CN108755693A - Grouting device and broken charges grouting method for multiple solution cavities - Google Patents

Grouting device and broken charges grouting method for multiple solution cavities Download PDF

Info

Publication number
CN108755693A
CN108755693A CN201810608939.4A CN201810608939A CN108755693A CN 108755693 A CN108755693 A CN 108755693A CN 201810608939 A CN201810608939 A CN 201810608939A CN 108755693 A CN108755693 A CN 108755693A
Authority
CN
China
Prior art keywords
grouting
core pipe
slip casting
slurry
check
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810608939.4A
Other languages
Chinese (zh)
Other versions
CN108755693B (en
Inventor
高盛翔
史继彪
何宝林
李帅
陈益民
朱元武
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Cumt Geotechnical Engineering & New Technology Development Co ltd
Original Assignee
Cumt Geotechnical Engineering & New Technology Development Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Cumt Geotechnical Engineering & New Technology Development Co ltd filed Critical Cumt Geotechnical Engineering & New Technology Development Co ltd
Priority to CN201810608939.4A priority Critical patent/CN108755693B/en
Publication of CN108755693A publication Critical patent/CN108755693A/en
Application granted granted Critical
Publication of CN108755693B publication Critical patent/CN108755693B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D15/00Handling building or like materials for hydraulic engineering or foundations
    • E02D15/02Handling of bulk concrete specially for foundation or hydraulic engineering purposes
    • E02D15/04Placing concrete in mould-pipes, pile tubes, bore-holes or narrow shafts
    • EFIXED CONSTRUCTIONS
    • E02HYDRAULIC ENGINEERING; FOUNDATIONS; SOIL SHIFTING
    • E02DFOUNDATIONS; EXCAVATIONS; EMBANKMENTS; UNDERGROUND OR UNDERWATER STRUCTURES
    • E02D3/00Improving or preserving soil or rock, e.g. preserving permafrost soil
    • E02D3/12Consolidating by placing solidifying or pore-filling substances in the soil
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02EREDUCTION OF GREENHOUSE GAS [GHG] EMISSIONS, RELATED TO ENERGY GENERATION, TRANSMISSION OR DISTRIBUTION
    • Y02E10/00Energy generation through renewable energy sources
    • Y02E10/20Hydro energy

Landscapes

  • Engineering & Computer Science (AREA)
  • General Engineering & Computer Science (AREA)
  • Structural Engineering (AREA)
  • Life Sciences & Earth Sciences (AREA)
  • General Life Sciences & Earth Sciences (AREA)
  • Mining & Mineral Resources (AREA)
  • Paleontology (AREA)
  • Civil Engineering (AREA)
  • Agronomy & Crop Science (AREA)
  • Environmental & Geological Engineering (AREA)
  • Soil Sciences (AREA)
  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

A kind of broken charges grouting method this application discloses grouting device and for multiple solution cavities, this method include:S1, it is drilled using drilling machine, and is connected to multiple solution cavities by once drilling;S2, the end that grouting device is mounted on to slip casting drilling rod, specified solution cavity is fed through by slurry casting machine;S3, slip casting drilling rod are passed through slurries, and hoisting grouting pressure makes first check-valve open, and borehole sidewall is close in the second spring-backed quill expansion of rear portion grout stopping device;S4, continue to improve grouting pressure second check-valve is caused to open, slurries enter slurry casting machine and front grout stopping device, and borehole sidewall is close in the first spring-backed quill expansion of front grout stopping device;S5, continue improve grouting pressure cause the 4th check-valves of slurry casting machine to open, slurries are injected into solution cavity;S5, slip casting drilling rod is taken out.Construction technique is adjusted according to the size of solution cavity, filling operation during slip casting of the present invention, the processing intent layer position that can be shot the arrow at the target.

Description

Grouting device and broken charges grouting method for multiple solution cavities
Technical field
A kind of broken charges grouting method this application involves grouting device and for multiple solution cavities, belongs to Karst grouting and fills It fills out, tunnel Rock And Soil is reinforced, foundation stabilization field.
Background technology
Karst is also known as karst, refers to the limestone, dolomite and Sulfates of soluble rock stratum such as carbonate Gypsum etc. is generated groove, crack and cavity by the chemically and physically effect of water, and since empty top plate slump makes earth's surface generate The general name of the erosions such as cratering, depression and depositional landforms morphological feature and geologic process.
The geological conditions of karst area is generally all complex, and prospecting difficulty is big, and the influence and harm generated is generally also It is larger.In the city of karsts developing area, special geological conditions causes solution crack, solution cavity to be developed by force, easily causes Seepage liquidification, underground The latent erosion of water and vacuum action, so as to cause karst ground subsidence geological disaster.It has sudden, mass-sending property and strong destruction The problem of property, karst collapse problem is urgent need to resolve in urban construction, especially when there are subway, buried pipes in urban construction When the underground engineering constructions such as corridor, karst is even more that can not be ignored to the influence that the existing construction of underground engineering construction and its periphery is built 's.
Karst area carry out construction project when, on how to rationally, scientifically handle Cave, prevent underground and ground Face collapses the emphasis of always domestic and international experts and scholars' research.China karst area is widely distributed, in recent years with me State increases infrastructure in the engineerings such as railway, highway, building, water conservancy, frequently encounters complex karst stratum, this gives engineering construction It is to solve the problems, such as this new technology to bring a series of problems, Karst grouting.
In general, Karst grouting is mostly to use surface vertical borehole, the slurries formed using inert material are made in certain pressure With in lower injection Karst Fissures, solution cavity and in soft modeling clay body opening gap, to reach filling karst cavity, control ground integrally sinks Drop, the effect for reducing deformation.This mode is mostly to be directed to during the basement process of early construction, and built for what is be completed It constructs when there is karst ground subsidence, since construction space is limited, can not just be solved by the way of surface vertical borehole.
Existing karst cavity injecting treatment is mostly to rely on vertical exploratory hole to carry out, and vertical drilling is for monomer construction of structures Treatment effect it is preferable, construction cost is relatively low, such as the solution cavity filling under pile foundation, isolated footing, but is directed to subway, underground The line styles construction such as piping lane, railway, highway build under basement process when, since the discontinuity of solution cavity, dispersibility can be such that ground bores Hole treatment effect is had a greatly reduced quality.Meanwhile when ground construction complicated condition, many places do not have conventional drilling equipment, and (vertical hole is drilled Equipment) execution conditions when, the construction feasibility of surface drilling slip casting can substantially reduce, currently, the country there is no effective processing hand Section completes the task that the solution cavity encountered in the line styles construction projects such as subway, piping lane carries out filling and injecting slurry processing.
Invention content
A kind of broken charges grouting method the purpose of the present invention is to provide grouting device and for multiple solution cavities, with gram Take deficiency in the prior art.
To achieve the above object, the present invention provides the following technical solutions:
The embodiment of the present application discloses a kind of grouting device, including the front grout stopping device, slurry casting machine and the rear portion that are sequentially communicated are stopped Device is starched,
Wherein,
The front grout stopping device includes:
First core pipe has the slurry channels axially communicated;
First spring-backed quill is sheathed on the outside of the first core pipe, and is formed with dielectric cavity between the outer wall of the first core pipe Body, the first spring-backed quill maximum outside diameter are variable;
Plug is plugged in the one end open of the first core pipe, third check-valves is provided in the first core pipe, the third check-valves When pressure is greater than or equal to setting pressure in slurry channels medium cavity is connected to slurry channels,
The rear portion grout stopping device includes:
Second core pipe has the slurry channels axially communicated;
Second spring-backed quill is sheathed on the outside of the second core pipe, and is formed with dielectric cavity between the outer wall of the second core pipe Body, the second spring-backed quill maximum outside diameter is variable, is provided with first check-valve in second core pipe, the first check-valve is in slurries Channel inner pressure, which is greater than or equal under the first setting pressure, makes medium cavity be connected to slurry channels, the slurry of second core pipe Liquid exit is provided with second check-valve, and second check-valve pressure in slurry channels, which is more than or equal under the second setting pressure, beats The serum outlet of the second core pipe is opened, the second setting pressure is more than the first setting pressure.
Preferably, in above-mentioned grouting device, the slurry casting machine includes the tube body axially communicated, is offered on tube body more A injected hole, is correspondingly arranged that there are one the 4th check-valves on each injected hole respectively.
Preferably, it in above-mentioned grouting device, is rotated using engagement thread between the slurry casting machine and front grout stopping device Connection.
Preferably, it in above-mentioned grouting device, is rotated using engagement thread between the slurry casting machine and rear portion grout stopping device Connection.
Preferably, in above-mentioned grouting device, it is provided with accelerator in the dielectric cavity body of the front grout stopping device,
It is provided with accelerator in the dielectric cavity body of the rear portion grout stopping device.
Preferably, in above-mentioned grouting device, first core pipe is provided with respect to the other end of plug with screw thread The quick coupling of contact surface, the quick coupling are set in the outside of the first core pipe;
The both ends of second core pipe are respectively arranged with the quick coupling with thread surface, which is set in The outside of two core pipes.
Correspondingly, disclosed herein as well is a kind of broken charges grouting methods for multiple solution cavities, including:
S1, it is drilled using drilling machine, and is connected to multiple solution cavities by once drilling;
S2, the end that any grouting device is mounted on to slip casting drilling rod, specified solution cavity is fed through by slurry casting machine;
S3, slip casting drilling rod are passed through slurries, and hoisting grouting pressure makes first check-valve open, the second bullet of rear portion grout stopping device Property casing expandable is close to borehole sidewall;
S4, continue improve grouting pressure cause second check-valve to open, slurries enter slurry casting machine and front grout stopping device, front Borehole sidewall is close in the first spring-backed quill expansion of grout stopping device;
S5, continue improve grouting pressure cause the 4th check-valves of slurry casting machine to open, slurries are injected into solution cavity;
S5, slip casting drilling rod is taken out.
Preferably, in the above-mentioned broken charges grouting method for multiple solution cavities, the slip casting drilling rod and slip casting are bored It is rotatablely connected between bar,
After waiting for slip casting, by rotating slip casting drilling rod, slip casting drilling rod is taken out, grouting device entirely stays in drilling.
Preferably, in the above-mentioned broken charges grouting method for multiple solution cavities, the drilling machine is horizontal directional drill Machine.
Preferably, in the above-mentioned broken charges grouting method for multiple solution cavities, the multiple solution cavity is in level side To series connection.
Compared with the prior art, the advantages of the present invention are as follows:
(1), use the orientation slip casting of high-precision ultra-long horizontal for undergrounds such as rail traffic, piping lanes under the existing building in ground Construction project provides new solution cavity mortar depositing construction means and (is not required to remove existing construction of structures, not caused to having construction of structures It influences, influence traffic);
(2), it constructs by planned course in level bores drilling process, correction is measured to track in real time, is reached Reduction level bores trajectory error to meet the purpose that the high-precision in subway, piping lane construction is detected, solve conventional vertical drilling because Inquisition topic is leaked caused by pitch of holes.It is directed to Karst grouting, caused by conventional vertical drilling pitch of holes can be reduced to the greatest extent Leakage note problem (carries out underground line-shape construction completely to detect slip casting, the point type than vertical hole detects range of grouting bigger, administers Effect is more preferable).
(3), by the control during high-precision horizontal trajectory design and construction, record rate of penetration, slurry consumption, Whipstocking intensity etc. carries out on the basis of detecting the position of the horizontal all karst soil caves for boring passed through range with brill with parameter is bored Processing, reduce underground engineering construction in risk (find out linear underground engineering it is all along bad geological phenomenon, be carried out at the same time Pretreatment reduces the risk in work progress, is that the dotted drilling in ground is not achieved).
(4), it due to the position grouping of horizontal drilling and solution cavity, is affected by gravity, slurries are easy outflow, nothing before not solidifying Method is reinforced, and this grouting device and construction method is taken slurries can to leak during effective solution lateral aperture slip casting Problem.
(5), horizontal drilling slip casting, construction site are fixed, and material in conventional construction mode, equipment conveying transition are reduced Cost improves work efficiency.
(6), construction technique is adjusted according to the size of solution cavity, filling operation during slip casting, the place that can be shot the arrow at the target Manage purpose of horizon.
(7), one-step pore-creating, the mode of once grouting can be taken to fill the solution cavity around horizontal grouting hole, improved Construction efficiency.
(8), the grouting device formed using disposable front grout stopping device, slurry casting machine, rear portion grout stopping device is without waiting for slurry Liquid solidifies, and improves construction efficiency, while being also effectively prevented the outflow for not solidifying slurries in the solution cavity of injected hole top The problem of caused solution-cavity filling rate difference.
Description of the drawings
In order to illustrate the technical solutions in the embodiments of the present application or in the prior art more clearly, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments described in application, for those of ordinary skill in the art, without creative efforts, Other drawings may also be obtained based on these drawings.
Fig. 1 show the structural schematic diagram of grouting device in the specific embodiment of the invention;
Fig. 2 show the structural schematic diagram of specific embodiment of the invention middle front part grout stopping device;
Fig. 3 show the structural schematic diagram of specific embodiment of the invention middle and back grout stopping device;
Fig. 4 show the side view of slurry casting machine in the specific embodiment of the invention;
Fig. 5 show the sectional view of slurry casting machine in the specific embodiment of the invention;
Fig. 6 show horizontal orientation Grouting engineering sectional view in the first Application Example of the invention;
Fig. 7 show horizontal brill slip casting in the first Application Example of the invention and starts preceding slurry casting machine state;
Fig. 8 show horizontal brill slip casting in the first Application Example of the invention and starts post grouting device state;
Fig. 9 show horizontal orientation Grouting engineering sectional view in the second Application Example of the invention;
Figure 10 show horizontal brill slip casting in the second Application Example of the invention and starts preceding slurry casting machine state;
Figure 11 show horizontal brill slip casting in the second Application Example of the invention and starts post grouting device state.
Specific implementation mode
Under conditions of not having conventional vertical probing progress solution cavity slip casting for solution ground, technology used by the present embodiment Scheme is a kind of shallow-layer horizontal directional drill Construction technology of Pouring cement mortar.It is set including construction area selection, horizontal drill type selecting, drilling track Several working procedures such as meter, drilling data record, unfavorable geologic body (solution cavity) detection and the solution cavity slip casting of horizontal drilling region.
Horizontal orientation exploration engineering is based on Horizontal Directional Drilling and Geophysical Logging.Horizontal directional drilling skill Art is to pierce stratum at pilot hole, then using the drilling device of installation and earth's surface with the angle of penetration smaller relative to ground By expanding to the required size of pilot hole and it is laid with a technology of pipeline, there is tracking and guide function in construction.
Horizontal orientation pore-forming selects suitable horizontal directional drilling machine according to geologic information, pull-back force size, feed stroke and Drilling rod model is the leading indicator of drilling machine type selecting.
After selected drilling machine model, according to floor space, traffic conditions, water and electricity supply situation, deslagging requires and noise requirements The reasonable place of index choosing.
According to the spatial relation in place and solution cavity slip casting section, no more than screw rod drill bit maximum deflecting ability the case where Lower design drilling track coordinates the preliminary analysis of geologic information to determine drilling after investigating and analysing periphery targeting signal interference source Method and drilling parameter, including penetrating angle, rate of penetration, slurry consumption, whipstocking intensity.
It can be sentenced according to parameters such as the parameters of drilling process, such as rate of penetration, drilling pressure in level bores drilling process The position of disconnected solution cavity.Simultaneously using Geophysical Logging, such as electricity, magnetic, sound, heat, core physical principle manufacture various Logger is sent to shaft bottom by logging cable, and with above carrying for cable, surface acquisition system is by continuous record with change in depth Various parameters, by characterizing the curvilinear motion of these parameters, to identify the horizontal preservation position for boring solution cavity on bore path.
Technical scheme of the present invention is clearly and completely described below in conjunction with attached drawing, it is clear that described implementation Example is a part of the embodiment of the present invention, instead of all the embodiments.Based on the embodiments of the present invention, ordinary skill The every other embodiment that personnel are obtained without making creative work, shall fall within the protection scope of the present invention.
In the description of the present invention, it should be noted that term "center", "upper", "lower", "left", "right", "vertical", The orientation or positional relationship of the instructions such as "horizontal", "inner", "outside" be based on the orientation or positional relationship shown in the drawings, merely to Convenient for the description present invention and simplify description, do not indicate or imply the indicated device or element must have a particular orientation, With specific azimuth configuration and operation, therefore it is not considered as limiting the invention.In addition, term " first ", " second ", " third " is used for description purposes only, and is not understood to indicate or imply relative importance.
In the description of the present invention, it should be noted that unless otherwise clearly defined and limited, term " installation ", " phase Even ", " connection " shall be understood in a broad sense, for example, it may be being fixedly connected, may be a detachable connection, or be integrally connected;It can Can also be electrical connection to be mechanical connection;It can be directly connected, can also indirectly connected through an intermediary, Ke Yishi Connection inside two elements.For the ordinary skill in the art, above-mentioned term can be understood at this with concrete condition Concrete meaning in invention.
In conjunction with described in Fig. 1, in the embodiment of the application, a kind of grouting device is provided, including the front being sequentially communicated is stopped Starch device 10, slurry casting machine 20 and rear portion grout stopping device 30.
In the technical solution, front grout stopping device and rear portion grout stopping device carry out to treat the drilling at slip casting solution cavity both ends respectively It blocks, slurry casting machine treats the progress slip casting of slip casting solution cavity to realize.
In conjunction with shown in Fig. 2, front grout stopping device 10 includes the first core pipe 101, the first spring-backed quill 102 and plug 103.
There are first core pipe 101 slurry channels axially communicated, the first spring-backed quill 102 to be sheathed on the first core pipe 101 Outside, and medium cavity is formed between the outer wall of the first core pipe 101,101 maximum outside diameter of the first spring-backed quill is variable.
Plug 103 is plugged in the one end open of the first core pipe 101, the other end of the first core pipe 101 to slurry casting machine 20 One end connection.
It is provided with third check-valves 104 in first core pipe 101, which is more than Or when equal to setting pressure medium cavity is connected to slurry channels,
In the technical solution, third check-valves one-way conduction, and pressure is greater than or equal to setting pressure in slurry channels Down so that medium cavity is connected to slurry channels, and pressure is less than under setting pressure so that medium cavity and slurry in slurry channels Liquid is closed between channel.
In one embodiment, it is provided with accelerator in the dielectric cavity body of front grout stopping device 10.
In one embodiment, the first spring-backed quill 102 is rubber capsule, and the both ends of the rubber capsule are bound to first respectively In core pipe 101.
In one embodiment, the both ends of the first core pipe 101 are respectively arranged with quick coupling 105, which is arranged In the outside of the first core pipe 101.
Further, quick coupling 105 has thread joint face, is connect by screw-thread fit between slurry casting machine 20.
During 10 slip casting of front grout stopping device, slurries enter front grout stopping device 10 by quick coupling 105, with slip casting pressure The raising of power, third check-valves 104 are opened immediately, and slurries enter in rubber capsule 102, and with the promotion of pressure, rubber is by capsule Slip casting increases and is close to borehole wall, while slurries are combined with the accelerator in rubber capsule 102, quickly makes rubber after solidification Capsule becomes an entity, achievees the purpose that the gap for preventing slurries between grout stopping device and borehole wall is flowed out.Front grout stopping device Front is provided with plug, therefore cannot be used alone.
In conjunction with shown in Fig. 3, rear portion grout stopping device 30 includes the second core pipe 301 and the second spring-backed quill 302.
There are second core pipe 301 slurry channels axially communicated, the second spring-backed quill 302 to be sheathed on the second core pipe 301 Outside, and medium cavity is formed between the outer wall of the second core pipe 301,302 maximum outside diameter of the second spring-backed quill is variable.
It is provided with first check-valve 303 in second core pipe 301, which is more than Or it is set equal to first under pressure so that medium cavity is connected to slurry channels.
It is provided with second check-valve 304 at the serum outlet of second core pipe 301, the second check-valve 304 is in slurry channels Interior pressure is more than or equal under the second setting pressure the serum outlet for opening the second core pipe, and the second setting pressure is more than the first setting and presses Power.
In the technical solution, first check-valve one-way conduction, and pressure is greater than or equal to the first setting in slurry channels So that medium cavity is connected to slurry channels under pressure, and pressure is less than under the first setting pressure so that medium in slurry channels It is closed between cavity and slurry channels;Second check-valve one-way conduction, and pressure is more than or equal to the second setting in slurry channels The serum outlet of core pipe is opened under pressure, and pressure goes out less than the slurries for closing core pipe under the second setting pressure in slurry channels Mouthful.
In one embodiment, it is provided with accelerator in the dielectric cavity body of rear portion grout stopping device 30.
In one embodiment, the second spring-backed quill 302 is rubber capsule, and the both ends of the rubber capsule are bound to second respectively In core pipe 301.
In one embodiment, the both ends of the second core pipe 301 are respectively arranged with quick coupling 305,306, the quick coupling 305,306 outside for being set in the second core pipe 301.
Further, quick coupling 305,306 has thread joint face.
In the technical solution, for the 30 left side quick coupling 305 of rear portion grout stopping device to be connected with slurry casting machine 20, right side is quick Connector 306 is connected with drilling rod, and during slip casting, slurries enter rear portion grout stopping device by right side quick coupling 306, with slip casting The raising of pressure, first check-valve 303 are opened immediately, and slurries enter in rubber capsule 302, and with the promotion of pressure, rubber will Capsule slip casting increases and is close to borehole wall, while slurries are combined with the accelerator in rubber capsule 302, quickly makes rubber after solidification Hide glue capsule becomes an entity, achievees the purpose that the gap for preventing slurries between grout stopping device and borehole wall is flowed out.It only starches at rear portion Device can be used alone.
In conjunction with shown in Fig. 4 and Fig. 5, slurry casting machine 20 includes the tube body 201 axially communicated, and multiple notes are offered on tube body 201 Hole 202 is starched, is correspondingly arranged that there are one the 4th check-valves 203 on each injected hole 202 respectively.
The both ends of tube body 201 are also respectively formed with thread joint face 204, and thread joint face 204 is preferably formed in tube body 201 Inner surface.
Slurry casting machine is the horizontal grouting device for boring grouting device, and left side thread joint face is connected with front grout stopping device, right Side thread joint face is connected with rear portion grout stopping device, when slurries enter from rear portion grout stopping device in slurry casting machine, while entering front and only starching Device is close to hole wall with the gradual increase of pressure after causing front and back grout stopping device to expand, when grouting pressure continues to increase, the 4th Check-valves is opened, and slurries are entered by injected hole in karst cavity, starts to carry out slip casting to the passed through solution cavity that drills.Slip casting Device need to be applied in combination with forward and backward grout stopping device, not can be used alone.
In conjunction with shown in Fig. 6 to Fig. 8, in the first Application Example, the section of the engineering of 401 lower section of building generally includes Soil layer 402, development Karst Cave Formation 403 are developed stratum 404 without solution cavity and are formed in multiple molten in development Karst Cave Formation 403 Hole 405.
When solution cavity disclosed in region is more independent, solution cavity spacing distance farther out when;It is directed to built construction of structures When lower section regional area carries out slip casting, broken charges slip casting can be selected.
It is drilled using drilling machine 406, and multiple solution cavities 405 is connected first by drilling 407.
According to the solution cavity size of quasi- slip casting when slip casting, the slurry casting machine 20 of appropriate length is selected, by front grout stopping device 10, slip casting Device 20, rear portion grout stopping device 30, drilling rod 50 are sequentially connected, and grouting pump are connected with slip casting drilling rod, gradual hoisting grouting pressure makes Hole wall (in conjunction with shown in Fig. 8) is close in front grout stopping device, the expansion of rear portion grout stopping device outer capsule, and continuing raising grouting pressure causes to note It starches check-valves at device injected hole to open, slurries is injected into solution cavity, after waiting for slip casting, rotary drill rod takes out slip casting drilling rod, Repeat slip casting according to next solution cavity position.
In the Application Example, can slip casting be carried out to the solution cavity of distalmost end first, then replace grouting device (before containing Portion's grout stopping device, slurry casting machine and rear portion grout stopping device), according to being sequentially completed slip casting operation from the distant to the near.After the completion of slip casting, grouting device Permanent stay in realizes closure in solution cavity.
In conjunction with shown in Fig. 9 to Figure 11, when disclosed solution cavity connectivity is preferable in hole, and the disclosed solution cavity that drills is more, choosing With complete opening grouting mode.
It is drilled using drilling machine 606, and multiple solution cavities 605 is connected first by drilling 607.
Rear portion grout stopping device 30, drilling rod 50 are sequentially connected, 30 tripping in of rear portion grout stopping device to quasi- slip casting section, by grouting pump and note It starches drilling rod to be connected, gradual hoisting grouting pressure makes grout stopping device outer capsule expansion in rear portion be close to hole wall (see Figure 11), continues to carry High grouting pressure causes check-valves at slurry casting machine injected hole to open, and slurries are injected into solution cavity, after waiting for slip casting, rotary drilling Bar takes out slip casting drilling rod.
In the Application Example, can slip casting directly be carried out to the solution cavity of most proximal end, after the completion of slip casting, grouting device is forever Long property, which stays in, realizes closure in solution cavity.
Finally it should be noted that:The above embodiments are only used to illustrate the technical solution of the present invention., rather than its limitations;To the greatest extent Present invention has been described in detail with reference to the aforementioned embodiments for pipe, it will be understood by those of ordinary skill in the art that:Its according to So can with technical scheme described in the above embodiments is modified, either to which part or all technical features into Row equivalent replacement;And these modifications or replacements, various embodiments of the present invention technology that it does not separate the essence of the corresponding technical solution The range of scheme.

Claims (10)

1. a kind of grouting device, which is characterized in that including the front grout stopping device, slurry casting machine and rear portion grout stopping device being sequentially communicated,
Wherein,
The front grout stopping device includes:
First core pipe has the slurry channels axially communicated;
First spring-backed quill is sheathed on the outside of the first core pipe, and is formed with medium cavity between the outer wall of the first core pipe, the One spring-backed quill maximum outside diameter is variable;
Plug is plugged in the one end open of the first core pipe, third check-valves is provided in the first core pipe, which is starching Liquid channel inner pressure makes medium cavity be connected to slurry channels when being greater than or equal to setting pressure,
The rear portion grout stopping device includes:
Second core pipe has the slurry channels axially communicated;
Second spring-backed quill is sheathed on the outside of the second core pipe, and is formed with medium cavity between the outer wall of the second core pipe, the Two spring-backed quill maximum outside diameters are variable, are provided with first check-valve in second core pipe, the first check-valve is in slurry channels Interior pressure is greater than or equal under the first setting pressure so that medium cavity is connected to slurry channels, and the slurries of second core pipe go out It is provided with second check-valve at mouthful, second check-valve pressure in slurry channels, which is more than or equal under the second setting pressure, opens the The serum outlet of two core pipes, the second setting pressure are more than the first setting pressure.
2. grouting device according to claim 1, which is characterized in that the slurry casting machine includes the tube body axially communicated, pipe Multiple injected holes are offered on body, are correspondingly arranged respectively on each injected hole there are one the 4th check-valves.
3. grouting device according to claim 1, which is characterized in that use spiral shell between the slurry casting machine and front grout stopping device Line mode is rotatablely connected.
4. grouting device according to claim 1, which is characterized in that use spiral shell between the slurry casting machine and rear portion grout stopping device Line mode is rotatablely connected.
5. grouting device according to claim 1, which is characterized in that be provided in the dielectric cavity body of the front grout stopping device Accelerator,
It is provided with accelerator in the dielectric cavity body of the rear portion grout stopping device.
6. grouting device according to claim 1, which is characterized in that first core pipe is arranged with respect to the other end of plug There is the quick coupling with thread contact face, which is set in the outside of the first core pipe;
The both ends of second core pipe are respectively arranged with the quick coupling with thread surface, which is set in the second core The outside of pipe.
7. a kind of broken charges grouting method for multiple solution cavities, which is characterized in that including:
S1, it is drilled using drilling machine, and is connected to multiple solution cavities by once drilling;
S2, the end that any grouting device of claim 2 to 6 is mounted on to slip casting drilling rod, finger is fed through by slurry casting machine Determine solution cavity;
S3, slip casting drilling rod are passed through slurries, and hoisting grouting pressure makes first check-valve open, the second resilient sleeve of rear portion grout stopping device Tube swelling is close to borehole sidewall;
S4, continue to improve grouting pressure second check-valve is caused to open, slurries enter slurry casting machine and front grout stopping device, and front is only starched Borehole sidewall is close in the first spring-backed quill expansion of device;
S5, continue improve grouting pressure cause the 4th check-valves of slurry casting machine to open, slurries are injected into solution cavity;
S5, slip casting drilling rod is taken out.
8. the broken charges grouting method according to claim 7 for multiple solution cavities, which is characterized in that the slip casting is bored It is rotatablely connected between bar and slip casting drilling rod,
After waiting for slip casting, by rotating slip casting drilling rod, slip casting drilling rod is taken out, grouting device entirely stays in drilling.
9. the broken charges grouting method according to claim 7 for multiple solution cavities, which is characterized in that the drilling machine is Horizontal directional drilling machine.
10. the broken charges grouting method according to claim 7 for multiple solution cavities, which is characterized in that the multiple Solution cavity is connected in the horizontal direction.
CN201810608939.4A 2018-06-13 2018-06-13 Grouting device and in-hole sectional grouting method for multiple karst caves Active CN108755693B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810608939.4A CN108755693B (en) 2018-06-13 2018-06-13 Grouting device and in-hole sectional grouting method for multiple karst caves

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810608939.4A CN108755693B (en) 2018-06-13 2018-06-13 Grouting device and in-hole sectional grouting method for multiple karst caves

Publications (2)

Publication Number Publication Date
CN108755693A true CN108755693A (en) 2018-11-06
CN108755693B CN108755693B (en) 2024-02-23

Family

ID=64021583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810608939.4A Active CN108755693B (en) 2018-06-13 2018-06-13 Grouting device and in-hole sectional grouting method for multiple karst caves

Country Status (1)

Country Link
CN (1) CN108755693B (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566215A (en) * 2019-09-27 2019-12-13 中铁第四勘察设计院集团有限公司 Shield tunnel instant quick-setting type synchronous grouting method and quick-setting agent capsule
CN112392509A (en) * 2020-11-12 2021-02-23 中铁十六局集团路桥工程有限公司 Grouting method for karst caves with different filling types

Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2466348Y (en) * 2001-01-17 2001-12-19 铁道部隧道工程局科学研究所 Small bore rigid external valve one-way type sublevel grouting device
CN1485505A (en) * 2003-08-29 2004-03-31 北京市城市建设工程研究院 Slip casting lattice pipe with double plug and construction process
JP2004270710A (en) * 2003-03-05 2004-09-30 Ashimori Ind Co Ltd Check valve for filling slurry
CN103061785A (en) * 2012-12-28 2013-04-24 山东大学 Borehole casing pressure-proof seepage sealing grouting device and process for roadway breaking water burst surrounding rock
CN103526748A (en) * 2013-09-30 2014-01-22 中铁二十局集团有限公司 Technology for constructing deepwater bridge underwater pier large-diameter bored piles in bead-stringed type karst areas
US20140234031A1 (en) * 2013-02-15 2014-08-21 9187-8850 Québec Inc. Method, kit and system for injecting grout into a borehole, method of deploying a tube into a borehole for grout injection and leader for use in a grout injection system
CN207145003U (en) * 2017-09-04 2018-03-27 徐州中国矿大岩土工程新技术发展有限公司 Disposably and permanently stop grouting plug for goaf grouting filling
CN108060908A (en) * 2017-11-14 2018-05-22 北京中煤矿山工程有限公司 Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN208346822U (en) * 2018-06-13 2019-01-08 徐州中国矿大岩土工程新技术发展有限公司 grouting device

Patent Citations (9)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN2466348Y (en) * 2001-01-17 2001-12-19 铁道部隧道工程局科学研究所 Small bore rigid external valve one-way type sublevel grouting device
JP2004270710A (en) * 2003-03-05 2004-09-30 Ashimori Ind Co Ltd Check valve for filling slurry
CN1485505A (en) * 2003-08-29 2004-03-31 北京市城市建设工程研究院 Slip casting lattice pipe with double plug and construction process
CN103061785A (en) * 2012-12-28 2013-04-24 山东大学 Borehole casing pressure-proof seepage sealing grouting device and process for roadway breaking water burst surrounding rock
US20140234031A1 (en) * 2013-02-15 2014-08-21 9187-8850 Québec Inc. Method, kit and system for injecting grout into a borehole, method of deploying a tube into a borehole for grout injection and leader for use in a grout injection system
CN103526748A (en) * 2013-09-30 2014-01-22 中铁二十局集团有限公司 Technology for constructing deepwater bridge underwater pier large-diameter bored piles in bead-stringed type karst areas
CN207145003U (en) * 2017-09-04 2018-03-27 徐州中国矿大岩土工程新技术发展有限公司 Disposably and permanently stop grouting plug for goaf grouting filling
CN108060908A (en) * 2017-11-14 2018-05-22 北京中煤矿山工程有限公司 Water-rich sand layer long range horizontal orientation drilling grouting and reinforcing technology under groups of building
CN208346822U (en) * 2018-06-13 2019-01-08 徐州中国矿大岩土工程新技术发展有限公司 grouting device

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN110566215A (en) * 2019-09-27 2019-12-13 中铁第四勘察设计院集团有限公司 Shield tunnel instant quick-setting type synchronous grouting method and quick-setting agent capsule
CN112392509A (en) * 2020-11-12 2021-02-23 中铁十六局集团路桥工程有限公司 Grouting method for karst caves with different filling types

Also Published As

Publication number Publication date
CN108755693B (en) 2024-02-23

Similar Documents

Publication Publication Date Title
CN107119669A (en) For shield, the pre-pouring grout consolidated subsoil method in house is worn in side in water-rich sand layer
CN102134967B (en) Construction method of consolidating horizontal directional drilling hole by grouting coal seam baseboard
CN100588816C (en) Construction method for horizontal drilling
CN109440794A (en) A kind of fine method of disposal suitable for shallow embedding subway shield tunnel construction Tunnel Karst
CN103899321B (en) The legal rectangular top pipe method for tunnel construction of top drawknot
CN110578468B (en) Engineering geology exploration method adopting horizontal directional drilling
CN103266638A (en) Detection method of leakage site position of underground concrete continuous wall
WO2024078506A1 (en) Method and apparatus for regionalized coal mine methane drainage in deep hole
CN106567714A (en) Grouting material for underground mine roadway and grouting water control method
CN106320354A (en) Anti-seepage construction method for karst cave development stratum under overburden
CN112814737B (en) Collapse column advanced treatment method and system based on laminated multi-branch horizontal well
CN208346822U (en) grouting device
CN108265720A (en) A kind of single-point bellows grouting device and its method for controlling soil deformation
CN110093912A (en) A kind of surface subsidence deformation monitoring device and its construction method
CN108150101B (en) A kind of pipeline three-dimensional construction method for crossing
CN106049418A (en) Combined grouting reinforcement method for tunnel surface in shallow buried traversing faultage
CN108755693A (en) Grouting device and broken charges grouting method for multiple solution cavities
CN108755694A (en) Grout stopping device and complete opening grouting method for multiple solution cavities
CN103573269B (en) Shield tunnel grouting layer performance detection method
CN108331595A (en) One kind is soft to mould the body Karst Tunnel reinforcement process that caves in
CN113338921B (en) Shale oil horizontal well track control method
CN208346821U (en) Grout stopping device
CN207406345U (en) Rich water sand-pebble layer shield tunnel end horizontal grouting ruggedized construction
CN111005379A (en) Construction method for removing pile body of reinforced concrete cast-in-place pile
CN105019458A (en) Deep and thick sand layer covered karst cave grouting system device and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
CB02 Change of applicant information
CB02 Change of applicant information

Address after: 221000 10th floor, building C6, Xuzhou Software Park, No. 6, Software Park Road, Quanshan District, Xuzhou City, Jiangsu Province

Applicant after: Xuzhou Zhongkuang geotechnical Technology Co.,Ltd.

Address before: Room 101, unit 1, building 1, science and Technology Incubation Center, National University Science and Technology Park, China University of mining and technology, Xuzhou City, Jiangsu Province

Applicant before: CUMT GEOTECHNICAL ENGINEERING & NEW TECHNOLOGY DEVELOPMENT Co.,Ltd.

GR01 Patent grant
GR01 Patent grant