assignee
Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guizhou Xinlian Blasting Engineering Group Co Ltd filed Critical Guizhou Xinlian Blasting Engineering Group Co Ltd
Priority to CN201810746618.0A priority Critical patent/CN108772506A/en
Publication of CN108772506A publication Critical patent/CN108772506A/en
Pending legal-status Critical Current

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F7/00Twisting wire; Twisting wire together
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21CMANUFACTURE OF METAL SHEETS, WIRE, RODS, TUBES OR PROFILES, OTHERWISE THAN BY ROLLING; AUXILIARY OPERATIONS USED IN CONNECTION WITH METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL
    • B21C51/00Measuring, gauging, indicating, counting, or marking devices specially adapted for use in the production or manipulation of material in accordance with subclasses B21B - B21F
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B21MECHANICAL METAL-WORKING WITHOUT ESSENTIALLY REMOVING MATERIAL; PUNCHING METAL
    • B21FWORKING OR PROCESSING OF METAL WIRE
    • B21F23/00Feeding wire in wire-working machines or apparatus

Landscapes

  • Engineering & Computer Science (AREA)
  • Mechanical Engineering (AREA)
  • Wire Processing (AREA)

Abstract

The invention discloses a kind of full-automatic prestress wire blankings to compile bundle device, including pedestal, lateral compartment is provided with multiple volume beam devices on the pedestal, the upper end side of the pedestal is equipped with cutting machine, the volume beam device includes initialization platform, compiles Shu Yuanpan and compile beam disk support, steel strand wires limit hole is offered at the outside and center for compiling Shu Yuanpan, the steel strand wires limit hole and compiling, which hollows out on the outside of Shu Yuanpan between the gear teeth, to be set as steel strand wires and broadcasts hole, and the middle part of the initialization platform offers steel strand wires and launches hole;It is safe and reliable that the present invention forms horse structure, it is economical and practical, improve steel wire accuracy, decrement is away from number, make steel strand wires in order, ensure to compile beam quality, avoids steel strand wires and steel wire bundle is contaminated, steel wire bundle is difficult to duct lashing, steel strand wires curl and turns round the problem that fried dough twist and tensioning are easy;Ensure work quality, improves working efficiency, save a large amount of human resources.

Description

A kind of full-automatic prestress wire blanking volume bundle device
Technical field
The present invention relates to science of bridge building restressed beam slab component technology field, specially a kind of full-automatic prestress wire Bundle device is compiled in blanking.
Background technology
Measuring tape manually arranges steel strand wires and compiles beam, then to steel strand wires span, cutting on reinforcing steel processing shed hardened ground Before the steel strand wires after volume beam manually lift to member aperture to be worn.The steel wire bundle that beam is completed is compiled to transport to component hole position to be worn In the process, it is necessary to which the Shu Rongyi manually shoulder, lift, compiling scatters and twined due to being bent in transportational process, reversing to be easy to cause in beam Around;In blanking, compiling beam and transportational process, steel strand wires are in direct contact with ground, are easy the dirt by dust, mud, water, oil stain etc. Dye, impacts the prestressing force durability of steel strand wires;Manually blanking, compile beam operation quality it is difficult to ensure that, and it is strong to work Spend big, production efficiency bottom.
Invention content
The purpose of the present invention is to provide a kind of full-automatic prestress wire blankings to compile bundle device, to solve above-mentioned background The problem of being proposed in technology.
To achieve the above object, the present invention provides the following technical solutions:A kind of full-automatic prestress wire blanking volume beam Device, including pedestal, lateral compartment is provided with multiple volume beam devices on the pedestal, and the upper end side of the pedestal is equipped with cutting Machine, the volume beam device include initialization platform, compile Shu Yuanpan and compile beam disk support, be respectively provided with below the volume beam device To compile beam disk support, the inside for compiling beam disk support is mounted on three groups of Power Components, the volume beam disk support Upper end, which is movably installed with, compiles Shu Yuanpan, and the outside for compiling Shu Yuanpan is surrounded with the gear teeth, Power Component described in three groups It is sequentially connected with the volume Shu Yuanpan with the gear teeth, the top for compiling Shu Yuanpan is both provided with initialization platform, the volume Steel strand wires limit hole, the steel strand wires limit hole and the gear teeth on the outside of volume Shu Yuanpan are offered at the outside and center of Shu Yuanpan Between hollow out and be set as steel strand wires and broadcast hole, steel strand wires are laterally interspersed in corresponding steel strand wires limit hole, the steel twists Line is broadcasted and is both provided with steel strand retaining clip between hole and steel strand wires limit hole, and the middle part of the initialization platform offers Steel strand wires launch hole, and the side upper end for compiling beam device is installed with steel strand wires and broadcasts motor, and the steel strand wires broadcast electricity The output end of machine is respectively connected with steel wire, and the steel wire is connect with steel strand wires.
Preferably, the volume beam device is arranged one on pedestal every 3m.
Preferably, the initialization platform is disposed as " V " shape shape, and the diameter that the steel strand wires launch hole is all higher than steel At least one centimeter of the diameter of twisted wire.
Preferably, Power Component described in three groups includes a power motor and a driving gear, the power motor Be fixedly mounted on and compile in beam disk support, fixed driving gear on the output shaft of power motor, driving gear with compile beam Gear teeth meshing on the outside of disk.
Preferably, the steel strand retaining clip can be circumferentially fixed by steel strand wires.
Compared with prior art, the beneficial effects of the invention are as follows:Present invention formation horse structure is safe and reliable, economical real With raising steel wire accuracy, decrement makes steel strand wires in order away from number, ensures to compile beam quality, avoids steel strand wires and steel Strand bundle is contaminated, steel wire bundle is difficult to duct lashing, steel strand wires curl and turns round the problem that fried dough twist and tensioning are easy;It avoids Compile the hand haulage after beam;Ensure work quality, improves working efficiency, save a large amount of human resources.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is that the present invention compiles beam device front elevational view;
Fig. 3 is that the present invention compiles beam disk support schematic diagram;
Fig. 4 is that the present invention compiles Shu Yuanpan schematic diagrames;
Fig. 5 is that the present invention compiles beam device sectional side view.
In figure:Pedestal 1, volume beam device 2, steel strand wires 3, cutting machine 4, initialization platform 5, volume Shu Yuanpan 6, steel strand wires are broadcasted Hole 7, Power Component 8, volume beam disk support 9, steel strand wires limit hole 10, steel strand retaining clip 11, steel strand wires broadcast motor 12, steel Silk 13, steel strand wires launch hole 14.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other Embodiment shall fall within the protection scope of the present invention.
- 5 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of full-automatic prestress wire blanking volume is got one's things ready It sets, including pedestal 1, lateral compartment is provided with multiple volume beam devices 2 on pedestal 1, compiles beam device 2 and is arranged one every 3m on pedestal 1, The upper end side of pedestal 1 is equipped with cutting machine 4, and it is flat including initialization to compile beam device 2 for cutting steel strand wires 3 earnestly for cutting machine 4 Platform 5 compiles Shu Yuanpan 6 and compiles beam disk support 9, and the lower section for compiling beam device 2 is disposed as compiling beam disk support 9, compiles beam disk support 9 Inside be mounted on three groups of Power Components 8, the upper end for compiling beam disk support 9 is movably installed with and compiles Shu Yuanpan 6, compiles Shu Yuanpan 6 outside is surrounded with the gear teeth, and three groups of Power Components 8 are sequentially connected with the volume Shu Yuanpan 6 with the gear teeth, three groups of power Component 8 includes a power motor and a driving gear, and power motor, which is fixedly mounted on, to be compiled in beam disk support 9, is moved Fixed driving gear on the output shaft of force motor, gear teeth meshing of the driving gear with 6 outsides volume Shu Yuanpan, compiles Shu Yuanpan 6 Top be both provided with initialization platform 5, compile and offer steel strand wires limit hole 10 at the outside and center of Shu Yuanpan 6, Steel strand wires limit hole 10 and compiling, which hollows out between the 6 outside gear teeth of Shu Yuanpan, to be set as steel strand wires and broadcasts hole 7, and laterally corresponding steel twists It is interspersed with steel strand wires 3 in line limit hole 10, steel strand wires broadcast that steel strand wires are both provided between hole 7 and steel strand wires limit hole 10 is solid Clamp 11, steel strand retaining clip 11 can be circumferentially fixed by steel strand wires 3, and the middle part of initialization platform 5 offers steel strand Line launches hole 14, and initialization platform 5 is disposed as " V " shape shape, and the diameter that steel strand wires launch hole 14 is all higher than the straight of steel strand wires 3 At least one centimeter of diameter is launched for passing through for steel strand wires 3, and the side upper end of volume beam device 2 is installed with steel strand wires and broadcasts Motor 12, the output end that steel strand wires broadcast motor 12 are respectively connected with steel wire 13, and steel wire 13 is connect with steel strand wires 3.
The operation principle of the present invention:When blanking, after steel strand wires 3 enter initialization platform 5, in laser range finder work shape The length that steel strand wires 3 are measured under condition, is cut steel strand wires 3 using cutting machine 4, starts Power Component 8 and volume Shu Yuanpan 6 is driven to carry out Rotation, when compile Shu Yuanpan 6 above one of steel strand wires broadcast hole 7 on initialization platform 5 above and below the position of steel strand wires 3 it is right At once, start steel strand wires and broadcast motor 12, steel strand wires 3 drive steel wire 13 downward under the effect of gravity, and are broadcasted by steel strand wires Hole 7 enters in steel strand wires limit hole 10, and it is circumferentially fixed then to give steel strand wires 3 using steel strand retaining clip 11, opens steel wire 13 other ends restore 13 other end of steel wire to initial position after loosening steel wire 13, start the rotation of Power Component 8 and compile Shu Yuanpan 6, When compile a 6 lower steel strand wires of Shu Yuanpan broadcast hole 7 on initialization platform 5 above and below 3 position of steel strand wires to it is corresponding when stop power packages Part 8 works, and after steel strand wires 3 enter initialization platform 5,3 length of steel strand wires is measured under laser range finder working condition, again Steel strand wires are cut using cutting machine 4, starts steel strand wires and broadcasts motor 12, steel strand wires 3 drive under the effect of gravity steel wire 13 to Under, and broadcast hole 7 by steel strand wires and enter in steel strand wires limit hole 10, then steel strand wires are given using steel strand retaining clip 11 3 is circumferentially fixed;The volume beam work for sequentially completing all steel strand wires 3, compiling Shu Yuanpan 6, steel strand wires limit hole 10 is compiled above Number, while corresponding steel strand wires 3 are numbered, it is compiled in 1 left end of pedestal and binds 3 bunchy of steel strand wires with galvanized wire at 2 outside 2m of beam device, Carry out prestressed pore passage end lashing operation.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace And modification, the scope of the present invention is defined by the appended.

Claims (5)

1. bundle device, including pedestal are compiled in a kind of full-automatic prestress wire blanking(1), it is characterised in that:The pedestal(1)On Lateral compartment is provided with multiple volume beam devices(2), the pedestal(1)Upper end side cutting machine is installed(4), the volume beam device (2)It include initialization platform(5), compile Shu Yuanpan(6)With volume beam disk support(9), the volume beam device(2)Lower section be all provided with It is set to and compiles beam disk support(9), the volume beam disk support(9)Inside be mounted on three groups of Power Components(8), the volume beam Disk support(9)Upper end be movably installed with compile Shu Yuanpan(6), the volume Shu Yuanpan(6)Outside be surrounded with wheel Tooth, Power Component described in three groups(8)With the volume Shu Yuanpan with the gear teeth(6)It is sequentially connected, the volume Shu Yuanpan(6)Top It is both provided with initialization platform(5), the volume Shu Yuanpan(6)Outside and center at offer steel strand wires limit hole (10), the steel strand wires limit hole(10)With volume Shu Yuanpan(6)It is hollowed out between the gear teeth of outside and is set as steel strand wires and broadcasts hole (7), lateral corresponding steel strand wires limit hole(10)In be interspersed with steel strand wires(3), the steel strand wires broadcast hole(7)With steel strand wires Limit hole(10)Between be both provided with steel strand retaining clip(11), the initialization platform(5)Middle part offer steel strand Line launches hole(14), the volume beam device(2)Side upper end be installed with steel strand wires and broadcast motor(12), the steel strand wires Broadcast motor(12)Output end be respectively connected with steel wire(13), the steel wire(13)And steel strand wires(3)Connection.
2. bundle device is compiled in a kind of full-automatic prestress wire blanking according to claim 1, it is characterised in that:The volume Beam device(2)In pedestal(1)On every 3m be arranged one.
3. bundle device is compiled in a kind of full-automatic prestress wire blanking according to claim 1, it is characterised in that:It is described first Beginning workbench(5)It is disposed as " V " shape shape, the steel strand wires launch hole(14)Diameter be all higher than steel strand wires(3)Diameter At least one centimeter.
4. bundle device is compiled in a kind of full-automatic prestress wire blanking according to claim 1, it is characterised in that:Three groups of institutes State Power Component(8)Include a power motor and a driving gear, the power motor, which is fixedly mounted on, compiles Shu Yuan Disk bearing(9)It is interior, fixed driving gear on the output shaft of power motor, driving gear with compile Shu Yuanpan(6)The wheel in outside Tooth engagement.
5. bundle device is compiled in a kind of full-automatic prestress wire blanking according to claim 1, it is characterised in that:The steel Twisted wire geometrical clamp(11)It can be by steel strand wires(3)It is circumferentially fixed.
CN201810746618.0A 2018-07-09 2018-07-09 A kind of full-automatic prestress wire blanking volume bundle device Pending CN108772506A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810746618.0A CN108772506A (en) 2018-07-09 2018-07-09 A kind of full-automatic prestress wire blanking volume bundle device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810746618.0A CN108772506A (en) 2018-07-09 2018-07-09 A kind of full-automatic prestress wire blanking volume bundle device

Publications (1)

Publication Number Publication Date
CN108772506A true CN108772506A (en) 2018-11-09

Family

ID=64029814

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810746618.0A Pending CN108772506A (en) 2018-07-09 2018-07-09 A kind of full-automatic prestress wire blanking volume bundle device

Country Status (1)

Country Link
CN (1) CN108772506A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04198565A (en) * 1990-11-29 1992-07-17 Tokyo Seiko Co Ltd Cable bundling device for assembling flexible steel rod
CN104550048A (en) * 2014-12-25 2015-04-29 中国烟草总公司郑州烟草研究院 Diameter measurement device for rod-like products as well as discharging and sorting mechanism and sorting roll of device
CN205189424U (en) * 2015-10-22 2016-04-27 江阴法尔胜住电新材料有限公司 Tie rod cable draw gear
CN107175301A (en) * 2017-05-18 2017-09-19 中铁十六局集团铁运工程有限公司 A kind of fixed length steel wire machine and its processing method
US20180036788A1 (en) * 2016-08-02 2018-02-08 Dimension Fabricators, Inc. Rebar cage assembly apparatus
CN208743569U (en) * 2018-07-09 2019-04-16 保利新联爆破工程集团有限公司 A kind of full-automatic prestress wire blanking volume bundle device

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPH04198565A (en) * 1990-11-29 1992-07-17 Tokyo Seiko Co Ltd Cable bundling device for assembling flexible steel rod
CN104550048A (en) * 2014-12-25 2015-04-29 中国烟草总公司郑州烟草研究院 Diameter measurement device for rod-like products as well as discharging and sorting mechanism and sorting roll of device
CN205189424U (en) * 2015-10-22 2016-04-27 江阴法尔胜住电新材料有限公司 Tie rod cable draw gear
US20180036788A1 (en) * 2016-08-02 2018-02-08 Dimension Fabricators, Inc. Rebar cage assembly apparatus
CN107175301A (en) * 2017-05-18 2017-09-19 中铁十六局集团铁运工程有限公司 A kind of fixed length steel wire machine and its processing method
CN208743569U (en) * 2018-07-09 2019-04-16 保利新联爆破工程集团有限公司 A kind of full-automatic prestress wire blanking volume bundle device

Similar Documents

Publication Publication Date Title
CN102003073A (en) Constructing method for threading pre-stress structure steel strands
CN208743569U (en) A kind of full-automatic prestress wire blanking volume bundle device
CN204945456U (en) Twisted synthesizing cable production line
CN108772506A (en) A kind of full-automatic prestress wire blanking volume bundle device
CN101654880B (en) Two-in-one rope machine and rope manufacturing method thereof
CN203064900U (en) Steel wire rope winding machine
CN203613812U (en) Pre-stressed steel strand blanking and binding rack
CN212613816U (en) Two-dimensional walking mechanism
CN202023103U (en) One-line type steel cord stranding machine
CN111519907A (en) Two-dimensional walking mechanism
CN106744081A (en) A kind of power test cable reel installation
CN201040306Y (en) Steel bar rounding straightening machine
CN205471960U (en) Wire pay -off
CN211522889U (en) Bridge prestressing force whole bundle of steel strand wires compresses tightly conveyor
CN211285036U (en) Stranding device for steel wire rope production
CN204917803U (en) Tower machine spooling gear
CN216646142U (en) Mechanical horizontal steel wire rope bending fatigue testing machine
CN208531920U (en) A kind of prestress wire take-up
CN201068507Y (en) Hand-operated winding machine
CN217352153U (en) Automatic pore device that penetrates of steel strand wires
CN209920258U (en) Super cast concrete cutting device
CN109823924A (en) Pay-off rack for construction of prestressed steel strand finished product bundle
CN104675121B (en) Bundle stand is compiled in a kind of prestress wire blanking
CN201865359U (en) Connecting device of prestress steel box beam steel strand pulling
CN210245156U (en) Electric wire stranding device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
WD01 Invention patent application deemed withdrawn after publication

Application publication date: 20181109

WD01 Invention patent application deemed withdrawn after publication