CN105741003A - Plan generation method and plan generation device - Google Patents
Plan generation method and plan generation device Download PDFInfo
- Publication number
- CN105741003A CN105741003A CN201410765202.5A CN201410765202A CN105741003A CN 105741003 A CN105741003 A CN 105741003A CN 201410765202 A CN201410765202 A CN 201410765202A CN 105741003 A CN105741003 A CN 105741003A
- Authority
- CN
- China
- Prior art keywords
- plan
- prospectus
- amount
- per day
- adjustment information
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Landscapes
- General Factory Administration (AREA)
- Management, Administration, Business Operations System, And Electronic Commerce (AREA)
Abstract
The embodiments of the invention disclose a plan generation method and a plan generation device, for making a complete plan by taking problems of various production aspects into consideration when the plan is made. The method provided by one embodiment of the invention comprises the following steps: the plan generation device obtaining a plan compiling instruction; the plan generation device obtaining a plan completion degree; the plan generation device determining whether the plan completion degree reaches a preset plan condition; if the plan completion degree reaches the preset plan condition, the plan generation device obtaining a residual daily average plan amount; if the plan completion degree does not reach the preset plan condition, the plan generation device obtaining adjustment information and obtaining the residual daily average plan amount according to the adjustment information; the plan generation device determines whether the residual daily average plan amount reaches a preset plan amount condition; and if the residual daily average plan amount reaches the preset plan amount condition, generating the plan according to the residual daily average plan amount. The embodiments of the invention also provide a plan generation device.
Description
Technical field
The present invention relates to computer realm, particularly relate to a kind of prospectus and generate method and prospectus generation equipment.
Background technology
Present Continuous Manufacturing is when formulating day production planning and sequencing, generally use " per day method " or " advanced average day production and marketing method ", the purpose of day production planning and sequencing establishment is in that the year of enterprise, season, manufacturing program of a month progressively resolves into a day job task, production scheduling department and concrete production unit is made to ensure smoothly completing of corporate plan by volume by matter, material supplying department ensures raw-material supply according to plan, and according to production, supply, accident that sales department runs into and dispatched at any time and adjusted, the day establishment of production planning and sequencing relates to the production schedule that enterprise is total, material supply plan, all constraints such as the condition of production of sales planning and product and machine operation.
Existing day, production planning and sequencing compilation process was: production division obtains per day job task when working out a production plan book according to producing number of days, and per day job task is as day job task;Or, the advanced person's meansigma methods made in Japan in producing according to the past is assigned as day job task.
But, the scheduling strategy of prior art is all the arrival situation according to accident, it is scheduling by rule of thumb, very easily cause a deviation accumulation, and the course of processing of consecutive production enterprise continuously performs, and every day is all probably due to plan implementation deviation occurs different reasons, in many reasons, only dispatch by rule of thumb, it is difficult to take into account links, take the whole situation into account and plan accordingly, just influence whether formulating of day production planning and sequencing book and being smoothed out that enterprise produces.
Summary of the invention
Embodiments provide a kind of prospectus and generate method and prospectus generation equipment, it is possible to prospectus related to when working out and takes into account the reason of each production aspect, developing complete prospectus.
In view of this, first aspect present invention provides a kind of prospectus to generate method, including:
Prospectus generates equipment and obtains prospectus establishment instruction;
Described prospectus generates equipment and obtains plan completeness;
Described prospectus generates equipment and judges whether described plan completeness reaches predetermined plan condition;
If described plan completeness reaches predetermined plan condition, then described prospectus generates equipment and obtains the per day amount of plan of residue;
If described plan completeness is not up to predetermined plan condition, then described prospectus generates equipment and obtains adjustment information, and obtains remaining per day amount of plan according to described adjustment information;
Described prospectus generates equipment and judges whether the per day amount of plan of described residue reaches predetermined plan amount condition;
If the per day amount of plan of described residue reaches predetermined plan amount condition, then generate prospectus according to the per day amount of plan of described residue.
In conjunction with first aspect present invention, in the first embodiment of first aspect present invention, described prospectus generates equipment acquisition plan completeness and includes:
Described prospectus generate equipment according to described establishment instruction obtain plan target amount, complete task amount, complete average daily production and residue working day;
Described prospectus generate equipment according to described plan target amount, described completed task amount, described completed average daily production and described residue calculates and obtain plan completeness working day.
In conjunction with first aspect present invention, in the second embodiment of first aspect present invention, described prospectus generates equipment and obtains adjustment information, and obtains remaining per day amount of plan according to described adjustment information and include:
Described prospectus generates equipment and obtains adjustment information;
Described prospectus generates equipment and resolves the described adjustment information amount of being adjusted;
Described prospectus generates equipment and obtains the per day amount of plan of described residue according to the calculating of described adjustment amount.
In conjunction with the second embodiment of first aspect present invention, in the 3rd embodiment of first aspect present invention, described prospectus generates equipment acquisition adjustment information and includes:
Described prospectus generates equipment and obtains adjustment information from external equipment.
In conjunction with the second embodiment of first aspect present invention, in the 4th embodiment of first aspect present invention, described prospectus generates equipment acquisition adjustment information and includes:
Described prospectus generates equipment and obtains adjustment information from its data storehouse.
The 4th embodiment in conjunction with first aspect present invention, the first embodiment of first aspect present invention, the second embodiment of first aspect present invention, the 3rd embodiment of first aspect present invention or first aspect present invention, in first aspect present invention the 5th embodiment, also include:
If the per day amount of plan of described residue is not up to predetermined plan amount condition, then described prospectus generates equipment and obtains time adjustment information, and adjusts the per day amount of plan of described residue according to described adjustment information.
Second aspect present invention provides a kind of prospectus to generate equipment, including:
First acquisition module, is used for obtaining prospectus establishment instruction;
Second acquisition module, is used for obtaining plan completeness;
First judge module, is used for judging whether described plan completeness reaches predetermined plan condition;
3rd acquisition module, for when described plan completeness reaches predetermined plan condition, obtaining and remain per day amount of plan;
4th acquisition module, for when described plan completeness is not up to predetermined plan condition, obtaining adjustment information, and obtain remaining per day amount of plan according to described adjustment information;
Second judge module, is used for judging whether the per day amount of plan of described residue reaches predetermined plan amount condition;
Generation module, for when the per day amount of plan of described residue reaches predetermined plan amount condition, generating prospectus according to the per day amount of plan of described residue.
In conjunction with second aspect present invention, in the first embodiment of second aspect present invention, described second acquisition module includes:
First acquiring unit, for according to described establishment instruction obtain plan target amount, complete task amount, complete average daily production and residue working day;
First processing unit, for according to described plan target amount, described completed task amount, described completed average daily production and described residue calculates and obtain plan completeness working day.
In conjunction with second aspect present invention, in the second embodiment of second aspect present invention, described 4th acquisition module includes:
Second acquisition unit, is used for obtaining adjustment information;
Resolution unit, is used for resolving the described adjustment information amount of being adjusted;
Second processing unit, obtains the per day amount of plan of described residue for calculating according to described adjustment amount.
In conjunction with the second embodiment of second aspect present invention, in the 3rd embodiment of second aspect present invention, described second acquisition unit includes:
First obtains subelement, for obtaining adjustment information from external equipment.
In conjunction with the second embodiment of second aspect present invention, in the 4th embodiment of second aspect present invention, described second acquisition unit includes:
Second obtains subelement, for obtaining adjustment information from data base.
The 4th embodiment in conjunction with second aspect present invention, the first embodiment of second aspect present invention, the second embodiment of second aspect present invention, the 3rd embodiment of second aspect present invention or second aspect present invention, in 5th embodiment of second aspect present invention, also include:
Processing module, for when the per day amount of plan of described residue is not up to predetermined plan amount condition, described prospectus generates equipment and obtains time adjustment information, and adjusts the per day amount of plan of described residue according to described adjustment information.
As can be seen from the above technical solutions, the embodiment of the present invention has the advantage that
In the embodiment of the present invention, when starting to work out prospectus, prospectus generates equipment and obtains prospectus establishment instruction, prospectus generates equipment and obtains plan completeness according to prospectus establishment instruction, prospectus generates equipment and judges whether plan completeness reaches predetermined plan condition, if plan completeness reaches predetermined plan condition, then prospectus generates equipment and obtains the per day amount of plan of residue;If plan completeness is not up to predetermined plan condition, then prospectus generates equipment and obtains adjustment information, and obtain remaining per day amount of plan according to adjustment information, prospectus generates equipment and judges to remain whether per day amount of plan reaches predetermined plan amount condition, if remaining per day amount of plan to reach predetermined plan amount condition, then according to remaining per day amount of plan generation prospectus, predetermined plan amount condition can be multiple production status or raw material state etc., each condition is verified, when each predetermined plan amount condition can meet, generate prospectus, therefore, when the reason in multiple production, this prospectus generates equipment and can relate to and take into account each reason, more quick, effectively develop prospectus, enterprise is made to produce more smooth.
Accompanying drawing explanation
Fig. 1 is the embodiment schematic diagram that in the embodiment of the present invention, a kind of prospectus generates method;
Fig. 2 is another embodiment schematic diagram that in the embodiment of the present invention, a kind of prospectus generates method;
Fig. 3 is another embodiment schematic diagram that in the embodiment of the present invention, a kind of prospectus generates method;
Fig. 4 is another embodiment schematic diagram that in the embodiment of the present invention, a kind of prospectus generates method;
Fig. 5 is another embodiment schematic diagram that in the embodiment of the present invention, a kind of prospectus generates method;
Fig. 6 is the embodiment schematic diagram that in the embodiment of the present invention, a kind of prospectus generates equipment;
Fig. 7 is another embodiment schematic diagram that in the embodiment of the present invention, a kind of prospectus generates equipment;
Fig. 8 is another embodiment schematic diagram that in the embodiment of the present invention, a kind of prospectus generates equipment.
Detailed description of the invention
Embodiments provide a kind of prospectus and generate method and prospectus generates equipment, it is possible to the problem in making when prospectus work out pool and taking into account each production, develop complete prospectus.
Referring to Fig. 1, in the embodiment of the present invention, an embodiment of a kind of prospectus generation method includes:
101, prospectus generates equipment and obtains prospectus establishment instruction;
In the embodiment of the present invention, when user starts the establishment of prospectus, prospectus generates equipment and obtains prospectus establishment instruction.
102, prospectus generates equipment and obtains prospectus completeness;
In the embodiment of the present invention, after prospectus generation equipment gets prospectus establishment instruction, prospectus generates equipment and obtains plan completeness.
103, prospectus generation equipment judges whether plan completeness reaches predetermined plan condition;
In the embodiment of the present invention, after prospectus generates equipment acquisition plan completeness, it is judged that whether plan completeness reaches predetermined plan condition, if plan completeness reaches predetermined plan condition, then perform step 104;If plan completeness is not up to predetermined plan condition, then perform step 105.
104, prospectus generates equipment and obtains the per day amount of plan of residue;
In the embodiment of the present invention, when prospectus completeness reaches predetermined plan condition, prospectus generates equipment and obtains the per day amount of plan of residue.
105, prospectus generates equipment and obtains adjustment information, and obtains remaining per day amount of plan according to adjustment information;
In the embodiment of the present invention, when planning completeness not up to predetermined plan condition, prospectus generates equipment and obtains adjustment information, and obtains remaining per day amount of plan according to adjustment information.
106, prospectus generation equipment judges to remain whether per day amount of plan reaches predetermined plan amount condition;
In the embodiment of the present invention, prospectus generates after equipment obtains remaining per day amount of plan, it is judged that remains whether per day amount of plan reaches predetermined plan amount condition, when remaining per day amount of plan and reaching predetermined plan amount condition, performs step 107.
107, prospectus generates equipment and generates prospectus according to remaining per day amount of plan.
In the embodiment of the present invention, when remaining per day amount of plan and reaching predetermined plan amount condition, prospectus generates equipment and generates prospectus according to the per day amount of plan of the residue obtained.
nullIn the embodiment of the present invention,When user starts to work out prospectus,Prospectus generates equipment and obtains prospectus establishment instruction,Prospectus generates equipment and obtains plan completeness,Prospectus generates equipment and judges whether plan completeness reaches predetermined plan condition,If plan completeness reaches predetermined plan condition,Then prospectus generates equipment and obtains the per day amount of plan of residue,If plan completeness is not up to predetermined plan condition,Then prospectus generates equipment and obtains adjustment information,And obtain remaining per day amount of plan according to adjustment information,Prospectus generates equipment and judges to remain whether per day amount of plan reaches predetermined plan amount condition,If remaining per day amount of plan to reach predetermined plan amount condition,Then according to remaining per day amount of plan generation prospectus,When running into various problem in producing,Predetermined plan amount condition can change accordingly,Now adjustment information by coordination and takes into account each problem,Generate prospectus generation equipment when meeting all predetermined plan amount conditions and just generate prospectus,Therefore,When the reason in multiple production,Can be faster、Effectively develop prospectus,Enterprise is made to produce more smooth.
For ease of understanding, below prospectus being generated equipment acquisition plan completeness and be described in detail, refer to Fig. 2, a kind of prospectus in the embodiment of the present invention generates another embodiment of method and includes:
201, prospectus generates equipment and obtains prospectus establishment instruction;
In the embodiment of the present invention, when user starts the establishment of prospectus, prospectus generates equipment and obtains prospectus establishment instruction according to the operation of user.
202, prospectus generate equipment according to edit instruction obtain plan target amount, complete task amount, complete average daily production and residue working day;
In the embodiment of the present invention, when prospectus generate equipment get prospectus establishment instruction after, prospectus generate equipment according to edit instruction extract from data base this plan plan target amount, complete task amount, complete average daily production and residue working day.
203, prospectus generate equipment according to plan target amount, complete task amount, complete average daily production and residue working day calculate obtain plan completeness;
In the embodiment of the present invention, prospectus generate equipment according to obtain plan target amount, complete task amount, complete average daily production and residue working day calculate obtain plan completeness.
204, prospectus generation equipment judges whether plan completeness reaches predetermined plan condition;
In the embodiment of the present invention, after prospectus generates equipment acquisition plan completeness, it is judged that whether plan completeness reaches predetermined plan condition, if plan completeness reaches predetermined plan condition, then perform step 205;If plan completeness is not up to predetermined plan condition, then perform step 206.
205, prospectus generates equipment and obtains the per day amount of plan of residue;
In the embodiment of the present invention, when prospectus completeness reaches predetermined plan condition, prospectus generates equipment and calculates the per day amount of plan of residue.
206, prospectus generates equipment and obtains adjustment information, and obtains remaining per day amount of plan according to adjustment information;
In the embodiment of the present invention, when planning completeness not up to predetermined plan condition, prospectus generates equipment and obtains adjustment information, and obtains remaining per day amount of plan according to adjustment information calculating.
207, prospectus generation equipment judges to remain whether per day amount of plan reaches predetermined plan amount condition;
In the embodiment of the present invention, prospectus generates after equipment obtains remaining per day amount of plan, it is judged that remains whether per day amount of plan reaches predetermined plan amount condition, when remaining per day amount of plan and reaching predetermined plan amount condition, performs step 208;When remaining per day amount of plan not up to predetermined plan amount condition, perform step 209.
208, prospectus generates equipment and generates prospectus according to remaining per day amount of plan;
In the embodiment of the present invention, when remaining per day amount of plan and reaching predetermined plan amount condition, prospectus generates equipment and generates prospectus according to the per day amount of plan of the residue obtained.
209, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment.
In the embodiment of the present invention, when the per day amount of plan of described residue is not up to predetermined plan amount condition, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan, the per day amount of plan of residue after being adjusted according to secondary adjustment information adjustment.
nullIn the embodiment of the present invention,When user starts to work out prospectus,Prospectus generates equipment and obtains prospectus establishment instruction,Prospectus generates equipment and obtains plan completeness,Prospectus generates equipment and judges whether plan completeness reaches predetermined plan condition,If plan completeness reaches predetermined plan condition,Then prospectus generates equipment and obtains the per day amount of plan of residue,If plan completeness is not up to predetermined plan condition,Then prospectus generates equipment and obtains adjustment information,And obtain remaining per day amount of plan according to adjustment information,Prospectus generates equipment and judges to remain whether per day amount of plan reaches predetermined plan amount condition,If remaining per day amount of plan to reach predetermined plan amount condition,Then according to remaining per day amount of plan generation prospectus,When running into various problem in producing,Predetermined plan amount condition can change accordingly,Now adjustment information by coordination and takes into account each problem,Generate prospectus generation equipment when meeting all predetermined plan amount conditions and just generate prospectus,Therefore,When the reason in multiple production,Can be faster、Effectively develop prospectus,Enterprise is made to produce more smooth.
Secondly, prospectus generates equipment and obtains the refinement of plan completeness step so that scheme is more concrete.
Again, when judging to remain per day amount of plan not up to predetermined plan amount condition, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment so that scheme has exploitativeness more.
For ease of understanding, below prospectus being generated equipment and obtain adjustment information, and obtain remaining per day amount of plan according to described adjustment information and be described in detail, refer to Fig. 3, a kind of prospectus in the embodiment of the present invention generates another embodiment of method and includes:
301, prospectus generates equipment and obtains prospectus establishment instruction;
In the embodiment of the present invention, when user starts the establishment of prospectus, prospectus generates equipment and obtains prospectus establishment instruction according to the operation of user.
302, prospectus generates equipment and obtains plan completeness;
In the embodiment of the present invention, after prospectus generation equipment gets prospectus establishment instruction, prospectus generation equipment extracts corresponding data calculating from data base and obtains plan completeness.
303, prospectus generation equipment judges whether plan completeness reaches predetermined plan condition;
In the embodiment of the present invention, after prospectus generates equipment acquisition plan completeness, it is judged that whether plan completeness reaches predetermined plan condition, if plan completeness reaches predetermined plan condition, then perform step 304;If plan completeness is not up to predetermined plan condition, then perform step 305.
304, prospectus generates equipment and obtains the per day amount of plan of residue;
In the embodiment of the present invention, when prospectus completeness reaches predetermined plan condition, prospectus generates equipment and obtains the per day amount of plan of residue.
305, prospectus generates equipment and obtains adjustment information;
In the embodiment of the present invention, when planning completeness not up to predetermined plan condition, prospectus generates equipment and obtains adjustment information.
306, prospectus generates equipment and resolves the adjustment information amount of being adjusted;
In the embodiment of the present invention, prospectus resolves this adjustment information amount of being adjusted after generating equipment acquisition adjustment information.
307, prospectus generation equipment calculates according to adjustment amount and obtains remaining per day amount of plan;
In the embodiment of the present invention, prospectus generates equipment and obtains remaining per day amount of plan according to the adjustment amount calculating obtained.
308, prospectus generation equipment judges to remain whether per day amount of plan reaches predetermined plan amount condition;
In the embodiment of the present invention, prospectus generates after equipment obtains remaining per day amount of plan, it is judged that remains whether per day amount of plan reaches predetermined plan amount condition, when remaining per day amount of plan and reaching predetermined plan amount condition, performs step 309;When remaining per day amount of plan not up to predetermined plan amount condition, perform step 310.
309, prospectus generates equipment and generates prospectus according to remaining per day amount of plan;
In the embodiment of the present invention, when remaining per day amount of plan and reaching predetermined plan amount condition, prospectus generates equipment and generates prospectus according to the per day amount of plan of the residue obtained.
310, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment.
In the embodiment of the present invention, when the per day amount of plan of described residue is not up to predetermined plan amount condition, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan, the per day amount of plan of residue after being adjusted according to secondary adjustment information adjustment.
nullIn the embodiment of the present invention,When user starts to work out prospectus,Prospectus generates equipment and obtains prospectus establishment instruction,Prospectus generates equipment and obtains plan completeness,Prospectus generates equipment and judges whether plan completeness reaches predetermined plan condition,If plan completeness reaches predetermined plan condition,Then prospectus generates equipment and obtains the per day amount of plan of residue,If plan completeness is not up to predetermined plan condition,Then prospectus generates equipment and obtains adjustment information,And obtain remaining per day amount of plan according to adjustment information,Prospectus generates equipment and judges to remain whether per day amount of plan reaches predetermined plan amount condition,If remaining per day amount of plan to reach predetermined plan amount condition,Then according to remaining per day amount of plan generation prospectus,When running into various problem in producing,Predetermined plan amount condition can change accordingly,Now adjustment information by coordination and takes into account each problem,Generate prospectus generation equipment when meeting all predetermined plan amount conditions and just generate prospectus,Therefore,When the reason in multiple production,Can be faster、Effectively develop prospectus,Enterprise is made to produce more smooth.
Secondly, prospectus generates equipment and obtains adjustment information, and obtains remaining the step refinement of per day amount of plan according to described adjustment information so that scheme is more concrete.
Again, when judging to remain per day amount of plan not up to predetermined plan amount condition, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment so that scheme has exploitativeness more.
It should be noted that, prospectus generates the mode of equipment acquisition adjustment information can obtain adjustment information for prospectus generation equipment from external equipment, equipment can also be generated for prospectus from its data storehouse, obtain adjustment information, prospectus generates equipment can also otherwise obtain adjustment information, does not limit herein.
The equipment that below prospectus generated obtains the two ways of adjustment information from external equipment and its data storehouse and is described in detail respectively:
(1), prospectus generates equipment and obtains adjustment information from external equipment;
Referring to Fig. 4, a kind of prospectus in the embodiment of the present invention generates another embodiment of method and includes:
401, prospectus generates equipment and obtains prospectus establishment instruction;
In the embodiment of the present invention, when user starts the establishment of prospectus, prospectus generates equipment and obtains prospectus establishment instruction according to the operation of user.
402, prospectus generates equipment and obtains plan completeness;
In the embodiment of the present invention, after prospectus generation equipment gets prospectus establishment instruction, prospectus generation equipment extracts corresponding data calculating from data base and obtains plan completeness.
403, prospectus generation equipment judges whether plan completeness reaches predetermined plan condition;
In the embodiment of the present invention, after prospectus generates equipment acquisition plan completeness, it is judged that whether plan completeness reaches predetermined plan condition, if plan completeness reaches predetermined plan condition, then perform step 404;If plan completeness is not up to predetermined plan condition, then perform step 405.
404, prospectus generates equipment and obtains the per day amount of plan of residue;
In the embodiment of the present invention, when prospectus completeness reaches predetermined plan condition, prospectus generates equipment and obtains the per day amount of plan of residue.
405, prospectus generates equipment and obtains adjustment information from external equipment;
In the embodiment of the present invention, when planning completeness not up to predetermined plan condition, prospectus generates equipment and obtains adjustment information from external equipment.
406, prospectus generates equipment and resolves the adjustment information amount of being adjusted;
In the embodiment of the present invention, prospectus resolves this adjustment information amount of being adjusted after generating equipment acquisition adjustment information.
407, prospectus generation equipment calculates according to adjustment amount and obtains remaining per day amount of plan;
In the embodiment of the present invention, prospectus generates equipment and obtains remaining per day amount of plan according to the adjustment amount calculating obtained.
408, prospectus generation equipment judges to remain whether per day amount of plan reaches predetermined plan amount condition;
In the embodiment of the present invention, prospectus generates after equipment obtains remaining per day amount of plan, it is judged that remains whether per day amount of plan reaches predetermined plan amount condition, when remaining per day amount of plan and reaching predetermined plan amount condition, performs step 409;When remaining per day amount of plan not up to predetermined plan amount condition, perform step 410.
409, prospectus generates equipment and generates prospectus according to remaining per day amount of plan;
In the embodiment of the present invention, when remaining per day amount of plan and reaching predetermined plan amount condition, prospectus generates equipment and generates prospectus according to the per day amount of plan of the residue obtained.
410, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment.
In the embodiment of the present invention, when the per day amount of plan of described residue is not up to predetermined plan amount condition, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan, the per day amount of plan of residue after being adjusted according to secondary adjustment information adjustment.
nullIn the embodiment of the present invention,When user starts to work out prospectus,Prospectus generates equipment and obtains prospectus establishment instruction,Prospectus generates equipment and obtains plan completeness,Prospectus generates equipment and judges whether plan completeness reaches predetermined plan condition,If plan completeness reaches predetermined plan condition,Then prospectus generates equipment and obtains the per day amount of plan of residue,If plan completeness is not up to predetermined plan condition,Then prospectus generates equipment and obtains adjustment information,And obtain remaining per day amount of plan according to adjustment information,Prospectus generates equipment and judges to remain whether per day amount of plan reaches predetermined plan amount condition,If remaining per day amount of plan to reach predetermined plan amount condition,Then according to remaining per day amount of plan generation prospectus,When running into various problem in producing,Predetermined plan amount condition can change accordingly,Now adjustment information by coordination and takes into account each problem,Generate prospectus generation equipment when meeting all predetermined plan amount conditions and just generate prospectus,Therefore,When the reason in multiple production,Can be faster、Effectively develop prospectus,Enterprise is made to produce more smooth.
Secondly, prospectus generates equipment and obtains adjustment information from external equipment so that scheme is more concrete.
Again, when judging to remain per day amount of plan not up to predetermined plan amount condition, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment so that scheme has exploitativeness more.
(2), prospectus generates equipment and obtains adjustment information from its data storehouse.
Referring to Fig. 5, a kind of prospectus in the embodiment of the present invention generates another embodiment of method and includes:
501, prospectus generates equipment and obtains prospectus establishment instruction;
In the embodiment of the present invention, when user starts the establishment of prospectus, prospectus generates equipment and obtains prospectus establishment instruction according to the operation of user.
502, prospectus generates equipment and obtains plan completeness;
In the embodiment of the present invention, after prospectus generation equipment gets prospectus establishment instruction, prospectus generation equipment extracts corresponding data calculating from data base and obtains plan completeness.
503, prospectus generation equipment judges whether plan completeness reaches predetermined plan condition;
In the embodiment of the present invention, after prospectus generates equipment acquisition plan completeness, it is judged that whether plan completeness reaches predetermined plan condition, if plan completeness reaches predetermined plan condition, then perform step 504;If plan completeness is not up to predetermined plan condition, then perform step 505.
504, prospectus generates equipment and obtains the per day amount of plan of residue;
In the embodiment of the present invention, when prospectus completeness reaches predetermined plan condition, prospectus generates equipment and obtains the per day amount of plan of residue.
505, prospectus generates equipment and obtains adjustment information from its data storehouse;
In the embodiment of the present invention, when planning completeness not up to predetermined plan condition, prospectus generates equipment and obtains adjustment information from its data storehouse.
506, prospectus generates equipment and resolves the adjustment information amount of being adjusted;
In the embodiment of the present invention, prospectus resolves this adjustment information amount of being adjusted after generating equipment acquisition adjustment information.
507, prospectus generation equipment calculates according to adjustment amount and obtains remaining per day amount of plan;
In the embodiment of the present invention, prospectus generates equipment and obtains remaining per day amount of plan according to the adjustment amount calculating obtained.
508, prospectus generation equipment judges to remain whether per day amount of plan reaches predetermined plan amount condition;
In the embodiment of the present invention, prospectus generates after equipment obtains remaining per day amount of plan, it is judged that remains whether per day amount of plan reaches predetermined plan amount condition, when remaining per day amount of plan and reaching predetermined plan amount condition, performs step 509;When remaining per day amount of plan not up to predetermined plan amount condition, perform step 510.
509, prospectus generates equipment and generates prospectus according to remaining per day amount of plan;
In the embodiment of the present invention, when remaining per day amount of plan and reaching predetermined plan amount condition, prospectus generates equipment and generates prospectus according to the per day amount of plan of the residue obtained.
510, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment.
In the embodiment of the present invention, when the per day amount of plan of described residue is not up to predetermined plan amount condition, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan, the per day amount of plan of residue after being adjusted according to secondary adjustment information adjustment.
nullIn the embodiment of the present invention,When user starts to work out prospectus,Prospectus generates equipment and obtains prospectus establishment instruction,Prospectus generates equipment and obtains plan completeness,Prospectus generates equipment and judges whether plan completeness reaches predetermined plan condition,If plan completeness reaches predetermined plan condition,Then prospectus generates equipment and obtains the per day amount of plan of residue,If plan completeness is not up to predetermined plan condition,Then prospectus generates equipment and obtains adjustment information,And obtain remaining per day amount of plan according to adjustment information,Prospectus generates equipment and judges to remain whether per day amount of plan reaches predetermined plan amount condition,If remaining per day amount of plan to reach predetermined plan amount condition,Then according to remaining per day amount of plan generation prospectus,When running into various problem in producing,Predetermined plan amount condition can change accordingly,Now adjustment information by coordination and takes into account each problem,Generate prospectus generation equipment when meeting all predetermined plan amount conditions and just generate prospectus,Therefore,When the reason in multiple production,Can be faster、Effectively develop prospectus,Enterprise is made to produce more smooth.
Secondly, prospectus generates equipment and obtains adjustment information from its data storehouse so that scheme is more concrete.
Again, when judging to remain per day amount of plan not up to predetermined plan amount condition, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment so that scheme has exploitativeness more.
For ease of understanding, with a concrete application scenarios, a kind of prospectus is generated method below and be described in detail, concrete:
nullPlan in one production is carried out prospectus establishment by the enterprise of one continuous production matter,This plan concrete condition is " producing 10000 tons of chemical fertilizer in 150 days ",Start establishment on the client,Prospectus generates equipment and receives according to starting prospectus establishment instruction " 0001 " that establishment operation obtains,Prospectus generates equipment book according to this plan establishment instruction " 0001 " and extracts plan target amount from data base、Complete task amount、Complete average daily production and remained working day,The value of plan target amount is " 10000 tons ",Complete task value for " 5000 tons ",Complete average daily production value for " 50 tons "、The residue work earning in a day is " 50 days ",Prospectus generates the plan target amount that the processor of equipment will obtain、Complete task amount、Complete average daily production and residue has carried out computing working day,Obtain plan and complete angle value for " 75% ";
Prospectus generation equipment is intended to the value " 75% " of completeness and contrasts with predetermined plan condition " 100% ", judge that plan completeness is not up to predetermined plan condition, then prospectus generates equipment and receives the adjustment information that user sends, adjustment information is " increasing the volume of production of 70 tons of chemical fertilizer every day ", it is " 70 tons " according to the adjustment amount that adjustment information obtains, obtains remaining per day plan value for " 120 tons " according to adjustment amount;
nullThe predetermined plan condition that prospectus generates in device databases has " 1 " and " 2 ",Information in " 1 " is for " material inventory is 1000,Raw material 5000 is supplemented " behind 10 days from today,Information in " 2 " is that " amount of storage of product is 3000 tons,The sales volume playing every day today is 110 tons ",Raw material value " 1 " is corresponding produces one ton of chemical fertilizer,Prospectus generates device handler and show that the raw material of every daily consumption is for " 120 " according to residue per day amount of plan " 120 tons " computing,The material quantity of 10 daily consumptions is " 1200 ",And the material inventory in raw material storage is " 1000 ",Therefore prospectus generates equipment judgement and show that the per day amount of plan of residue is unsatisfactory for predetermined plan condition " 1 ",Then prospectus generates equipment and receives the secondary adjustment information that user sends,Secondary adjustment information is " volume of production that every day increases by 50 tons of chemical fertilizer ",It is " 100 tons " according to the per day plan value of residue that secondary adjustment information obtains,Judge to draw that remaining per day amount of plan has reached the requirement of predetermined plan condition " 1 " and " 2 ",Therefore,Prospectus generates equipment and generates prospectus according to the per day amount of plan of the residue that this value is " 100 tons ".
Referring to Fig. 6, in the embodiment of the present invention, an embodiment of a kind of prospectus generation equipment includes:
First acquisition module 601, is used for obtaining prospectus establishment instruction;
Second acquisition module 602, is used for obtaining plan completeness;
First judge module 603, for judging whether the plan completeness that the second acquisition module 602 obtains reaches predetermined plan condition;
3rd acquisition module 604, for when the first judge module 603 judges that the plan completeness that the second acquisition module 602 obtains reaches predetermined plan condition, obtaining and remain per day amount of plan;
4th acquisition module 605, is used for, when the first judge module 603 judges the plan completeness of the second acquisition module 602 acquisition not up to predetermined plan condition, obtaining adjustment information, and obtaining remaining per day amount of plan according to described adjustment information;
Second judge module 606, is used for judging to remain whether per day amount of plan reaches predetermined plan amount condition;
Generation module 607, for when the second judge module 606 judges that remaining per day amount of plan reaches predetermined plan amount condition, generating prospectus according to remaining per day amount of plan.
nullIn the embodiment of the present invention,When user starts to work out prospectus,First acquisition module 601 obtains prospectus establishment instruction,Second acquisition module 602 obtains plan completeness,First judge module 603 judges whether plan completeness reaches predetermined plan condition,If plan completeness reaches predetermined plan condition,3rd acquisition module 604 obtains and remains per day amount of plan,If plan completeness is not up to predetermined plan condition,4th acquisition module 605 obtains adjustment information,And obtain remaining per day amount of plan according to adjustment information,Second judge module 606 judges to remain whether per day amount of plan reaches predetermined plan amount condition,If remaining per day amount of plan to reach predetermined plan amount condition,Then generation module 607 generates prospectus according to remaining per day amount of plan,When running into various problem in producing,Predetermined plan amount condition in second judge module 606 judge process can change accordingly,The adjustment information that now the 4th acquisition module 605 obtains by coordination and takes into account each problem,Generate prospectus generation equipment when meeting all predetermined plan amount conditions and just generate prospectus,Therefore,When the reason in multiple production,Can be faster、Effectively develop prospectus,Enterprise is made to produce more smooth.
Referring to Fig. 7, in the embodiment of the present invention, another embodiment of a kind of prospectus generation equipment includes:
First acquisition module 701, is used for obtaining prospectus establishment instruction;
Second acquisition module 702, is used for obtaining plan completeness;
First judge module 703, for judging whether the plan completeness that the second acquisition module 702 obtains reaches predetermined plan condition;
3rd acquisition module 704, for when the first judge module 703 judges that the plan completeness that the second acquisition module 702 obtains reaches predetermined plan condition, obtaining and remain per day amount of plan;
4th acquisition module 705, is used for, when the first judge module 703 judges the plan completeness of the second acquisition module 702 acquisition not up to predetermined plan condition, obtaining adjustment information, and obtaining remaining per day amount of plan according to described adjustment information;
Second judge module 706, is used for judging to remain whether per day amount of plan reaches predetermined plan amount condition;
Generation module 707, for when the second judge module 706 judges that remaining per day amount of plan reaches predetermined plan amount condition, generating prospectus according to remaining per day amount of plan;
Processing module 708, for when the second judge module 706 judges to remain per day amount of plan not up to predetermined plan amount condition, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment.
In the present embodiment, the second acquisition module 702 includes:
First acquiring unit 7021, the establishment instruction for getting according to the first acquisition module 701 obtains plan target amount, completes task amount, completes average daily production and residue working day;
First processing unit 7022, for the plan target amount got according to the first acquiring unit 7021, described has completed task amount, described has completed average daily production and described residue calculates and obtain plan completeness working day.
nullIn the embodiment of the present invention,When user starts to work out prospectus,First acquisition module 701 obtains prospectus establishment instruction,The establishment instruction that the first acquiring unit 7021 in second acquisition module 702 gets according to the first acquisition module 701 obtains plan target amount、Complete task amount、Complete average daily production and remained working day,The plan target amount that first processing unit 7022 gets according to the first acquiring unit 7021、Described complete task amount、Described complete average daily production and described residue calculates and obtain plan completeness working day,First judge module 703 judges whether plan completeness reaches predetermined plan condition,If plan completeness reaches predetermined plan condition,3rd acquisition module 704 obtains and remains per day amount of plan,If plan completeness is not up to predetermined plan condition,4th acquisition module 705 obtains adjustment information,And obtain remaining per day amount of plan according to adjustment information,Second judge module 706 judges to remain whether per day amount of plan reaches predetermined plan amount condition,If remaining per day amount of plan to reach predetermined plan amount condition,Then generation module 707 generates prospectus according to remaining per day amount of plan,If the second judge module 706 judges to remain per day amount of plan not up to predetermined plan amount condition,Then processing module 708 obtains time adjustment information,And remain per day amount of plan according to secondary adjustment information adjustment,When running into various problem in producing,Predetermined plan amount condition in second judge module 706 judge process can change accordingly,The adjustment information that now the 4th acquisition module 705 obtains by coordination and takes into account each problem,Generate prospectus generation equipment when meeting all predetermined plan amount conditions and just generate prospectus,Therefore,When the reason in multiple production,Can be faster、Effectively develop prospectus,Enterprise is made to produce more smooth.
Secondly, the second acquisition module 702 obtains the refinement of plan completeness step so that scheme is more concrete.
Again, when judging to remain per day amount of plan not up to predetermined plan amount condition, processing module 708 obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment so that scheme has exploitativeness more.
Referring to Fig. 8, in the embodiment of the present invention, another embodiment of a kind of prospectus generation equipment includes:
First acquisition module 801, is used for obtaining prospectus establishment instruction;
Second acquisition module 802, is used for obtaining plan completeness;
First judge module 803, for judging whether the plan completeness that the second acquisition module 802 obtains reaches predetermined plan condition;
3rd acquisition module 804, for when the first judge module 803 judges that the plan completeness that the second acquisition module 802 obtains reaches predetermined plan condition, obtaining and remain per day amount of plan;
4th acquisition module 805, is used for, when the first judge module 803 judges the plan completeness of the second acquisition module 802 acquisition not up to predetermined plan condition, obtaining adjustment information, and obtaining remaining per day amount of plan according to described adjustment information;
Second judge module 806, is used for judging to remain whether per day amount of plan reaches predetermined plan amount condition;
Generation module 807, for when the second judge module 806 judges that remaining per day amount of plan reaches predetermined plan amount condition, generating prospectus according to remaining per day amount of plan;
Processing module 808, for when the second judge module 806 judges to remain per day amount of plan not up to predetermined plan amount condition, prospectus generates equipment and obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment.
In the present embodiment, the 4th acquisition module 805 includes:
Second acquisition unit 8051, is used for obtaining adjustment information;
Resolution unit 8052, for resolving the adjustment information amount of being adjusted that second acquisition unit 8051 gets;
Second processing unit 8053, obtains remaining per day amount of plan for resolving the adjustment amount calculating obtained according to resolution unit 8052.
In the present embodiment, second acquisition unit 8051 includes:
First obtains subelement 80511, for obtaining adjustment information from external equipment;
Or,
Second obtains subelement 80512, for obtaining adjustment information from data base.
nullIn the embodiment of the present invention,When user starts to work out prospectus,First acquisition module 801 obtains prospectus establishment instruction,Second acquisition module 802 obtains plan completeness,First judge module 803 judges whether plan completeness reaches predetermined plan condition,If plan completeness reaches predetermined plan condition,3rd acquisition module 804 obtains and remains per day amount of plan,If plan completeness is not up to predetermined plan condition,In second acquisition unit 8051 in 4th acquisition module 805, the first acquisition subelement 80511 or the second acquisition subelement 80512 obtain adjustment information from data base or external equipment,The adjustment information amount of being adjusted that resolution unit 8052 is analyzed and acquired by,Second processing unit 8053 resolves the adjustment amount calculating obtained and obtains remaining per day amount of plan according to resolution unit 8052,Second judge module 806 judges to remain whether per day amount of plan reaches predetermined plan amount condition,If remaining per day amount of plan to reach predetermined plan amount condition,Then generation module 807 generates prospectus according to remaining per day amount of plan,If the second judge module 806 judges to remain per day amount of plan not up to predetermined plan amount condition,Then processing module 808 obtains time adjustment information,And remain per day amount of plan according to secondary adjustment information adjustment,When running into various problem in producing,Predetermined plan amount condition in second judge module 806 judge process can change accordingly,The adjustment information that now the 4th acquisition module 805 obtains by coordination and takes into account each problem,Generate prospectus generation equipment when meeting all predetermined plan amount conditions and just generate prospectus,Therefore,When the reason in multiple production,Can be faster、Effectively develop prospectus,Enterprise is made to produce more smooth.
Secondly, the 4th acquisition module 805 obtains the refinement of plan completeness step so that scheme is more concrete.
Again, when judging to remain per day amount of plan not up to predetermined plan amount condition, processing module 808 obtains time adjustment information, and remains per day amount of plan according to secondary adjustment information adjustment so that scheme has exploitativeness more.
With a specific implementation, the interaction of each unit in embodiment of the present invention prospectus generation equipment is described in detail below:
nullPlan in one production is carried out prospectus establishment by the enterprise of one continuous production matter,This plan concrete condition is " producing 10000 tons of chemical fertilizer in 150 days ",Start establishment on the client,First acquisition module 801 receives according to starting prospectus establishment instruction " 0001 " that establishment operation obtains,Second acquisition module 802 book according to this plan establishment instruction " 0001 " extracts plan target amount from data base、Complete task amount、Complete average daily production and remained working day,The value of plan target amount is " 10000 tons ",Complete task value for " 5000 tons ",Complete average daily production value for " 50 tons "、The residue work earning in a day is " 50 days ",The plan target amount that will obtain、Complete task amount、Complete average daily production and residue has carried out computing working day,Obtain plan and complete angle value for " 75% ";
First judge module 803 is intended to the value " 75% " of completeness and contrasts with predetermined plan condition " 100% ", judge that plan completeness is not up to predetermined plan condition, then first in the second acquisition unit 8051 in the 4th acquisition module 805 obtains subelement 80511 and receives the adjustment information that user sends, adjustment information is " increasing the volume of production of 70 tons of chemical fertilizer every day ", resolution unit 8052 resolves the adjustment information amount of being adjusted for " 70 tons ", and the second processing unit 8053 is " 120 tons " according to the per day plan value of residue that adjustment amount obtains;
nullPredetermined plan condition in data base has " 1 " and " 2 ",Information in " 1 " is for " material inventory is 1000,Raw material 5000 is supplemented " behind 10 days from today,Information in " 2 " is that " amount of storage of product is 3000 tons,The sales volume playing every day today is 110 tons ",Raw material value " 1 " is corresponding produces one ton of chemical fertilizer,According to residue per day amount of plan " 120 tons " computing, processor show that the raw material of every daily consumption is for " 120 ",The material quantity of 10 daily consumptions is " 1200 ",And the material inventory in raw material storage is " 1000 ",Therefore the second judge module 806 judges to show that the per day amount of plan of residue is unsatisfactory for predetermined plan condition " 1 ",Then processing module 808 receives the secondary adjustment information that user sends,Secondary adjustment information is " volume of production that every day increases by 50 tons of chemical fertilizer ",It is " 100 tons " according to the per day plan value of residue that secondary adjustment information obtains,Second judge module 806 judges to draw that remaining per day amount of plan has reached the requirement of predetermined plan condition " 1 " and " 2 ",Therefore,Produce module 807 and generate prospectus according to the per day amount of plan of the residue that this value is " 100 tons ".
Those skilled in the art is it can be understood that arrive, for convenience and simplicity of description, the system of foregoing description, the specific works process of device and unit, it is possible to reference to the corresponding process in preceding method embodiment, do not repeat them here.
In several embodiments provided herein, it should be understood that disclosed system, apparatus and method, it is possible to realize by another way.Such as, device embodiment described above is merely schematic, such as, the division of described unit, being only a kind of logic function to divide, actual can have other dividing mode when realizing, for instance multiple unit or assembly can in conjunction with or be desirably integrated into another system, or some features can ignore, or do not perform.Another point, shown or discussed coupling each other or direct-coupling or communication connection can be through INDIRECT COUPLING or the communication connection of some interfaces, device or unit, it is possible to be electrical, machinery or other form.
The described unit illustrated as separating component can be or may not be physically separate, and the parts shown as unit can be or may not be physical location, namely may be located at a place, or can also be distributed on multiple NE.Some or all of unit therein can be selected according to the actual needs to realize the purpose of the present embodiment scheme.
It addition, each functional unit in each embodiment of the present invention can be integrated in a processing unit, it is also possible to be that unit is individually physically present, it is also possible to two or more unit are integrated in a unit.Above-mentioned integrated unit both can adopt the form of hardware to realize, it would however also be possible to employ the form of SFU software functional unit realizes.
If described integrated unit is using the form realization of SFU software functional unit and as independent production marketing or use, it is possible to be stored in a computer read/write memory medium.Based on such understanding, part or all or part of of this technical scheme that prior art is contributed by technical scheme substantially in other words can embody with the form of software product, this computer software product is stored in a storage medium, including some instructions with so that a computer equipment (can be personal computer, server, or the network equipment etc.) perform all or part of step of method described in each embodiment of the present invention.And aforesaid storage medium includes: USB flash disk, portable hard drive, read only memory (ROM, Read-OnlyMemory), the various media that can store program code such as random access memory (RAM, RandomAccessMemory), magnetic disc or CD.
The above, above example only in order to technical scheme to be described, is not intended to limit;Although the present invention being described in detail with reference to previous embodiment, it will be understood by those within the art that: the technical scheme described in foregoing embodiments still can be modified by it, or wherein portion of techniques feature is carried out equivalent replacement;And these amendments or replacement, do not make the essence of appropriate technical solution depart from the spirit and scope of various embodiments of the present invention technical scheme.
Claims (12)
1. a prospectus generates method, it is characterised in that including:
Prospectus generates equipment and obtains prospectus establishment instruction;
Described prospectus generates equipment and obtains plan completeness;
Described prospectus generates equipment and judges whether described plan completeness reaches predetermined plan condition;
If described plan completeness reaches predetermined plan condition, then described prospectus generates equipment and obtains the per day amount of plan of residue;
If described plan completeness is not up to predetermined plan condition, then described prospectus generates equipment and obtains adjustment information, and obtains remaining per day amount of plan according to described adjustment information;
Described prospectus generates equipment and judges whether the per day amount of plan of described residue reaches predetermined plan amount condition;
If the per day amount of plan of described residue reaches predetermined plan amount condition, then generate prospectus according to the per day amount of plan of described residue.
2. prospectus according to claim 1 generates method, it is characterised in that described prospectus generates equipment acquisition plan completeness and includes:
Described prospectus generate equipment according to described establishment instruction obtain plan target amount, complete task amount, complete average daily production and residue working day;
Described prospectus generate equipment according to described plan target amount, described completed task amount, described completed average daily production and described residue calculates and obtain plan completeness working day.
3. prospectus according to claim 1 generates method, it is characterised in that described prospectus generates equipment and obtains adjustment information, and obtains remaining per day amount of plan according to described adjustment information and include:
Described prospectus generates equipment and obtains adjustment information;
Described prospectus generates equipment and resolves the described adjustment information amount of being adjusted;
Described prospectus generates equipment and obtains the per day amount of plan of described residue according to the calculating of described adjustment amount.
4. prospectus according to claim 3 generates method, it is characterised in that described prospectus generates equipment acquisition adjustment information and includes:
Described prospectus generates equipment and obtains adjustment information from external equipment.
5. prospectus according to claim 3 generates method, it is characterised in that described prospectus generates equipment acquisition adjustment information and includes:
Described prospectus generates equipment and obtains adjustment information from its data storehouse.
6. prospectus according to any one of claim 1 to 5 generates method, it is characterised in that also include:
If the per day amount of plan of described residue is not up to predetermined plan amount condition, then described prospectus generates equipment and obtains time adjustment information, and adjusts the per day amount of plan of described residue according to described adjustment information.
7. a prospectus generates equipment, it is characterised in that including:
First acquisition module, is used for obtaining prospectus establishment instruction;
Second acquisition module, is used for obtaining plan completeness;
First judge module, is used for judging whether described plan completeness reaches predetermined plan condition;
3rd acquisition module, for when described plan completeness reaches predetermined plan condition, obtaining and remain per day amount of plan;
4th acquisition module, for when described plan completeness is not up to predetermined plan condition, obtaining adjustment information, and obtain remaining per day amount of plan according to described adjustment information;
Second judge module, is used for judging whether the per day amount of plan of described residue reaches predetermined plan amount condition;
Generation module, for when the per day amount of plan of described residue reaches predetermined plan amount condition, generating prospectus according to the per day amount of plan of described residue.
8. prospectus according to claim 7 generates equipment, it is characterised in that described second acquisition module includes:
First acquiring unit, for according to described establishment instruction obtain plan target amount, complete task amount, complete average daily production and residue working day;
First processing unit, for according to described plan target amount, described completed task amount, described completed average daily production and described residue calculates and obtain plan completeness working day.
9. prospectus according to claim 7 generates equipment, it is characterised in that described 4th acquisition module includes:
Second acquisition unit, is used for obtaining adjustment information;
Resolution unit, is used for resolving the described adjustment information amount of being adjusted;
Second processing unit, obtains the per day amount of plan of described residue for calculating according to described adjustment amount.
10. prospectus according to claim 9 generates equipment, it is characterised in that described second acquisition unit includes:
First obtains subelement, for obtaining adjustment information from external equipment.
11. prospectus according to claim 9 generates equipment, it is characterised in that described second acquisition unit includes:
Second obtains subelement, for obtaining adjustment information from data base.
12. the prospectus according to any one of claim 7 to 11 generates equipment, it is characterised in that also include:
Processing module, for when the per day amount of plan of described residue is not up to predetermined plan amount condition, described prospectus generates equipment and obtains time adjustment information, and adjusts the per day amount of plan of described residue according to described adjustment information.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410765202.5A CN105741003A (en) | 2014-12-11 | 2014-12-11 | Plan generation method and plan generation device |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201410765202.5A CN105741003A (en) | 2014-12-11 | 2014-12-11 | Plan generation method and plan generation device |
Publications (1)
Publication Number | Publication Date |
---|---|
CN105741003A true CN105741003A (en) | 2016-07-06 |
Family
ID=56241315
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201410765202.5A Pending CN105741003A (en) | 2014-12-11 | 2014-12-11 | Plan generation method and plan generation device |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN105741003A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107544444A (en) * | 2017-08-16 | 2018-01-05 | 浙江力太科技有限公司 | A kind of synchronous production management method for more equipment rooms |
CN109388116A (en) * | 2018-10-31 | 2019-02-26 | 金蝶软件(中国)有限公司 | A kind of production management method, management system for internet of things and relevant device |
CN109426918A (en) * | 2017-09-05 | 2019-03-05 | 辽宁伟龙科技有限公司 | A method of Workshop Production is carried out based on time data and processes scheduled production |
WO2019223152A1 (en) * | 2018-05-23 | 2019-11-28 | 平安科技(深圳)有限公司 | Task assigning method, server and computer-readable storage medium |
-
2014
- 2014-12-11 CN CN201410765202.5A patent/CN105741003A/en active Pending
Cited By (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN107544444A (en) * | 2017-08-16 | 2018-01-05 | 浙江力太科技有限公司 | A kind of synchronous production management method for more equipment rooms |
CN109426918A (en) * | 2017-09-05 | 2019-03-05 | 辽宁伟龙科技有限公司 | A method of Workshop Production is carried out based on time data and processes scheduled production |
WO2019223152A1 (en) * | 2018-05-23 | 2019-11-28 | 平安科技(深圳)有限公司 | Task assigning method, server and computer-readable storage medium |
CN109388116A (en) * | 2018-10-31 | 2019-02-26 | 金蝶软件(中国)有限公司 | A kind of production management method, management system for internet of things and relevant device |
CN109388116B (en) * | 2018-10-31 | 2021-08-20 | 金蝶软件(中国)有限公司 | Production management method, Internet of things management system and related equipment |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
US11687859B2 (en) | Software with improved view of a business process | |
CN104317618B (en) | A kind of firmware partition treating method and apparatus | |
CN105741003A (en) | Plan generation method and plan generation device | |
CN104102696A (en) | Content recommendation method and device | |
SG10201807358YA (en) | Workload automation and data lineage analysis | |
CN105719112A (en) | Determination method and device for distribution abnormal state, and server | |
CN103842921A (en) | Production planning device and production planning method | |
JP6880892B2 (en) | Process plan generation program and process plan generation method | |
CN104407779A (en) | Arrangement display method and device for graphical interface | |
MX2020001411A (en) | System, method, and computer program product for determining category alignment of an account. | |
CN111369190A (en) | Super BOM (bill of material) matching number selecting method and device | |
JP6344010B2 (en) | Production plan creation support program, production plan creation support method, and production plan creation support device | |
EP3410354A1 (en) | Method and device for initializing two-dimensional code | |
ATE557364T1 (en) | METHOD AND DEVICE FOR THE COMPUTER-IMPLEMENTED PROCESSING OF ELECTRONIC PAYMENT ORDERS | |
CN108416300A (en) | Method and device for recognizing writing track and terminal equipment | |
JP5440655B2 (en) | Information processing system and program | |
CN104268084A (en) | User ranking method and system for online program evaluation system | |
WO2020158246A1 (en) | Planning assistance device, planning assistance method, and planning assistance system | |
JP2021022329A (en) | Sheet metal machining cost management device and sheet metal machining cost management method | |
CN111191999A (en) | Product research and development management method and device, computer equipment and storage medium | |
Mens et al. | Qualgen: Modeling and analysing the quality of evolving software systems | |
KR102270381B1 (en) | Method for providing shopping interface based on consumer data and apparatus thereof | |
JP2008090660A (en) | Cost estimation device, cost estimation system, program, and cost estimation method | |
CN105046467A (en) | Device and method for distributed document printing | |
US20130060718A1 (en) | Tooling design price quotation in product data management systems |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
C06 | Publication | ||
PB01 | Publication | ||
C10 | Entry into substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20160706 |
|
RJ01 | Rejection of invention patent application after publication |