CN108765238A - A method of it is calculated by grid model and realizes grid water early warning - Google Patents

A method of it is calculated by grid model and realizes grid water early warning Download PDF

Info

Publication number
CN108765238A
CN108765238A CN201810518830.1A CN201810518830A CN108765238A CN 108765238 A CN108765238 A CN 108765238A CN 201810518830 A CN201810518830 A CN 201810518830A CN 108765238 A CN108765238 A CN 108765238A
Authority
CN
China
Prior art keywords
grid
water
early warning
warning
detected
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810518830.1A
Other languages
Chinese (zh)
Inventor
黄敏
夏永卫
陈金满
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Water Information Technology Co Ltd
Original Assignee
Zhejiang Water Information Technology Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Water Information Technology Co Ltd filed Critical Zhejiang Water Information Technology Co Ltd
Priority to CN201810518830.1A priority Critical patent/CN108765238A/en
Publication of CN108765238A publication Critical patent/CN108765238A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q50/00Information and communication technology [ICT] specially adapted for implementation of business processes of specific business sectors, e.g. utilities or tourism
    • G06Q50/10Services
    • G06Q50/26Government or public services
    • G06Q50/265Personal security, identity or safety
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06TIMAGE DATA PROCESSING OR GENERATION, IN GENERAL
    • G06T15/003D [Three Dimensional] image rendering
    • G06T15/10Geometric effects
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A20/00Water conservation; Efficient water supply; Efficient water use
    • Y02A20/152Water filtration

Landscapes

  • Business, Economics & Management (AREA)
  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Tourism & Hospitality (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Economics (AREA)
  • General Health & Medical Sciences (AREA)
  • Development Economics (AREA)
  • Educational Administration (AREA)
  • Geometry (AREA)
  • Health & Medical Sciences (AREA)
  • Computer Security & Cryptography (AREA)
  • Computer Graphics (AREA)
  • Human Resources & Organizations (AREA)
  • Marketing (AREA)
  • Primary Health Care (AREA)
  • Strategic Management (AREA)
  • General Business, Economics & Management (AREA)
  • Alarm Systems (AREA)

Abstract

Method that realizing grid water early warning is calculated by grid model the present invention relates to a kind of, by acquiring following rainfall product data and real-time monitoring data and the relevant data of other hydrology, on the basis of after mesh generation, be obtained by calculation following several days on each grid water transfinite information.And the water information that transfinites is converted by visual interface by gis Cartographic Techniques.User can in system at any time check the following several days water early warning situations in grid area, facilitate and preferably protected masses' life and property safety.

Description

A method of it is calculated by grid model and realizes grid water early warning
Technical field
The present invention relates to flood control is information-based and base takes precautions against natural calamities application field, especially it is a kind of passing through grid model and calculate realize The method of grid water early warning.
Background technology
Early warning take precautions against natural calamities as one of component part important in organizational framework of taking precautions against natural calamities, plays and can not estimate in the condition of a disaster prevention The effect of amount.In the course of work is taken precautions against natural calamities in current flood control, various, changeable phenomenon that there are the condition of a disasters, while lacking coming few hours Early warning remind.Currently, the condition of a disaster system early warning in each province and city is relatively simple, it is stronger to real-time monitoring data dependence.It leads Cause lacks effective time for preventing the condition of a disaster with shifting masses' resource.Existing the condition of a disaster system exists to monitoring data dependence By force, the problem that type of prediction area is relatively simple, prediction is not prompt enough.In order to solve the problems, such as appeal, propose one kind to have obtained Under conditions of taking premised on following rainfall data, the future may appear the area of the condition of a disaster and carried out by system automatic decision Early warning.The condition of a disaster early warning to coming few hours can be carried out in advance.
Invention content
Method that realizing grid water early warning is calculated by grid model the purpose of the present invention is to provide a kind of, to overcome Defect existing in the prior art.
To achieve the above object, the technical scheme is that:One kind is calculated by grid model realizes that grid water is pre- Alert method, is realized in accordance with the following steps:
Step S1:Mesh generation is carried out to prewarning area to be detected;Using the criteria for classifying in mountain area, Plain, by early warning to be detected Region carries out the division of grid, mountain area grid and Plain grid is obtained, as corresponding grid to be detected;
Step S2:For different grids to be detected, the rainfall, water level, water quality of the prediction in the following preset number of days are obtained, is uploaded To server;
Step S3:The current rainfall of each grid to be detected of acquisition in real time, water level, water quality, it is current to calculate grid to be detected Water data or waterlevel data, be uploaded to server;
Step S4:The data that the server is obtained according to step S2 calculate water or SEA LEVEL VARIATION trend curve;For mountain area Grid calculates water change trend curve, judges whether corresponding water alreadys exceed preset warning flood limit flow, and according to Acquired water generates the flow warning information of several flow grades;For Plain grid, it is bent to calculate SEA LEVEL VARIATION trend Line, judges whether corresponding water level alreadys exceed preset warning flood season limit level, and generates several according to acquired water level The water level warning information of water level grade;
Step S5:The server according to the current water data of the grid to be detected of acquisition or waterlevel data, respectively it is corresponding with The flow warning information or water level warning information are compared, and obtain the corresponding warning grade of grid to be detected and the early warning The corresponding early warning water level of grade or early warning water, and store to database;
Step S6:Warning grade and corresponding early warning water level or early warning water are passed through a visual system by the server It is shown;The server is based on GIS map after database obtains corresponding information, by warning grade and correspondence Early warning water level or early warning water shown on map, the corresponding grid in alert status can be into line flicker and Map The variation of layer is reminded.
Compared to the prior art, the invention has the advantages that:It is proposed by the present invention a kind of real by grid model calculating The method of existing grid water early warning, the method for obtaining grid water using the following rainfall of acquisition to realize grid water early warning, Method by acquiring the following rainfall, can estimate the water early warning details of coming few hours, can improve the reaction speed of early warning Degree and largely time shift people's life safety and property.The area of early warning is also not limited to plain river.With a large amount of The meaning of popularization.
Description of the drawings
Fig. 1 is a kind of flow chart calculating the method for realizing grid water early warning by grid model proposed by the present invention.
Specific implementation mode
Below in conjunction with the accompanying drawings, technical scheme of the present invention is specifically described.
The present invention provides a kind of method calculating realization grid water early warning by grid model, as shown in Figure 1, including such as Lower step:
1, mesh generation is carried out to prewarning area.Using the criteria for classifying in mountain area, Plain, early warning area is subjected to drawing for grid Point.It can effectively be directed to the warning information calculating that different regions type carries out various rule in this way.Warning information can be more Accurately.Mesh generation is carried out to prewarning area to be detected;Using the criteria for classifying in mountain area, Plain, by prewarning area to be detected into The division of row grid obtains mountain area grid and Plain grid, as corresponding grid to be detected.
2, for different grids to be detected, the rainfall, water level, water quality of the prediction in the following preset number of days is obtained, is uploaded To server.The rainfall and other hydrographic datas of following several days of acquisition.Following forecast data being capable of better help system It calculates following water variation tendency and judges whether corresponding water alreadys exceed the preset flood amount of restricting water supply, and corresponded to Warning information
3, the current rainfall of each grid to be detected of acquisition in real time, water level, water quality, calculate the current water of grid to be detected Data or waterlevel data, are uploaded to server.The monitoring data such as acquisition rainfall, water level in real time.System is by real time monitoring Rainfall, waterlevel data can obtain water data existing for current grid, and final forecast result error can be made to become smaller, allowed pre- The result of report is more acurrate.
4, the data that server is obtained according to step S2 calculate water or SEA LEVEL VARIATION trend curve;For mountain area grid, Water change trend curve is calculated, judges whether corresponding water alreadys exceed preset warning flood limit flow, and according to being obtained The water taken generates the flow warning information of several flow grades;For Plain grid, SEA LEVEL VARIATION trend curve is calculated, is sentenced Whether the corresponding water level that breaks alreadys exceed preset warning flood season limit level, and generates several water levels etc. according to acquired water level The water level warning information of grade.Server-side converts obtained forecast information to corresponding warning information by a series of rule, Different grids has some hydrographic informations of different calculations and needs.Service can be in early period by some water in grid The data of text, population etc generate corresponding warning value.The rain condition data that service system is come by comparing warning value with acquisition, To obtain specific warning data.
5, server corresponds to and the stream respectively according to the current water data of the grid to be detected of acquisition or waterlevel data Amount warning information or water level warning information are compared, and obtain the corresponding warning grade of grid to be detected and the warning grade pair The early warning water level or early warning water answered, and store to database.
6, server carries out warning grade and corresponding early warning water level or early warning water by a visual system Displaying;Server is based on GIS map after database obtains corresponding information, by warning grade and corresponding early warning water Position or early warning water are shown on map, and the corresponding grid in alert status can be into the variation of line flicker and map layer It is reminded.It converts warning data to visual system to be shown, after database obtains corresponding warning information, lead to The technology for crossing GIS map is shown warning information by the concept of upper thread, for the net in alert status on map Lattice can be into the prompting of line flicker and other modes.It can allow user that can more intuitively know which place has the condition of a disaster, Ke Yigeng Good deprotection.
The above are preferred embodiments of the present invention, all any changes made according to the technical solution of the present invention, and generated function is made When with range without departing from technical solution of the present invention, all belong to the scope of protection of the present invention.

Claims (1)

1. a kind of calculating the method for realizing grid water early warning by grid model, which is characterized in that realize in accordance with the following steps:
Step S1:Mesh generation is carried out to prewarning area to be detected;Using the criteria for classifying in mountain area, Plain, by early warning to be detected Region carries out the division of grid, mountain area grid and Plain grid is obtained, as corresponding grid to be detected;
Step S2:For different grids to be detected, the rainfall, water level, water quality of the prediction in the following preset number of days are obtained, is uploaded To server;
Step S3:The current rainfall of each grid to be detected of acquisition in real time, water level, water quality, it is current to calculate grid to be detected Water data or waterlevel data, be uploaded to server;
Step S4:The data that the server is obtained according to step S2 calculate water or SEA LEVEL VARIATION trend curve;For mountain area Grid calculates water change trend curve, judges whether corresponding water alreadys exceed preset warning flood limit flow, and according to Acquired water generates the flow warning information of several flow grades;For Plain grid, it is bent to calculate SEA LEVEL VARIATION trend Line, judges whether corresponding water level alreadys exceed preset warning flood season limit level, and generates several according to acquired water level The water level warning information of water level grade;
Step S5:The server according to the current water data of the grid to be detected of acquisition or waterlevel data, respectively it is corresponding with The flow warning information or water level warning information are compared, and obtain the corresponding warning grade of grid to be detected and the early warning The corresponding early warning water level of grade or early warning water, and store to database;
Step S6:Warning grade and corresponding early warning water level or early warning water are passed through a visual system by the server It is shown;The server is based on GIS map after database obtains corresponding information, by warning grade and correspondence Early warning water level or early warning water shown on map, the corresponding grid in alert status can be into line flicker and Map The variation of layer is reminded.
CN201810518830.1A 2018-05-25 2018-05-25 A method of it is calculated by grid model and realizes grid water early warning Pending CN108765238A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810518830.1A CN108765238A (en) 2018-05-25 2018-05-25 A method of it is calculated by grid model and realizes grid water early warning

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810518830.1A CN108765238A (en) 2018-05-25 2018-05-25 A method of it is calculated by grid model and realizes grid water early warning

Publications (1)

Publication Number Publication Date
CN108765238A true CN108765238A (en) 2018-11-06

Family

ID=64006385

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810518830.1A Pending CN108765238A (en) 2018-05-25 2018-05-25 A method of it is calculated by grid model and realizes grid water early warning

Country Status (1)

Country Link
CN (1) CN108765238A (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110705759A (en) * 2019-09-18 2020-01-17 平安科技(深圳)有限公司 Water level early warning monitoring method and device, storage medium and electronic equipment

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030212493A1 (en) * 2002-03-26 2003-11-13 Shuichi Tanahashi Disaster predicting method, disaster predicting apparatus, disaster predicting program, and computer-readable recording medium recorded with disaster predicting program
CN105302777A (en) * 2015-09-25 2016-02-03 福建四创软件有限公司 Water environment information displaying method and system based on grid dynamic play
CN106844531A (en) * 2016-12-29 2017-06-13 福建四创软件有限公司 A kind of flood control command based on grid studies and judges system

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20030212493A1 (en) * 2002-03-26 2003-11-13 Shuichi Tanahashi Disaster predicting method, disaster predicting apparatus, disaster predicting program, and computer-readable recording medium recorded with disaster predicting program
CN105302777A (en) * 2015-09-25 2016-02-03 福建四创软件有限公司 Water environment information displaying method and system based on grid dynamic play
CN106844531A (en) * 2016-12-29 2017-06-13 福建四创软件有限公司 A kind of flood control command based on grid studies and judges system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110705759A (en) * 2019-09-18 2020-01-17 平安科技(深圳)有限公司 Water level early warning monitoring method and device, storage medium and electronic equipment
CN110705759B (en) * 2019-09-18 2022-06-03 平安科技(深圳)有限公司 Water level early warning monitoring method and device, storage medium and electronic equipment

Similar Documents

Publication Publication Date Title
Gronewold et al. Coasts, water levels, and climate change: A Great Lakes perspective
Ruggiero et al. Increasing wave heights and extreme value projections: The wave climate of the US Pacific Northwest
Damrath et al. Operational quantitative precipitation forecasting at the German Weather Service
JP5537883B2 (en) Disaster prediction system and disaster prediction method
CN105608840A (en) Mountain torrents early warning platform based on fused quantitative rainfall forecast algorithm, and early warning method thereof
CN106373070B (en) A kind of four pre- methods for coping with urban rainstorm waterlogging
US8914266B2 (en) Systems and methods for modeling floods
Raicich Recent evolution of sea-level extremes at Trieste (Northern Adriatic)
Diodato et al. Storminess and environmental changes in the Mediterranean Central Area
Ciavola et al. Prediction of storm impacts on beach and dune systems
CN108765238A (en) A method of it is calculated by grid model and realizes grid water early warning
Guzmám et al. Economic impacts of drought risks for water utilities through Severity-Duration-Frequency framework under climate change scenarios
Murray et al. Characteristics of circulation in an Indonesian archipelago strait from hydrography, current measurements and modeling results
CN115909664A (en) BIM-based river channel safety early warning method, device and equipment
CN116307691A (en) Risk assessment method and device for hydrologic disaster condition and electronic equipment
Horrillo-Caraballo et al. Application of a source-pathway-receptor-consequence (SPRC) methodology to the Teign Estuary, UK
Wolfs et al. Flood probability mapping by means of conceptual modeling
JP2004094641A (en) Evacuation form determination system
Mavrakis et al. A case of nighttime high ozone concentration over the greater Athens area
Şen et al. Climate change impact on floods
CN117198000B (en) Mountain torrent disaster forecasting and early warning method and system
CN111047213A (en) Middle and long term water resource critical early warning index method based on multi-factor joint discrimination
Wu et al. Scaling of snake line change based on Clausius-Clapeyron Relation
Wang et al. Evaluating the Accuracy of Reclamation's 24-Month Study Lake Powell Projections
CN117831231B (en) Method for carrying out flooding early warning on easily flooded and easily waterlogged areas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106

RJ01 Rejection of invention patent application after publication