CN108762736A - Management method, device, equipment and the computer readable storage medium of project branch - Google Patents

Management method, device, equipment and the computer readable storage medium of project branch Download PDF

Info

Publication number
CN108762736A
CN108762736A CN201810235044.0A CN201810235044A CN108762736A CN 108762736 A CN108762736 A CN 108762736A CN 201810235044 A CN201810235044 A CN 201810235044A CN 108762736 A CN108762736 A CN 108762736A
Authority
CN
China
Prior art keywords
management
project
project branch
branch
instruction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810235044.0A
Other languages
Chinese (zh)
Other versions
CN108762736B (en
Inventor
孔校军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuba Co Ltd
Original Assignee
Wuba Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuba Co Ltd filed Critical Wuba Co Ltd
Priority to CN201810235044.0A priority Critical patent/CN108762736B/en
Publication of CN108762736A publication Critical patent/CN108762736A/en
Application granted granted Critical
Publication of CN108762736B publication Critical patent/CN108762736B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06FELECTRIC DIGITAL DATA PROCESSING
    • G06F8/00Arrangements for software engineering
    • G06F8/30Creation or generation of source code
    • GPHYSICS
    • G06COMPUTING; CALCULATING OR COUNTING
    • G06QINFORMATION AND COMMUNICATION TECHNOLOGY [ICT] SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES; SYSTEMS OR METHODS SPECIALLY ADAPTED FOR ADMINISTRATIVE, COMMERCIAL, FINANCIAL, MANAGERIAL OR SUPERVISORY PURPOSES, NOT OTHERWISE PROVIDED FOR
    • G06Q10/00Administration; Management
    • G06Q10/10Office automation; Time management
    • G06Q10/103Workflow collaboration or project management

Landscapes

  • Engineering & Computer Science (AREA)
  • Business, Economics & Management (AREA)
  • Theoretical Computer Science (AREA)
  • Strategic Management (AREA)
  • Human Resources & Organizations (AREA)
  • General Physics & Mathematics (AREA)
  • Entrepreneurship & Innovation (AREA)
  • General Engineering & Computer Science (AREA)
  • Software Systems (AREA)
  • Physics & Mathematics (AREA)
  • Marketing (AREA)
  • Economics (AREA)
  • Data Mining & Analysis (AREA)
  • Operations Research (AREA)
  • Quality & Reliability (AREA)
  • Tourism & Hospitality (AREA)
  • General Business, Economics & Management (AREA)
  • Management, Administration, Business Operations System, And Electronic Commerce (AREA)
  • Stored Programmes (AREA)

Abstract

The present invention proposes a kind of management method of project branch, including:When receiving the instruction of project branch management, based on the check analysis instructed to the project branch management, obtains the project branch management and instruct corresponding preset project branch management command history;Based on the corresponding preset management data of the project branch management command history got, and by calling the corresponding preset management interface of the project branch management command history, corresponding project branch is instructed to execute management operation the project branch management.The invention also discloses a kind of managing device, equipment and the computer readable storage mediums of project branch can effectively simplify the management process of the branch of software development sub-project, management operating process is friendly and easy by implementing said program.

Description

Management method, device, equipment and the computer readable storage medium of project branch
Technical field
The present invention relates to field of computer technology more particularly to a kind of management method, device, equipment and the meters of project branch Calculation machine readable storage medium storing program for executing.
Background technology
With the fast development of computer technology, in daily software development process, usually using distributed version control System Git processed carries out the version management of software code.But it is generally comprised in some bigger development projects multiple soft Part develops sub-project, and each software development sub-project is required for programmer that the warehouses a Git progress software generation is used alone The version management of code, and the branch of each software development sub-project is required for programmer by executing corresponding order stroke Sequence is managed, and management process complexity is cumbersome.
Invention content
The present invention proposes a kind of management method, device, equipment and the computer readable storage medium of project branch, to Solve the problems, such as that the branch management process of sub-project in development project in the prior art is complicated cumbersome.
The technical solution adopted by the present invention is to provide the management method of project branch, including:
When receiving the instruction of project branch management, based on the check analysis instructed to the project branch management, obtain The project branch management instructs corresponding preset project branch management command history;
Based on the corresponding preset management data of the project branch management command history got, and by described in calling The corresponding preset management interface of project branch management command history instructs corresponding project branch to hold the project branch management Row management operation.
Optionally, the project branch management that receives instructs, including:
The instruction of project branch management is received by preset user interface.
Optionally, described based on the check analysis instructed to the project branch management, obtain the project branch management Corresponding preset project branch management command history is instructed, including:
Based on the mapping relations of preset project branch management instruction and project branch management command history, the item is obtained Mesh branch management instructs corresponding project branch management command history.
Optionally, after corresponding project branch execution management operation is instructed to the project branch management described, institute The method of stating further includes:
The management operational status information of the project branch is presented in the user interface.
Optionally, it is described to the project branch management instruct corresponding project branch execute management operation include at least with One of lower operation:
Handover operation is executed to the project branch, the project branch is executed and creates operation, and to the project Branch executes delete operation.
The present invention also provides a kind of managing devices of project branch, including:
Parsing module, for when receive project branch management instruction when, based on what is instructed to the project branch management Check analysis obtains the project branch management and instructs corresponding preset project branch management command history;
Execution module, for based on the corresponding preset management data of the project branch management command history got, And by calling the corresponding preset management interface of the project branch management command history, to project branch management instruction pair The project branch answered executes management operation.
Optionally, the project branch management that receives instructs, including:
The instruction of project branch management is received by preset user interface.
Optionally, described based on the check analysis instructed to the project branch management, obtain the project branch management Corresponding preset project branch management command history is instructed, including:
Based on the mapping relations of preset project branch management instruction and project branch management command history, the item is obtained Mesh branch management instructs corresponding project branch management command history.
Optionally, described device further includes:
Module is presented, is used for after instructing corresponding project branch to execute management operation the project branch management, The management operational status information of the project branch is presented in the user interface.
Optionally, it is described to the project branch management instruct corresponding project branch execute management operation include at least with One of lower operation:
Handover operation is executed to the project branch, the project branch is executed and creates operation, and to the project Branch executes delete operation.
The present invention also provides a kind of management equipment of project branch, the management equipment of the project branch include processor and Memory;The processor is used to execute the management program of the project branch stored in memory, to realize above-mentioned project point The step of management method of branch.
The present invention also provides a kind of computer readable storage medium, the computer-readable recording medium storage there are one or The multiple programs of person, one or more of programs can be executed by one or more processor, to realize above-mentioned project point The step of management method of branch.
Using above-mentioned technical proposal, the present invention at least has following advantages:
Management method, device, equipment and the computer readable storage medium of a kind of project branch of the present invention, Neng Gouyou The management process user interface management operating process that effect simplifies the branch of software development sub-project is friendly and easy, effective to improve The branch management efficiency of software development sub-project.
Description of the drawings
Fig. 1 is the management method flow chart of the project branch of first embodiment of the invention;
Fig. 2 is the management method flow chart of the project branch of second embodiment of the invention;
Fig. 3 is the management method flow chart of the project branch of third embodiment of the invention;
Fig. 4 is the management method flow chart of the project branch of fourth embodiment of the invention;
Fig. 5 is the management method flow chart of the project branch of fifth embodiment of the invention;
Fig. 6 is the management method flow chart of the project branch of sixth embodiment of the invention;
Fig. 7 is that the project branch of sixth embodiment of the invention switches/create board interface schematic diagram;
Fig. 8 is the management method flow chart of the project branch of seventh embodiment of the invention;
Fig. 9 is the project branch Delete Tab interface schematic diagram of seventh embodiment of the invention;
Figure 10 is the managing device composed structure schematic diagram of the project branch of the 8th to the tenth embodiment of the invention;
Figure 11 is the managing device composed structure schematic diagram of the project branch of the 11st to the 12nd embodiment of the invention;
Figure 12 is the management equipment composed structure schematic diagram of the project branch of thriteenth embodiment of the invention.
Specific implementation mode
Further to illustrate the present invention to reach the technological means and effect that predetermined purpose is taken, below in conjunction with attached drawing And preferred embodiment, the present invention is described in detail as after.
First embodiment of the invention, a kind of management method of project branch, as shown in Figure 1, including step in detail below:
Step S101, when receiving the instruction of project branch management, based on the check analysis instructed to project branch management, Acquisition project branch management instructs corresponding preset project branch management command history.
Optionally, project branch management instruction is included at least one of to give an order:
Project branch switching command, project branch create instruction and instruction is deleted by project branch.
Wherein, project branch switching command corresponds to project branch switching command set;Project branch creates instruction respective items Mesh branch creates command history;Instruction corresponding project branch delete command set is deleted by project branch.
In the present embodiment, the mode of the check analysis of project branch management instruction is not specifically limited.
By the check analysis instructed to project branch management, obtains project branch management and instruct corresponding preset project point Zhi Guanli command histories avoid and need programmer to input a plurality of project branch management life project branch management in the prior art Row, the troublesome operation brought is enabled effectively to simplify the operation of project branch management.
Step S102 based on the corresponding preset management data of project branch management command history got, and passes through tune With the corresponding preset management interface of project branch management command history, corresponding project branch is instructed to execute project branch management Management operation.
Optionally, it is one or more that project branch management, which instructs the quantity of corresponding project branch,.
By preset management data, and preset management interface is called, corresponding project is instructed to project branch management Branch executes management operation, realizes and executes quickly management operation to one or more project branches, avoids programmer and pass through Inputting a plurality of project branch management order line, quickly management operates to the execution of each project branch, the troublesome operation brought, effectively Simplify project branch management operation, improve project branch management operating efficiency.
The management method of the project branch of first embodiment of the invention can effectively simplify the branch of software development sub-project Management process, user interface management operating process is friendly and easy, effectively raises the branched pipe of software development sub-project Manage efficiency.
Second embodiment of the invention, a kind of management method of project branch, as shown in Fig. 2, including step in detail below:
Step S201, when receiving the instruction of project branch management, based on the check analysis instructed to project branch management, Acquisition project branch management instructs corresponding preset project branch management command history.
Optionally, project branch management instruction is included at least one of to give an order:
Project branch switching command, project branch create instruction and instruction is deleted by project branch.
Wherein, project branch switching command corresponds to project branch switching command set;Project branch creates instruction respective items Mesh branch creates command history;Instruction corresponding project branch delete command set is deleted by project branch.
Optionally, receiving the mode that project branch management instructs includes but not limited to:
The instruction of project branch management is received by preset user interface.
Such as:Step S201 is based on application layer when receiving the instruction of project branch management by preset user interface To the check analysis of project branch management instruction, obtains project branch management in application layer and instruct corresponding preset project branched pipe Manage command history.
In the present embodiment, the mode of the check analysis of project branch management instruction is not specifically limited.
By the check analysis instructed to project branch management, obtains project branch management and instruct corresponding preset project point Zhi Guanli command histories avoid and need programmer to input a plurality of project branch management life project branch management in the prior art Row, the troublesome operation brought is enabled effectively to simplify the operation of project branch management.
Step S202 based on the corresponding preset management data of project branch management command history got, and passes through tune With the corresponding preset management interface of project branch management command history, corresponding project branch is instructed to execute project branch management Management operation.
Optionally, it is one or more that project branch management, which instructs the quantity of corresponding project branch,.
By preset management data, and preset management interface is called, corresponding project is instructed to project branch management Branch executes management operation, realizes and executes quickly management operation to one or more project branches, avoids programmer and pass through Inputting a plurality of project branch management order line, quickly management operates to the execution of each project branch, the troublesome operation brought, effectively Simplify project branch management operation, improve project branch management operating efficiency.
Such as:Step S202, based on the corresponding present tube of project branch management command history got in service layer Data are managed, and by calling the corresponding preset management interface of project branch management command history in service layer, to project branched pipe Reason instructs corresponding project branch to execute management operation.
The management method of the project branch of second embodiment of the invention can effectively simplify the branch of software development sub-project Management process, and the management that user interface carries out the branch of software development sub-project can be passed through, management operating process is friendly And it is easy, effectively raise the branch management efficiency of software development sub-project.
Third embodiment of the invention, a kind of management method of project branch, as shown in figure 3, including step in detail below:
Step S301, when receiving the instruction of project branch management, based on the check analysis instructed to project branch management, Acquisition project branch management instructs corresponding preset project branch management command history.
Optionally, project branch management instruction is included at least one of to give an order:
Project branch switching command, project branch create instruction and instruction is deleted by project branch.
Wherein, project branch switching command corresponds to project branch switching command set;Project branch creates instruction respective items Mesh branch creates command history;Instruction corresponding project branch delete command set is deleted by project branch.
Optionally, receiving the mode that project branch management instructs includes but not limited to:
The instruction of project branch management is received by preset user interface.
Optionally, based on the check analysis instructed to project branch management, it is corresponding pre- to obtain the instruction of project branch management The mode of project branch management command history is set, including but not limited to:
Based on the mapping relations of preset project branch management instruction and project branch management command history, project point is obtained Zhi Guanli instructs corresponding project branch management command history.
Such as:Step S301 is based on application layer when receiving the instruction of project branch management by preset user interface In preset project branch management instruction and project branch management command history mapping relations, obtain project branch in application layer Management instructs corresponding project branch management command history.
By the check analysis instructed to project branch management, obtains project branch management and instruct corresponding preset project point Zhi Guanli command histories avoid and need programmer to input a plurality of project branch management life project branch management in the prior art Row, the troublesome operation brought is enabled effectively to simplify the operation of project branch management.
Step S302 based on the corresponding preset management data of project branch management command history got, and passes through tune With the corresponding preset management interface of project branch management command history, corresponding project branch is instructed to execute project branch management Management operation.
Optionally, it is one or more that project branch management, which instructs the quantity of corresponding project branch,.
By preset management data, and preset management interface is called, corresponding project is instructed to project branch management Branch executes management operation, realizes and executes quickly management operation to one or more project branches, avoids programmer and pass through Inputting a plurality of project branch management order line, quickly management operates to the execution of each project branch, the troublesome operation brought, effectively Simplify project branch management operation, improve project branch management operating efficiency.
Such as:Step S302, based on the corresponding present tube of project branch management command history got in service layer Data are managed, and by calling the corresponding preset management interface of project branch management command history in service layer, to project branched pipe Reason instructs corresponding project branch to execute management operation.
The management method of the project branch of third embodiment of the invention can effectively simplify the branch of software development sub-project Management process, and the management that user interface carries out the branch of software development sub-project can be passed through, management operating process is friendly And it is easy, effectively raise the branch management efficiency of software development sub-project.
Fourth embodiment of the invention, a kind of management method of project branch, as shown in figure 4, including step in detail below:
Step S401, when receiving the instruction of project branch management, based on the check analysis instructed to project branch management, Acquisition project branch management instructs corresponding preset project branch management command history.
Optionally, project branch management instruction is included at least one of to give an order:
Project branch switching command, project branch create instruction and instruction is deleted by project branch.
Wherein, project branch switching command corresponds to project branch switching command set;Project branch creates instruction respective items Mesh branch creates command history;Instruction corresponding project branch delete command set is deleted by project branch.
Optionally, receiving the mode that project branch management instructs includes but not limited to:
The instruction of project branch management is received by preset user interface.
Optionally, based on the check analysis instructed to project branch management, it is corresponding pre- to obtain the instruction of project branch management The mode of project branch management command history is set, including but not limited to:
Based on the mapping relations of preset project branch management instruction and project branch management command history, project point is obtained Zhi Guanli instructs corresponding project branch management command history.
Such as:Step S401 is based on application layer when receiving the instruction of project branch management by preset user interface In preset project branch management instruction and project branch management command history mapping relations, obtain project branch in application layer Management instructs corresponding project branch management command history.
By the check analysis instructed to project branch management, obtains project branch management and instruct corresponding preset project point Zhi Guanli command histories avoid and need programmer to input a plurality of project branch management life project branch management in the prior art Row, the troublesome operation brought is enabled effectively to simplify the operation of project branch management.
Step S402 based on the corresponding preset management data of project branch management command history got, and passes through tune With the corresponding preset management interface of project branch management command history, corresponding project branch is instructed to execute project branch management Management operation.
Optionally, it is one or more that project branch management, which instructs the quantity of corresponding project branch,.
By preset management data, and preset management interface is called, corresponding project is instructed to project branch management Branch executes management operation, realizes and executes quickly management operation to one or more project branches, avoids programmer and pass through Inputting a plurality of project branch management order line, quickly management operates to the execution of each project branch, the troublesome operation brought, effectively Simplify project branch management operation, improve project branch management operating efficiency.
Such as:Step S402, based on the corresponding present tube of project branch management command history got in service layer Data are managed, and by calling the corresponding preset management interface of project branch management command history in service layer, to project branched pipe Reason instructs corresponding project branch to execute management operation.
The management operational status information of project branch is presented in step S403 in the user interface.
Optionally, it manages operational status information packet but is not limited to following information:
Complete the status information of management operation, or the status information of management operation failure.
The management method of the project branch of fourth embodiment of the invention can effectively simplify the branch of software development sub-project Management process, and the management that user interface carries out the branch of software development sub-project can be passed through, management operating process is friendly And it is easy, effectively raise the branch management efficiency of software development sub-project.
Fifth embodiment of the invention, a kind of management method of project branch, as shown in figure 5, including step in detail below:
Step S501, when receiving the instruction of project branch management, based on the check analysis instructed to project branch management, Acquisition project branch management instructs corresponding preset project branch management command history.
Optionally, project branch management instruction is included at least one of to give an order:
Project branch switching command, project branch create instruction and instruction is deleted by project branch.
Wherein, project branch switching command corresponds to project branch switching command set;Project branch creates instruction respective items Mesh branch creates command history;Instruction corresponding project branch delete command set is deleted by project branch.
Optionally, receiving the mode that project branch management instructs includes but not limited to:
The instruction of project branch management is received by preset user interface.
Optionally, based on the check analysis instructed to project branch management, it is corresponding pre- to obtain the instruction of project branch management The mode of project branch management command history is set, including but not limited to:
Based on the mapping relations of preset project branch management instruction and project branch management command history, project point is obtained Zhi Guanli instructs corresponding project branch management command history.
Such as:Step S501 is based on application layer when receiving the instruction of project branch management by preset user interface In preset project branch management instruction and project branch management command history mapping relations, obtain project branch in application layer Management instructs corresponding project branch management command history.
By the check analysis instructed to project branch management, obtains project branch management and instruct corresponding preset project point Zhi Guanli command histories avoid and need programmer to input a plurality of project branch management life project branch management in the prior art Row, the troublesome operation brought is enabled effectively to simplify the operation of project branch management.
Step S502 based on the corresponding preset management data of project branch management command history got, and passes through tune With the corresponding preset management interface of project branch management command history, corresponding project branch is instructed to execute project branch management Management operation.
Optionally, it is one or more that project branch management, which instructs the quantity of corresponding project branch,.
Optionally, corresponding project branch is instructed to execute management operation including at least following operation project branch management One:
Handover operation is executed to project branch, project branch is executed and creates operation, and deletion is executed to project branch Operation.
Wherein, project branch switching command executes handover operation to reply project branch;Project branch creates instruction and corresponds to Project branch is executed and creates operation;Project branch deletes instruction and executes delete operation to reply project branch.
By preset management data, and preset management interface is called, corresponding project is instructed to project branch management Branch executes management operation, realizes and executes quickly management operation to one or more project branches, avoids programmer and pass through Inputting a plurality of project branch management order line, quickly management operates to the execution of each project branch, the troublesome operation brought, effectively Simplify project branch management operation, improve project branch management operating efficiency.
Such as:Step S502, based on the corresponding present tube of project branch management command history got in service layer Data are managed, and by calling the corresponding preset management interface of project branch management command history in service layer, to project branched pipe Reason instructs corresponding project branch to execute management operation.
The management operational status information of project branch is presented in step S503 in the user interface.
Optionally, management operational status information includes but not limited to following information:
Complete the status information of management operation, or the status information of management operation failure.
For example, the status information of the completion management operation of project branch is presented in the user interface.
For another example, the status information of the management operation failure of project branch is presented in the user interface.
The management method of the project branch of fifth embodiment of the invention can effectively simplify the branch of software development sub-project Management process, and the management that user interface carries out the branch of software development sub-project can be passed through, management operating process is friendly And it is easy, effectively raise the branch management efficiency of software development sub-project.
Sixth embodiment of the invention, the present embodiment are on the basis of the above embodiments, with a kind of management of project branch For method, an application example of the invention is introduced in conjunction with 6~Fig. 7 of attached drawing.
Step S601 is cut in the development process of project branch by the project branch under click tools (Tools) menu Change/create (Batch Checkout) option, open project branch switch/create panel;By project, branch switches/establishment face Board interface receives project branch switching/establishment instruction.
It is instructed as shown in fig. 7, switching/creating board interface by project branch and receive project branch switching/establishment, packet It includes:
The identification information of the first switching project of input branch in FirstBranch input frames;It is defeated in SecondBranch Enter to input the identification information of second item branch in frame.
Step S602, based on project branch switching/establishment instruction preset in application layer and project branch management command set The mapping relations of conjunction obtain project branch switching/establishment in application layer and instruct corresponding project branch management command history.
Step S603 switches/creates the corresponding preset management data of command history based on the project branch got, and leads to It crosses calling project branch and switches/create the corresponding preset management interface of command history, project branch switching/establishment instruction is corresponded to Project branch execute switching/establishment operation.
Wherein, corresponding project branch is instructed to execute the mode that switching/establishment is grasped project branch switching/establishment, including:
As shown in fig. 7, in the case where first item branch is not present, it is switched to second item branch, clicks OK button Can rapid batch switching project branch, the state letter of pop-up finished item branch management operation after the completion of the switching of project branch Breath;
When Force options in choosing, it is switched to first item branch;In the case where first item branch is not present, wound The branch is built, to realize that batch creates project branch.
The management method of the project branch of sixth embodiment of the invention can effectively simplify the branch of software development sub-project Management process, and the management that user interface carries out the branch of software development sub-project can be passed through, management operating process is friendly And it is easy, effectively raise the branch management efficiency of software development sub-project.
Seventh embodiment of the invention, the present embodiment are on the basis of the above embodiments, with a kind of management of project branch For method, an application example of the invention is introduced in conjunction with 8~Fig. 9 of attached drawing.
Step S701 is deleted in the development process of project branch by the project branch under click tools (Tools) menu Except (Batch Remove) option, project branch Delete Tab is opened;Project is received by project branch Delete Tab interface Instruction is deleted by branch.
As shown in figure 9, receiving project branch by project branch Delete Tab interface deletes instruction, including:
Input needs the identification information for the project branch deleted in Remove Barnch input frames.
Step S702 deletes reflecting for instruction and project branch management command history based on preset project branch in application layer Relationship is penetrated, project branch in application layer is obtained and deletes the corresponding project branch management command history of instruction.
Step S703 based on the corresponding preset management data of project branch delete command set got, and passes through tune With the corresponding preset management interface of project branch delete command set, project branch is deleted, corresponding project branch is instructed to execute Delete operation.
Wherein, project branch is deleted and corresponding project branch is instructed to execute the mode for deleting behaviour, including:
As shown in figure 9, deleting the project branch when clicking OK button rapid batch, project branch has popped up after the completion of deleting The status information operated at project branch management.
The management method of the project branch of seventh embodiment of the invention can effectively simplify the branch of software development sub-project Management process, and the management that user interface carries out the branch of software development sub-project can be passed through, management operating process is friendly And it is easy, effectively raise the branch management efficiency of software development sub-project.
Eighth embodiment of the invention, a kind of managing device of project branch, as shown in Figure 10, including consisting of part:
Parsing module 100, for when receive project branch management instruction when, based on the school instructed to project branch management Analysis is tested, project branch management is obtained and instructs corresponding preset project branch management command history.
Optionally, project branch management instruction is included at least one of to give an order:
Project branch switching command, project branch create instruction and instruction is deleted by project branch.
Wherein, project branch switching command corresponds to project branch switching command set;Project branch creates instruction respective items Mesh branch creates command history;Instruction corresponding project branch delete command set is deleted by project branch.
In the present embodiment, the mode of the check analysis of project branch management instruction is not specifically limited.
By the check analysis instructed to project branch management, obtains project branch management and instruct corresponding preset project point Zhi Guanli command histories avoid and need programmer to input a plurality of project branch management life project branch management in the prior art Row, the troublesome operation brought is enabled effectively to simplify the operation of project branch management.
Execution module 200, for based on the corresponding preset management data of project branch management command history got, and By calling the corresponding preset management interface of project branch management command history, corresponding project point is instructed to project branch management Zhi Zhihang management operations.
Optionally, it is one or more that project branch management, which instructs the quantity of corresponding project branch,.
By preset management data, and preset management interface is called, corresponding project is instructed to project branch management Branch executes management operation, realizes and executes quickly management operation to one or more project branches, avoids programmer and pass through Inputting a plurality of project branch management order line, quickly management operates to the execution of each project branch, the troublesome operation brought, effectively Simplify project branch management operation, improve project branch management operating efficiency.
The managing device of the project branch of eighth embodiment of the invention can effectively simplify the branch of software development sub-project Management process, management operating process is friendly and easy, effectively raises the branch management efficiency of software development sub-project.
Ninth embodiment of the invention, a kind of managing device of project branch, as shown in Figure 10, including consisting of part:
Parsing module 100, for when receive project branch management instruction when, based on the school instructed to project branch management Analysis is tested, project branch management is obtained and instructs corresponding preset project branch management command history.
Optionally, project branch management instruction is included at least one of to give an order:
Project branch switching command, project branch create instruction and instruction is deleted by project branch.
Wherein, project branch switching command corresponds to project branch switching command set;Project branch creates instruction respective items Mesh branch creates command history;Instruction corresponding project branch delete command set is deleted by project branch.
Optionally, receiving the mode that project branch management instructs includes but not limited to:
The instruction of project branch management is received by preset user interface.
Such as:Parsing module 100, for when by preset user interface receive project branch management instruction when, base In the check analysis that application layer instructs project branch management, obtains project branch management in application layer and instruct corresponding preset item Mesh branch management command history.
In the present embodiment, the mode of the check analysis of project branch management instruction is not specifically limited.
By the check analysis instructed to project branch management, obtains project branch management and instruct corresponding preset project point Zhi Guanli command histories avoid and need programmer to input a plurality of project branch management life project branch management in the prior art Row, the troublesome operation brought is enabled effectively to simplify the operation of project branch management.
Execution module 200, for based on the corresponding preset management data of project branch management command history got, and By calling the corresponding preset management interface of project branch management command history, corresponding project point is instructed to project branch management Zhi Zhihang management operations.
Optionally, it is one or more that project branch management, which instructs the quantity of corresponding project branch,.
By preset management data, and preset management interface is called, corresponding project is instructed to project branch management Branch executes management operation, realizes and executes quickly management operation to one or more project branches, avoids programmer and pass through Inputting a plurality of project branch management order line, quickly management operates to the execution of each project branch, the troublesome operation brought, effectively Simplify project branch management operation, improve project branch management operating efficiency.
Such as:Execution module 200, for corresponding based on the project branch management command history got in service layer Preset management data, and by calling the corresponding preset management interface of project branch management command history in service layer, to project Branch management instructs corresponding project branch to execute management operation.
The managing device of the project branch of ninth embodiment of the invention can effectively simplify the branch of software development sub-project Management process, and the management that user interface carries out the branch of software development sub-project can be passed through, management operating process is friendly And it is easy, effectively raise the branch management efficiency of software development sub-project.
Tenth embodiment of the invention, a kind of managing device of project branch, as shown in Figure 10, including consisting of part:
Parsing module 100, for when receive project branch management instruction when, based on the school instructed to project branch management Analysis is tested, project branch management is obtained and instructs corresponding preset project branch management command history.
Optionally, project branch management instruction is included at least one of to give an order:
Project branch switching command, project branch create instruction and instruction is deleted by project branch.
Wherein, project branch switching command corresponds to project branch switching command set;Project branch creates instruction respective items Mesh branch creates command history;Instruction corresponding project branch delete command set is deleted by project branch.
Optionally, receiving the mode that project branch management instructs includes but not limited to:
The instruction of project branch management is received by preset user interface.
Optionally, based on the check analysis instructed to project branch management, it is corresponding pre- to obtain the instruction of project branch management The mode of project branch management command history is set, including but not limited to:
Based on the mapping relations of preset project branch management instruction and project branch management command history, project point is obtained Zhi Guanli instructs corresponding project branch management command history.
Such as:Parsing module 100, for when by preset user interface receive project branch management instruction when, base The mapping relations of preset project branch management instruction and project branch management command history, obtain in application layer in application layer Project branch management instructs corresponding project branch management command history.
By the check analysis instructed to project branch management, obtains project branch management and instruct corresponding preset project point Zhi Guanli command histories avoid and need programmer to input a plurality of project branch management life project branch management in the prior art Row, the troublesome operation brought is enabled effectively to simplify the operation of project branch management.
Execution module 200, for based on the corresponding preset management data of project branch management command history got, and By calling the corresponding preset management interface of project branch management command history, corresponding project point is instructed to project branch management Zhi Zhihang management operations.
Optionally, it is one or more that project branch management, which instructs the quantity of corresponding project branch,.
By preset management data, and preset management interface is called, corresponding project is instructed to project branch management Branch executes management operation, realizes and executes quickly management operation to one or more project branches, avoids programmer and pass through Inputting a plurality of project branch management order line, quickly management operates to the execution of each project branch, the troublesome operation brought, effectively Simplify project branch management operation, improve project branch management operating efficiency.
Such as:Execution module 200, for corresponding based on the project branch management command history got in service layer Preset management data, and by calling the corresponding preset management interface of project branch management command history in service layer, to project Branch management instructs corresponding project branch to execute management operation.
The managing device of the project branch of tenth embodiment of the invention can effectively simplify the branch of software development sub-project Management process, and the management that user interface carries out the branch of software development sub-project can be passed through, management operating process is friendly And it is easy, effectively raise the branch management efficiency of software development sub-project.
Eleventh embodiment of the invention, a kind of managing device of project branch, as shown in figure 11, including consisting of portion Point:
Parsing module 100, for when receive project branch management instruction when, based on the school instructed to project branch management Analysis is tested, project branch management is obtained and instructs corresponding preset project branch management command history.
Optionally, project branch management instruction is included at least one of to give an order:
Project branch switching command, project branch create instruction and instruction is deleted by project branch.
Wherein, project branch switching command corresponds to project branch switching command set;Project branch creates instruction respective items Mesh branch creates command history;Instruction corresponding project branch delete command set is deleted by project branch.
Optionally, receiving the mode that project branch management instructs includes but not limited to:
The instruction of project branch management is received by preset user interface.
Optionally, based on the check analysis instructed to project branch management, it is corresponding pre- to obtain the instruction of project branch management The mode of project branch management command history is set, including but not limited to:
Based on the mapping relations of preset project branch management instruction and project branch management command history, project point is obtained Zhi Guanli instructs corresponding project branch management command history.
Such as:Parsing module 100, for when by preset user interface receive project branch management instruction when, base The mapping relations of preset project branch management instruction and project branch management command history, obtain in application layer in application layer Project branch management instructs corresponding project branch management command history.
By the check analysis instructed to project branch management, obtains project branch management and instruct corresponding preset project point Zhi Guanli command histories avoid and need programmer to input a plurality of project branch management life project branch management in the prior art Row, the troublesome operation brought is enabled effectively to simplify the operation of project branch management.
Execution module 200, for based on the corresponding preset management data of project branch management command history got, and By calling the corresponding preset management interface of project branch management command history, corresponding project point is instructed to project branch management Zhi Zhihang management operations.
Optionally, it is one or more that project branch management, which instructs the quantity of corresponding project branch,.
By preset management data, and preset management interface is called, corresponding project is instructed to project branch management Branch executes management operation, realizes and executes quickly management operation to one or more project branches, avoids programmer and pass through Inputting a plurality of project branch management order line, quickly management operates to the execution of each project branch, the troublesome operation brought, effectively Simplify project branch management operation, improve project branch management operating efficiency.
Such as:Execution module 200, for corresponding based on the project branch management command history got in service layer Preset management data, and by calling the corresponding preset management interface of project branch management command history in service layer, to project Branch management instructs corresponding project branch to execute management operation.
Module 300 is presented, the management operational status information for project branch to be presented in the user interface.
Optionally, it manages operational status information packet but is not limited to following information:
Complete the status information of management operation, or the status information of management operation failure.
The managing device of the project branch of eleventh embodiment of the invention can effectively simplify point of software development sub-project The management process of branch, and the management of the branch of software development sub-project can be carried out by user interface, management operating process friend It is good and easy, effectively raise the branch management efficiency of software development sub-project.
Twelveth embodiment of the invention, a kind of managing device of project branch, as shown in figure 11, including consisting of portion Point:
Parsing module 100, for when receive project branch management instruction when, based on the school instructed to project branch management Analysis is tested, project branch management is obtained and instructs corresponding preset project branch management command history.
Optionally, project branch management instruction is included at least one of to give an order:
Project branch switching command, project branch create instruction and instruction is deleted by project branch.
Wherein, project branch switching command corresponds to project branch switching command set;Project branch creates instruction respective items Mesh branch creates command history;Instruction corresponding project branch delete command set is deleted by project branch.
Optionally, receiving the mode that project branch management instructs includes but not limited to:
The instruction of project branch management is received by preset user interface.
Optionally, based on the check analysis instructed to project branch management, it is corresponding pre- to obtain the instruction of project branch management The mode of project branch management command history is set, including but not limited to:
Based on the mapping relations of preset project branch management instruction and project branch management command history, project point is obtained Zhi Guanli instructs corresponding project branch management command history.
Such as:Parsing module 100, for when by preset user interface receive project branch management instruction when, base The mapping relations of preset project branch management instruction and project branch management command history, obtain in application layer in application layer Project branch management instructs corresponding project branch management command history.
By the check analysis instructed to project branch management, obtains project branch management and instruct corresponding preset project point Zhi Guanli command histories avoid and need programmer to input a plurality of project branch management life project branch management in the prior art Row, the troublesome operation brought is enabled effectively to simplify the operation of project branch management.
Execution module 200, for based on the corresponding preset management data of project branch management command history got, and By calling the corresponding preset management interface of project branch management command history, corresponding project point is instructed to project branch management Zhi Zhihang management operations.
Optionally, it is one or more that project branch management, which instructs the quantity of corresponding project branch,.
Optionally, corresponding project branch is instructed to execute management operation including at least following operation project branch management One:
Handover operation is executed to project branch, project branch is executed and creates operation, and deletion is executed to project branch Operation.
Wherein, project branch switching command executes handover operation to reply project branch;Project branch creates instruction and corresponds to Project branch is executed and creates operation;Project branch deletes instruction and executes delete operation to reply project branch.
By preset management data, and preset management interface is called, corresponding project is instructed to project branch management Branch executes management operation, realizes and executes quickly management operation to one or more project branches, avoids programmer and pass through Inputting a plurality of project branch management order line, quickly management operates to the execution of each project branch, the troublesome operation brought, effectively Simplify project branch management operation, improve project branch management operating efficiency.
Such as:Execution module 200, for corresponding based on the project branch management command history got in service layer Preset management data, and by calling the corresponding preset management interface of project branch management command history in service layer, to project Branch management instructs corresponding project branch to execute management operation.
Module 300 is presented, the management operational status information for project branch to be presented in the user interface.
Optionally, management operational status information includes but not limited to following information:
Complete the status information of management operation, or the status information of management operation failure.
For example, the status information of the completion management operation of project branch is presented in the user interface.
For another example, the status information of the management operation failure of project branch is presented in the user interface.
The managing device of the project branch of twelveth embodiment of the invention can effectively simplify point of software development sub-project The management process of branch, and the management of the branch of software development sub-project can be carried out by user interface, management operating process friend It is good and easy, effectively raise the branch management efficiency of software development sub-project.
Thriteenth embodiment of the invention, a kind of management equipment of project branch, as shown in figure 12, including consisting of portion Point:
Processor 501 and memory 502.In some embodiments of the invention, processor 501 and memory 502 can lead to Cross bus or other manner connection.
Processor 501 can be general processor, such as central processing unit (Central Processing Unit, CPU), it can also be digital signal processor (Digital Signal Processor, DSP), application-specific integrated circuit (English: Application Specific Integrated Circuit, ASIC), or be arranged to implement the embodiment of the present invention One or more integrated circuits.Wherein, memory 502 is used to store the executable instruction of processor 501;
Memory 502 is transferred to processor 501 for storing program code, and by the program code.Memory 502 can To include volatile memory (Volatile Memory), such as random access memory (Random Access Memory, RAM);Memory 502 can also include nonvolatile memory (Non-Volatile Memory), such as read-only memory (Read-Only Memory, ROM), flash memory (Flash Memory), hard disk (Hard Disk Drive, HDD) or solid State hard disk (Solid-State Drive, SSD);Memory 502 can also include the combination of the memory of mentioned kind.
Wherein, the program code management code that processor 501 is used to that memory 502 to be called to store executes the present invention first In embodiment to seventh embodiment of the invention in any embodiment part or Overall Steps.
The management equipment of the project branch of thriteenth embodiment of the invention can effectively simplify point of software development sub-project The management process of branch, and the management of the branch of software development sub-project can be carried out by user interface, management operating process friend It is good and easy, effectively raise the branch management efficiency of software development sub-project.
Fourteenth embodiment of the invention, a kind of computer readable storage medium.
Computer storage media can be RAM memory, flash memory, ROM memory, eprom memory, EEPROM storages The storage medium of device, register, hard disk, mobile hard disk, CD-ROM or any other form known in the art.
Computer-readable recording medium storage there are one or multiple programs, one or more program can by one or The multiple processors of person execute, with realize in first embodiment of the invention to seventh embodiment of the invention in any embodiment part or Overall Steps.
Computer readable storage medium described in fourteenth embodiment of the invention is stored with one or more program, should One or more program can be executed by one or more processor, can effectively simplify the branch of software development sub-project Management process, and the management of the branch of software development sub-project can be carried out by user interface, management operating process it is friendly and Simplicity effectively raises the branch management efficiency of software development sub-project.
It should be noted that herein, the terms "include", "comprise" or its any other variant are intended to non-row His property includes, so that process, method, article or device including a series of elements include not only those elements, and And further include other elements that are not explicitly listed, or further include for this process, method, article or device institute it is intrinsic Element.In the absence of more restrictions, the element limited by sentence "including a ...", it is not excluded that including this There is also other identical elements in the process of element, method, article or device.
The embodiments of the present invention are for illustration only, can not represent the quality of embodiment.
Through the above description of the embodiments, those skilled in the art can be understood that above-described embodiment side Method can add the mode of required general hardware platform to realize by software, naturally it is also possible to by hardware, but in many cases The former is more preferably embodiment.Based on this understanding, technical scheme of the present invention substantially in other words does the prior art Going out the part of contribution can be expressed in the form of software products, which is stored in a storage medium In (such as ROM/RAM, magnetic disc, CD), including some instructions are used so that a station terminal (can be mobile phone, computer, service Device, air conditioner or network equipment etc.) execute method described in each embodiment of the present invention.
The embodiment of the present invention is described with above attached drawing, but the invention is not limited in above-mentioned specific Embodiment, the above mentioned embodiment is only schematical, rather than restrictive, those skilled in the art Under the inspiration of the present invention, without breaking away from the scope protected by the purposes and claims of the present invention, it can also make very much Form, all of these belong to the protection of the present invention.

Claims (12)

1. a kind of management method of project branch, which is characterized in that including:
When receiving the instruction of project branch management, based on the check analysis instructed to the project branch management, described in acquisition Project branch management instructs corresponding preset project branch management command history;
Based on the corresponding preset management data of the project branch management command history got, and by calling the project The corresponding preset management interface of branch management command history instructs corresponding project branch to execute pipe the project branch management Reason operation.
2. according to the method described in claim 1, it is characterized in that, it is described receive project branch management instruction, including:
The instruction of project branch management is received by preset user interface.
3. according to the method described in claim 1, it is characterized in that, described based on the verification instructed to the project branch management Analysis obtains the project branch management and instructs corresponding preset project branch management command history, including:
Based on the mapping relations of preset project branch management instruction and project branch management command history, the project point is obtained Zhi Guanli instructs corresponding project branch management command history.
4. according to the method described in claim 2, it is characterized in that, instructing corresponding item to the project branch management described After mesh branch executes management operation, the method further includes:
The management operational status information of the project branch is presented in the user interface.
5. method according to claim 1 to 4, which is characterized in that described to refer to the project branch management It enables corresponding project branch execute management operation and includes at least one of following operation:
Handover operation is executed to the project branch, the project branch is executed and creates operation, and to the project branch Execute delete operation.
6. a kind of managing device of project branch, which is characterized in that including:
Parsing module, for when receive project branch management instruction when, based on the verification instructed to the project branch management Analysis obtains the project branch management and instructs corresponding preset project branch management command history;
Execution module for based on the corresponding preset management data of the project branch management command history got, and is led to It crosses and calls the corresponding preset management interface of the project branch management command history, the project branch management is instructed corresponding Project branch executes management operation.
7. device according to claim 6, which is characterized in that the project branch management that receives instructs, including:
The instruction of project branch management is received by preset user interface.
8. device according to claim 6, which is characterized in that described based on the verification instructed to the project branch management Analysis obtains the project branch management and instructs corresponding preset project branch management command history, including:
Based on the mapping relations of preset project branch management instruction and project branch management command history, the project point is obtained Zhi Guanli instructs corresponding project branch management command history.
9. device according to claim 7, which is characterized in that described device further includes:
Module is presented, is used for after instructing corresponding project branch to execute management operation the project branch management, in institute State the management operational status information that the project branch is presented in user interface.
10. the device according to any one of claim 6 to 9, which is characterized in that described to refer to the project branch management It enables corresponding project branch execute management operation and includes at least one of following operation:
Handover operation is executed to the project branch, the project branch is executed and creates operation, and to the project branch Execute delete operation.
11. a kind of management equipment of project branch, which is characterized in that the management equipment of the project branch includes processor and deposits Reservoir;
The processor is used to execute the management program of the project branch stored in memory, to realize according to Claims 1 to 5 Any one of described in project branch management method the step of.
12. a kind of computer readable storage medium, which is characterized in that the computer-readable recording medium storage there are one or Multiple programs, one or more of programs can be executed by one or more processor, with realize according to claim 1~ The step of management method of project branch described in any one of 5.
CN201810235044.0A 2018-03-21 2018-03-21 Project branch management method, device and equipment and computer readable storage medium Active CN108762736B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810235044.0A CN108762736B (en) 2018-03-21 2018-03-21 Project branch management method, device and equipment and computer readable storage medium

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810235044.0A CN108762736B (en) 2018-03-21 2018-03-21 Project branch management method, device and equipment and computer readable storage medium

Publications (2)

Publication Number Publication Date
CN108762736A true CN108762736A (en) 2018-11-06
CN108762736B CN108762736B (en) 2022-09-02

Family

ID=63980579

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810235044.0A Active CN108762736B (en) 2018-03-21 2018-03-21 Project branch management method, device and equipment and computer readable storage medium

Country Status (1)

Country Link
CN (1) CN108762736B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109976801A (en) * 2019-04-24 2019-07-05 网宿科技股份有限公司 A kind of code development method, system and computer readable storage medium

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101136780A (en) * 2007-09-12 2008-03-05 华为技术有限公司 Method, system to obtain user command information, and user command registered device
CN101160800A (en) * 2005-08-11 2008-04-09 华为技术有限公司 Network management system interface negotiating method and device thereof
US20100023498A1 (en) * 2004-06-25 2010-01-28 International Business Machines Corporation Relationship management in a data abstraction model
KR20100071361A (en) * 2008-12-19 2010-06-29 한국전자통신연구원 Project management device and method for architecture modeling tool of application software on autosar and computer readable recording medium therefor
CN101932999A (en) * 2007-12-20 2010-12-29 汇丰技术股份有限公司 Automated methods and systems for developing and deploying projects in parallel
CN102053855A (en) * 2010-12-13 2011-05-11 浪潮(北京)电子信息产业有限公司 Software generation system and method
CN104376431A (en) * 2014-12-02 2015-02-25 国网浙江余姚市供电公司 Engineering project management method and system
CN104423960A (en) * 2013-09-10 2015-03-18 阿里巴巴集团控股有限公司 Continuous project integration method and continuous project integration system
CN105487912A (en) * 2015-11-30 2016-04-13 西安闻泰电子科技有限公司 Public problem modification multi-branch maintenance system and method
CN105589684A (en) * 2014-10-23 2016-05-18 中兴通讯股份有限公司 Mobile terminal parameter management method and apparatus
CN106648589A (en) * 2016-09-28 2017-05-10 郑州云海信息技术有限公司 svn source code online management and shared viewing system and method
CN107291448A (en) * 2017-05-19 2017-10-24 上海瀚乾信息技术服务有限公司 A kind of Software Develop Project Management system
CN107451172A (en) * 2016-03-31 2017-12-08 阿里巴巴集团控股有限公司 Method of data synchronization and equipment for edition management system
CN107728996A (en) * 2017-10-11 2018-02-23 郑州云海信息技术有限公司 A kind of GIT branch managements method and device

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US20100023498A1 (en) * 2004-06-25 2010-01-28 International Business Machines Corporation Relationship management in a data abstraction model
CN101160800A (en) * 2005-08-11 2008-04-09 华为技术有限公司 Network management system interface negotiating method and device thereof
CN101136780A (en) * 2007-09-12 2008-03-05 华为技术有限公司 Method, system to obtain user command information, and user command registered device
CN101932999A (en) * 2007-12-20 2010-12-29 汇丰技术股份有限公司 Automated methods and systems for developing and deploying projects in parallel
KR20100071361A (en) * 2008-12-19 2010-06-29 한국전자통신연구원 Project management device and method for architecture modeling tool of application software on autosar and computer readable recording medium therefor
CN102053855A (en) * 2010-12-13 2011-05-11 浪潮(北京)电子信息产业有限公司 Software generation system and method
CN104423960A (en) * 2013-09-10 2015-03-18 阿里巴巴集团控股有限公司 Continuous project integration method and continuous project integration system
CN105589684A (en) * 2014-10-23 2016-05-18 中兴通讯股份有限公司 Mobile terminal parameter management method and apparatus
CN104376431A (en) * 2014-12-02 2015-02-25 国网浙江余姚市供电公司 Engineering project management method and system
CN105487912A (en) * 2015-11-30 2016-04-13 西安闻泰电子科技有限公司 Public problem modification multi-branch maintenance system and method
CN107451172A (en) * 2016-03-31 2017-12-08 阿里巴巴集团控股有限公司 Method of data synchronization and equipment for edition management system
CN106648589A (en) * 2016-09-28 2017-05-10 郑州云海信息技术有限公司 svn source code online management and shared viewing system and method
CN107291448A (en) * 2017-05-19 2017-10-24 上海瀚乾信息技术服务有限公司 A kind of Software Develop Project Management system
CN107728996A (en) * 2017-10-11 2018-02-23 郑州云海信息技术有限公司 A kind of GIT branch managements method and device

Non-Patent Citations (4)

* Cited by examiner, † Cited by third party
Title
P. O. SKOBELEV: "Designing a multi-service internet platform for managing an agricultural enterprise: Searching for an innovative solution during joint work of a university and an IT company", 《2017 IEEE VI FORUM STRATEGIC PARTNERSHIP OF UNIVERSITIES AND ENTERPRISES OF HI-TECH BRANCHES (SCIENCE. EDUCATION. INNOVATIONS) (SPUE)》 *
佚名: "git-自动化脚本", 《HTTPS://BLOG.CSDN.NET/WEIXIN_33779515/ARTICLE/DETAILS/92485143》 *
李翔: "面向多核的串行程序并行化关键技术研究", 《万方》 *
黄慧丹: "基于Web Services的软件配置管理系统构建", 《中国优秀硕士学位论文全文数据库 信息科技辑》 *

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109976801A (en) * 2019-04-24 2019-07-05 网宿科技股份有限公司 A kind of code development method, system and computer readable storage medium
CN109976801B (en) * 2019-04-24 2022-09-09 网宿科技股份有限公司 Code development method, system and computer readable storage medium

Also Published As

Publication number Publication date
CN108762736B (en) 2022-09-02

Similar Documents

Publication Publication Date Title
CN103294586B (en) For the automatic detection of the user preference of alternative user interface model
CN104699363B (en) A kind of window interface shows method and system
CN107066188A (en) A kind of method and terminal for sending screenshot picture
CN109598427B (en) Robot management method and device and electronic equipment
CN109359091A (en) File management method, device, terminal and computer readable storage medium
CN101916399A (en) Method and system for adding recipients
CN111145836A (en) Method for inserting gene nucleic acid sequence, computer storage medium and electronic device
EP2998857A1 (en) Control method and device for displaying screen background
CN102819500B (en) A kind of method and device creating peripheral equipment control interface
CN109325034A (en) Data processing method, device, computer equipment and storage medium
CN105426232B (en) A kind of method and device of interface processing
CN108762736A (en) Management method, device, equipment and the computer readable storage medium of project branch
CN102375668B (en) Window management method and device for mobile terminal
CN106339155A (en) File sharing method and device
CN108228220A (en) Using update method and its system, storage medium, electronic equipment
CN103475521B (en) A kind of method and apparatus of deployment server
US11917104B2 (en) System and method for enhanced outbound campaign management
CN108009426A (en) Acquisition methods, device, medium and the electronic equipment of trusted area log information
CN108984238B (en) Gesture processing method and device of application program and electronic equipment
CN107977154A (en) A kind of file management system under touch-control state
CN108733548A (en) One kind burying a setting method, device, equipment and computer readable storage medium
JP6081613B2 (en) Call control method and communication terminal
JP6226895B2 (en) Network evaluation system and network evaluation method
CN106657530B (en) Mobile terminal contact person packet processing method and device
CN107391702A (en) Speech message dump method, mobile terminal and computer-readable recording medium

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant