CN108763753A - 一种基于bim的建筑施工图设计模型构建方法 - Google Patents

一种基于bim的建筑施工图设计模型构建方法 Download PDF

Info

Publication number
CN108763753A
CN108763753A CN201810525593.1A CN201810525593A CN108763753A CN 108763753 A CN108763753 A CN 108763753A CN 201810525593 A CN201810525593 A CN 201810525593A CN 108763753 A CN108763753 A CN 108763753A
Authority
CN
China
Prior art keywords
model
bim
design
architectural
designs
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810525593.1A
Other languages
English (en)
Inventor
成月
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Tianyuan Guangdong Architectural Design Co Ltd
Original Assignee
Tianyuan Guangdong Architectural Design Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Tianyuan Guangdong Architectural Design Co Ltd filed Critical Tianyuan Guangdong Architectural Design Co Ltd
Priority to CN201810525593.1A priority Critical patent/CN108763753A/zh
Publication of CN108763753A publication Critical patent/CN108763753A/zh
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F30/00Computer-aided design [CAD]
    • G06F30/10Geometric CAD
    • G06F30/13Architectural design, e.g. computer-aided architectural design [CAAD] related to design of buildings, bridges, landscapes, production plants or roads

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Geometry (AREA)
  • General Physics & Mathematics (AREA)
  • Computer Hardware Design (AREA)
  • Theoretical Computer Science (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Computational Mathematics (AREA)
  • Architecture (AREA)
  • Mathematical Analysis (AREA)
  • Mathematical Optimization (AREA)
  • Pure & Applied Mathematics (AREA)
  • Evolutionary Computation (AREA)
  • General Engineering & Computer Science (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)

Abstract

一种基于BIM的建筑施工图设计模型构建方法;根据各专业设计人员意见优化得出的建筑设计方案,通过revit软件搭建建筑模型;在建筑模型搭建完成后执行多次“审核模型→补充资料并完善模型”的工作流程,并在每次“审核模型”完成后出具对应的核模报告:根据最终完善的建筑模型,完成BIM图纸的二维加工和出图工作。在BIM协同设计平台上,各专业设计人员以模型为提资条件,将各自建好的模型在设计过程中及时开展协同设计,审核人及各专业技术总工也提前介入并参与协同设计和定案工作。使建筑施工图设计正向展开,依次解决各专业技术问题。通过制定各阶段建模标准和核模标准,使各专业在一个统一的标准下协同合作,大大地提高了设计效率和设计质量。

Description

一种基于BIM的建筑施工图设计模型构建方法
技术领域
本发明涉及建筑施工图设计模型的构建方法,特别是一种基于BIM的建筑施工图设计模型构建方法。
背景技术
基于CAD平台的协同设计,并不能充分实现专业间的信息交流,专业间的数据不具有关联性,导致CAD的二维设计方法无法满足目前建筑行业的精细化管理要求。传统CAD协同工作流程:建筑方案报建图纸→建筑专业施工图设计→结构专业施工图设计→机电专业施工图设计→建筑专业根据机电意见修改施工图纸→结构专业根据机电意见修改施工图纸→机电专业重新套图。各专业在施工图设计过程中各自为政,无法做到有效的技术沟通,导致图纸完成后要反复修改,并容易在图纸修改过程中产生二次错误,严重降低了设计效率和设计质量。
背景技术
为实现上述目的,本发明提出一种基于BIM的建筑施工图设计模型构建方法,根据各专业设计人员意见优化得出的建筑设计方案,通过revit软件搭建建筑模型;
在建筑施工图设计模型搭建完成后执行多次“审核模型→补充资料并完善模型”的工作流程,并在每次“审核模型”完成后出具对应的核模报告:
根据最终完善的建筑模型,完成BIM图纸的二维加工和出图工作。
优选的,多个专业领域包括建筑专业、结构专业、水利专业、暖通专业和电气专业。
优选的,执行“审核模型→补充资料并完善模型”的工作流程的次数为三次。
传统的CAD施工图设计流程相比,BIM的出现使协同已经不再是简单的文件参照,在BIM协同设计平台上,各专业设计人员以模型为提资条件,将各自建好的模型在设计过程中及时开展协同设计,审核人及各专业技术总工也提前介入并参与协同设计和定案工作。使建筑施工图设计正向展开,依次解决各专业技术问题。通过制定各阶段建模标准和核模标准,使各专业在一个统一的标准下协同合作,大大地提高了设计效率和设计质量。
具体实施方式
下面对本发明实施例中的技术方案进行清楚、完整地描述,显然,所描述的实施例仅仅是本发明的一部分实施例,而不是全部的实施例。基于本发明中的实施例,本领域普通技术人员在没有作出创造性劳动前提下所获得的所有其他实施例,都属于本发明保护的范围。
本发明的一种基于BIM的建筑模型构建方法,包括以下几个步骤:
(1)以建筑专业提资的方案报建版二维电子版图纸为依据,组织根据多个专业领域的技术人员(本实施例中的多个专业领域的技术人员包括但不限于建筑专业、结构专业、水利专业、暖通专业和电气专业的技术人员)展开技术评审会,针对方案中各专业中将会产生的技术问题给出解决方案,BIM 负责人根据会议决策制定本项目BIM策划书,各专业设计人员以BIM策划书为依据展开工作。
(2)以步骤(1)中优化后的二维电子版图纸为依据,各专业领域的技术人员根据初模搭建标准,并进行第一次相互提资,完成BIM初模搭建工作 (以revit软件搭建模型为例)。
(3)BIM初模完成后,组织各专业领域的技术人员检查BIM初模,核模过程中提出核模报告,将模型中出现的问题给出解决方案,写入核模报告中。
(4)根据BIM初模核模记录,各专业领域的技术人员按节点进行模型提资,根据BIM中模建模深度及标准,深化BIM模型。
(5)BIM中模完成后,组织各专业领域的技术人员检查BIM中模,核模过程中提出核模报告,将模型中出现的问题给出解决方案,写入核模报告中。
(6)根据BIM中模核模记录,各专业领域的技术人员按节点进行模型提资,根据BIM终模建模深度及标准,深化BIM模型。
(7)BIM终模完成后,组织各专业领域的技术人员检查BIM中模,核模过程中提出核模报告,将模型中出现搜的问题给出解决方案,写入核模报告中。
(8)根据BIM终模核模记录,各专业领域的技术人员修改最终BIM模型,BIM模型搭建完成。
(9)根据BIM终模和出图标准,完成BIM图纸的二维加工和出图工作。
与传统的CAD施工图设计流程相比,BIM的出现使协同已经不再是简单的文件参照,在BIM协同设计平台上,各专业设计人员以模型为提资条件,将各自建好的模型在设计过程中及时开展协同设计,审核人及各专业技术总工也提前介入并参与协同设计和定案工作。使建筑施工图设计正向展开,依次解决各专业技术问题。通过制定各阶段建模标准和核模标准,使各专业在一个统一的标准下协同合作,大大地提高了设计效率和设计质量。
以上所述仅为本发明的优选实施例,并非因此限制本发明的专利范围,凡是在本发明的发明构思下,利用本发明说明书的内容所作的等效结构变换,或直接/间接运用在其他相关的技术领域均包括在本发明的专利保护范围内。

Claims (3)

1.一种基于BIM的建筑施工图设计模型构建方法,其特征在于,根据各专业设计人员意见优化得出的建筑设计方案,通过revit软件搭建建筑模型;
在建筑施工图设计模型搭建完成后执行多次“审核模型→补充资料并完善模型”的工作流程,并在每次“审核模型”完成后出具对应的核模报告:
根据最终完善的建筑模型,完成BIM图纸的二维加工和出图工作。
2.如权利要求1所述的建筑施工图设计模型构建方法,其特征在于,多个专业领域包括建筑专业、结构专业、水利专业、暖通专业和电气专业。
3.如权利要求1或2所述的建筑施工图设计模型构建方法,其特征在于,执行“审核模型→补充资料并完善模型”的工作流程的次数为三次。
CN201810525593.1A 2018-05-28 2018-05-28 一种基于bim的建筑施工图设计模型构建方法 Pending CN108763753A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810525593.1A CN108763753A (zh) 2018-05-28 2018-05-28 一种基于bim的建筑施工图设计模型构建方法

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810525593.1A CN108763753A (zh) 2018-05-28 2018-05-28 一种基于bim的建筑施工图设计模型构建方法

Publications (1)

Publication Number Publication Date
CN108763753A true CN108763753A (zh) 2018-11-06

Family

ID=64002974

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810525593.1A Pending CN108763753A (zh) 2018-05-28 2018-05-28 一种基于bim的建筑施工图设计模型构建方法

Country Status (1)

Country Link
CN (1) CN108763753A (zh)

Cited By (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110377987A (zh) * 2019-07-03 2019-10-25 广东天元建筑设计有限公司 一种基于bim的高层办公楼框架-核心筒设计方法
CN110390145A (zh) * 2019-07-03 2019-10-29 广东天元建筑设计有限公司 一种基于bim的建筑户型平面设计方法
CN111950979A (zh) * 2020-08-03 2020-11-17 上海原构设计咨询有限公司 一种提高协同设计效率的方法
CN112257137A (zh) * 2019-07-22 2021-01-22 成都笔木智绘科技有限公司 一种基于Revit的建筑结构BIM正向自动设计方法
CN112307539A (zh) * 2020-10-23 2021-02-02 成都市建筑设计研究院 一种基于bim的城市轨道交通正向协同设计方法
CN112528373A (zh) * 2020-12-09 2021-03-19 四川蓉信开工程设计有限公司 基于bim的水处理工程专业间交互和协同设计方法
CN113806840A (zh) * 2021-08-23 2021-12-17 中国建筑西南设计研究院有限公司 一种基于Revit和CAD的建筑结构混合设计方法
CN114118977A (zh) * 2021-12-06 2022-03-01 中科智领(青岛)数字科技有限公司 基于Revit的同步中心模型校审信息的数据处理方法

Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6405364B1 (en) * 1999-08-31 2002-06-11 Accenture Llp Building techniques in a development architecture framework
CN106709660A (zh) * 2016-12-29 2017-05-24 天津市建筑设计院 基于bim的建筑设计方法
CN107169214A (zh) * 2017-05-24 2017-09-15 辽宁工程技术大学 一种建筑模型设计方法

Patent Citations (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US6405364B1 (en) * 1999-08-31 2002-06-11 Accenture Llp Building techniques in a development architecture framework
CN106709660A (zh) * 2016-12-29 2017-05-24 天津市建筑设计院 基于bim的建筑设计方法
CN107169214A (zh) * 2017-05-24 2017-09-15 辽宁工程技术大学 一种建筑模型设计方法

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
杨成月等: "使用双基站无线传感器网络进行电网连续灾害追踪与预警研究", 《武汉大学学报(信息科学版)》 *
罗兰: "装饰工程BIM模型的审核研究", 《土木建筑工程信息技术》 *

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110377987A (zh) * 2019-07-03 2019-10-25 广东天元建筑设计有限公司 一种基于bim的高层办公楼框架-核心筒设计方法
CN110390145A (zh) * 2019-07-03 2019-10-29 广东天元建筑设计有限公司 一种基于bim的建筑户型平面设计方法
CN112257137A (zh) * 2019-07-22 2021-01-22 成都笔木智绘科技有限公司 一种基于Revit的建筑结构BIM正向自动设计方法
CN111950979A (zh) * 2020-08-03 2020-11-17 上海原构设计咨询有限公司 一种提高协同设计效率的方法
CN111950979B (zh) * 2020-08-03 2024-01-09 上海原构设计咨询有限公司 一种提高协同设计效率的方法
CN112307539A (zh) * 2020-10-23 2021-02-02 成都市建筑设计研究院 一种基于bim的城市轨道交通正向协同设计方法
CN112528373A (zh) * 2020-12-09 2021-03-19 四川蓉信开工程设计有限公司 基于bim的水处理工程专业间交互和协同设计方法
CN112528373B (zh) * 2020-12-09 2023-04-11 四川蓉信开工程设计有限公司 基于bim的水处理工程专业间交互和协同设计方法
CN113806840A (zh) * 2021-08-23 2021-12-17 中国建筑西南设计研究院有限公司 一种基于Revit和CAD的建筑结构混合设计方法
CN113806840B (zh) * 2021-08-23 2022-06-14 中国建筑西南设计研究院有限公司 一种基于Revit和CAD的建筑结构混合设计方法
CN114118977A (zh) * 2021-12-06 2022-03-01 中科智领(青岛)数字科技有限公司 基于Revit的同步中心模型校审信息的数据处理方法

Similar Documents

Publication Publication Date Title
CN108763753A (zh) 一种基于bim的建筑施工图设计模型构建方法
CN104346663A (zh) 一种基于工作流的合同审批方法
Wei Planning Chinese cities: The limits of transitional institutions
CN104036059B (zh) 一种基于图元的工程协同设计方法和系统
Liu et al. Review and prospect of BIM policy in China
CN106095989A (zh) 一种基于bim的建筑工程信息交换方法
CN107665122A (zh) 一种土建bim模型的自动更新方法
CN104978411B (zh) 一种高速列车的车型开发方法和装置
CN110727983A (zh) 一种关于公共医疗建筑的bim建模方法
Redaelli American cultural policy and the rise of arts management programs: The creation of a new professional identity
CN110390145A (zh) 一种基于bim的建筑户型平面设计方法
CN106779620A (zh) 基于ipd体系的数字化设计平台建设方法
Chen et al. BIM-Based design coordination for china’s architecture, engineering and construction industry
CN113901570A (zh) 一种将bim应用到变电站建设过程的方法
CN109344560A (zh) 基于bim技术的装配式建筑建模方法及模型管理系统
CN104850068B (zh) 一种复杂生产制造过程的智能建模方法
WO2021042585A1 (zh) 一种建筑构件的 cdm 建模方法
CN117573105A (zh) 基于Dynamo实现机电工程可视化施工进度控制方法
CN108959824A (zh) 一种营邑规划管线bim设计断面图层次化生成方法
Dehaghi et al. Reverse engineering: a way of technology transfer in developing countries like Iran
CN110377987A (zh) 一种基于bim的高层办公楼框架-核心筒设计方法
EP3657410A1 (en) Energy transition decision support method based on technology-economy-real participant-computer agent interactive simulation
CN109087062A (zh) 一种工艺协同管理系统及其协同管理方法
Amankwah-Amoah et al. Newly independent nations and large engineering projects: the case of the Volta River Project
Lehtinen Increasing integration in construction projects: A case study on a PPP project adopting BIM

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication
RJ01 Rejection of invention patent application after publication

Application publication date: 20181106