CN108764697A - Task work dispatching method, server and computer readable storage medium - Google Patents

Task work dispatching method, server and computer readable storage medium Download PDF

Info

Publication number
CN108764697A
CN108764697A CN201810501878.1A CN201810501878A CN108764697A CN 108764697 A CN108764697 A CN 108764697A CN 201810501878 A CN201810501878 A CN 201810501878A CN 108764697 A CN108764697 A CN 108764697A
Authority
CN
China
Prior art keywords
team
moon
working day
day
amount
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810501878.1A
Other languages
Chinese (zh)
Inventor
史大毛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Ping An Technology Shenzhen Co Ltd
Original Assignee
Ping An Technology Shenzhen Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Ping An Technology Shenzhen Co Ltd filed Critical Ping An Technology Shenzhen Co Ltd
Priority to CN201810501878.1A priority Critical patent/CN108764697A/en
Priority to PCT/CN2018/102404 priority patent/WO2019223152A1/en
Publication of CN108764697A publication Critical patent/CN108764697A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/06Resources, workflows, human or project management; Enterprise or organisation planning; Enterprise or organisation modelling
    • G06Q10/063Operations research, analysis or management
    • G06Q10/0631Resource planning, allocation, distributing or scheduling for enterprises or organisations
    • G06Q10/06311Scheduling, planning or task assignment for a person or group

Landscapes

  • Business, Economics & Management (AREA)
  • Human Resources & Organizations (AREA)
  • Engineering & Computer Science (AREA)
  • Strategic Management (AREA)
  • Entrepreneurship & Innovation (AREA)
  • Economics (AREA)
  • Operations Research (AREA)
  • Game Theory and Decision Science (AREA)
  • Development Economics (AREA)
  • Marketing (AREA)
  • Educational Administration (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • Physics & Mathematics (AREA)
  • General Business, Economics & Management (AREA)
  • General Physics & Mathematics (AREA)
  • Theoretical Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

The invention discloses a kind of task work dispatching methods, including:The working day moon and the daily work load accounting of team are set according to strategy of default date and team month workload;The monthly plan amount of each employee is calculated according to the headcount of the team month workload, the team;Remaining monthly plan amount, the moon on the remaining working day of each employee are obtained, and calculates the same day amount of plan of each employee according to the remaining monthly plan amount of each employee, the moon on remaining working day and the daily work load accounting;And the task of respective numbers is assigned to each employee according to the same day amount of plan for each employee being calculated.The present invention also provides a kind of server and computer readable storage mediums.The task amount that task work dispatching method, server and computer readable storage medium provided by the invention can should be distributed according to the of that month task scheduling amount of the automatic calculating of workaday setting and the same day.

Description

Task work dispatching method, server and computer readable storage medium
Technical field
The present invention relates to technical field of data processing more particularly to task work dispatching method, server and computer-readable deposit Storage media.
Background technology
The festivals or holidays that the working day setting of each department of existing company is substantially unified arrange, impersonality arrangement, nothing Method meets the job placement of different team.The dangerous customer resources of production sends number amount monthly to be assigned for the period, to carry out phone Sale is dialed, and each mechanism needs first group of time in the self-defined period, work Time of Day, workaday workload accounting.It is different Region, different month dial rhythm and need to be distinguished, and need self-defined to dial the period.
Invention content
In view of this, a kind of task work dispatching method of present invention proposition, server and computer readable storage medium, Ke Yishi Job placement is adjusted flexibly according to itself workload in Xian Ge team, and workload allocations are more flexible, intelligent.
First, to achieve the above object, the present invention proposes a kind of server, and the server includes memory, processor, The task dispatching system that can be run on the processor is stored on the memory, the task dispatching system is by the place Reason device realizes following steps when executing:
The working day moon and the daily work load accounting of team are set according to strategy of default date and team month workload;
The monthly plan amount of each employee is calculated according to the headcount of the team month workload, the team;
Remaining monthly plan amount, the moon on the remaining working day of each employee are obtained, and according to the residue of each employee Monthly plan amount, the moon remaining working day and the daily work load accounting calculate the same day amount of plan of each employee, wherein described Same day amount of plan is calculated by the following formula to obtain:(the moon residue working day * day work of same day amount of plan=residue monthly plan amount/SUM Work amount accounting);And
According to the task of the same day amount of plan for each employee being calculated assignment respective numbers to each institute State employee.
Optionally, the basis is preset the step of the date is tactful and team month workload sets the working day moon of team and is wrapped It includes:
The legal working day moon and the day off moon are adjusted according to team month workload, to obtain the working day moon of team And the day off moon;
Wherein, the moon working day number of days of the team are more than default moon benchmark job number of days.
Optionally, following steps are also realized when the task dispatching system is executed by the processor:
Judge whether a date is working day according to the working day moon of the team;And
If judging, the date is working day, for the working day related job daily record, and according to the work log State generates working day label;Wherein, the work log includes the progress msg for the task being currently assigned to.
Optionally, described the step of generating working day label according to the state of the work log, includes:
If the state of the work log is when not filling in, first work period label is generated;
If the state of the work log is when having filled in, the second working day label is generated;Or
If the state of the work log is updated, working day mark is generated according to the state of the work log again Note.
In addition, to achieve the above object, the present invention also provides a kind of task work dispatching methods, are applied to server, the side Method includes:
The working day moon and the daily work load accounting of team are set according to strategy of default date and team month workload;
The monthly plan amount of each employee is calculated according to the headcount of the team month workload, the team;
Remaining monthly plan amount, the moon on the remaining working day of each employee are obtained, and according to the residue of each employee Monthly plan amount, the moon remaining working day and the daily work load accounting calculate the same day amount of plan of each employee, wherein described Same day amount of plan is calculated by the following formula to obtain:(the moon residue working day * day work of same day amount of plan=residue monthly plan amount/SUM Work amount accounting);And
According to the task of the same day amount of plan for each employee being calculated assignment respective numbers to each institute State employee.
Optionally, the basis is preset the step of the date is tactful and team month workload sets the working day moon of team and is wrapped It includes:
The legal working day moon and the day off moon are adjusted according to team month workload, to obtain the working day moon of team And the day off moon;
Wherein, the moon working day number of days of the team are more than default moon benchmark job number of days.
Optionally, the task work dispatching method further includes:
The group is calculated according to the headcount of the team, the working day moon of the team and the daily work load accounting The expection manpower of team;
Judge whether the ratio of the expection manpower of the team and the headcount of the team is more than a default ratio;And
If more than the default ratio, export with the information warning of one work task excess load.
Optionally, the task work dispatching method further includes:
Judge whether a date is working day according to the working day moon of the team;And
If judging, the date is working day, for the working day related job daily record, and according to the work log State generates working day label;
Wherein, the work log includes the progress msg for the task being currently assigned to.
Optionally, described the step of generating working day label according to the state of the work log, includes:
If the state of the work log is when not filling in, first work period label is generated;
If the state of the work log is when having filled in, the second working day label is generated;Or
If the state of the work log is updated, working day mark is generated according to the state of the work log again Note.
Further, to achieve the above object, the present invention also provides a kind of computer readable storage medium, the computers Readable storage medium storing program for executing is stored with task dispatching system, and the task dispatching system can be executed by least one processor, so that institute At least one processor is stated to execute such as the step of above-mentioned task work dispatching method.
Compared to the prior art, task work dispatching method, server and computer readable storage medium proposed by the invention, First, the working day moon and the daily work load accounting of team are set according to strategy of default date and team month workload;Next, according to The team month workload, the team headcount calculate the monthly plan amount of each employee;Furthermore obtain each institute Remaining monthly plan amount, the moon on the remaining working day of employee are stated, and according to the remaining monthly plan amount of each employee, moon residue work Day and the daily work load accounting calculate the same day amount of plan of each employee, wherein the same day amount of plan passes through following Formula is calculated:Same day amount of plan=residue monthly plan amount/SUM (residue working day * moon daily work load accounting);Finally, root Assign the task of respective numbers to each employee according to the same day amount of plan for each employee being calculated.This The working day of the demand setting individual according to different zones, different team may be implemented, in advance according to the task amount of team in sample The input for calculating manpower is gone forward side by side the job placement of office staff's work, and can calculate this month task scheduling amount according to workaday setting is automatic And the task amount that the same day should distribute, it can also be according to the work log of each employee of working day auto-associating.
Description of the drawings
Fig. 1 is the schematic diagram of one optional hardware structure of server of the present invention;
Fig. 2 is the program module schematic diagram of task dispatching system first embodiment of the present invention;
Fig. 3 is the program module schematic diagram of task dispatching system second embodiment of the present invention;
Fig. 4 is the implementation process diagram of task work dispatching method first embodiment of the present invention;
Fig. 5 is the implementation process diagram of task work dispatching method second embodiment of the present invention.
Reference numeral:
The embodiments will be further described with reference to the accompanying drawings for the realization, the function and the advantages of the object of the present invention.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.Based on the embodiments of the present invention, those of ordinary skill in the art are not before making creative work The every other embodiment obtained is put, shall fall within the protection scope of the present invention.
It should be noted that the description for being related to " first ", " second " etc. in the present invention is used for description purposes only, and cannot It is interpreted as indicating or implying its relative importance or implicitly indicates the quantity of indicated technical characteristic.Define as a result, " the One ", the feature of " second " can explicitly or implicitly include at least one of the features.In addition, the skill between each embodiment Art scheme can be combined with each other, but must can be implemented as basis with those of ordinary skill in the art, when technical solution Will be understood that the combination of this technical solution is not present in conjunction with there is conflicting or cannot achieve when, also not the present invention claims Protection domain within.
As shown in fig.1, being the schematic diagram of 2 one optional hardware structure of server of the present invention.
In the present embodiment, the server 2 may include, but be not limited only to, and can be in communication with each other connection by system bus and deposit Reservoir 11, processor 12, network interface 13.It should be pointed out that Fig. 2 illustrates only the server 2 with component 11-13, but Be it should be understood that, it is not required that implement all components shown, the implementation that can be substituted is more or less component.
Wherein, the server 2 can be rack-mount server, blade server, tower server or cabinet-type clothes The computing devices such as business device, which can be independent server, can also be the server set that multiple servers are formed Group.
The memory 11 include at least a type of readable storage medium storing program for executing, the readable storage medium storing program for executing include flash memory, Hard disk, multimedia card, card-type memory (for example, SD or DX memories etc.), random access storage device (RAM), static random are visited It asks memory (SRAM), read-only memory (ROM), electrically erasable programmable read-only memory (EEPROM), may be programmed read-only deposit Reservoir (PROM), magnetic storage, disk, CD etc..In some embodiments, the memory 11 can be the server 2 internal storage unit, for example, the server 2 hard disk or memory.In further embodiments, the memory 11 can also It is the External memory equipment of the server 2, such as the plug-in type hard disk being equipped on the server 2, intelligent memory card (Smart Media Card, SMC), secure digital (Secure Digital, SD) card, flash card (Flash Card) etc..Certainly, described Memory 11 can also both include the server 2 internal storage unit and also including its External memory equipment.In the present embodiment, The memory 11 is installed on the operating system and types of applications software of the server 2, such as task group commonly used in storage The program code etc. of work system 100.In addition, the memory 11 can be also used for temporarily storing and export or will be defeated The Various types of data gone out.
The processor 12 can be in some embodiments central processing unit (Central Processing Unit, CPU), controller, microcontroller, microprocessor or other data processing chips.The processor 12 is commonly used in the control clothes The overall operation of business device 2.In the present embodiment, the processor 12 for run the program code stored in the memory 11 or Person handles data, such as runs the task dispatching system 100 etc..
The network interface 13 may include radio network interface or wired network interface, which is commonly used in Communication connection is established between the server 2 and other electronic equipments.
So far, oneself is through describing the hardware configuration and function of relevant device of the present invention in detail.In the following, above-mentioned introduction will be based on It is proposed each embodiment of the present invention.
First, the present invention proposes a kind of task dispatching system 100.
As shown in fig.2, being the Program modual graph of 100 first embodiment of task dispatching system of the present invention.
In the present embodiment, the task dispatching system 100 includes a series of computer journey being stored on memory 11 Sequence instructs, and when the computer program instructions are executed by processor 12, task of various embodiments of the present invention may be implemented sends work to be grasped Make.In some embodiments, the specific operation realized based on the computer program instructions each section, task dispatching system 100 can be divided into one or more modules.For example, in fig. 2, task dispatching system 100 can be divided into setting mould Block 101, the first computing module 102, the second computing module 103 and dispatch module 104.Wherein:
The setting module 101 be used for according to the working day moon for presetting date strategy and month workload setting team of team and Daily work load accounting.
In one embodiment, the arrangement that can be had a holiday or vacation according to national year of the initial working day moon is configured.Such as it is legal Festivals or holidays, weekend can be day off by default setting, and monthly workaday benchmark number of days could be provided as 20 days.Not same district Domain, different team can formulate the different default date strategies, can be passed through according to the actual demand of team described default Date strategy to working day and day off freely set and adjust.The day off of team can be the legal rest of acquiescence Day and selected day off.The selected day off can be arbitrarily chosen date, can formulate the default day by team When phase strategy, voluntarily selected according to self-demand.Taking off inside each team can be configured to selected day off.Not by It is set as the date on day off, i.e., by the working day as team.Which can be expressly understood that by the default date strategy Date is the working day, which is the day off on date, and can be adjusted in real time.What the setting module 101 was set Team month working day and the day off moon are both needed to be more than benchmark day off number of days and benchmark moon working day number of days, to avoid the moon from working The number of days setting of day is too many or very little.For example, if monthly workaday benchmark number of days is 20 days, 20 days corresponding groups Team month workload is quantity A.The moon working day number of days that the setting module 101 is set should be greater than 20 days.If team's January The moon, workload was less than A, then the working day moon of this month is 20 days.If the workload of team's March is B and B>A, the setting mould The working day moon for the team that block 101 is set can be calculated by the following formula to obtain:The working day moon=B*A/20 of team;Its In, the working day moon for the team which is calculated is preferably positive integer, if it is decimal, result of calculation that data, which are calculated, It is automatic to add 1.
In one embodiment, if the moon workload of team is more than annual monthly average workload, on the working day benchmark moon On the basis of increase working day of the first preset number of days, if the moon workload of team is less than annual monthly average workload, in benchmark Increase the working day of the second preset number of days on the basis of the working day moon.First preset number of days is more than second preset number of days. Daily work load accounting can be arranged in every workday, and the daily work load accounting of acquiescence is 100%.Due to the moon workaday number of days With the upper limit, when of that month workload is larger, the moon workload that can be completed according to actual needs carries out daily work load accounting adjustment. If team month workload is heavier, it is (such as being adjusted to 110%) that the daily work load accounting, which can suitably be turned up, if team month When workload is lighter, it is (such as being adjusted to 95%) that can suitably turn down the daily work load accounting.For example, the working day moon Benchmark number of days be 20 days, this 20 days corresponding team month workloads are quantity A, and corresponding daily work load accounting is 100%, if The working day moon upper limit of team's March is 25 days, and the workload of March is quantity C, and quantity C passes through the above-mentioned moon The result of calculation that working day formula is calculated is more than 25 days, and adjustment daily work load accounting is needed to be likely to 25 more than 100% It completes task, and daily work load accounting can be calculated by the following formula to obtain at this time:Daily work load accounting=20*C/A*25.
First computing module 102 is used to be calculated according to the headcount of the team month workload, the team every The monthly plan amount of one employee.
In one embodiment, first computing module 102 is additionally operable to the headcount according to the team, the group The working day moon of team and the daily work load accounting calculate the expection manpower of the team.
In one embodiment, the team month workload can be calculated by the following formula to obtain:Team month workload =system moon amount of work * (the current total manpower of manpower/system of team).The monthly plan amount of each employee can be by following Formula is calculated:The current manpower of workload/team of the monthly plan amount of employee=team month.The expection manpower of the team can be with It is calculated by the following formula to obtain:The current manpower * SUM of manpower=team (working day * daily work load accounting)/work is expected by team Day number of days.For example, it is 10,000 parts that system, which uploads moon general assignment amount, and team's manpower is 10 people, and the total manpower of department is 40 people, the moon Working day be in 20 days, 20 days daily corresponding workload accounting be 110%, 110%, 120%, 100%, 110%, 120%, 110%, 110%, 120%, 100%, 110%, 110%, 120%, 100%, 110%, 120%, 110%, 110%, 120%, 100%, then team month workload=[10000* (10/40)]=2500 parts, employee's monthly plan amount=2500/10= 250 parts, manpower is expected by team
=10* [(110%+110%+120%+100%+110%+120%+110%+110%+120%+100%+ 110%+110%+120%+100%+110%+120%+110%+110%+120%+100%)/20].
In one embodiment, first computing module 102 is additionally operable to the expection for the team for judging to be calculated Whether the ratio of manpower and the current headcount of the team is more than a default ratio;If expection manpower and the institute of the team The current headcount for stating team is more than the default ratio, and first computing module 102 controls a display unit, and (figure is not Show) it exports with the information warning of one work task excess load.
Second computing module 103 be used for according to the remaining monthly plan amount of each employee, the moon on remaining working day and The daily work load accounting calculates the same day amount of plan of each employee.
In one embodiment, the same day amount of plan of the employee can be calculated by the following formula to obtain:Work as daily planning Amount=residue monthly plan amount/SUM (residue working day * moon daily work load accounting).
The dispatch module 104 is used to assign respective numbers according to the same day amount of plan for each employee being calculated Task to each employee.
For example, if the same day amount of plan that second computing module 103 calculates an employee is 13 parts, the assignment Module 104 assigns 13 parts of task to the employee.
By above procedure module 101-104, task dispatching system 100 proposed by the invention, first, according to default day The working day moon and daily work load accounting of phase strategy and workload setting team of team month;Secondly, it is worked according to the team month It measures, the headcount of the team calculates the monthly plan amount of each employee;Furthermore obtain the remaining moon of each employee Amount of plan, the moon remaining working day, and according to the remaining monthly plan amount of each employee, the moon on remaining working day and work the day Amount accounting calculates the same day amount of plan of each employee, wherein the same day amount of plan is calculated by the following formula to obtain:When Daily planning amount=residue monthly plan amount/SUM (residue working day * moon daily work load accounting);Finally, each according to what is be calculated The same day amount of plan of the employee assigns the tasks of respective numbers to each employee.In this manner it is achieved that according to not Same region, different team demand setting individual working day, the input of manpower is calculated simultaneously according to the task amount of team in advance Carry out the job placement of employee, and the work that can should be distributed according to the of that month task scheduling amount of the automatic calculating of workaday setting and the same day Make task amount, it can also be according to the work log of each employee of working day auto-associating.
As shown in fig.3, being the Program modual graph of 100 second embodiment of task dispatching system of the present invention.In the present embodiment, The task dispatching system 100 includes a series of computer program instructions being stored on memory 11, when the computer journey When sequence instruction is executed by processor 12, task of various embodiments of the present invention may be implemented sends work to operate.In some embodiments, base In the specific operation that the computer program instructions each section is realized, task dispatching system 100 can be divided into one or Multiple modules.For example, in figure 3, task dispatching system 100 can be divided into setting module 101, the first computing module 102, Second computing module 103, dispatch module 104 and relating module 105.Each program module 101-104 is sent with task of the present invention 100 first embodiment of work system is identical, and increases relating module 105 on this basis.Wherein:
The setting module 101 be used for according to the working day moon for presetting date strategy and month workload setting team of team and Daily work load accounting.
In one embodiment, the arrangement that can be had a holiday or vacation according to national year of the initial working day moon is configured.Such as it is legal Festivals or holidays, weekend can be day off by default setting, and monthly workaday benchmark number of days could be provided as 20 days.Not same district Domain, different team can formulate the different default date strategies, can be passed through according to the actual demand of team described default Date strategy to working day and day off freely set and adjust.The day off of team can be the legal rest of acquiescence Day and selected day off.The selected day off can be arbitrarily chosen date, can formulate the default day by team When phase strategy, voluntarily selected according to self-demand.Taking off inside each team can be configured to selected day off.Not by It is set as the date on day off, i.e., by the working day as team.Which can be expressly understood that by the default date strategy Date is the working day, which is the day off on date, and can be adjusted in real time.What the setting module 101 was set Team month working day and the day off moon are both needed to be more than benchmark day off number of days and benchmark moon working day number of days, to avoid the moon from working The number of days setting of day is too many or very little.For example, if monthly workaday benchmark number of days is 20 days, 20 days corresponding groups Team month workload is quantity A.The moon working day number of days that the setting module 101 is set should be greater than 20 days.If team's January The moon, workload was less than A, then the working day moon of this month is 20 days.If the workload of team's March is B and B>A, the setting mould The working day moon for the team that block 101 is set can be calculated by the following formula to obtain:The working day moon=B*A/20 of team;Its In, the working day moon for the team which is calculated is preferably positive integer, if it is decimal, result of calculation that data, which are calculated, It is automatic to add 1.
In one embodiment, if the moon workload of team is more than annual monthly average workload, on the working day benchmark moon On the basis of increase working day of the first preset number of days, if the moon workload of team is less than annual monthly average workload, in benchmark Increase the working day of the second preset number of days on the basis of the working day moon.First preset number of days is more than second preset number of days. Daily work load accounting can be arranged in every workday, and the daily work load accounting of acquiescence is 100%.Due to the moon workaday number of days With a upper limit value, when of that month workload is larger, the moon workload that can be completed according to actual needs carries out daily work load accounting Adjustment.If team month workload is heavier, it is (such as being adjusted to 110%) that the daily work load accounting, which can suitably be turned up, if When team month workload is lighter, it is (such as being adjusted to 95%) that can suitably turn down the daily work load accounting.For example, labourer hired by the month The benchmark number of days for making day is 20 days, and corresponding team month workload is quantity A within this 20 days, and corresponding daily work load accounting is 100%, if the working day moon upper limit of team's March is 25 days, the workload of March is quantity C, and quantity C passes through The result of calculation that above-mentioned working day moon formula is calculated is more than 25 days, needs to adjust daily work load accounting just more than 100% Task may be completed at 25 days, daily work load accounting can be calculated by the following formula to obtain at this time:Daily work load accounting=20* C/A*25。
First computing module 102 is used to be calculated according to the headcount of the team month workload, the team every The monthly plan amount of one employee.
In one embodiment, first computing module 102 is additionally operable to the headcount according to the team, the group The working day moon of team and the daily work load accounting calculate the expection manpower of the team.
In one embodiment, the team month workload can be calculated by the following formula to obtain:Team month workload =system moon amount of work * (the current total manpower of manpower/system of team).The monthly plan amount of each employee can be by following Formula is calculated:The current manpower of workload/team of the monthly plan amount of employee=team month.The expection manpower of the team can be with It is calculated by the following formula to obtain:The current manpower * SUM of manpower=team (working day * daily work load accounting)/work is expected by team Day number of days.For example, it is 10,000 parts that system, which uploads moon general assignment amount, and team's manpower is 10 people, and the total manpower of department is 40 people, the moon Working day be in 20 days, 20 days daily corresponding workload accounting be 110%, 110%, 120%, 100%, 110%, 120%, 110%, 110%, 120%, 100%, 110%, 110%, 120%, 100%, 110%, 120%, 110%, 110%, 120%, 100%, then team month workload=[10000* (10/40)]=2500 parts, employee's monthly plan amount=2500/10= 250 parts, manpower is expected by team
=10* [(110%+110%+120%+100%+110%+120%+110%+110%+120%+100%+ 110%+110%+120%+100%+110%+120%+110%+110%+120%+100%)/20].
In one embodiment, first computing module 102 is additionally operable to the expection for the team for judging to be calculated Whether the ratio of manpower and the current headcount of the team is more than a default ratio;If expection manpower and the institute of the team The current headcount for stating team is more than the default ratio, and first computing module 102 controls a display unit, and (figure is not Show) it exports with the information warning of one work task excess load.
Second computing module 103 is used to obtain the remaining monthly plan amount of each employee, the moon remaining working day, and Each employee is calculated according to the remaining monthly plan amount of each employee, the moon on remaining working day and the daily work load accounting Same day amount of plan.
In one embodiment, the same day amount of plan of the employee can be calculated by the following formula to obtain:Work as daily planning Amount=residue monthly plan amount/SUM (residue working day * moon daily work load accounting).
The dispatch module 104 is used to assign respective numbers according to the same day amount of plan for each employee being calculated Task to each employee.
For example, if the same day amount of plan that second computing module 103 calculates an employee is 13 parts, the assignment Module 104 assigns 13 parts of task to the employee.
The relating module 105 is used to according to the working day moon of the team judge whether a date is working day, and Judge for the working day related job daily record when date is working day, and work is generated according to the state of the work log Day marks.Wherein, the work log includes the progress msg for the task being currently assigned to.
In one embodiment, if a certain date is working day, employee is likely to require recording schedule arrangement, setting event Remind etc..The work log can be for employee into edlin and record.One working day associated work log can be one It is a, can also be multiple.If the state of the work log is when not filling in, the relating module 105 generates the first work Day marks;If the state of the work log is when having filled in, the relating module 105 generates the second working day label;If When the state of the work log is updated, then the relating module 105 generates work according to the state of the work log again Make day label.
For example, working day two work logs of association can be set, two work logs record the morning day respectively Journey and schedule in afternoon.When the state of the work log is not fill in, first work period label can be generated;When the working day The state of will is to have filled in, and can generate the second working day label.For example, the work log of working day record morning schedule is It fills in, the work log of record schedule in afternoon is not filled in, then one first work period of label label and one the on the date Two working days marked.If the work log user of record schedule in afternoon is filled out, mean the state update of work log, then Working day label also needs to update, that is, needs according to the updated state of work log, regenerates working day and marks and add Add.
By above procedure module 101-105, task dispatching system 100 proposed by the invention, first, according to default day The working day moon and daily work load accounting of phase strategy and workload setting team of team month;Secondly, it is worked according to the team month It measures, the headcount of the team calculates the monthly plan amount of each employee;Furthermore obtain the remaining moon of each employee Amount of plan, the moon remaining working day, and according to the remaining monthly plan amount of each employee, the moon on remaining working day and work the day Amount accounting calculates the same day amount of plan of each employee, wherein the same day amount of plan is calculated by the following formula to obtain:When Daily planning amount=residue monthly plan amount/SUM (residue working day * moon daily work load accounting);Furthermore it is each according to what is be calculated The same day amount of plan of the employee assigns the tasks of respective numbers to each employee;Finally, according to the team The working day moon judges whether a date is working day, and when judging that the date is working day for the working day related job day Will, and working day label is generated according to the state of the work log, wherein the work log includes currently to be assigned to The progress msg of task.In this manner it is achieved that according to different zones, the work of the demand setting individual of different team Day, the job placement for office staff's work of being gone forward side by side in advance according to the input of the task amount of team calculating manpower, and can be set according to workaday The automatic task amount for calculating of that month task scheduling amount and the same day should distribute is set, it can also be according to working day auto-associating per a member The work log of work.
In addition, the present invention also proposes a kind of task work dispatching method.
As shown in fig.4, being the implementation process diagram of task work dispatching method first embodiment of the present invention.In the present embodiment In, the execution sequence of the step in flow chart shown in Fig. 4 can change according to different requirements, and certain steps can be omitted.
Step S400, according to strategy of default date and team month workload sets the working day moon of team and daily work load accounts for Than.
In one embodiment, the arrangement that can be had a holiday or vacation according to national year of the initial working day moon is configured.Such as it is legal Festivals or holidays, weekend can be day off by default setting, and monthly workaday benchmark number of days could be provided as 20 days.Not same district Domain, different team can formulate the different default date strategies, can be passed through according to the actual demand of team described default Date strategy to working day and day off freely set and adjust.The day off of team can be the legal rest of acquiescence Day and selected day off.The selected day off can be arbitrarily chosen date, can formulate the default day by team When phase strategy, voluntarily selected according to self-demand.Taking off inside each team can be configured to selected day off.Not by It is set as the date on day off, i.e., by the working day as team.Which can be expressly understood that by the default date strategy Date is the working day, which is the day off on date, and can be adjusted in real time, the team being set month working day and The day off moon is both needed to be more than benchmark day off number of days and benchmark moon working day number of days, to avoid the workaday number of days setting of the moon too It is more or very little.For example, if monthly workaday benchmark number of days is 20 days, corresponding team month workload is number within this 20 days Measure A.The moon working day number of days then set should be greater than 20 days.If the moon workload of team's January is less than A, work the moon of this month Day is 20 days.If the workload of team's March is B and B>The working day moon of A, the team that the setting module 101 is set can be with It is calculated by the following formula to obtain:The working day moon=B*A/20 of team;Wherein, the moon for the team which is calculated works Day is preferably positive integer, if it is decimal that data, which are calculated, result of calculation adds 1 automatically.
In one embodiment, if the moon workload of team is more than annual monthly average workload, on the working day benchmark moon On the basis of increase working day of the first preset number of days, if the moon workload of team is less than annual monthly average workload, in benchmark Increase the working day of the second preset number of days on the basis of the working day moon.First preset number of days is more than second preset number of days. Daily work load accounting can be arranged in every workday, and the daily work load accounting of acquiescence is 100%.Due to the moon workaday number of days With the upper limit, when of that month workload is larger, the moon workload that can be completed according to actual needs carries out daily work load accounting adjustment. If team month workload is heavier, it is (such as being adjusted to 110%) that the daily work load accounting, which can suitably be turned up, if team month When workload is lighter, it is (such as being adjusted to 95%) that can suitably turn down the daily work load accounting.For example, the working day moon Benchmark number of days be 20 days, this 20 days corresponding team month workloads are quantity A, and corresponding daily work load accounting is 100%, if The working day moon upper limit of team's March is 25 days, and the workload of March is quantity C, and quantity C passes through the above-mentioned moon The result of calculation that working day formula is calculated is more than 25 days, and adjustment daily work load accounting is needed to be likely to 25 more than 100% It completes task, and daily work load accounting can be calculated by the following formula to obtain at this time:Daily work load accounting=20*C/A*25.
Step S402 calculates the moon of each employee according to the headcount of the team month workload, the team Amount of plan.
It in one embodiment, can also be according to the headcount of the team, working day moon of the team and described Daily work load accounting calculates the expection manpower of the team.
In one embodiment, the team month workload can be calculated by the following formula to obtain:Team month workload =system moon amount of work * (the current total manpower of manpower/system of team).The monthly plan amount of each employee can be by following Formula is calculated:The current manpower of workload/team of the monthly plan amount of employee=team month.The expection manpower of the team can be with It is calculated by the following formula to obtain:The current manpower * SUM of manpower=team (working day * daily work load accounting)/work is expected by team Day number of days.For example, it is 10,000 parts that system, which uploads moon general assignment amount, and team's manpower is 10 people, and the total manpower of department is 40 people, the moon Working day be in 20 days, 20 days daily corresponding workload accounting be 110%, 110%, 120%, 100%, 110%, 120%, 110%, 110%, 120%, 100%, 110%, 110%, 120%, 100%, 110%, 120%, 110%, 110%, 120%, 100%, then team month workload=[10000* (10/40)]=2500 parts, employee's monthly plan amount=2500/10= 250 parts, manpower is expected by team
=10* [(110%+110%+120%+100%+110%+120%+110%+110%+120%+100%+ 110%+110%+120%+100%+110%+120%+110%+110%+120%+100%)/20].
In one embodiment, when the current headcount of the expection manpower and the team of the team being calculated More than a default ratio, it will generate and export the information warning of one work task excess load.
Step S404 is accounted for according to the remaining monthly plan amount of each employee, the moon on remaining working day and the daily work load Than the same day amount of plan for calculating each employee.
In one embodiment, the same day amount of plan of the employee can be calculated by the following formula to obtain:Work as daily planning Amount=residue monthly plan amount/SUM (residue working day * moon daily work load accounting).
Step S406 assigns the task of respective numbers according to the same day amount of plan for each employee being calculated To each employee.
For example, if the same day amount of plan for calculating an employee is 13 parts, assign 13 parts of task to the employee.
S400-S406 through the above steps, task work dispatching method proposed by the invention, first, according to default date plan The working day moon and daily work load accounting of summary and workload setting team of team month;Secondly, according to the team month workload, institute The headcount for stating team calculates the monthly plan amount of each employee;Furthermore obtain the remaining monthly plan of each employee Amount, the moon remaining working day, and accounted for according to the remaining monthly plan amount of each employee, the moon on remaining working day and the daily work load Than the same day amount of plan for calculating each employee, wherein the same day amount of plan is calculated by the following formula to obtain:The same day counts Draw amount=residue monthly plan amount/SUM (residue working day * moon daily work load accounting);Finally, each described according to what is be calculated The same day amount of plan of employee assigns the tasks of respective numbers to each employee.In this manner it is achieved that according to not same district Domain, different team demand setting individual working day, input and the progress of manpower are calculated according to the task amount of team in advance The job placement of employee, and can be appointed according to the work that the of that month task scheduling amount of the automatic calculating of workaday setting and the same day should distribute Business amount, can also be according to the work log of each employee of working day auto-associating.
As shown in fig.5, being the implementation process diagram of task work dispatching method second embodiment of the present invention.In the present embodiment In, the execution sequence of the step in flow chart shown in fig. 5 can change according to different requirements, and certain steps can be omitted.
Step S400, according to strategy of default date and team month workload sets the working day moon of team and daily work load accounts for Than.
In one embodiment, the arrangement that can be had a holiday or vacation according to national year of the initial working day moon is configured.Such as it is legal Festivals or holidays, weekend can be day off by default setting, and monthly workaday benchmark number of days could be provided as 20 days.Not same district Domain, different team can formulate the different default date strategies, can be passed through according to the actual demand of team described default Date strategy to working day and day off freely set and adjust.The day off of team can be the legal rest of acquiescence Day and selected day off.The selected day off can be arbitrarily chosen date, can formulate the default day by team When phase strategy, voluntarily selected according to self-demand.Taking off inside each team can be configured to selected day off.Not by It is set as the date on day off, i.e., by the working day as team.Which can be expressly understood that by the default date strategy Date is the working day, which is the day off on date, and can be adjusted in real time, the team being set month working day and The day off moon is both needed to be more than benchmark day off number of days and benchmark moon working day number of days, to avoid the workaday number of days setting of the moon too It is more or very little.For example, if monthly workaday benchmark number of days is 20 days, corresponding team month workload is number within this 20 days Measure A.The moon working day number of days then set should be greater than 20 days.If the moon workload of team's January is less than A, work the moon of this month Day is 20 days.If the workload of team's March is B and B>The working day moon of A, the team that the setting module 101 is set can be with It is calculated by the following formula to obtain:The working day moon=B*A/20 of team;Wherein, the moon for the team which is calculated works Day is preferably positive integer, if it is decimal that data, which are calculated, result of calculation adds 1 automatically.
In one embodiment, if the moon workload of team is more than annual monthly average workload, on the working day benchmark moon On the basis of increase working day of the first preset number of days, if the moon workload of team is less than annual monthly average workload, in benchmark Increase the working day of the second preset number of days on the basis of the working day moon.First preset number of days is more than second preset number of days. Daily work load accounting can be arranged in every workday, and the daily work load accounting of acquiescence is 100%.Due to the moon workaday number of days With a upper limit value, when of that month workload is larger, the moon workload that can be completed according to actual needs carries out daily work load accounting Adjustment.If team month workload is heavier, it is (such as being adjusted to 110%) that the daily work load accounting, which can suitably be turned up, if When team month workload is lighter, it is (such as being adjusted to 95%) that can suitably turn down the daily work load accounting.For example, the moon Workaday benchmark number of days is 20 days, and corresponding team month workload is quantity A within this 20 days, and corresponding daily work load accounting is 100%, if the working day moon upper limit of team's March is 25 days, the workload of March is quantity C, and quantity C passes through The result of calculation that above-mentioned working day moon formula is calculated is more than 25 days, needs to adjust daily work load accounting just more than 100% Task may be completed at 25 days, daily work load accounting can be calculated by the following formula to obtain at this time:Daily work load accounting=20* C/A*25。
Step S402 calculates the moon of each employee according to the headcount of the team month workload, the team Amount of plan.
It in one embodiment, can also be according to the headcount of the team, working day moon of the team and described Daily work load accounting calculates the expection manpower of the team.
In one embodiment, the team month workload can be calculated by the following formula to obtain:Team month workload =system moon amount of work * (the current total manpower of manpower/system of team).The monthly plan amount of each employee can be by following Formula is calculated:The current manpower of workload/team of the monthly plan amount of employee=team month.The expection manpower of the team can be with It is calculated by the following formula to obtain:The current manpower * SUM of manpower=team (working day * daily work load accounting)/work is expected by team Day number of days.For example, it is 10,000 parts that system, which uploads moon general assignment amount, and team's manpower is 10 people, and the total manpower of department is 40 people, the moon Working day be in 20 days, 20 days daily corresponding workload accounting be 110%, 110%, 120%, 100%, 110%, 120%, 110%, 110%, 120%, 100%, 110%, 110%, 120%, 100%, 110%, 120%, 110%, 110%, 120%, 100%, then team month workload=[10000* (10/40)]=2500 parts, employee's monthly plan amount=2500/10= 250 parts, manpower is expected by team
=10* [(110%+110%+120%+100%+110%+120%+110%+110%+120%+100%+ 110%+110%+120%+100%+110%+120%+110%+110%+120%+100%)/20].
In one embodiment, when the current headcount of the expection manpower and the team of the team being calculated More than a default ratio, it will generate and export the information warning of one work task excess load.
Step S404 obtains remaining monthly plan amount, the moon on the remaining working day of each employee, and according to each member Remaining monthly plan amount, the moon on remaining working day and the daily work load accounting of work calculate the same day amount of plan of each employee.
In one embodiment, the same day amount of plan of the employee can be calculated by the following formula to obtain:Work as daily planning Amount=residue monthly plan amount/SUM (residue working day * moon daily work load accounting).
Step S406 assigns the task of respective numbers according to the same day amount of plan for each employee being calculated To each employee.
For example, if the same day amount of plan for calculating an employee is 13 parts, assign 13 parts of task to the employee.
Step S408 judges whether a date is working day according to the working day moon of the team, and is judging the date It is the working day related job daily record when being working day, and working day label is generated according to the state of the work log.Its In, the work log includes the progress msg for the task being currently assigned to.
In one embodiment, if a certain date is working day, employee is likely to require recording schedule arrangement, setting event Remind etc..The work log can be for employee into edlin and record.One working day associated work log can be one It is a, can also be multiple.If the state of the work log is when not filling in, first work period label is generated;If the work The state for making daily record is then to generate the second working day label when having filled in;If the state of the work log is updated, weigh New root generates working day label according to the state of the work log.
For example, working day two work logs of association can be set, two work logs record the morning day respectively Journey and schedule in afternoon.When the state of the work log is not fill in, first work period label can be generated;When the working day The state of will is to have filled in, and can generate the second working day label.For example, the work log of working day record morning schedule is It fills in, the work log of record schedule in afternoon is not filled in, then one first work period of label label and one the on the date Two working days marked.If the work log user of record schedule in afternoon is filled out, mean the state update of work log, then Working day label also needs to update, that is, needs according to the updated state of work log, regenerates working day and marks and add Add.
S400-S408 through the above steps, task work dispatching method proposed by the invention, first, according to default date plan The working day moon and daily work load accounting of summary and workload setting team of team month;Secondly, according to the team month workload, institute The headcount for stating team calculates the monthly plan amount of each employee;Furthermore obtain the remaining monthly plan of each employee Amount, the moon remaining working day, and accounted for according to the remaining monthly plan amount of each employee, the moon on remaining working day and the daily work load Than the same day amount of plan for calculating each employee, wherein the same day amount of plan is calculated by the following formula to obtain:The same day counts Draw amount=residue monthly plan amount/SUM (residue working day * moon daily work load accounting);Furthermore it is each described according to what is be calculated The same day amount of plan of employee assigns the tasks of respective numbers to each employee;Finally, according to the labourer hired by the month of the team Make to judge whether a date is working day day, and when judging that the date is working day for the working day related job daily record, And working day label is generated according to the state of the work log, wherein the work log includes the work being currently assigned to Make the progress msg of task.In this manner it is achieved that according to different zones, the working day of the demand setting individual of different team, The job placement for office staff's work of being gone forward side by side in advance according to the input of the task amount of team calculating manpower, and can be according to workaday setting certainly The task amount that dynamic calculating this month task scheduling amount and the same day should distribute, can also be according to each employee's of working day auto-associating Work log.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical scheme of the present invention substantially in other words does the prior art Going out the part of contribution can be expressed in the form of software products, which is stored in a storage medium In (such as ROM/RAM, magnetic disc, CD), including some instructions are used so that a station terminal equipment (can be mobile phone, computer, clothes Be engaged in device, air conditioner or the network equipment etc.) execute method described in each embodiment of the present invention.
It these are only the preferred embodiment of the present invention, be not intended to limit the scope of the invention, it is every to utilize this hair Equivalent structure or equivalent flow shift made by bright specification and accompanying drawing content is applied directly or indirectly in other relevant skills Art field, is included within the scope of the present invention.

Claims (10)

1. a kind of task work dispatching method is applied to server, which is characterized in that the method includes:
The working day moon and the daily work load accounting of team are set according to strategy of default date and team month workload;
The monthly plan amount of each employee is calculated according to the headcount of the team month workload, the team;
Remaining monthly plan amount, the moon on the remaining working day of each employee are obtained, and according to the remaining moon meter of each employee It draws amount, the moon remaining working day and the daily work load accounting calculates the same day amount of plan of each employee, wherein the same day Amount of plan is calculated by the following formula to obtain:Same day amount of plan=residue monthly plan amount/SUM (moon residue working day * daily work load Accounting);And
According to the task of the same day amount of plan for each employee being calculated assignment respective numbers to each member Work.
2. task work dispatching method as described in claim 1, which is characterized in that the basis presets date strategy and team's labourer hired by the month Work amount set team the working day moon the step of include:
The legal working day moon and the day off moon are adjusted according to team month workload, to obtain the working day moon and the moon of team Day off;
Wherein, the moon working day number of days of the team are more than default moon benchmark job number of days.
3. task work dispatching method as described in claim 1, which is characterized in that the method further includes:
The team is calculated according to the headcount of the team, the working day moon of the team and the daily work load accounting It is expected that manpower;
Judge whether the ratio of the expection manpower of the team and the headcount of the team is more than a default ratio;And
If more than the default ratio, export with the information warning of one work task excess load.
4. task work dispatching method according to claim 1, which is characterized in that the method further includes:
Judge whether a date is working day according to the working day moon of the team;And
If judging, the date is working day, for the working day related job daily record, and according to the state of the work log Generate working day label;
Wherein, the work log includes the progress msg for the task being currently assigned to.
5. task work dispatching method according to claim 4, which is characterized in that described to be given birth to according to the state of the work log The step of being marked at working day include:
If the state of the work log is when not filling in, first work period label is generated;
If the state of the work log is when having filled in, the second working day label is generated;Or
If the state of the work log is updated, working day label is generated according to the state of the work log again.
6. a kind of server, which is characterized in that the server includes memory, processor, and being stored on the memory can The task dispatching system run on the processor realizes following step when the task dispatching system is executed by the processor Suddenly:
The working day moon and the daily work load accounting of team are set according to strategy of default date and team month workload;
The monthly plan amount of each employee is calculated according to the headcount of the team month workload, the team;
Remaining monthly plan amount, the moon on the remaining working day of each employee are obtained, and according to the remaining moon meter of each employee It draws amount, the moon remaining working day and the daily work load accounting calculates the same day amount of plan of each employee, wherein the same day Amount of plan is calculated by the following formula to obtain:Same day amount of plan=residue monthly plan amount/SUM (moon residue working day * daily work load Accounting);And
According to the task of the same day amount of plan for each employee being calculated assignment respective numbers to each member Work.
7. server as claimed in claim 6, which is characterized in that the basis presets date strategy and team month workload is set The step of working day moon for determining team includes:
The legal working day moon and the day off moon are adjusted according to team month workload, to obtain the working day moon and the moon of team Day off;
Wherein, the moon working day number of days of the team are more than default moon benchmark job number of days.
8. server as claimed in claim 6, which is characterized in that when the task dispatching system is executed by the processor also Realize following steps:
Judge whether a date is working day according to the working day moon of the team;And
If judging, the date is working day, for the working day related job daily record, and according to the state of the work log Generate working day label;
Wherein, the work log includes the progress msg for the task being currently assigned to.
9. server as claimed in claim 8, which is characterized in that described to generate working day according to the state of the work log The step of label includes:
If the state of the work log is when not filling in, first work period label is generated;
If the state of the work log is when having filled in, the second working day label is generated;Or
If the state of the work log is updated, working day label is generated according to the state of the work log again.
10. a kind of computer readable storage medium, the computer-readable recording medium storage has a task dispatching system, described Business dispatching system can be executed by least one processor, so that at least one processor is executed as appointed in claim 1-5 The step of task work dispatching method described in one.
CN201810501878.1A 2018-05-23 2018-05-23 Task work dispatching method, server and computer readable storage medium Pending CN108764697A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810501878.1A CN108764697A (en) 2018-05-23 2018-05-23 Task work dispatching method, server and computer readable storage medium
PCT/CN2018/102404 WO2019223152A1 (en) 2018-05-23 2018-08-27 Task assigning method, server and computer-readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810501878.1A CN108764697A (en) 2018-05-23 2018-05-23 Task work dispatching method, server and computer readable storage medium

Publications (1)

Publication Number Publication Date
CN108764697A true CN108764697A (en) 2018-11-06

Family

ID=64004976

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810501878.1A Pending CN108764697A (en) 2018-05-23 2018-05-23 Task work dispatching method, server and computer readable storage medium

Country Status (2)

Country Link
CN (1) CN108764697A (en)
WO (1) WO2019223152A1 (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109726996A (en) * 2019-01-03 2019-05-07 深圳壹账通智能科技有限公司 Human input management method, device, computer equipment and storage medium
CN110264060A (en) * 2019-06-13 2019-09-20 广州宝荣科技应用有限公司 A kind of prescription distribution method and system for examining square state based on pharmacist

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN104036369A (en) * 2014-06-29 2014-09-10 谭希妤 Method and system for automatically generating electronic work log of bank team
WO2014174610A1 (en) * 2013-04-24 2014-10-30 Suguro Takao Work plan creation system
CN105094820A (en) * 2015-07-17 2015-11-25 北京乐动卓越科技有限公司 Display method and system for date information

Family Cites Families (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN105741003A (en) * 2014-12-11 2016-07-06 金蝶软件(中国)有限公司 Plan generation method and plan generation device
CN107844907A (en) * 2017-11-08 2018-03-27 厦门市再丰运动器材有限公司 A kind of production schedule and the production management method for sending work examination progress

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
WO2014174610A1 (en) * 2013-04-24 2014-10-30 Suguro Takao Work plan creation system
CN104036369A (en) * 2014-06-29 2014-09-10 谭希妤 Method and system for automatically generating electronic work log of bank team
CN105094820A (en) * 2015-07-17 2015-11-25 北京乐动卓越科技有限公司 Display method and system for date information

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109726996A (en) * 2019-01-03 2019-05-07 深圳壹账通智能科技有限公司 Human input management method, device, computer equipment and storage medium
CN110264060A (en) * 2019-06-13 2019-09-20 广州宝荣科技应用有限公司 A kind of prescription distribution method and system for examining square state based on pharmacist

Also Published As

Publication number Publication date
WO2019223152A1 (en) 2019-11-28

Similar Documents

Publication Publication Date Title
US7313530B2 (en) Methods and systems for generating and displaying the capacity of a delivery management system
US20090292381A1 (en) Production planning method and production planning system for mixed flows of production by order and forecasting
CN108764699A (en) Scheduling method, server and computer readable storage medium
JP4847030B2 (en) Ordering system and ordering method
JP4532042B2 (en) Production management method and production management program
Mattsson Inventory control in environments with seasonal demand
CN108764697A (en) Task work dispatching method, server and computer readable storage medium
CN109992418A (en) The multi-tenant big data platform resource priority level scheduling method and system of SLA perception
CN107909239A (en) Requirement analysis method, application server and the computer-readable recording medium of amount of money budget
TW539969B (en) A data processing method for a parts supply management system
JP6757437B1 (en) How to level the annual work by having the delivery person replace the meter
CN112241898A (en) Advertisement data delivery control method and device and computer equipment
WO2006082808A1 (en) Delivery date answering program, delivery date answering method, and system for implementing the method
CN109033045A (en) A kind of method, device and equipment generating garden business graphics
CN113407322B (en) Multi-terminal task allocation method and device, electronic equipment and readable storage medium
CN114897467A (en) Accessory replenishment method and device, readable storage medium and electronic equipment
CN106130757B (en) Information acquisition method and device
JP2000085925A (en) Supply plan preparing method
JP6173803B2 (en) Order quantity calculation system
JP2003228666A (en) Parts ordering system
JP4783990B2 (en) Material ordering system, server and method
CN112016958A (en) Product selection method and device, electronic equipment and storage medium
CN110533285A (en) Data processing method, electronic device and computer readable storage medium to be accepted
CN112085426A (en) Order issuing control method and device, storage medium and electronic equipment
WO2015073585A2 (en) Automated computer controlled system for measuring the consumption of printer resources and transacting environmental offsets

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106