CN108756916A - High intensity basement rock protrusion stratum shield construction method - Google Patents

High intensity basement rock protrusion stratum shield construction method Download PDF

Info

Publication number
CN108756916A
CN108756916A CN201810598433.XA CN201810598433A CN108756916A CN 108756916 A CN108756916 A CN 108756916A CN 201810598433 A CN201810598433 A CN 201810598433A CN 108756916 A CN108756916 A CN 108756916A
Authority
CN
China
Prior art keywords
shield
stratum
construction method
high intensity
basement rock
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810598433.XA
Other languages
Chinese (zh)
Other versions
CN108756916B (en
Inventor
怀小刚
王运涛
张志达
赵爱国
贾江峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Tunnel Group Co Ltd CRTG
China Railway Tunnel Stock Co Ltd
Original Assignee
China Railway Tunnel Group Co Ltd CRTG
China Railway Tunnel Stock Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Tunnel Group Co Ltd CRTG, China Railway Tunnel Stock Co Ltd filed Critical China Railway Tunnel Group Co Ltd CRTG
Priority to CN201810598433.XA priority Critical patent/CN108756916B/en
Publication of CN108756916A publication Critical patent/CN108756916A/en
Application granted granted Critical
Publication of CN108756916B publication Critical patent/CN108756916B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/08Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield
    • E21D9/087Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines
    • E21D9/0873Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining with additional boring or cutting means other than the conventional cutting edge of the shield with a rotary drilling-head cutting simultaneously the whole cross-section, i.e. full-face machines the shield being provided with devices for lining the tunnel, e.g. shuttering
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B28/00Compositions of mortars, concrete or artificial stone, containing inorganic binders or the reaction product of an inorganic and an organic binder, e.g. polycarboxylate cements
    • EFIXED CONSTRUCTIONS
    • E21EARTH OR ROCK DRILLING; MINING
    • E21DSHAFTS; TUNNELS; GALLERIES; LARGE UNDERGROUND CHAMBERS
    • E21D9/00Tunnels or galleries, with or without linings; Methods or apparatus for making thereof; Layout of tunnels or galleries
    • E21D9/06Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining
    • E21D9/0642Making by using a driving shield, i.e. advanced by pushing means bearing against the already placed lining the shield having means for additional processing at the front end
    • E21D9/0678Adding additives, e.g. chemical compositions, to the slurry or the cuttings
    • CCHEMISTRY; METALLURGY
    • C04CEMENTS; CONCRETE; ARTIFICIAL STONE; CERAMICS; REFRACTORIES
    • C04BLIME, MAGNESIA; SLAG; CEMENTS; COMPOSITIONS THEREOF, e.g. MORTARS, CONCRETE OR LIKE BUILDING MATERIALS; ARTIFICIAL STONE; CERAMICS; REFRACTORIES; TREATMENT OF NATURAL STONE
    • C04B2111/00Mortars, concrete or artificial stone or mixtures to prepare them, characterised by specific function, property or use
    • C04B2111/70Grouts, e.g. injection mixtures for cables for prestressed concrete

Landscapes

  • Engineering & Computer Science (AREA)
  • Chemical & Material Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Geochemistry & Mineralogy (AREA)
  • Environmental & Geological Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Chemical Kinetics & Catalysis (AREA)
  • Geology (AREA)
  • Ceramic Engineering (AREA)
  • General Chemical & Material Sciences (AREA)
  • Inorganic Chemistry (AREA)
  • Materials Engineering (AREA)
  • Structural Engineering (AREA)
  • Organic Chemistry (AREA)
  • Excavating Of Shafts Or Tunnels (AREA)

Abstract

The invention discloses a kind of high intensity basement rock protrusion stratum shield construction methods, and steps are as follows:(1)Choose shield machine:Choose composite soil pressure balance tunnel shielding machine tunneling construction;(2)Warehouse entry point is set and stabilization zone is arranged to warehouse entry point region;(3)It is bought securities with all one's capital boring mode using full soil pressure during Shield Construction Method Used, strictly controls amount of slag;The soil body is improved;Synchronize slip casting and secondary grouting;When shield driving is to warehouse entry point, warehouse entry with pressure checks whether cutter has inordinate wear;(4)Shield segment assembling is constructed;(5)After deviating from earth's surface after shield tail, increases synchronous grouting amount and carry out after-teeming slurry after the wall of section of jurisdiction.High intensity basement rock protrusion stratum of the present invention shield construction method, replacement cutter can be checked in time, problem in the native storehouse of processing, ensure rock breaking capacity, full soil pressure is bought securities with all one's capital boring mode, it prevents from face from also easily causing in pressure rapid fluctuation to cave in, meets the construction demand in the stratum large torque such as upper soft lower hard, layer of sand and possible presplit blasting.

Description

High intensity basement rock protrusion stratum shield construction method
Technical field
The present invention relates to tunneling shield technology construction fields, are applied more particularly, to a kind of high intensity basement rock protrusion stratum shield Work method.
Background technology
High intensity basement rock protrusion stratum natural compression strength reaches 160 ~ 204Mpa, and stratum is to remain matter clay and completely decomposed Granite, in locally lying in, gentle breeze weathered granite(Basement rock protrusion), basement rock protrusion interface of stone and earth in interstices of soil due to moving Dynamic moisture is stopped by the extremely low rock mass of porosity, accumulates flow on rock mass surface, water is abundant, easily goes out in work progress Now paste cutterhead, mud lining, face caves in, EPB shield tunneling is gushed, knife disc tool inordinate wear, shield machine working condition are bad, The problems such as building settlements such as Sewage pollution collecting hanging basket transfinite makes a big impact to tunneling shield construction, especially constructs by ring in urban district Border influences in the case of conventional means can not being used to carry out precrushing, and how shield machine, which passes through safely basement rock protrusion stratum, becomes tunnel Great difficult problem in road shield-tunneling construction.
It is more than 100m based on Guangzhou Underground shield crossing length, rock uniaxiality strength is more than for the above situation The requirement of engineering of the long range basement rock protrusion of 100Mpa uses Mining Method and excavates hard rock, and shield sky pushes away the construction method of mode, But such mode increases the risk of boring construction.In addition, brill has been carried out in the raised 11 shield sections of No. 5 line basement rock of Shenzhen Metro The matrix treatments modes such as hole explosion, the broken, impact grinding of artificial digging pile, have obtained the basement rock precrushing side of the different operating modes of adaptation Method, but the execution conditions of precrushing must be provided, while precrushing can bring surrounding enviroment and shield driving new secondary calamity Evil.
The apparent of ability, digging management theory and environmental protection requirement is studied and judged recently as shield equipment, geology It is promoted, for the secondary harm for avoiding basement rock protrusion precrushing from bringing, Some Domestic scholar proposes the new think of for returning shield driving Road can realize the replacement at any time of cutter, ensure that shield has rock breaking capacity, under careful operational circumstances, upper soft lower hard place Layer does not use precrushing to handle and smoothly tunnel.
Existing shield machine directly passes through in the Engineering Projects of hard-soft heterogeneous ground, and hard rock uniaxial compressive strength is mostly in 120Mpa Hereinafter, and tunnel upper environment it is single.And nowadays Xiamen area very high strength basement rock protrusion hard-soft heterogeneous ground encounter it is flat The very high strength hard rock of equal uniaxial compressive strength 160Mpa, maximum intensity 206Mpa, and there is large-scale rain pipe in hole top top 4m The complex working condition of culvert there is no both at home and abroad can use for reference case.When actually being constructed, it is primarily present following technical problem:Shield machine selects The more difficult assurance of applicability of type;In work progress easily occur paste cutterhead, mud lining, face caves in, EPB shield tunneling is gushed;Cutterhead The problems such as building settlements such as cutter inordinate wear, the bad, Sewage pollution collecting hanging basket of shield machine working condition transfinite.
Invention content
In order to more preferably solve it is above-mentioned the problems of in the prior art, the present invention provides a kind of high intensity basement rock protrusion ground Layer shield construction method.
In order to achieve the above-mentioned object of the invention, the technical scheme is that:
A kind of high intensity basement rock protrusion stratum shield construction method, steps are as follows
(1)Choose shield machine:The geology on stratum residing for position to be tunneled to shield machine is surveyed in advance, and according to geological exploration As a result, choosing composite soil pressure balance tunnel shielding machine tunneling construction, the cutterhead and support system sheet of the composite soil pressure balance tunnel shielding machine Body is provided with agitating device, and the composite soil pressure balance tunnel shielding machine is equipped with foam injection systems and bentonite injected system to improve The dregs on high intensity basement rock protrusion stratum;
(2)Warehouse entry point is set and stabilization zone is arranged to warehouse entry point region:The rock that detection is come out by boring and coring, to it Being ground property is analyzed, and the composite soil pressure balance tunnel shielding machine tool wear situation is prejudged, and predicts composite soil pressure balance tunnel shielding machine Primary driving is once tunneled up to length, and according to the composite soil pressure balance tunnel shielding machine up to length setting warehouse entry point and to institute State warehouse entry point region setting stabilization zone;
(3)Shield Construction Method Used:
Active warehouse entry checks primary before the composite soil pressure balance tunnel shielding machine high intensity basement rock to be entered raised section, then starts to dig Into construction;It is bought securities with all one's capital boring mode using full soil pressure during Shield Construction Method Used, strictly controls amount of slag;Close foam injection system System, unlatching bentonite slurry injected system injection sodium bentonite mud improve the soil body;The Shield Construction Method Used is complete While Cheng Yihuan and the balancing earth-pressure shielding machine promote, slip casting is synchronized, section of jurisdiction carries out after being detached from 4~6 ring of shield tail Secondary grouting;When shield driving is to warehouse entry point, warehouse entry with pressure checks whether cutter has inordinate wear;
(4)Shield segment assembling is constructed:Step(3)After middle Shield Construction Method Used completes a ring, according to conventional pipe sheet assembling lining cutting Construction technology carries out shield segment assembling construction;Constantly cycle, until completing whole work progress of constructed subway tunnel;
(5)After deviating from earth's surface after shield tail, increases synchronous grouting amount and carry out after-teeming slurry after the wall of section of jurisdiction.
The step(1)In composite soil pressure balance tunnel shielding machine use hydraulic-driven, driving power 945kW, nominal torque For 6000KNm, torque of getting rid of poverty is 7200KNm, drives rotating speed 0-3.7 rpm, rock breaking capacity is not less than 210Mpa, cutterhead aperture opening ratio For 30-40%, cutterhead rotating speed is 0.8 ~ 1.2r/min, and pile penetration is 2mm/r ~ 9mm/r, and knife spacing is 75-90mm.
The step(1)In agitating device include be arranged cutterhead back active stirring rod and be arranged before shield machine Passive stirring rod on shield partition board.
The step(1)In foam injection systems include the pump configuration of 6 single tube lists foam inlet, wherein 2 tunnels with Bentonite slurry shares.
The step(1)In cutter head of shield machine front panel heap be welded with clad steel plate, cycle beam appearance surface build-up welding clad steel Plate and alloy knife.
The step(2)In warehouse entry point between be divided into 20m, the stabilization zone size is width 2.5-3.5m, 6-7 meters a length of, Reinforcement depth is to Tunnel top, and reinforcing mode is quincuncial arrangement sleeve floral tube slip casting, and the distance between sleeve floral tube is 0.5-1m, is added The outer rings Gu Qu institute injection slurry is dual slurry, inner ring is cement mortar.
The step(3)In full soil pressure buy securities with all one's capital and often tunnel 33cm in driving and slag tap a pipeful of, exist per ring overall control of slagging tap 56m3
The step(3)In the sodium bentonite mud by sodium bentonite and water according to 1:8 ± 1 mass ratio is equal Even to configure, slump 195-205mm, viscosity are 50 seconds, and the grouting amount in shield driving is 4m3/ ring.
High intensity basement rock protrusion stratum as described in claim 1 shield construction method, it is characterised in that:The step (3)Described in simultaneous grouting slurry be uniformly mixed by cement, fine aggregate, coal dust ash, bentonite and water, it is the cement, thin Aggregate, coal dust ash, bentonite and water mass ratio be 120:1040:160:150:280, it is 4.7m per ring grouting amount3, slip casting pressure Power is not more than 0.2Mpa;The secondary grouting slurries use cement~waterglass dual slurry, presetting period to be set as 50~70s, Grouting pressure is not more than 0.4Mpa.
Advantageous effect:
1, high intensity basement rock protrusion stratum of the present invention shield construction method, using with high thrust, strong torque, hard cutterhead, anti-mud The composite balancing earth-pressure shielding machine of cake feature, rock breaking capacity are not less than 210Mpa, the combined type earth pressure balance that the present invention chooses Shield machine is capable of providing enough thrust, torque, and configuration prevents incrusted measure, it is ensured that pipe culvert is dug using full soil pressure safely Into.
2, the composite balancing earth-pressure shielding machine chosen in the shield construction method of high intensity basement rock protrusion stratum of the present invention is adopted With hydraulic-driven, driving power, nominal torque, maximum thrust can meet quick-fried in upper soft lower hard, layer of sand and possible presplitting The broken construction demand for waiting stratum large torque.
3, the composite balancing earth-pressure shielding machine that high intensity basement rock protrusion stratum of the present invention shield construction method is chosen uses Pocket knife line space design can improve the construction demand of the stratum such as rock breaking capacity, presplit blasting of cutterhead large torque.
4, the composite balancing earth-pressure shielding machine that high intensity basement rock protrusion stratum of the present invention shield construction method is chosen, passes through Enlarged opening rate improves the mobility of cutterhead surface dregs;Main passive stirring rod setting, can fill the dregs in native storehouse The stirring divided improves the mobility of dregs in native storehouse, prevents dregs in native storehouse from accumulating;By increasing bentonite injected system, make It improves dregs mobility with stronger sediment improvement ability.
5, high intensity basement rock protrusion stratum of the present invention shield construction method is arranged warehouse entry point and is set to warehouse entry point region Set stabilization zone, can check replacement cutter in time, handle the problem in native storehouse, should not operation in spite of illness, hobboing cutter broken rock is always maintained at Kilter ensures that the shield machine caused by torque, power overload can be greatly reduced in rock breaking capacity, the promotion of shield machine performance Card stops suddenly, and shield machine is made to smoothly pass.And warehouse entry precondition is to ensure area by pre-reinforcement and the method for warehouse entry with pressure The stabilization in face.
6, high intensity basement rock protrusion stratum of the present invention shield construction method, full soil pressure are bought securities with all one's capital boring mode, and ladder is formed in storehouse Spending pressure maintains face soil stabilization, the dregs accumulated in storehouse to form " soil plug " effect, effectively keep out face active soil pressure Power, often dig 33cm slag tap it is a pipeful of, per ring overall control in 56m3, firmly excess is avoided to slag tap, maintains earth pressure balance, prevent area Face also easily causes in pressure rapid fluctuation to cave in.
7, high intensity basement rock protrusion stratum of the present invention shield construction method improves dregs by the way that High Viscosity Bentonite is added Workability makes dregs character become the stream modeling shape for not spraying slag, also not consolidating, realizes amount of slag and cutter head torque totally may be used Control, avoid gushing the pressure oscillation brought, solves the problems, such as to gush so that slagging tap, it is continuous to be able to, shield machine can it is soft or hard not Safety and steady passes through in equal stratum.
8, high intensity basement rock protrusion stratum of the present invention shield construction method, when cutterhead is by this section of basement rock protrusion, thrust is most Greatly 2775T, speed control is in 1 ~ 4mm/min, while good sediment improvement effect ensure that peak torque only arrives 3721Knm is the 60% of rated value, 0.8 ~ 1.2r/min of cutterhead rotating speed.Pile penetration 2mm/r ~ 9mm/r, slag temperature control system is 40 ~ 50 DEG C, safety and steady has passed through this section of basement rock protrusion, it is ensured that the safety of pipe culvert.
Specific implementation mode
Below by specific embodiment, the invention will be further described.
Embodiment 1
The present embodiment is with high intensity basement rock protrusion stratum shield construction method in five edge of Xiamen City's rail transit Line 2 first stage of the project For concrete application in the construction of the edge gulf station section of gulf southern station~five, following embodiment is descriptive, is not restrictive, Protection scope of the present invention cannot be limited with this.
The edge gulf station section of five edge gulf southern station of Xiamen City's rail transit Line 2 first stage of the project~five uses shield construction, entirely Long 869m, section of jurisdiction outer diameter 6200mm, internal diameter 5500mm.After two composite soil pressure balance tunnel shielding machines are originated from five edge gulf southern stations, edge Rotary island arterial highway, which is northwards laid, reaches five edge gulf stations.
Xiamen area the 4th is before the granitic batholith bottom below residual soil is formed in 7,000 to 1.4 hundred million years.The Taiwan Straits are formed After forming Fujian east coastal fault in the process, mantle magma is gushed along crack.Granite basement rock is that the plutonic in magmatic rock major class is invaded Enter rock, being averagely formed in underground 6km, its surface layer shape is put down unlike sedimentary rock due to its special intrusive forming process Whole, also irregularities can be sayed region presence probability.Underground high temperature and pressure and slowly cooling velocity are as good mineralogical composition Divide different process, the high hardness mineral being precipitated in the process:Quartz(30%-50%), feldspar(45%-65%)Average mohs hardness> 7, as the essential mineral of composition granite, therefore driving substantially increases the abrasion of cutter in such stratum.
Tunnel mainly passes through hard plastic shape and remains chiltern cohesive soil and completely weathered granite, the wherein left threaded list road mileage in section For ZDK40+302.700~ZDK40+382.419 there are length 79.719m, middle light weathered granite basement rock protrusion, average saturation is anti- Compressive Strength 160MPa, highest 204MPa, maximum intrusion height is 5.62m, is upper-soft lower-hard ground.Due to the villages basement rock distance Zhong Zhai Residential house only 25m recently, and there are 3*DN2000mm Sewage pollution collecting hanging baskets right over basement rock, and only 4.5m is pushed up away from hole, can not use explosion or The mode of person's coring pre-processes.
High intensity basement rock protrusion stratum shield construction method, tool is described in detail by taking the Tunnel Engineering constructing tunnel as an example below Body includes the following steps:
(1)Choose shield machine:The geology on stratum residing for position to be tunneled to shield machine is surveyed in advance, and according to geological exploration As a result, choosing composite soil pressure balance tunnel shielding machine tunneling construction, the cutterhead and support system sheet of the composite soil pressure balance tunnel shielding machine Body is provided with agitating device, and the composite soil pressure balance tunnel shielding machine is equipped with foam injection systems and bentonite injected system to improve The dregs on high intensity basement rock protrusion stratum;
The composite soil pressure balance tunnel shielding machine uses hydraulic-driven, and driving power 945kW, nominal torque 6000KNm get rid of poverty Torque is 7200KNm, can meet the construction demand in the stratum large torque such as upper soft lower hard, layer of sand and possible presplit blasting; Rotating speed 0-3.7 rpm are driven, in tunneling boring decomposed rock floor height rotating speed construction requirement, rock breaking capacity can be met and be not less than 210Mpa, cutterhead aperture opening ratio are 30-40%, and cutterhead rotating speed is 0.8 ~ 1.2r/min, and pile penetration is 2mm/r ~ 9mm/r, and knife spacing is 75-90mm。
Cutterhead is designed using quasi- panel construction, has 6 operator beams, has 6 brackets, 6 corbels support beams and cycle beam Deng composition, according to construction demand, it can configure hobboing cutter or tearing cutter be installed on hobboing cutter girff, compound earth pressure balance in the present embodiment The cutterhead integral finish rate 34% of shield machine, cutter head center aperture opening ratio 38%, opening are uniformly distributed in entire disk, ensure cutterhead pick Tu Cang is can smoothly enter into quarrel soil in the process.Tearing cutter is installed on hobboing cutter girff, is aided with rational sediment improvement, can be met viscous The construction requirement of the soft soil layers such as soil, layer of sand;If installing hobboing cutter on cutterhead, the construction requirement on decomposed rock stratum can be met; Cutterhead circumferential direction corbels support beam is less than operator beam in the height of cutterhead axial direction, and cutter head center region openings are passed through with neighboring area opening It is logical, it is convenient for the quarrel soil of central area toward perimeter, improves the mobility of cutterhead radial direction dregs.Hobboing cutter size is 17 cun, knife High 175mm, center duplex hobboing cutter are 6, single-blade hob 35, totally 47 swords, between central hob knife spacing 90mm, positive hobboing cutter knife Away from 75mm, pocket knife spacing arrangement, cutterhead has stronger rock breaking capacity.The cutter head of shield machine front panel heap is welded with clad steel Plate, cycle beam appearance surface build-up welding clad steel plate and alloy knife.
The agitating device include be arranged cutterhead back active stirring rod and be arranged on shield machine anterior shield partition board Passive stirring rod.4 active stirring rod of cutterhead back designs, are stirred using the relative motion of cutterhead and pressure-bearing partition board, are changed The native mobility of quarrel in cubsoil storehouse in kind, and 2 passive stirring rod are designed on anterior shield partition board, can to the dregs in native storehouse into Row adequately stirring, improves the mobility of dregs in native storehouse, prevents dregs in native storehouse from accumulating, is formed " mud cake ".
The foam injection systems include the foam inlet for being uniformly arranged on the 6 single tube list pump configurations of cutterhead front panel, Wherein 2 tunnels are shared with bentonite slurry, and cutterhead front, Tu Cang and the screw machine of the composite soil pressure balance tunnel shielding machine are equipped with swelling Native incoming interface, bentonite system is used as injection pump using hose, good for the land reform that is cut, and can for construct provide it is puffing outside hole Scheme, by a large amount of bentonites by the bentonite tank installed on Pipeline transport to equipment, by peristaltic pump from cutterhead front, soil Storehouse and screw machine inject bentonite, increase stratum fine grained, form good grading help and smoothly slag tap, reduce abrasion, with compared with Strong sediment improvement ability can carry out stronger improvement to the dregs cut, improve dregs mobility, prevent knife Disk " mud cake ".
(2)Warehouse entry point is set and stabilization zone is arranged to warehouse entry point region:The rock that detection is come out by boring and coring, Its being ground property is analyzed, the composite soil pressure balance tunnel shielding machine tool wear situation is prejudged, predicts compound soil pressure balance shielding Once driving is once tunneled up to length setting warehouse entry point simultaneously structure machine up to length, and according to the composite soil pressure balance tunnel shielding machine Stabilization zone is arranged to warehouse entry point region;
In the present embodiment, for the formation characteristics of this engineering hard rock, prediction shield is once dug in this abrasiveness granitic formation Into up to 30m, being divided into 20m between warehouse entry point, the stabilization zone size is width 3m, a length of 6.6m, and reinforcement depth adds to Tunnel top Gu mode is quincuncial arrangement sleeve floral tube slip casting, the distance between floral tube of tucking inside the sleeve is 0.5-1m, between the present embodiment half sleeve floral tube Distance is 0.8m, and stabilization zone outer ring institute injection slurry is dual slurry, inner ring is cement mortar.
(3)Shield Construction Method Used:
Active warehouse entry checks primary before compound earth pressure balanced shield, EPBS high intensity basement rock to be entered raised section, then starts driving and applies Work;It is bought securities with all one's capital boring mode using full soil pressure during Shield Construction Method Used, strictly controls amount of slag, full soil pressure is bought securities with all one's capital every in driving Driving 33cm slags tap a pipeful of, slags tap overall control in 56m per ring3, strictly control amount of slag;
Closing foam injection systems, unlatching bentonite slurry injected system injection sodium bentonite mud improve the soil body, The sodium bentonite mud is by sodium bentonite and water according to 1:8 ± 1 mass ratio uniformly configures, and slump is 195-205mm, viscosity are 50 seconds, and the grouting amount in shield driving is 4m3/ ring;
While the Shield Construction Method Used completes a ring and balancing earth-pressure shielding machine propulsion, slip casting is synchronized, it is described Simultaneous grouting slurry is uniformly mixed by cement, fine aggregate, coal dust ash, bentonite and water, the cement, fine aggregate, coal dust The mass ratio of ash, bentonite and water is 120:1040:160:150:280, it is 4.7m per ring grouting amount3, grouting pressure is not more than 0.2Mpa;The secondary grouting slurries use cement~waterglass dual slurry, presetting period to be set as 50~70s, grouting pressure No more than 0.4Mpa.Section of jurisdiction carries out secondary grouting after being detached from 4~6 ring of shield tail, and slurries use cement~waterglass dual slurry, just The solidifying time is set as 50~70s, and grouting pressure is not greater than 0.4Mpa, mends slurry amount and is controlled with grouting pressure, is further mended Stratum Loss is filled, ground settlement is controlled;
When shield driving is to warehouse entry point, warehouse entry with pressure checks whether cutter has inordinate wear.
(4)Shield segment assembling is constructed:Step(3)After middle Shield Construction Method Used completes a ring, according to conventional pipe sheet assembling Lining construction technique carries out shield segment assembling construction;Constantly cycle, until the whole for completing constructed subway tunnel was constructed Journey;
(5)After deviating from earth's surface after shield tail, increases synchronous grouting amount and carry out after-teeming slurry after the wall of section of jurisdiction.
The left line in edge gulf station section of five edge gulf southern station of Xiamen City's rail transit Line 2 first stage of the project~five was from January 19 in 2017 Initially enter basement rock protrusion day, until this section of basement rock protrusion shield driving is completed within 14 days 2 months, average advance index 1-2 rings/day.It is logical It crosses and reinforces slag tap control and sediment improvement, control sedimentation well, the accumulative sedimentation maximum 1cm in ground, Sewage pollution collecting hanging basket is accumulative to sink 5.5mm drops, and it is safe and smooth to have passed through this section of basement rock protrusion.By on the way, twice according to tool changing plan warehouse entry, being total to tool changing 15, Wear form is eccentric wear, is replaced in time, and rock breaking efficiency has been effectively ensured.

Claims (9)

1. a kind of high intensity basement rock protrusion stratum shield construction method, it is characterised in that steps are as follows:
(1)Choose shield machine:The geology on stratum residing for position to be tunneled to shield machine is surveyed in advance, and according to geological exploration As a result, choosing composite soil pressure balance tunnel shielding machine tunneling construction, the cutterhead and support system sheet of the composite soil pressure balance tunnel shielding machine Body is provided with agitating device, and the composite soil pressure balance tunnel shielding machine is equipped with foam injection systems and bentonite injected system to improve The dregs on high intensity basement rock protrusion stratum;
(2)Warehouse entry point is set and stabilization zone is arranged to warehouse entry point region:The rock that detection is come out by boring and coring, to it Being ground property is analyzed, and the composite soil pressure balance tunnel shielding machine tool wear situation is prejudged, and predicts composite soil pressure balance tunnel shielding machine Primary driving is once tunneled up to length, and according to the composite soil pressure balance tunnel shielding machine up to length setting warehouse entry point and to institute State warehouse entry point region setting stabilization zone;
(3)Shield Construction Method Used:
Active warehouse entry checks once the composite soil pressure balance tunnel shielding machine before high intensity basement rock to be entered raised section, then starts Tunneling construction;It is bought securities with all one's capital boring mode using full soil pressure during Shield Construction Method Used, strictly controls amount of slag;Close foam injection System, unlatching bentonite slurry injected system injection sodium bentonite mud improve the soil body;The compound earth pressure balance While shield machine tunneling construction completes a ring and balancing earth-pressure shielding machine propulsion, slip casting is synchronized, section of jurisdiction is detached from shield Secondary grouting is carried out after 4~6 ring of tail;When shield driving is to warehouse entry point, warehouse entry with pressure checks whether cutter has inordinate wear;
(4)Shield segment assembling is constructed:Step(3)After middle Shield Construction Method Used completes a ring, according to conventional pipe sheet assembling lining cutting Construction technology carries out shield segment assembling construction;Constantly cycle, until completing whole work progress of constructed subway tunnel;
(5)After deviating from earth's surface after shield tail, increases synchronous grouting amount and carry out after-teeming slurry after the wall of section of jurisdiction.
2. high intensity basement rock protrusion stratum as described in claim 1 shield construction method, it is characterised in that:The step (1)In composite soil pressure balance tunnel shielding machine use hydraulic-driven, driving power 945kW, nominal torque 6000KNm, torsion of getting rid of poverty Square is 7200KNm, and it is 30-40% not less than 210Mpa, cutterhead aperture opening ratio to drive rotating speed 0-3.7 rpm, rock breaking capacity, and cutterhead turns Speed is 0.8-1.2r/min, and pile penetration 2mm/r-9mm/r, knife spacing is 75-90mm.
3. high intensity basement rock protrusion stratum as described in claim 1 shield construction method, it is characterised in that:The step (1)In agitating device include be arranged cutterhead back active stirring rod and what is be arranged on shield machine anterior shield partition board passive stir Mix stick.
4. high intensity basement rock protrusion stratum as described in claim 1 shield construction method, it is characterised in that:The step (1)In foam injection systems include the pump configuration of 6 single tube lists foam inlet, wherein 2 tunnels are shared with bentonite slurry.
5. high intensity basement rock protrusion stratum as described in claim 1 shield construction method, it is characterised in that:The step (1)In cutter head of shield machine front panel heap be welded with clad steel plate, cycle beam appearance surface build-up welding clad steel plate and alloy knife.
6. high intensity basement rock protrusion stratum as described in claim 1 shield construction method, it is characterised in that:The step (2)In warehouse entry point between be divided into 20m, the stabilization zone size is width 2.5-3.5m, 6-7 meters a length of, reinforcement depth to Tunnel Top, reinforcing mode are quincuncial arrangement sleeve floral tube slip casting, and the distance between sleeve floral tube is 0.5-1m, stabilization zone outer ring institute injection slurry It is cement mortar for dual slurry, inner ring.
7. high intensity basement rock protrusion stratum as described in claim 1 shield construction method, it is characterised in that:The step (3)In full soil pressure buy securities with all one's capital and often tunnel 33cm in driving and slag tap a pipeful of, slag tap overall control in 56m per ring3
8. high intensity basement rock protrusion stratum as described in claim 1 shield construction method, it is characterised in that:The step (3)In the sodium bentonite mud by sodium bentonite and water according to 1:8 ± 1 mass ratio uniformly configures, and collapses Degree of falling is 195-205mm, viscosity is 50 seconds, and the grouting amount in shield driving is 4m3/ ring.
9. high intensity basement rock protrusion stratum as described in claim 1 shield construction method, it is characterised in that:The step (3)Described in simultaneous grouting slurry be uniformly mixed by cement, fine aggregate, coal dust ash, bentonite and water, it is the cement, thin Aggregate, coal dust ash, bentonite and water mass ratio be 120:1040:160:150:280, it is 4.7m per ring grouting amount3, slip casting pressure Power is not more than 0.2Mpa;The secondary grouting slurries use cement~waterglass dual slurry, presetting period to be set as 50~70s, Grouting pressure is not more than 0.4Mpa.
CN201810598433.XA 2018-06-12 2018-06-12 High-intensitive basement rock protrusion stratum shield construction method Active CN108756916B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810598433.XA CN108756916B (en) 2018-06-12 2018-06-12 High-intensitive basement rock protrusion stratum shield construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810598433.XA CN108756916B (en) 2018-06-12 2018-06-12 High-intensitive basement rock protrusion stratum shield construction method

Publications (2)

Publication Number Publication Date
CN108756916A true CN108756916A (en) 2018-11-06
CN108756916B CN108756916B (en) 2019-11-05

Family

ID=64021910

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810598433.XA Active CN108756916B (en) 2018-06-12 2018-06-12 High-intensitive basement rock protrusion stratum shield construction method

Country Status (1)

Country Link
CN (1) CN108756916B (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110118087A (en) * 2019-06-19 2019-08-13 中铁第六勘察设计院集团有限公司 Ultra high water pressure long range seabed shield tunnel active tool-changing mechanism and construction method
CN110863833A (en) * 2019-11-22 2020-03-06 中铁隧道局集团有限公司 Tunneling parameter control process of tunnel shield tunneling starting end boulder area shield tunneling machine
CN117703408A (en) * 2023-12-25 2024-03-15 苏州大学 Construction method for shield to continuously cut through reinforced concrete diaphragm wall

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282782A (en) * 1999-03-29 2000-10-10 Gesuido Shingijutsu Suishin Kiko Shield machine and excavation method
CN101403307A (en) * 2008-08-04 2009-04-08 中铁十一局集团城市轨道工程有限公司 Construction method of composite soil pressure balance tunnel shielding machine for traversing shallow-buried water-rich sand layer
CN101509381A (en) * 2008-12-24 2009-08-19 中铁隧道集团有限公司 Composite shield structure suitable for bad ground construction
CN101666231A (en) * 2009-06-24 2010-03-10 中铁隧道股份有限公司 Shield machine warehouse entry method
CN102758635A (en) * 2012-07-31 2012-10-31 中铁二局股份有限公司 Construction method for tool changing under pressure in shield of water-rich silty soil and silty sand stratum under station tracks of railways
CN105626086A (en) * 2014-11-20 2016-06-01 宏润建设集团股份有限公司 Method for shield tunneling construction in pebble bed

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JP2000282782A (en) * 1999-03-29 2000-10-10 Gesuido Shingijutsu Suishin Kiko Shield machine and excavation method
CN101403307A (en) * 2008-08-04 2009-04-08 中铁十一局集团城市轨道工程有限公司 Construction method of composite soil pressure balance tunnel shielding machine for traversing shallow-buried water-rich sand layer
CN101509381A (en) * 2008-12-24 2009-08-19 中铁隧道集团有限公司 Composite shield structure suitable for bad ground construction
CN101666231A (en) * 2009-06-24 2010-03-10 中铁隧道股份有限公司 Shield machine warehouse entry method
CN102758635A (en) * 2012-07-31 2012-10-31 中铁二局股份有限公司 Construction method for tool changing under pressure in shield of water-rich silty soil and silty sand stratum under station tracks of railways
CN105626086A (en) * 2014-11-20 2016-06-01 宏润建设集团股份有限公司 Method for shield tunneling construction in pebble bed

Non-Patent Citations (2)

* Cited by examiner, † Cited by third party
Title
申军波: "浅谈盾构长距离穿越复合地层施工技术", 《门窗》 *
马云新: "砂卵石地层盾构辐板式刀盘的特点及掘进技术", 《建筑技术》 *

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110118087A (en) * 2019-06-19 2019-08-13 中铁第六勘察设计院集团有限公司 Ultra high water pressure long range seabed shield tunnel active tool-changing mechanism and construction method
CN110118087B (en) * 2019-06-19 2024-03-01 中铁第六勘察设计院集团有限公司 Active tool changing structure of ultrahigh water pressure long-distance submarine shield tunnel and construction method
CN110863833A (en) * 2019-11-22 2020-03-06 中铁隧道局集团有限公司 Tunneling parameter control process of tunnel shield tunneling starting end boulder area shield tunneling machine
CN117703408A (en) * 2023-12-25 2024-03-15 苏州大学 Construction method for shield to continuously cut through reinforced concrete diaphragm wall

Also Published As

Publication number Publication date
CN108756916B (en) 2019-11-05

Similar Documents

Publication Publication Date Title
CN112360462B (en) Mining process for filling and grouting short-wall fully-mechanized mining gangue
CN102080548B (en) Construction method of tunnel to cross airport runway by shield method
CN102352757B (en) Method for controlling upward floating of pipe piece during shield machine air pushing through mining tunnel
CN103470267A (en) Long tunnel fast construction process
CN109184694A (en) A kind of pre- anchor sublevel drilling stage open stope afterwards filling mining method of upper disk
CN110344400A (en) The hard rock pore-forming construction technology of churning driven opportunity
CN108867814A (en) It is newly-built to cut dirty branch pipe and existing sewage network is plugged into engineering method
CN108756916B (en) High-intensitive basement rock protrusion stratum shield construction method
CN108797618A (en) One kind being used for Urban Underground pipe gallery drainage of foundation pit structure and its construction method
CN104989408A (en) Safe and high-efficiency mining method for metal mine in mountainous area
CN109812271B (en) Construction method for shield-crossing limited box culvert
CN113818889B (en) Construction method for crossing underground shield tunnel through civil air defense roadway
CN112112657B (en) New construction method for digging and building inclined shaft of coal mine
CN108374674A (en) Six pilot tunnels, 12 step Underground Space Excavation method for protecting support
Wang Tunnelling and technological progress in tunnelling in China
CN104315251B (en) Artificial pipe jacking construction method under soil stone combination geological conditions
CN110500112A (en) Earth pressure balanced shield, EPBS is parallel with shallow burial hidden digging tunnel to overlap construction method
CN109555158A (en) A kind of piping lane construction method
CN205296194U (en) Rich irrigated land layer undercut tunnel interlock pipe curtain
CN111577331A (en) Construction method of expressway steep-dip phyllite IV-V-level surrounding rock tunnel
CN101205723A (en) Construction method of underground building access in precondition of non-relocation of pipelines
Wang et al. Shield Tunneling Treatment Technology in Boulder Stratum
Sullivan et al. Design and Construction of the South Hartford CSO Tunnel
Zhao et al. Shield Treatment Technology for Large-Size Pebble Stratum
CN114737974A (en) Construction method for receiving rectangular jacking pipe in hard rock

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant