CN108756284A - Postposition steel core concrete column - Google Patents
Postposition steel core concrete column Download PDFInfo
- Publication number
- CN108756284A CN108756284A CN201810564233.2A CN201810564233A CN108756284A CN 108756284 A CN108756284 A CN 108756284A CN 201810564233 A CN201810564233 A CN 201810564233A CN 108756284 A CN108756284 A CN 108756284A
- Authority
- CN
- China
- Prior art keywords
- concrete column
- postposition
- column
- postposition steel
- steel pipe
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G23/00—Working measures on existing buildings
- E04G23/02—Repairing, e.g. filling cracks; Restoring; Altering; Enlarging
- E04G23/0218—Increasing or restoring the load-bearing capacity of building construction elements
Abstract
The invention discloses a kind of postposition steel core concrete columns, postposition steel pipe column is added outside concrete column retaining, the cross section profile of the postposition steel pipe column is more than the cross section profile for retaining concrete column, but their cross sectional shape is identical, and grout blanket is perfused in the postposition steel pipe column;The postposition steel core concrete column of the present invention, more section can be retained to meet the requirement of construction, larger bearing capacity is obtained by replacing smaller sectional area, meet the requirement of structure, ensure old concrete and newly-laid concrete and the common stress of steel pipe column, meets the safe handling of structure.
Description
Technical field
The present invention relates to structural engineering field of reinforcement more particularly to a kind of postposition steel core concrete columns.
Background technology
In current engineer application, after being frequently encountered building structure construction, strong concrete can be found through Site Detection
Inadequate phenomenon is spent, such as all dismounting is reformed, and can be wasted a large amount of human and material resources and can be brought certain negative shadow to society
It rings, so the method for being all made of consolidation process under normal circumstances.
Processing method under normal circumstances typically locally replaces the concrete in concrete column(It is mixed to cut part
Solidifying soil, is then newly poured), integral replacement(After all cutting, newly-laid concrete), increase concrete column the methods of section.Work as bottom
When portion's floor frame column concrete strength is too low, design requirement is much not achieved in the bearing capacity of frame column, when top has constructed one
After the floor of fixed number amount, due to the pressure of upper floor, setting Construction Support cannot achieve, so as to cause frame column concrete without
Method is replaced;Such as enlarging section, then the use of building may be influenced, such as occupy parking stall, or influence the overall stiffness point of structure
With to influence whole structural internal force, need to consider carefully.
Invention content
For the defects in the prior art, the present invention provides a kind of postposition steel core concrete column, can retain more cut
Face meets the requirement of construction, obtains larger bearing capacity by replacing smaller sectional area, meets the requirement of structure,
Ensure old concrete and newly-laid concrete and the common stress of steel pipe column, meets the safe handling of structure.
Postposition steel pipe column, the postposition steel is added retaining in the postposition steel core concrete column of the present invention outside concrete column
The cross section profile of tubing string is more than the cross section profile for retaining concrete column, but their cross sectional shape is identical, the postposition steel pipe column
Inside it is perfused with grout blanket, the cross sectional shape of postposition steel pipe column is identical as the section of concrete column is retained, and is rectangular or is
The cross section profile of circle, postposition steel pipe column is identical as the outer profile of original structure concrete column, can not only obtain larger bearing capacity,
And compared to no more occupied spaces before reinforcing.
Further, the inner surface of the postposition steel pipe column is fixed with peg, can allow grout blanket effectively with after
Steel pipe column is set to concur.
Further, the reservation concrete column is implanted into transmission rod, and the outer end of transmission rod is cast in grout blanket;Transmission rod
For reinforcing bar, reinforcing bar outer end refers to stretching out the one end retained outside concrete column, and the outer end of transmission rod bends l-shaped, is allowed to and is in the milk
Layer combination is more firm.
Further, the transmission rod implantation retains the depth in concrete column and is not less than 10cm, it is ensured that transmission rod and reservation
The consolidation strength of concrete column.
Further, the wall thickness of the postposition steel pipe column is 10mm, and the thickness of the grout blanket is 90mm, the length of the peg
Degree is 80mm, and grout blanket uses high-strength expansive concrete, and the sidewise restraint of postposition steel pipe column and high-strength expansive concrete can also
Larger raising retains the intensity of concrete column.
Further, the transmission rod and peg interlaced arrangement, comprehensive stress performance are good.
Further, the grout blanket is poured in postposition steel pipe column using C50 grouting materials and is formed.
Further, construction method is as follows:By calculate analysis original structure concrete column periphery rooted out it is a certain proportion of
Section makes it meet the requirement of the dead weight bearing capacity of construction period, and remaining part is to retain concrete column, is retaining concrete
Column is implanted into transmission rod, and postposition steel pipe column is added outside, grouting material is poured into postposition steel pipe column, and it is mixed to apply utilization of hour reservation
Solidifying earth pillar reliably supports top-out, not only easy for construction without in addition setting up support construction, but also safety
Good, postposition steel pipe column is welded using steel plate, level weld seam requirement first-order weld.
The beneficial effects of the invention are as follows:The postposition steel core concrete column of the present invention, can retain more section to meet
The requirement of construction obtains larger bearing capacity by replacing smaller sectional area, meets the requirement of structure, ensures old mixed
Solidifying soil and newly-laid concrete and the common stress of steel pipe column, meet the safe handling of structure.
Description of the drawings
It, below will be to specific in order to illustrate more clearly of the specific embodiment of the invention or technical solution in the prior art
Embodiment or attached drawing needed to be used in the description of the prior art are briefly described.In the accompanying drawings, similar element or portion
Divide and is generally identified by similar reference numeral.In attached drawing, each element or part might not be drawn according to actual ratio.
Fig. 1 is the structural diagram of the present invention;
Fig. 2 is the cross-sectional configuration schematic diagram of the present invention;
Fig. 3 is the plan view for the concrete column that need to be reinforced.
Specific implementation mode
The embodiment of technical solution of the present invention is described in detail below in conjunction with attached drawing.Following embodiment is only used for
Clearly illustrate technical scheme of the present invention, therefore be only used as example, and the protection model of the present invention cannot be limited with this
It encloses.
It should be noted that unless otherwise indicated, technical term or scientific terminology used in this application should be this hair
The ordinary meaning that bright one of ordinary skill in the art are understood.
As shown in Figure 1, 2:Postposition steel pipe is added retaining in the postposition steel core concrete column of the present embodiment outside concrete column
Column, the cross section profile of the postposition steel pipe column is more than the cross section profile for retaining concrete column, but their cross sectional shape is identical, institute
It states and is perfused with grout blanket in postposition steel pipe column, the cross sectional shape of postposition steel pipe column is identical as the section of concrete column is retained, and is
Rectangular or be circle, the cross section profile of postposition steel pipe column is identical as the outer profile of original structure concrete column, can not only obtain
Larger bearing capacity, and compared to no more occupied spaces before reinforcing;Its construction method is as follows:It will be former by calculating analysis
A certain proportion of section is rooted out in structural concrete column periphery, it is made to meet the requirement of the dead weight bearing capacity of construction period, remaining
Part is implanted into transmission rod to retain concrete column, retaining concrete column, postposition steel pipe column is added outside, in postposition steel pipe
Grouting material is poured into column, applies utilization of hour reservation concrete column and top-out is reliably supported, without in addition setting up branch
Support structure, it is not only easy for construction, and also safety is good, and postposition steel pipe column is welded using steel plate, level weld seam requirement first-order weld.
In the present embodiment, the inner surface of the postposition steel pipe column is fixed with peg, and grout blanket can be allow effective
It is concured with postposition steel pipe column, the reservation concrete column is implanted into transmission rod, and the outer end of transmission rod is cast in grout blanket
It is interior;Transmission rod is reinforcing bar, and reinforcing bar outer end refers to stretching out the one end retained outside concrete column, and the outer end of transmission rod bends l-shaped, makes
Combined with grout blanket more firm, transmission rod implantation retains the depth in concrete column and is not less than 10cm, it is ensured that transmission rod
With the consolidation strength for retaining concrete column.
In the present embodiment, the wall thickness of the postposition steel pipe column is 10mm, and the thickness of the grout blanket is 90mm, the peg
Length be 80mm, grout blanket use high-strength expansive concrete, the sidewise restraint of postposition steel pipe column and high-strength expansive concrete
The intensity of raising reservation concrete column that can be larger, the transmission rod and peg interlaced arrangement, comprehensive stress performance is good, described
Grout blanket is poured in postposition steel pipe column using C50 grouting materials and is formed.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent
Present invention has been described in detail with reference to the aforementioned embodiments for pipe, it will be understood by those of ordinary skill in the art that:Its according to
So can with technical scheme described in the above embodiments is modified, either to which part or all technical features into
Row equivalent replacement;And these modifications or replacements, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution
The range of scheme should all cover in the claim of the present invention and the range of specification.
Claims (8)
1. a kind of postposition steel core concrete column, it is characterised in that:Postposition steel pipe column is added outside concrete column retaining, after described
The cross section profile for setting steel pipe column is more than the cross section profile for retaining concrete column, but their cross sectional shape is identical, the postposition steel
Grout blanket is perfused in tubing string.
2. postposition steel core concrete column according to claim 1, it is characterised in that:The inner surface of the postposition steel pipe column
It is fixed with peg.
3. postposition steel core concrete column according to claim 2, it is characterised in that:The reservation concrete column is implanted into biography
The outer end of power bar, transmission rod is cast in grout blanket.
4. postposition steel core concrete column according to claim 3, it is characterised in that:The transmission rod implantation retains concrete
Depth in column is not less than 10cm.
5. postposition steel core concrete column according to claim 4, it is characterised in that:The wall thickness of the postposition steel pipe column is
The thickness of 10mm, the grout blanket are 90mm, and the length of the peg is 80mm.
6. postposition steel core concrete column according to claim 5, it is characterised in that:The transmission rod and peg interlock cloth
It sets.
7. postposition steel core concrete column according to claim 1, it is characterised in that:The grout blanket uses C50 grouting materials
It is poured in postposition steel pipe column and is formed.
8. postposition steel core concrete column according to claim 1, it is characterised in that:Its construction method is as follows:Pass through calculating
A certain proportion of section is rooted out in original structure concrete column periphery by analysis, it is made to meet wanting for the dead weight bearing capacity of construction period
It asks, remaining part is to retain concrete column, is implanted into transmission rod retaining concrete column, postposition steel pipe column is added outside,
Grouting material is poured into postposition steel pipe column.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810564233.2A CN108756284A (en) | 2018-06-04 | 2018-06-04 | Postposition steel core concrete column |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810564233.2A CN108756284A (en) | 2018-06-04 | 2018-06-04 | Postposition steel core concrete column |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108756284A true CN108756284A (en) | 2018-11-06 |
Family
ID=64002741
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810564233.2A Pending CN108756284A (en) | 2018-06-04 | 2018-06-04 | Postposition steel core concrete column |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108756284A (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235282A (en) * | 2018-11-12 | 2019-01-18 | 中铁六局集团有限公司 | The anti-skidding cylinder and its construction method of temporary rest pier waterborne |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101463653A (en) * | 2008-12-30 | 2009-06-24 | 上海勘测设计研究院 | Method for reinforcing concrete rod |
CN101550767A (en) * | 2008-04-03 | 2009-10-07 | 上海市第七建筑有限公司 | Reinforcing method for concrete post and reinforced concrete post |
CN101581152A (en) * | 2009-06-05 | 2009-11-18 | 武汉大学 | Method for reinforcing concrete column by expanding section of coated concrete-filled steel tube (CFST) |
CN203174885U (en) * | 2013-01-23 | 2013-09-04 | 中国一冶集团有限公司 | Steel pipe concrete column for increasing grip force of steel pipe and concrete |
CN104005567A (en) * | 2014-05-07 | 2014-08-27 | 北京工业大学 | Ultra-high-performance concrete reinforced concrete column with fiber reinforced polymers wound around steel pipe |
CN208280650U (en) * | 2018-06-04 | 2018-12-25 | 安徽省建筑科学研究设计院 | A kind of concrete column that steel pipe is reinforced |
-
2018
- 2018-06-04 CN CN201810564233.2A patent/CN108756284A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101550767A (en) * | 2008-04-03 | 2009-10-07 | 上海市第七建筑有限公司 | Reinforcing method for concrete post and reinforced concrete post |
CN101463653A (en) * | 2008-12-30 | 2009-06-24 | 上海勘测设计研究院 | Method for reinforcing concrete rod |
CN101581152A (en) * | 2009-06-05 | 2009-11-18 | 武汉大学 | Method for reinforcing concrete column by expanding section of coated concrete-filled steel tube (CFST) |
CN203174885U (en) * | 2013-01-23 | 2013-09-04 | 中国一冶集团有限公司 | Steel pipe concrete column for increasing grip force of steel pipe and concrete |
CN104005567A (en) * | 2014-05-07 | 2014-08-27 | 北京工业大学 | Ultra-high-performance concrete reinforced concrete column with fiber reinforced polymers wound around steel pipe |
CN208280650U (en) * | 2018-06-04 | 2018-12-25 | 安徽省建筑科学研究设计院 | A kind of concrete column that steel pipe is reinforced |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN109235282A (en) * | 2018-11-12 | 2019-01-18 | 中铁六局集团有限公司 | The anti-skidding cylinder and its construction method of temporary rest pier waterborne |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104963415B (en) | A kind of round steel pipe binding type steel concrete column and steel beam joint structure | |
CN207260628U (en) | A kind of walls with brick masonry structure ruggedized construction | |
CN206737118U (en) | A kind of prefabricated regeneration concrete bean column node of reinforcement | |
CN204753615U (en) | Bridge pile foundation reinforced structure | |
CN108035493A (en) | A kind of antidetonation assembles half grout sleeve of self-locking | |
CN102071747A (en) | Joint of square steel tube concrete column and reinforced concrete floor and production method thereof | |
CN110130534A (en) | A kind of novel energy-consumption precast shear wall and its processing installation method | |
CN208280650U (en) | A kind of concrete column that steel pipe is reinforced | |
CN108756284A (en) | Postposition steel core concrete column | |
CN208792508U (en) | A kind of square steel tube constrains the node structure of combined steel and concrete column and girder steel | |
CN106013834A (en) | Device and method for storey addition of basement | |
CN104631850B (en) | Compressive pre-stress steel pile casting bar planting expand the reinforcement of concrete post method of section | |
CN104179166A (en) | Rigid pile composite foundation and construction method thereof | |
CN105971196A (en) | Method for constructing masonry structure embedded square concrete filled steel tube ring beam-constructional column | |
CN105133789B (en) | Interior truss type steel tube concrete T-shaped post and its construction method | |
CN105040828B (en) | A kind of round steel pipe binding type steel concrete column and steel beam joint structure | |
CN202899176U (en) | Existing bridge pile foundation cross section increasing reinforced structure | |
CN214530638U (en) | Multi-shaft stirring stiffness composite pile | |
CN209261322U (en) | A kind of indirect dry cooling tower X-type rod structure | |
CN214116642U (en) | Continuous embedded type row pile enclosure structure | |
CN213114607U (en) | Composite foundation structure | |
CN205399509U (en) | Existing structure foundation underpins structure temporarily | |
CN113482036A (en) | Column base structure of reinforced concrete and construction method thereof | |
CN204780892U (en) | Tubular pile crack reinforcement structure of high strength | |
CN206859208U (en) | Novel building concrete solid pile |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination |