CN108755964B - A partially prefabricated assembled steel-concrete mixed column and construction method - Google Patents

A partially prefabricated assembled steel-concrete mixed column and construction method Download PDF

Info

Publication number
CN108755964B
CN108755964B CN201810630820.7A CN201810630820A CN108755964B CN 108755964 B CN108755964 B CN 108755964B CN 201810630820 A CN201810630820 A CN 201810630820A CN 108755964 B CN108755964 B CN 108755964B
Authority
CN
China
Prior art keywords
steel
concrete
column
prefabricated
performance
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN201810630820.7A
Other languages
Chinese (zh)
Other versions
CN108755964A (en
Inventor
杨勇
冯世强
薛亦聪
于云龙
孙东德
魏博
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xian University of Architecture and Technology
Original Assignee
Xian University of Architecture and Technology
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xian University of Architecture and Technology filed Critical Xian University of Architecture and Technology
Priority to CN201810630820.7A priority Critical patent/CN108755964B/en
Publication of CN108755964A publication Critical patent/CN108755964A/en
Application granted granted Critical
Publication of CN108755964B publication Critical patent/CN108755964B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/30Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons the supporting parts being composed of two or more materials; Composite steel and concrete constructions
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04BGENERAL BUILDING CONSTRUCTIONS; WALLS, e.g. PARTITIONS; ROOFS; FLOORS; CEILINGS; INSULATION OR OTHER PROTECTION OF BUILDINGS
    • E04B1/00Constructions in general; Structures which are not restricted either to walls, e.g. partitions, or floors or ceilings or roofs
    • E04B1/18Structures comprising elongated load-supporting parts, e.g. columns, girders, skeletons
    • E04B1/185Connections not covered by E04B1/21 and E04B1/2403, e.g. connections between structural parts of different material
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/32Columns; Pillars; Struts of metal
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04CSTRUCTURAL ELEMENTS; BUILDING MATERIALS
    • E04C3/00Structural elongated elements designed for load-supporting
    • E04C3/30Columns; Pillars; Struts
    • E04C3/34Columns; Pillars; Struts of concrete other stone-like material, with or without permanent form elements, with or without internal or external reinforcement, e.g. metal coverings

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Physics & Mathematics (AREA)
  • Electromagnetism (AREA)
  • Rod-Shaped Construction Members (AREA)

Abstract

本发明采用部分预制装配部分现浇的思想,公开了一种部分预制装配型钢混凝土混合柱,其包括有预制高性能混凝土空心柱;沿柱长方向设置于预制高性能混凝土空心柱中的纵筋、型钢与钢板,其中钢板设着于型钢上形成蜂窝状空心结构;等间距铺设的箍筋;填充于预制高性能混凝土空心柱中心空腔的现浇混凝土;以及沿柱长方向设置于上、下部预制高性能混凝土空心柱两端的端板和高强螺栓;本发明还提供了其施工方法。本发明具有自重轻,承载力高,不需内部支模,提升施工速度,减小施工现场结构装配难度,同时改善构件在运输与吊装过程中变形能力,降低吊装难度等优点,全面增强了部分预制装配型钢混凝土构件的受力性能和使用性能。

Figure 201810630820

The invention adopts the idea of partially prefabricated and assembled partially cast-in-place, and discloses a partially prefabricated assembled steel-concrete mixed column, which includes a prefabricated high-performance concrete hollow column; longitudinal bars arranged in the prefabricated high-performance concrete hollow column along the column length direction , section steel and steel plate, wherein the steel plate is arranged on the section steel to form a honeycomb hollow structure; stirrups laid at equal intervals; cast-in-place concrete filled in the central cavity of the prefabricated high-performance concrete hollow column; End plates and high-strength bolts at both ends of the lower prefabricated high-performance concrete hollow column; the invention also provides a construction method thereof. The invention has the advantages of light weight, high bearing capacity, no need for internal formwork, improved construction speed, reduced difficulty in structural assembly at the construction site, improved deformation ability of components during transportation and hoisting, reduced hoisting difficulty, etc. Mechanical performance and service performance of prefabricated steel-concrete components.

Figure 201810630820

Description

一种部分预制装配型钢混凝土混合柱及施工方法A partially prefabricated assembled steel-concrete mixed column and construction method

技术领域technical field

本发明属于建筑技术领域,特别涉及一种部分预制装配型钢混凝土混合柱及施工方法。The invention belongs to the technical field of construction, in particular to a partially prefabricated assembled steel-concrete mixed column and a construction method.

背景技术Background technique

型钢混凝土结构(常译为Steel Reinforced Concrete Structure)又称钢骨混凝土结构或劲性钢筋混凝土结构,简称SRC结构,是指在混凝土中配置有型钢、并配有一定的纵向钢筋和箍筋的结构。与钢结构相比,型钢混凝土结构外部包裹有钢筋混凝土,能显著改善型钢的平面扭转屈曲性能,同时提高了结构的耐久性和耐火性;与钢筋混凝土结构相比,型钢混凝土结构能够有效的减小截面尺寸并提高抗震性能。型钢混凝土结构以其优越的受力性能和相对较低的经济成本受到工程师的青睐。我国型钢混凝土结构发展迅猛,在超高层、大跨结构及重载工业建筑等领域发展应用日趋广泛,如广州国际汽车大厦、上海世界金融大厦、西安信息中心大厦、上海森茂大厦、上海金茂大、厦上海环球金融中心等工程均采用型钢混凝土结构。但型钢混凝土结构施工工序繁多且构造连接复杂,导致型钢混凝土结构推广应用受到极大制约。Steel Reinforced Concrete Structure (often translated as Steel Reinforced Concrete Structure), also known as Steel Reinforced Concrete Structure or Stiff Reinforced Concrete Structure, SRC Structure for Short . Compared with the steel structure, the steel reinforced concrete structure is wrapped with reinforced concrete, which can significantly improve the plane torsional buckling performance of the steel, and at the same time improve the durability and fire resistance of the structure; compared with the reinforced concrete structure, the steel reinforced concrete structure can effectively reduce Small section size and improved seismic performance. Steel-concrete structures are favored by engineers because of their superior mechanical properties and relatively low economic costs. my country's steel-concrete structures are developing rapidly, and they are widely used in super high-rise, long-span structures and heavy-duty industrial buildings, such as Guangzhou International Automobile Building, Shanghai World Financial Building, Xi'an Information Center Building, Shanghai Senmao Building, Shanghai Jinmao University , Xiamen Shanghai World Financial Center and other projects all use steel and concrete structures. However, due to the numerous construction procedures and complex structural connections of the reinforced concrete structure, the popularization and application of the reinforced concrete structure has been greatly restricted.

发明内容SUMMARY OF THE INVENTION

为了克服上述现有技术的缺点,本发明的目的在于提供一种部分预制装配型钢混凝土混合柱及施工方法,采用部分预制装配部分现浇的思想,在工厂预制的型钢混凝土混合柱,可在工地现场安装并浇筑混凝土,通过端板与高强螺栓与上下柱连接,也可通过高强螺栓与外伸钢梁与梁、板进行连接,适合于各种工程情况需求,施工简洁、成本低廉、性能优良。In order to overcome the above-mentioned shortcomings of the prior art, the purpose of the present invention is to provide a partially prefabricated assembled steel-concrete mixed column and a construction method, adopting the idea of partially prefabricated and assembled partially cast-in-place, the prefabricated steel-concrete mixed column in the factory can be used at the construction site The concrete is installed and poured on site, connected with the upper and lower columns through end plates and high-strength bolts, and can also be connected with beams and slabs through high-strength bolts and outrigger steel beams. It is suitable for various engineering needs, with simple construction, low cost and excellent performance. .

为了实现上述目的,本发明采用的技术方案是:In order to achieve the above object, the technical scheme adopted in the present invention is:

一种部分预制装配型钢混凝土混合柱,其特征在于,包括:A partially prefabricated assembled steel-concrete mixed column is characterized in that, comprising:

预制高性能混凝土空心柱1;Prefabricated high performance concrete hollow column 1;

沿柱长方向设置于预制高性能混凝土空心柱1中的纵筋2;longitudinal bars 2 arranged in the prefabricated high-performance concrete hollow column 1 along the length of the column;

沿柱长方向设置于预制高性能混凝土空心柱1中的型钢3;The section steel 3 arranged in the prefabricated high-performance concrete hollow column 1 along the column length direction;

沿柱长方向设置于预制高性能混凝土空心柱1中的型钢3上的钢板4;The steel plate 4 arranged on the section steel 3 in the prefabricated high-performance concrete hollow column 1 along the column length direction;

等间距铺设于预制高性能混凝土空心柱1横截面上的箍筋5,其中纵筋2和型钢3均位于箍筋5的包围之中;The stirrups 5 laid on the cross section of the prefabricated high-performance concrete hollow column 1 at equal intervals, wherein the longitudinal bars 2 and the section steel 3 are both located in the surrounding of the stirrups 5;

填充于预制高性能混凝土空心柱1中的中心空腔的现浇混凝土6;The cast-in-place concrete 6 filled in the central cavity of the prefabricated high-performance concrete hollow column 1;

设置于预制高性能混凝土空心柱1上下两端的端板7;end plates 7 arranged on the upper and lower ends of the prefabricated high-performance concrete hollow column 1;

以及,as well as,

设置于端板7上的用于连接相邻预制高性能混凝土空心柱1的高强螺栓8。The high-strength bolts 8 arranged on the end plate 7 are used to connect the adjacent prefabricated high-performance concrete hollow columns 1 .

所述型钢3为工字钢,或者由两个工字钢呈十字交错构成。The section steel 3 is an I-beam, or is formed by two I-beams in a crisscross pattern.

所述型钢3在柱长方向上,伸出预制高性能混凝土空心柱1的两端。The section steel 3 protrudes from both ends of the prefabricated high-performance concrete hollow column 1 in the column length direction.

所述钢板4通过焊接方式沿柱长方向布置在型钢3上,形成环形蜂窝状空心结构。The steel plate 4 is arranged on the section steel 3 along the length direction of the column by welding to form an annular honeycomb hollow structure.

所述箍筋5为焊接复合箍筋或连续螺旋高强箍筋。The stirrups 5 are welded composite stirrups or continuous spiral high-strength stirrups.

所述现浇普通混凝土6所采用的混凝土为普通混凝土、再生混凝土、轻骨料混凝土、橡胶混凝土、吸声混凝土或保温隔热混凝土。The concrete used in the cast-in-place ordinary concrete 6 is ordinary concrete, recycled concrete, lightweight aggregate concrete, rubber concrete, sound-absorbing concrete or heat-insulating concrete.

所述端板7焊接在伸出的型钢3和钢板4上,通过焊接和高强螺栓8连接。The end plate 7 is welded on the protruding section steel 3 and the steel plate 4, and is connected with high-strength bolts 8 by welding.

本发明还提供了所述部分预制装配型钢混凝土混合柱的施工方法,步骤如下:The present invention also provides a construction method for the partially prefabricated assembled steel-concrete mixed column, the steps are as follows:

1)、在工厂,将钢板4通过焊接方式沿柱长方向布置在型钢3上,形成环形蜂窝状空心结构;将端板7焊接在型钢3与钢板4组成的环形蜂窝状空心结构两端;在钢板4与型钢3形成的环形蜂窝状空心结构外侧支模浇筑高性能混凝土空心柱1,并置入纵筋2和箍筋5,完成预制部分;1), in the factory, the steel plate 4 is arranged on the section steel 3 along the column length direction by welding to form an annular honeycomb hollow structure; the end plate 7 is welded on the two ends of the annular honeycomb hollow structure formed by the section steel 3 and the steel plate 4; The high-performance concrete hollow column 1 is poured on the outer side of the annular honeycomb hollow structure formed by the steel plate 4 and the section steel 3, and the longitudinal reinforcement 2 and the stirrup 5 are inserted to complete the prefabricated part;

2)、在现场,安装带有纵筋2、型钢3、钢板4、箍筋5和端板7的预制高性能混凝土空心柱1;将设置于上部预制高性能混凝土空心柱1下端的端板7和设置于下部预制高性能混凝土空心柱1上端的端板7,通过焊接和高强螺栓8连接;2) On the site, install the prefabricated high-performance concrete hollow column 1 with longitudinal reinforcement 2, section steel 3, steel plate 4, stirrup 5 and end plate 7; the end plate will be set at the lower end of the upper prefabricated high-performance concrete hollow column 1 7 and the end plate 7 arranged on the upper end of the lower prefabricated high-performance concrete hollow column 1, connected by welding and high-strength bolts 8;

3)、在现场,向下部预制高性能混凝土空心柱1中心的蜂窝状空腔中浇筑现浇普通混凝土6,形成型钢混凝土混合柱;3), on the site, pour the cast-in-place ordinary concrete 6 into the honeycomb cavity in the center of the lower prefabricated high-performance concrete hollow column 1 to form a steel-concrete mixed column;

4)、在现场,将端板7通过焊接和高强螺栓8与组合柱或钢柱直接连接;通过外伸钢梁与高强螺栓与钢梁进行连接。4) In the field, the end plate 7 is directly connected to the composite column or steel column through welding and high-strength bolts 8; the steel beam is connected to the steel beam through the overhanging steel beam and the high-strength bolt.

与现有技术相比,本发明的有益效果是:Compared with the prior art, the beneficial effects of the present invention are:

1)施工过程简便。部分预制装配型钢混凝土混合柱各部分均在工厂预制生产完成,且型钢与钢板形成环形蜂窝状空心结构,免去了在浇筑高性能混凝土空心柱过程中的内部支模步骤。在工地,首先将预制的上、下柱通过端板的焊接和高强螺栓连接起来,再浇筑下部高性能混凝土空心柱的内部空心部分,即形成型钢混凝土混合柱。通过将预制部分的端板与节点或钢柱通过开孔钢板焊接和高强螺栓连接,即完成型钢混凝土混合柱施工安装。与传统型钢混凝土柱施工安装相比,现场不用绑扎钢筋、支模、拆模和架设柱下临时支撑。经合理设计,型钢混凝土混合柱的施工安装将与钢柱同样方便和快捷,施工性能将大为提高。1) The construction process is simple. Part of the prefabricated steel-concrete hybrid column is prefabricated in the factory, and the steel and the steel plate form an annular honeycomb hollow structure, eliminating the need for the internal formwork step in the process of pouring the high-performance concrete hollow column. On the construction site, firstly, the prefabricated upper and lower columns are connected by welding of end plates and high-strength bolts, and then the inner hollow part of the lower high-performance concrete hollow column is poured to form a steel-concrete mixed column. By welding the end plate of the prefabricated part and the node or steel column through the perforated steel plate welding and high-strength bolt connection, the construction and installation of the steel-concrete mixed column is completed. Compared with the traditional steel concrete column construction and installation, there is no need to bind steel bars, support formwork, remove formwork and erect temporary support under the column on site. After a reasonable design, the construction and installation of the steel-concrete mixed column will be as convenient and fast as the steel column, and the construction performance will be greatly improved.

2)施工质量优良。在传统型钢混凝土柱施工中,由于型钢混凝土柱施工工序多、施工难度大,常出现型钢混凝土柱腹板中混凝土振捣差、混凝土强度不足和柱中钢筋错位等质量问题,施工质量不易控制。而在部分预制装配型钢混凝土混合柱中,高性能混凝土空心柱为工厂预制,混凝土浇筑振捣方便并且可采用蒸汽养护,混凝土施工质量易于控制,尤其对于采用高性能混凝土时,部分预制装配型钢混凝土混合柱在施工质量控制方面优势更加明显。2) The construction quality is excellent. In the construction of traditional steel reinforced concrete columns, due to the many construction procedures and difficult construction of the steel reinforced concrete columns, there are often quality problems such as poor concrete vibration in the steel reinforced concrete column webs, insufficient concrete strength and dislocation of steel bars in the columns, and the construction quality is not easy to control. In some prefabricated steel-concrete mixed columns, the high-performance concrete hollow columns are factory prefabricated, the concrete is easy to pour and vibrate and can be cured by steam, and the quality of the concrete construction is easy to control, especially when high-performance concrete is used, some prefabricated steel-concrete Hybrid columns have more obvious advantages in construction quality control.

3)承载力与综合功能提升。型钢混凝土混合柱下部受力较大区域,柱中浇筑有普通混凝土,型钢与钢板形成的环形蜂窝状空心结构可以对核心区混凝土产生环向约束力,预制高性能混凝土空心柱可对内部型钢产生环向约束力,内部焊接的钢板参与了柱的承重,同时为型钢提供了侧向约束力,从而大幅度提高了柱子的承载能力;内部型钢与钢板焊接形成环形蜂窝状空心结构,免去了在施工过程中的内部支模步骤,并能有效减轻结构的自重,提高了结构的整体性能和抗震性能;在型钢混凝土混合柱中可以在预制部分采用高性能混凝土,现浇部分采用普通强度混凝土,二者混凝土强度等级可以不同。因此,在实际工程应用中,楼板混凝土选择时可以不受柱中混凝土强度限制,选用不同特性的各种类型混凝土,有效提升结构使用功能需求。例如对于型钢混凝土混合柱的现浇部分混凝土,可以采用再生混凝土来节约资源能源;也可采用轻骨料混凝土减轻自重;可以采用橡胶混凝土或吸声混凝土提高减振隔音效果;可以采用保温隔热混凝土提高保温性能。3) The bearing capacity and comprehensive functions are improved. The lower part of the section steel-concrete mixed column is under relatively large force, and ordinary concrete is poured in the column. The annular honeycomb hollow structure formed by section steel and steel plate can produce circumferential restraint force on the concrete in the core area. Circumferential binding force, the internally welded steel plate participates in the load-bearing of the column, and provides lateral binding force for the section steel, thus greatly improving the bearing capacity of the column; the internal section steel and the steel plate are welded to form a ring-shaped honeycomb hollow structure, which eliminates the need for The internal formwork step in the construction process can effectively reduce the self-weight of the structure and improve the overall performance and seismic performance of the structure; in the steel-concrete mixed column, high-performance concrete can be used in the prefabricated part, and ordinary strength concrete can be used in the cast-in-place part. , the two concrete strength grades can be different. Therefore, in practical engineering applications, the choice of floor concrete can not be limited by the strength of the concrete in the column, and various types of concrete with different characteristics can be selected to effectively improve the functional requirements of the structure. For example, for the cast-in-place concrete of the steel-concrete mixed column, recycled concrete can be used to save resources and energy; lightweight aggregate concrete can also be used to reduce the self-weight; rubber concrete or sound-absorbing concrete can be used to improve the effect of vibration reduction and sound insulation; thermal insulation can be used Concrete improves thermal insulation properties.

总体来讲,部分预制装配型钢混凝土混合柱与传统型钢混凝土柱相比,简化了施工工序和施工难度,能有效解决长期制约传统型钢混凝土柱推广应用的关键难题,并且能充分发挥和有效提升传统型钢混凝土柱在受力性能、耐久性能、耐火性能和经济性能等方面的显著优势,可以广泛应用于各类钢筋混凝土和钢结构建筑中,尤其适用超高层、大跨结构及重载工业建筑。因此,对部分预制装配型钢混凝土混合柱开展深入研究以促进其推广应用极具工程实际意义。Generally speaking, some prefabricated steel-concrete hybrid columns, compared with traditional steel-concrete columns, simplifies the construction process and construction difficulty, can effectively solve the key problems that restrict the popularization and application of traditional steel-concrete columns for a long time, and can give full play to and effectively improve traditional steel-concrete columns. Profiled steel concrete columns have significant advantages in mechanical performance, durability, fire resistance and economic performance, and can be widely used in various reinforced concrete and steel structure buildings, especially for super high-rise, long-span structures and heavy-duty industrial buildings. Therefore, it is of practical engineering significance to carry out in-depth research on some prefabricated steel-concrete hybrid columns to promote their popularization and application.

附图说明Description of drawings

图1是本发明部分预制装配型钢混凝土混合柱的结构示意图。FIG. 1 is a schematic structural diagram of a partially prefabricated steel-concrete mixed column of the present invention.

图2是本发明部分预制装配型钢混凝土混合柱的正立面图。Figure 2 is a front elevational view of a partially prefabricated steel-concrete mixed column of the present invention.

图3是本发明部分预制装配型钢混凝土混合柱A-A剖面示意图Fig. 3 is the cross-sectional schematic diagram of part of the prefabricated steel-concrete mixed column A-A of the present invention

图4是本发明部分预制装配型钢混凝土混合柱B-B剖面示意图。FIG. 4 is a schematic cross-sectional view of part of the prefabricated steel-concrete mixed column B-B of the present invention.

图5是本发明部分预制装配型钢混凝土混合柱C-C剖面示意图。5 is a schematic cross-sectional view of a part of the prefabricated steel-concrete mixed column C-C of the present invention.

图6是本发明部分预制装配型钢混凝土混合柱开孔端板截面示意图。Fig. 6 is a schematic cross-sectional view of the open end plate of a partially prefabricated steel-concrete mixed column of the present invention.

图7是本发明部分预制装配型钢混凝土混合柱与钢梁的连接示意图。FIG. 7 is a schematic diagram of the connection of a part of the prefabricated steel-concrete hybrid column and the steel beam according to the present invention.

具体实施方式Detailed ways

下面结合附图和实施例详细说明本发明的实施方式。The embodiments of the present invention will be described in detail below with reference to the accompanying drawings and examples.

本发明部分预制装配型钢混凝土混合柱,采用部分预制装配部分现浇的思想,由预制部分和现浇部分组成,如图1至图5所示,包括:Part of the prefabricated and assembled steel-concrete mixed column of the present invention adopts the idea of partially prefabricated and assembled part cast-in-place, and consists of a prefabricated part and a cast-in-place part, as shown in Figures 1 to 5, including:

预制高性能混凝土空心柱1;沿柱长方向设置于预制高性能混凝土空心柱1中的纵筋2;沿柱长方向设置于预制高性能混凝土空心柱1中的型钢3;沿柱长方向设置于预制高性能混凝土空心柱1中的型钢3上的钢板4;等间距铺设于预制高性能混凝土空心柱1横截面上的箍筋5,其中纵筋2和型钢3均位于箍筋5的包围之中;填充于预制高性能混凝土空心柱1中的中心空腔的现浇混凝土6;设置于预制高性能混凝土空心柱1两端的端板7;以及,设置于端板7上的高强螺栓8。其中,预制高性能混凝土空心柱1、纵筋2、型钢3、钢板4、箍筋5和端板7组成预制部分,而现浇部分主要是现浇混凝土6。Prefabricated high-performance concrete hollow column 1; longitudinal bars 2 arranged in the prefabricated high-performance concrete hollow column 1 along the column length direction; shaped steel 3 arranged in the prefabricated high-performance concrete hollow column 1 along the column length direction; arranged along the column length direction The steel plate 4 on the profiled steel 3 in the prefabricated high-performance concrete hollow column 1; the stirrups 5 laid on the cross-section of the prefabricated high-performance concrete hollow column 1 at equal intervals, wherein the longitudinal reinforcement 2 and the profiled steel 3 are located in the surrounding of the stirrup 5 Among them; the cast-in-place concrete 6 filled in the central cavity of the prefabricated high-performance concrete hollow column 1; the end plates 7 arranged at both ends of the prefabricated high-performance concrete hollow column 1; . Among them, prefabricated high-performance concrete hollow column 1, longitudinal reinforcement 2, section steel 3, steel plate 4, stirrup 5 and end plate 7 constitute the prefabricated part, and the cast-in-place part is mainly cast-in-place concrete 6.

其中,型钢3由两个工字钢呈十字交错构成,型钢3在柱长方向上,伸出预制高性能混凝土空心柱1的两端,钢板4通过焊接方式沿柱长方向布置在型钢3上,形成环形蜂窝状空心结构。箍筋5为焊接复合箍筋或连续螺旋高强箍筋。现浇普通混凝土6所采用的混凝土根据不同的需求可以为普通混凝土、再生混凝土、轻骨料混凝土、橡胶混凝土、吸声混凝土或保温隔热混凝土。端板7为开孔端板,焊接在伸出的型钢3和钢板4上,沿柱长方向设置于上部预制高性能混凝土空心柱1下端的端板7和设置于下部预制高性能混凝土空心柱1上端的端板7,通过焊接和高强螺栓8连接。Among them, the section steel 3 is composed of two I-beams in a crisscross pattern. The section steel 3 extends from both ends of the prefabricated high-performance concrete hollow column 1 in the column length direction. The steel plate 4 is arranged on the section steel 3 along the column length direction by welding. , forming an annular honeycomb hollow structure. The stirrups 5 are welded composite stirrups or continuous spiral high-strength stirrups. The concrete used for the cast-in-place ordinary concrete 6 can be ordinary concrete, recycled concrete, lightweight aggregate concrete, rubber concrete, sound-absorbing concrete or thermal insulation concrete according to different requirements. The end plate 7 is a perforated end plate, which is welded on the protruding section steel 3 and the steel plate 4, and is arranged along the length direction of the column. 1. The end plate 7 at the upper end is connected with high-strength bolts 8 by welding.

本发明预制高性能混凝土空心柱1、纵筋2、型钢3、钢板4、箍筋5和端板7在工厂一次性预制成型,得到预制装配型钢混凝土空心柱。将成型的预制装配型钢混凝土空心柱运送至施工现场,通过焊接和高强螺栓将上下两部分端板连接起来,浇筑内部混凝土,形成型钢混凝土混合柱;再与柱、梁等拼接。本发明采用部分预制装配的思想,可获得更加的整体性能。The prefabricated high-performance concrete hollow column 1, longitudinal reinforcement 2, section steel 3, steel plate 4, stirrup 5 and end plate 7 of the present invention are prefabricated at one time in a factory to obtain a prefabricated steel concrete hollow column. The prefabricated prefabricated steel-concrete hollow column is transported to the construction site, the upper and lower end plates are connected by welding and high-strength bolts, and the internal concrete is poured to form a steel-concrete mixed column; then spliced with columns, beams, etc. The present invention adopts the idea of partial prefabrication to obtain more overall performance.

本发明具体施工方法为:The concrete construction method of the present invention is:

1)、在工厂,将钢板4通过焊接方式沿柱长方向布置在型钢3上,形成环形蜂窝状空心结构;将端板7焊接在型钢3与钢板4组成的环形蜂窝状空心结构两端;在钢板4与型钢3形成的环形蜂窝状空心结构外侧支模浇筑高性能混凝土空心柱1,并置入纵筋2和箍筋5,完成预制部分;1), in the factory, the steel plate 4 is arranged on the section steel 3 along the column length direction by welding to form an annular honeycomb hollow structure; the end plate 7 is welded on the two ends of the annular honeycomb hollow structure formed by the section steel 3 and the steel plate 4; The high-performance concrete hollow column 1 is poured on the outer side of the annular honeycomb hollow structure formed by the steel plate 4 and the section steel 3, and the longitudinal reinforcement 2 and the stirrup 5 are inserted to complete the prefabricated part;

2)、在现场,安装带有纵筋2、型钢3、钢板4、箍筋5和端板7的预制高性能混凝土空心柱1;将设置于上部预制高性能混凝土空心柱1下端的端板7和设置于下部预制高性能混凝土空心柱1上端的端板7,通过焊接和高强螺栓8连接;2) On the site, install the prefabricated high-performance concrete hollow column 1 with longitudinal reinforcement 2, section steel 3, steel plate 4, stirrup 5 and end plate 7; the end plate will be set at the lower end of the upper prefabricated high-performance concrete hollow column 1 7 and the end plate 7 arranged on the upper end of the lower prefabricated high-performance concrete hollow column 1, connected by welding and high-strength bolts 8;

3)、在现场,向下部预制高性能混凝土空心柱(1)中心的蜂窝状空腔中浇筑现浇普通混凝土6,形成型钢混凝土混合柱;3) On the site, pour the cast-in-place ordinary concrete 6 into the honeycomb cavity in the center of the lower prefabricated high-performance concrete hollow column (1) to form a steel-concrete mixed column;

4)、在现场,将端板7通过焊接和高强螺栓8与组合柱或钢柱直接连接;通过外伸钢梁与高强螺栓与钢梁进行连接。4) In the field, the end plate 7 is directly connected to the composite column or steel column through welding and high-strength bolts 8; the steel beam is connected to the steel beam through the overhanging steel beam and the high-strength bolt.

综上,本发明部分预制装配型钢混凝土混合柱采用高性能混凝土,有较好的耐久性和延性,同时预制高性能混凝土空心柱可对内部型钢产生环向约束力,内部焊接的钢板参与受力,同时为型钢和内部浇筑混凝土提供了侧向约束力,从而大幅度提高其承载能力,型钢和钢板对预制高性能混凝土空心柱部分提供一定的防止侧向破坏作用。To sum up, some prefabricated steel-concrete mixed columns of the present invention use high-performance concrete, which has good durability and ductility. At the same time, the prefabricated high-performance concrete hollow columns can generate circumferential constraints on the internal steel, and the internally welded steel plates participate in the stress. At the same time, it provides a lateral restraint force for the profiled steel and internal pouring concrete, thereby greatly improving its bearing capacity.

本发明内部型钢与钢板焊接形成环形蜂窝状空心结构,免去了在施工过程中的内部支模步骤,并能有效减轻结构的自重,提高了结构的整体性能和抗震性能,并改善构件在运输与吊装过程中变形能力,降低了吊装难度,实现预制型钢混凝土构件受力性能和使用性能全面增强提高,形成一种新型高效的部分预制装配型钢混凝土混合柱技术。本发明所提出的部分预制装配型钢混凝土混合柱技术具有施工方便、适用性广、结构自重轻、承载能力高、抗震性能好等诸多显著性能优势,可以广泛应用建筑、厂房、桥柱等各种钢筋混凝土工程结构,具有广泛应用前景,具有重要的工程实践意义和社会经济效益。The inner section steel and the steel plate of the invention are welded to form an annular honeycomb hollow structure, which eliminates the internal formwork support step in the construction process, can effectively reduce the self-weight of the structure, improve the overall performance and seismic performance of the structure, and improve the transportation of components. With the deformation ability during the hoisting process, the difficulty of hoisting is reduced, and the mechanical performance and service performance of prefabricated steel-concrete components are comprehensively enhanced and improved, forming a new type of high-efficiency partially prefabricated steel-concrete mixed column technology. The partially prefabricated steel-concrete hybrid column technology proposed by the present invention has many significant performance advantages, such as convenient construction, wide applicability, light structure weight, high bearing capacity, good seismic performance, etc., and can be widely used in buildings, workshops, bridge columns and other Reinforced concrete engineering structures have broad application prospects, important engineering practical significance and social and economic benefits.

Claims (7)

1. The utility model provides a prefabricated assembly shaped steel concrete hybrid column in part, its characterized in that includes:
prefabricating a high-performance concrete hollow column (1);
longitudinal bars (2) arranged in the prefabricated high-performance concrete hollow column (1) along the column length direction;
the section steel (3) is arranged in the prefabricated high-performance concrete hollow column (1) along the column length direction;
a steel plate (4) arranged on the section steel (3) in the prefabricated high-performance concrete hollow column (1) along the column length direction;
the stirrups (5) are laid on the cross section of the prefabricated high-performance concrete hollow column (1) at equal intervals, and the longitudinal reinforcements (2) and the section steel (3) are both surrounded by the stirrups (5);
the cast-in-place concrete (6) is filled in a central cavity in the prefabricated high-performance concrete hollow column (1);
end plates (7) arranged at the upper end and the lower end of the prefabricated high-performance concrete hollow column (1);
and the number of the first and second groups,
the high-strength bolt (8) is arranged on the end plate (7) and used for connecting the adjacent prefabricated high-performance concrete hollow columns (1);
the steel plates (4) are arranged on the section steel (3) along the column length direction in a welding mode to form an annular honeycomb hollow structure;
the end plates (7) are welded on the extended section steel (3) and the steel plates (4) and are connected with the high-strength bolts (8) through welding.
2. The partially prefabricated assembled steel reinforced concrete hybrid column according to claim 1, wherein said section steel (3) is an i-steel.
3. The partially prefabricated assembled steel reinforced concrete mixing column according to claim 1, wherein said section steel (3) is composed of two i-beams crisscrossed.
4. The partially prefabricated assembled steel reinforced concrete hybrid column according to claim 1, 2 or 3, wherein the section steel (3) is protruded from both ends of the prefabricated high performance concrete hollow column (1) in the column length direction.
5. The partially prefabricated assembly type steel concrete mixing column according to claim 1, wherein the stirrup (5) is a welded composite stirrup or a continuous spiral high-strength stirrup.
6. The partially prefabricated assembly type steel concrete mixing column according to claim 1, wherein the concrete adopted by the cast-in-place concrete (6) is ordinary concrete, recycled concrete, lightweight aggregate concrete, rubber concrete, sound absorption concrete or thermal insulation concrete.
7. The construction method of the partially prefabricated assembled steel reinforced concrete mixing column according to claim 1, characterized by comprising the following steps:
1) in a factory, arranging steel plates (4) on the section steel (3) along the column length direction in a welding mode to form an annular honeycomb hollow structure; welding end plates (7) at two ends of an annular honeycomb hollow structure formed by the section steel (3) and the steel plates (4); pouring a high-performance concrete hollow column (1) on the outer side of an annular honeycomb hollow structure formed by the steel plate (4) and the section steel (3) through a formwork, and arranging longitudinal bars (2) and stirrups (5) to finish a prefabricated part;
2) the method comprises the following steps of installing a prefabricated high-performance concrete hollow column (1) with longitudinal ribs (2), section steel (3), steel plates (4), stirrups (5) and end plates (7) on site; connecting an end plate (7) arranged at the lower end of the upper prefabricated high-performance concrete hollow column (1) with an end plate (7) arranged at the upper end of the lower prefabricated high-performance concrete hollow column (1) through welding and a high-strength bolt (8);
3) pouring cast-in-place concrete (6) into a honeycomb cavity in the center of a prefabricated high-performance concrete hollow column (1) at the lower part on site to form a steel concrete mixed column;
4) in the field, the end plate (7) is directly connected with the combined column or the steel column through welding and a high-strength bolt (8); the steel beam is connected with the high-strength bolt through the overhanging steel beam.
CN201810630820.7A 2018-06-19 2018-06-19 A partially prefabricated assembled steel-concrete mixed column and construction method Active CN108755964B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810630820.7A CN108755964B (en) 2018-06-19 2018-06-19 A partially prefabricated assembled steel-concrete mixed column and construction method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810630820.7A CN108755964B (en) 2018-06-19 2018-06-19 A partially prefabricated assembled steel-concrete mixed column and construction method

Publications (2)

Publication Number Publication Date
CN108755964A CN108755964A (en) 2018-11-06
CN108755964B true CN108755964B (en) 2020-12-22

Family

ID=63978811

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810630820.7A Active CN108755964B (en) 2018-06-19 2018-06-19 A partially prefabricated assembled steel-concrete mixed column and construction method

Country Status (1)

Country Link
CN (1) CN108755964B (en)

Families Citing this family (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN109208822B (en) * 2018-11-10 2024-01-05 福建工程学院 Assembled multi-cavity concrete filled steel tube column and construction method
CN110512799B (en) * 2019-08-28 2021-10-01 北京工业大学 A laminated cored column for underground frame structure and its construction method
CN111173195A (en) * 2020-02-11 2020-05-19 中冶建筑研究总院(深圳)有限公司 Partially-coated steel-concrete combined member and combined structure building thereof
CN111502127A (en) * 2020-04-27 2020-08-07 三峡大学 Upright column module for prefabricating embedded honeycomb cell structure
CN112681612A (en) * 2020-12-28 2021-04-20 西安建筑科技大学 High-strength steel concrete cross-shaped column partially prefabricated and assembled
CN112681611A (en) * 2020-12-28 2021-04-20 西安建筑科技大学 Partially-prefabricated double-layer steel reinforced concrete L-shaped column
CN112663870A (en) * 2020-12-28 2021-04-16 西安建筑科技大学 Partially prefabricated and assembled T-shaped steel concrete column with hidden column
CN113216516A (en) * 2021-03-05 2021-08-06 西安建筑科技大学 Superposed column with ultra-short stud and double-layer high-strength spiral stirrup and construction method
CN114718186A (en) * 2022-03-10 2022-07-08 东南大学 Partially using ECC section steel concrete column-steel beam assembly structure and assembly method
CN114809445B (en) * 2022-04-28 2024-03-08 广东睿住住工科技有限公司 Modular steel column installation method and modular steel column components

Family Cites Families (13)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
JPS51113321A (en) * 1975-03-31 1976-10-06 Nippon Kokan Kk Octagonal steel pipe pillar that concrete is filled
JPH0673785A (en) * 1992-08-25 1994-03-15 Kawasaki Steel Corp Steel-framed reinforced concrete column and construction method of this column and steel beam
JP2005220699A (en) * 2004-02-09 2005-08-18 Shimizu Corp Reinforcing structure of existing pillar and method of reinforcing the same
JP4649283B2 (en) * 2005-07-21 2011-03-09 Jfeエンジニアリング株式会社 Columnar structure, pier or foundation pile using shape steel, and manufacturing method thereof
JP2008138366A (en) * 2006-11-30 2008-06-19 Daiwa House Ind Co Ltd Structure and method for joining reinforced concrete column/steel-frame beam
CN201593238U (en) * 2009-10-16 2010-09-29 北京建筑工程学院 Composite joint of steel concrete column-steel beam horizontal shear plate
CN103437425A (en) * 2013-08-27 2013-12-11 陕西建科兴业钢结构有限公司 Connecting joint of prefabricated hollow steel-reinforced concrete column and steel beam and construction method
CN103924741B (en) * 2014-04-10 2016-08-17 北京工业大学 Band cross constraint batten plate box-shaped reinforcing bar confined concrete models and the practice
KR20160070023A (en) * 2014-12-08 2016-06-17 (주)영구조엔지니어링 Combination structure for centrifugal casting high strength pc concrete complex columns using steel pipe
CN104652705B (en) * 2014-12-22 2017-03-22 西安建筑科技大学 Prefabricated and assembly type steel reinforced concrete column with high-performance concrete frame and construction method
CN107859169A (en) * 2016-09-22 2018-03-30 重庆大学 A kind of spigot-and-socket bean column node and construction method
CN107299683B (en) * 2017-06-02 2019-03-29 长安大学 Compound concrete-filled tubular column assembled docks node and connection method
CN208501895U (en) * 2018-06-19 2019-02-15 西安建筑科技大学 A kind of partial precast assembly steel reinforced concrete mixed column

Also Published As

Publication number Publication date
CN108755964A (en) 2018-11-06

Similar Documents

Publication Publication Date Title
CN108755964B (en) A partially prefabricated assembled steel-concrete mixed column and construction method
CN103074941B (en) Assembling regeneration concrete node and the practice of steel bar girder beam are contained in a kind of end
CN104453093B (en) Prefabricated steel reinforced concrete beam with transversal high-strength concrete clapboard, and construction method
CN104594561A (en) Prefabricated reinforced concrete column with high-performance concrete frame and construction method
CN104652705B (en) Prefabricated and assembly type steel reinforced concrete column with high-performance concrete frame and construction method
CN108755963B (en) A partially prefabricated steel concrete giant frame structure and its construction method
CN102747781A (en) Fiber reinforce plastic (FRP) combination structure frame where integral type node is adopted and construction method thereof
CN108756061A (en) A kind of partial precast assembly prestress steel reinforced concrete hybrid beam and construction method
CN104594556A (en) Prefabricated type steel reinforced concrete beam with transverse steel partition boards and construction method
CN212773147U (en) A kind of prefabricated assembly part outsourcing honeycomb steel-concrete composite beam
CN106013432A (en) Joint connecting structure in high-ductility assembled integrated frame and construction method
CN108755962A (en) A kind of partial precast assembly hollow profile steel concrete hollow column and construction method
CN108457422A (en) Precast prestressed beam, assembled composite frame structure and its installation method
CN113062476A (en) Heavy-load large-span combined beam-column structure and construction method
CN207919746U (en) A kind of prefabricated node of high-strength high concrete assembled frame of ductility
CN112267575A (en) Prefabricated steel-encased concrete column and steel beam connecting joint and construction process
CN102587576B (en) Combined precast column with nodes
CN204357001U (en) A kind of prefabrication and assembly construction profile steel concrete column skeleton
CN204357000U (en) A kind of precast and assembled reinforced concrete spinous process of the seventh cervical vertebra frame
CN109024915A (en) A kind of PVC-FRP pipe binding type steel concrete column-reinforced beam L-type node
CN208501895U (en) A kind of partial precast assembly steel reinforced concrete mixed column
CN102493329A (en) Concrete-filled tube web member combined box girder
CN111021553B (en) A precast concrete column and steel beam connection node with internal partition
CN218116110U (en) Prefabricated double-layer steel pipe concrete composite pier structure
CN115928882A (en) A prefabricated composite structure hybrid connection node suitable for coastal areas

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant
OL01 Intention to license declared
OL01 Intention to license declared