CN108765552A - A kind of method of deploying of runner rebound - Google Patents

A kind of method of deploying of runner rebound Download PDF

Info

Publication number
CN108765552A
CN108765552A CN201810474023.4A CN201810474023A CN108765552A CN 108765552 A CN108765552 A CN 108765552A CN 201810474023 A CN201810474023 A CN 201810474023A CN 108765552 A CN108765552 A CN 108765552A
Authority
CN
China
Prior art keywords
line
runner
rebound
projection
contour line
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810474023.4A
Other languages
Chinese (zh)
Other versions
CN108765552B (en
Inventor
杨伟锋
曾凡强
刘凯
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Original Assignee
CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CSSC Huangpu Wenchong Shipbuilding Co Ltd filed Critical CSSC Huangpu Wenchong Shipbuilding Co Ltd
Priority to CN201810474023.4A priority Critical patent/CN108765552B/en
Publication of CN108765552A publication Critical patent/CN108765552A/en
Application granted granted Critical
Publication of CN108765552B publication Critical patent/CN108765552B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T17/00Three dimensional [3D] modelling, e.g. data description of 3D objects
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/15Vehicle, aircraft or watercraft design
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T19/00Manipulating 3D models or images for computer graphics

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Computer Graphics (AREA)
  • Computer Hardware Design (AREA)
  • General Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Automation & Control Theory (AREA)
  • Aviation & Aerospace Engineering (AREA)
  • Computational Mathematics (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • Length-Measuring Instruments Using Mechanical Means (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The present invention relates to a kind of method of deploying of runner rebound, it passes through on the only linear base of runner rebound, the downward projection line of several equal runners rebound outer wheels profiles, and it connects corresponding Along ent and forms bisector, again by bisector back projection to threedimensional model, connection forms new runner rebound line style, it diagonally connects each decile line projection and forms diagonal line, again by diagonal line back projection to threedimensional model, and it connects and to form diagonal line style, measure each decile line style and diagonal line style actual size, each line length is drawn successively to both sides from centre, to realize the expansion of runner rebound.In addition, the present invention can also according to the runner rebound threedimensional model and new line style establish the model of sample case, to solve the technical issues of cannot cutting suitable, accurate processing sample case in the prior art.

Description

A kind of method of deploying of runner rebound
Technical field
The present invention relates to hull construction field more particularly to a kind of method of deploying of runner rebound.
Background technology
Runner is the important feature of water jet propulsion ship, generally by runner rebound and ship hull plate smooth connection, is made For a part for ship shell.Runner rebound line style is more complicated, and required precision is high, and in irregular shape, accurate to be unfolded It is the construction weight difficult point of hydraulic jet propulsion class ship with processing and fabricating.Only shipform is not enough to expansion runner rebound zero Part can not also provide suitable sample case processing and fabricating.Runner rebound approximate can only roughly be unfolded, and place certain surplus, reduce Plate cutting stock precision.
Secondly, suitable, accurate processing sample case cannot be cut, plate forming effect is influenced, plate assembly difficulty is big, increases Production cost.
Invention content
In view of the above technical problems, the present invention provides a kind of method of deploying of runner rebound, the prior art is solved The technical issues of middle runner rebound can not accurately be unfolded and cannot cut suitable, accurate processing sample case.
To achieve the above object, the present invention provides a kind of method of deploying of runner rebound, include the following steps:
S1, runner rebound and threedimensional model when ship hull plate smooth connection are established, the threedimensional model established is painted It makes a plurality of buttocks being mutually parallel and forms vertical profile line style;
S2, runner rebound will be obtained in the exterior contour line projection to the vertical view of shipform of the runner rebound Projection view;
S3, the longest projection line in the projection view of the runner rebound is defined as first contour line, it will be with institute It states the opposite projection line of first contour line and is defined as the second contour line, the first contour line and the second contour line are carried out respectively N deciles;
S4, it connects the corresponding Along ent in position on the first contour line and the second contour line and forms n-1 decile Line;
S5, by the intersection point back projection of all bisectors in the projection view of runner rebound and the vertical profile line style extremely In vertical profile line style in the threedimensional model, extremely by Along ent back projection all in the first contour line and the second contour line On outer wheels profile in the threedimensional model, each subpoint being correspondingly connected in threedimensional model obtains the bisector three All back projection's line styles are defined as the new line style of runner rebound by back projection's line style in dimension module;
S6, in the projection view of the runner rebound, by adjacent two bisectors and the first contour line, second Contour line surrounds the diagonal line connection for the quadrangle to be formed, by the intersection point back projection of all diagonal lines and the vertical profile line style To the vertical profile line style in the threedimensional model, each subpoint being correspondingly connected in threedimensional model obtains the diagonal line three Back projection's line style in dimension module;
The reality of S7, the new line style for measuring the runner rebound and the diagonal line back projection's line style in the three-dimensional model Length, correspondence draw each length line and obtain the expanded view of runner rebound.
Preferably, a plurality of buttocks spaced set in step S1.
Preferably, the projection view of the runner rebound includes 4 projection lines, and 4 projection lines are received Tail connects to forming a closed figure.
Preferably, the first contour line and the second contour line are subjected to 6 deciles respectively in step S3.
Preferably, 4 articles of projection lines are first contour line, the second contour line and for being separately connected described the One contour line, the third contour line at the second contour line both ends, fourth round profile;Specific steps in step S4 include:With described Third contour line as the initial segment, using the fourth round profile as clearing end, by all Along ents of the first contour line from The initial segment to clearing end number consecutively is b~f, and all Along ents of the second contour line are compiled successively from the initial segment to clearing end Number it is b~f, is separately connected on the first contour line and the second contour line and numbers identical Along ent and be used as bisector, formation 5 Bisector.
Preferably, each subpoint being correspondingly connected in step S5 in threedimensional model obtains the bisector three The specific steps of back projection's line style include in dimension module:By in the projection view of runner rebound, by being projected in same bisector Back projection's line style of the bisector is formed to all the points smooth connection in threedimensional model.
Preferably, each subpoint being correspondingly connected in step S6 in threedimensional model obtains the diagonal line three The specific steps of back projection's line style include in dimension module:By in the projection view of runner rebound, by being projected on same diagonal line Cornerwise back projection's line style is formed to all the points smooth connection in threedimensional model.
Preferably, be b~f from the initial segment to clearing end number consecutively by 5 bisectors, in step S7 with The bisector that number is d draws each length line to the initial segment and clearing end respectively as starting point and obtains the expansion of runner rebound Figure.
Preferably, further include sample case modeling procedure in step S5, the sample case modeling procedure includes:It is being parallel to The model that sample bottom seat is established at hull basal plane and plane apart from 400~500mm of runner rebound, in the runner rebound The model for connecting passage rebound and the middle baffle plate and edge guard of sample bottom seat is established between the sample bottom seat, The cross sectional shape of the middle baffle plate is identical as the new line style of runner rebound and position and the new line style are corresponding, institute State edge guard cross sectional shape is identical as the third contour line, the shape of fourth round profile and position and the third profile Line, fourth round profile are corresponding.
The method of deploying for a kind of runner rebound that above-mentioned technical proposal is provided, first by the exterior contour of runner rebound In line projection to the vertical view of shipform, the bisector of runner rebound projection line and decile that will be drawn then are drawn In line back projection to threedimensional model, and then the bisector of runner rebound is determined in the three-dimensional model, further, according to above-mentioned Step establishes diagonal line back projection's line style in the three-dimensional model in the three-dimensional model, to increase the three-dimensional mould of runner rebound Alignment type measures the new line style of the runner rebound when the threedimensional model of runner rebound to be unfolded really in type It is corresponding to draw each length line and obtain runner rebound with the physical length of diagonal line back projection's line style in the three-dimensional model Expanded view.The accurate expansion to runner rebound can be realized by the above method.In addition, the technical program can also be according to institute of institute It states the threedimensional model of runner rebound and new line style establishes the model of sample case, to which conjunction cannot be cut in the prior art by solving The technical issues of suitable, accurate processing sample case.
Description of the drawings
Fig. 1 is runner and shipform relation schematic diagram (one);
Fig. 2 is runner and shipform relation schematic diagram (two);
Fig. 3 is the vertical profile line illustration of runner rebound;
Fig. 4 is the Line Chart after drafting bisector in the vertical view of runner rebound;
Fig. 5 is the Line Chart after bisector back projection to the threedimensional model of runner rebound;
Fig. 6 is that the Line Chart after diagonal line is drawn in Fig. 4;
Fig. 7 is the Line Chart after Tu5Zhong diagonal lines back projection to the threedimensional model of runner rebound;
Fig. 8 is the Line Chart after the expansion of runner rebound;
Fig. 9 is the structural schematic diagram of the sample case of runner rebound.
Wherein:1, runner;2, runner rebound;3, ship hull plate;4, the second contour line;5, first contour line;6, third Contour line;7, fourth round profile;8, vertical profile line style;9, bisector.
Specific implementation mode
With reference to the accompanying drawings and examples, the specific implementation mode of the present invention is described in further detail.Implement below Example is not limited to the scope of the present invention for illustrating the present invention.
As shown in figs 1-9, it is a kind of method of deploying of runner rebound provided by the present invention, includes the following steps:
S1, runner rebound 2 and threedimensional model when 3 smooth connection of ship hull plate are established, to the threedimensional model established It draws a plurality of buttocks being mutually parallel and forms vertical profile line style 8;
It is as shown in Figs. 1-2 runner and shipform relation schematic diagram comprising described in runner 1, ship hull plate 3 and connection The runner rebound 2 of runner 1 and ship hull plate 3.As illustrated in fig. 1-3, the vertical profile line illustration of runner rebound 2 has been made.
S2, runner transition will be obtained in the exterior contour line projection to the vertical view of shipform of the runner rebound 2 The projection view of plate 2;As shown in figure 4, having made the projection view of runner rebound 2.
S3, the longest projection line in the projection view of the runner rebound 2 is defined as first contour line 5, it will be with The opposite projection line of the first contour line 5 is defined as the second contour line 4, and the first contour line 5 and the second contour line 4 are divided It carry out not n deciles;Refer to Fig. 4.
The corresponding Along ent in position and n-1 items are formed on S4, connection 5 and second contour line 4 of first contour line etc. Separated time 9;Refer to Fig. 4.
S5, it throws the intersection point of all bisectors 9 in the projection view of runner rebound 2 and the vertical profile line style 8 is counter In vertical profile line style 8 in shadow to the threedimensional model, by Along ent all in the first contour line 5 and the second contour line 4 On outer wheels profile in back projection to the threedimensional model, each subpoint for being correspondingly connected in threedimensional model obtains described etc. All back projection's line styles, are defined as the new line style of runner rebound 2 by the back projection's line style in the three-dimensional model of separated time 9;Ginseng See Fig. 5.
S6, in the projection view of the runner rebound 2, by adjacent two bisectors 9 and the first contour line 5, Second contour line 4 surrounds the diagonal line connection for the quadrangle to be formed, by the intersection point of all diagonal lines and the vertical profile line style 8 In vertical profile line style 8 in back projection to the threedimensional model, it is described right that each subpoint for being correspondingly connected in threedimensional model obtains Linea angulata back projection's line style in the three-dimensional model;Referring to Fig. 6-7.
The reality of S7, the new line style for measuring the runner rebound 2 and the diagonal line back projection's line style in the three-dimensional model Border length, correspondence draw each length line and obtain the expanded view of runner rebound 2.Referring to Fig. 8.
Specifically, in the present embodiment, first by the vertical view of the exterior contour line projection of runner rebound 2 to shipform On, then draw the bisector 9 of 2 projection line of runner rebound and by 9 back projection to threedimensional model of bisector drawn, And then determine that the bisector 9 of runner rebound 2 is further built according to above-mentioned steps in the three-dimensional model in the three-dimensional model Vertical diagonal line back projection's line style in the three-dimensional model, alignment type really in the threedimensional model to increase runner rebound 2, When the threedimensional model of runner rebound 2 is unfolded, measure the runner rebound 2 new line style and the diagonal line three The physical length of back projection's line style in dimension module, correspondence draw each length line and obtain the expanded view of runner rebound 2.By above-mentioned The accurate expansion to runner rebound 2 can be realized in method.In addition, the technical program can also be according to the runner rebound 2 Threedimensional model and new line style establish the model of sample case, to which suitable, accurate processing cannot be cut in the prior art by solving The technical issues of sample case.
In the present embodiment, a plurality of buttocks spaced set in step S1.As shown in figure 3, the runner rebound 2 Projection view include 4 projection lines, 4 projection lines endings connect to forming a closed figure, wherein third profile Line 6 and fourth round profile 7 are straight line.The first contour line 5 and the second contour line 4 are subjected to 6 deciles respectively in step S3, Wherein, vertical profile line style 8 is closeer, and decile quantity is more, and the runner line style cut out is more accurate, and the plate washer of sample case is just relatively more, adds Work forming effect is better, and the setting-out expansion of plate is more accurate.4 projection lines are first contour line 5, the second contour line 4 and for being separately connected the first contour line 5, the third contour line 6 at 4 both ends of the second contour line, fourth round profile 7;Step Specific steps in S4 include:Using the third contour line 6 as the initial segment, using the fourth round profile 7 as clearing end, will 5 all Along ents of the first contour line are b~f from the initial segment to clearing end number consecutively, and second contour line 4 is owned Along ent is b~f from the initial segment to clearing end number consecutively, is separately connected the first contour line 5 and is compiled on the second contour line 4 Number identical Along ent forms 5 bisectors 9 as bisector 9.
Specifically, each subpoint being correspondingly connected in step S5 in threedimensional model obtains the bisector 9 in three-dimensional mould The specific steps of Xing Zhong back projections line style include:By in the projection view of runner rebound 2, by projected in same bisector 9 to All the points smooth connection in threedimensional model forms back projection's line style of the bisector 9.It is correspondingly connected with threedimensional model in step S6 In each subpoint obtain the specific steps of diagonal line back projection's line style in the three-dimensional model and include:By runner rebound In 2 projection view, it is cornerwise anti-that this is formed by projection to all the points smooth connection in threedimensional model on same diagonal line Project line style.From the initial segment to clearing end number consecutively be b~f by 5 bisectors 9, in step S7 with number be d etc. Separated time 9 draws each length line to the initial segment and clearing end respectively as starting point and obtains the expanded view of runner rebound 2, and expanded view is such as Shown in Fig. 8, the present embodiment uses the method for drawing each line length successively from centre to both sides, to realize runner rebound 2 Expansion.
As shown in figure 9, further including sample case modeling procedure in the present embodiment, in step S5, the sample case modeling procedure includes: It is being parallel to hull basal plane and is establishing the model of sample bottom seat at plane apart from 2400~500mm of runner rebound, described Middle baffle plate and the side for connecting passage rebound 2 with sample bottom seat are established between runner rebound 2 and the sample bottom seat The model of edge baffle, the cross sectional shape of the middle baffle plate is identical as the new line style of the runner rebound 2 and position with it is described New line style is corresponding, the cross sectional shape of the edge guard it is identical as the third contour line 6, the shape of fourth round profile 7 and Position is corresponding with the third contour line 6, fourth round profile 7, wherein as shown in figure 9, the sample bottom seat and the runner The side of 2 indent of rebound is opposite.To solve the technology that cannot cut suitable, accurate processing sample case in the prior art Problem, in addition, this method is simple, convenient, reliability is high, and versatility is good, can reduce production cost, improves work effect Rate.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can Can also be electrical connection to be mechanical connection;It can be directly connected, can also indirectly connected through an intermediary, Ke Yishi Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.In addition, term " first ", " second ", " third " are used for description purposes only, and should not be understood as indicating Or imply relative importance.
The above is only a preferred embodiment of the present invention, it is noted that for the ordinary skill people of the art For member, without departing from the technical principles of the invention, several improvement and replacement can also be made, these improve and replace Also it should be regarded as protection scope of the present invention.

Claims (9)

1. a kind of method of deploying of runner rebound, which is characterized in that include the following steps:
S1, runner rebound and threedimensional model when ship hull plate smooth connection are established, the threedimensional model established is drawn more The buttocks that item is mutually parallel forms vertical profile line style;
S2, the throwing of runner rebound will be obtained in the exterior contour line projection to the vertical view of shipform of the runner rebound Video display figure;
S3, the longest projection line in the projection view of the runner rebound is defined as first contour line, it will be with described The opposite projection line of one contour line is defined as the second contour line, and the first contour line and the second contour line are carried out n etc. respectively Point;
S4, it connects the corresponding Along ent in position on the first contour line and the second contour line and forms n-1 bisector;
S5, by the intersection point back projection of all bisectors in the projection view of runner rebound and the vertical profile line style to described In vertical profile line style in threedimensional model, by Along ent back projection all in the first contour line and the second contour line to described On outer wheels profile in threedimensional model, each subpoint being correspondingly connected in threedimensional model obtains the bisector in three-dimensional mould All back projection's line styles are defined as the new line style of runner rebound by Xing Zhong back projections line style;
S6, in the projection view of the runner rebound, by adjacent two bisectors and the first contour line, the second profile Line surrounds the diagonal line connection for the quadrangle to be formed, by intersection point back projection to the institute of all diagonal lines and the vertical profile line style It states in the vertical profile line style in threedimensional model, each subpoint being correspondingly connected in threedimensional model obtains the diagonal line in three-dimensional mould Xing Zhong back projections line style;
The actual (tube) length of S7, the new line style for measuring the runner rebound and the diagonal line back projection's line style in the three-dimensional model Degree, correspondence draw each length line and obtain the expanded view of runner rebound.
2. the method for deploying of runner rebound according to claim 1, which is characterized in that a plurality of vertical profile in step S1 Line spaced set.
3. the method for deploying of runner rebound according to claim 1, which is characterized in that the projection of the runner rebound View includes 4 projection lines, and 4 projection line endings connect to forming a closed figure.
4. the method for deploying of runner rebound according to claim 3, which is characterized in that by the first round in step S3 Profile and the second contour line carry out 6 deciles respectively.
5. the method for deploying of runner rebound according to claim 4, which is characterized in that 4 projection lines are first Contour line, the second contour line and for being separately connected the first contour line, the third contour line at the second contour line both ends, the 4th Contour line;Specific steps in step S4 include:Using the third contour line as the initial segment, using the fourth round profile as Clearing end, by all Along ents of the first contour line from the initial segment to clearing end number consecutively be b~f, described second is taken turns All Along ents of profile are b~f from the initial segment to clearing end number consecutively, are separately connected the first contour line and the second profile Identical Along ent is numbered on line as bisector, forms 5 bisectors.
6. the method for deploying of runner rebound according to claim 1, which is characterized in that be correspondingly connected with three-dimensional in step S5 The specific steps that each subpoint in model obtains bisector back projection's line style in the three-dimensional model include:By runner mistake In the projection view of cab apron, the bisector is formed by being projected to all the points smooth connection in threedimensional model in same bisector Back projection's line style.
7. the method for deploying of runner rebound according to claim 1, which is characterized in that be correspondingly connected with three-dimensional in step S6 The specific steps that each subpoint in model obtains diagonal line back projection's line style in the three-dimensional model include:By runner mistake In the projection view of cab apron, by being projected on same diagonal line, to all the points smooth connection in threedimensional model to form this cornerwise Back projection's line style.
8. the method for deploying of runner rebound according to claim 5, which is characterized in that by 5 bisectors from Beginning section to clearing end number consecutively is b~f, in step S7 using number be d bisector as starting point respectively to the initial segment and end Not-go-end draws each length line and obtains the expanded view of runner rebound.
9. the method for deploying of runner rebound according to claim 5, which is characterized in that further include that sample case is built in step S5 Mould step, the sample case modeling procedure include:It is being parallel to hull basal plane and apart from the plane of 400~500mm of runner rebound Place establishes the model of sample bottom seat, is established between the runner rebound and the sample bottom seat and is used for connecting passage rebound With the model of the middle baffle plate and edge guard of sample bottom seat, the cross sectional shape of the middle baffle plate and the runner rebound New line style is identical and position is corresponding with the new line style, the cross sectional shape of the edge guard and the third contour line, the The shape of four contour lines is identical and position is corresponding with the third contour line, fourth round profile.
CN201810474023.4A 2018-05-17 2018-05-17 Unfolding method of runner transition plate Active CN108765552B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810474023.4A CN108765552B (en) 2018-05-17 2018-05-17 Unfolding method of runner transition plate

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810474023.4A CN108765552B (en) 2018-05-17 2018-05-17 Unfolding method of runner transition plate

Publications (2)

Publication Number Publication Date
CN108765552A true CN108765552A (en) 2018-11-06
CN108765552B CN108765552B (en) 2022-05-10

Family

ID=64008495

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810474023.4A Active CN108765552B (en) 2018-05-17 2018-05-17 Unfolding method of runner transition plate

Country Status (1)

Country Link
CN (1) CN108765552B (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040107356A1 (en) * 1999-03-16 2004-06-03 Intertrust Technologies Corp. Methods and apparatus for persistent control and protection of content
CN106204736A (en) * 2016-03-01 2016-12-07 临沂市博信机械有限公司 The expansion setting-out of a kind of three-dimensional surface triangle method of development makes new invention method
CN106599426A (en) * 2016-12-05 2017-04-26 中船黄埔文冲船舶有限公司 Space transition board generation method and apparatus
CN107301279A (en) * 2017-06-07 2017-10-27 中船黄埔文冲船舶有限公司 A kind of three-dimensional modeling method of hull kuppe
CN107391798A (en) * 2017-06-22 2017-11-24 中船黄埔文冲船舶有限公司 A kind of three-dimensional modeling method of side selection structure
CN108001614A (en) * 2017-12-08 2018-05-08 中船黄埔文冲船舶有限公司 A kind of lofting Design method of large-scale anchor station and anchor lip

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20040107356A1 (en) * 1999-03-16 2004-06-03 Intertrust Technologies Corp. Methods and apparatus for persistent control and protection of content
CN106204736A (en) * 2016-03-01 2016-12-07 临沂市博信机械有限公司 The expansion setting-out of a kind of three-dimensional surface triangle method of development makes new invention method
CN106599426A (en) * 2016-12-05 2017-04-26 中船黄埔文冲船舶有限公司 Space transition board generation method and apparatus
CN107301279A (en) * 2017-06-07 2017-10-27 中船黄埔文冲船舶有限公司 A kind of three-dimensional modeling method of hull kuppe
CN107391798A (en) * 2017-06-22 2017-11-24 中船黄埔文冲船舶有限公司 A kind of three-dimensional modeling method of side selection structure
CN108001614A (en) * 2017-12-08 2018-05-08 中船黄埔文冲船舶有限公司 A kind of lofting Design method of large-scale anchor station and anchor lip

Also Published As

Publication number Publication date
CN108765552B (en) 2022-05-10

Similar Documents

Publication Publication Date Title
CN107235119B (en) The method for fairing of molded line is built on a kind of
CN101853523B (en) Method for adopting rough drawings to establish three-dimensional human face molds
CN108001614B (en) It is a kind of large size anchor station and anchor lip lofting Design method
CN104365954A (en) 3D printing production method of multi-flavor sandwiched food
CN106650085B (en) Method for generating hollow model by entity model based on finite element mesh
CN103341929A (en) Method for manufacturing injection product model
CN106995037B (en) Ship hull surface outside plate indulges the arrangement method of bone
CN104573272A (en) Digital quick reversal design technology for injection moulds
CN108765552A (en) A kind of method of deploying of runner rebound
CN100580296C (en) Thin wall non-corrodible steel sharp corner square, rectangular pipe and its production facility
CN108760368A (en) The judgment method of aerial fog nozzle typical operation conditions
CN111414662B (en) Method for assembling strip-shaped curved surface building skin by using linear profile
CN109094717A (en) The method of deploying of veneer bilge keelson
CN106985394A (en) A kind of 3D model Method of printings assembled based on parted pattern and fastener
CN206011579U (en) A kind of multipurpose detachably adjusts sizing calibration tool device
CN108629108A (en) Design method of parametric wave rider with controllable fuselage and wing parts
CN107951103A (en) The plate-making method of garment decoration sleeve
CN106424555B (en) Engineering tire mold pattern block slab die model and its processing method
CN207707365U (en) A kind of garment decoration sleeve model
CN209272408U (en) Robot hand arm mold
CN208214068U (en) A kind of auxiliary mould of airplane wingtip skins front edges stretch forming
CN204642139U (en) A kind of semi-spade rudder structure
CN204150145U (en) Automobile master model
CN104002434B (en) A kind of mould for being easy to the demoulding
CN205704868U (en) A kind of light-conducting board mold

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
EE01 Entry into force of recordation of patent licensing contract

Application publication date: 20181106

Assignee: Zhanjiang Nanhai Shipbuilding High tech Service Co.,Ltd.

Assignor: CSSC HUANGPU WENCHONG SHIPBUILDING Co.,Ltd.

Contract record no.: X2023980048830

Denomination of invention: A method for unfolding transition plates in flow channels

Granted publication date: 20220510

License type: Common License

Record date: 20231130

EE01 Entry into force of recordation of patent licensing contract