CN108755342A - Pavement with head cover and its construction method - Google Patents

Pavement with head cover and its construction method Download PDF

Info

Publication number
CN108755342A
CN108755342A CN201810767196.5A CN201810767196A CN108755342A CN 108755342 A CN108755342 A CN 108755342A CN 201810767196 A CN201810767196 A CN 201810767196A CN 108755342 A CN108755342 A CN 108755342A
Authority
CN
China
Prior art keywords
column
backbar
precast slab
head cover
full precast
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810767196.5A
Other languages
Chinese (zh)
Inventor
黄天祥
黄慧敏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
YOULIHUA BUILDING PREFAB (SHENZHEN) CO Ltd
Original Assignee
YOULIHUA BUILDING PREFAB (SHENZHEN) CO Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by YOULIHUA BUILDING PREFAB (SHENZHEN) CO Ltd filed Critical YOULIHUA BUILDING PREFAB (SHENZHEN) CO Ltd
Priority to CN201810767196.5A priority Critical patent/CN108755342A/en
Priority to SG10201807171SA priority patent/SG10201807171SA/en
Publication of CN108755342A publication Critical patent/CN108755342A/en
Pending legal-status Critical Current

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C15/00Pavings specially adapted for footpaths, sidewalks or cycle tracks
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01FADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
    • E01F7/00Devices affording protection against snow, sand drifts, side-wind effects, snowslides, avalanches or falling rocks; Anti-dazzle arrangements ; Sight-screens for roads, e.g. to mask accident site

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of pavement with head cover and its construction method, which includes:Pedestal(1), left and right sides column(2), backbar(3)And head cover(5);The column(2), backbar(3)And head cover(5)Using full prefabricated component;Backbar(3)End and column(2)The support recess at top(21)Connect and the reserved exposed steel bar of the two is connected;The head cover(5)Full precast slab unit(51)End and backbar(3)And column(2)Connect and its reserved exposed steel bar is connected;By in support recess(21)Interior and full precast slab unit(51)With backbar(3)And column(2)Joint cast-in-place concrete is by column(2), backbar(3)With full precast slab unit(51)It links together.Without using scaffold when the pavement construction with head cover of the present invention, floor space is small, and construction time and construction cost is greatly saved in convenient and quick construction.

Description

Pavement with head cover and its construction method
Technical field
The present invention relates to a kind of building and its construction method more particularly to a kind of pavement with top blind flange and its Construction method, the pavement being arranged in open-air area especially suitable for residence district, park etc..
Background technology
In open-air areas such as residence district, parks, in order to avoid the pedestrian passing in hot summer and rainy day is subjected to The hardship exposed to the sun and rain will often build the pavement with head cover, can also be planted on head cover it is green plant to increase green coverage, it is traditional Way is typically the basis of cast-in-place concrete structure, column, crossbeam and head cover, but the construction of this cast-in-place structural at the construction field (site) Method process is miscellaneous, long construction period.
For this purpose, the Chinese invention patent that notification number is CN102979026B discloses a kind of pavement with head cover and its builds Method is made, this pavement is integrally formed molding prefabricated mixed by the backbar at the top of two heel posts of left and right sides column and connection Solidifying soil supporting rack unit, column bottom pour together with cast-in-place concrete pedestal, setting multiple half at the top of the supporting rack unit Prefabricated bottom board unit, then above cast-in-place concrete so that multiple half prefabricated panel unit be linked together.
But above-mentioned pavement has the disadvantage that:1. when building, half prefabricated panel unit of head cover is relatively thin, and intensity is not It is enough, it just must not only be accounted in bottom truss, the scaffold support of half prefabricated panel unit in construction casting concrete above Ground area is big, and expenditure of construction is high.2. because supporting rack unit is larger heavier, column is poured with cast-in-place concrete pedestal and is connect When, need setting complicated and strong support, and this connection method is not firm enough, and the construction time spent compared with Construction material that is long, spending is also more.3. head cover is half precast construction, need cast-in-place concrete, working procedure more above.
Invention content
It is applied in view of the deficiencies of the prior art, the present invention provides scaffold, easy for construction, saving need not be used when a kind of construction Between working hour and the pavement with head cover of construction cost and its construction method.
The present invention adopts the following technical scheme that:A kind of pavement with head cover, including:Pedestal fixes company with the pedestal The left and right sides column connect, the backbar being connected across at the top of the column of the left and right sides and the head cover being fixed on the backbar.
The column, backbar and head cover use full prefabricated component;Support recess is equipped at the top of the column and along the support Recess extends upwardly to the reserved exposed steel bar of head cover;The bearing beam end connects with support recess, and support beam end and Top is equipped with reserved exposed steel bar;The post end is connected with the reserved exposed steel bar of bearing beam end;The head cover packet The full precast slab unit of polylith is included, the end of the full precast slab unit connects with backbar and column and is equipped with reserved exposed steel bar point It is not connected with the reserved exposed steel bar at the top of backbar and at the top of column.
By in the support recess and full precast slab unit will with backbar and the cast-in-place concrete of column joint The column, backbar and full precast slab unit link together.
The column bottom is equipped with the inside grouting cavity communicated with its bottom surface and is connected to inside grouting cavity and stands The grouting channel of column side and plasma discharge channel;The pedestal is equipped with the reinforcing bar for extending upwardly to inside grouting cavity, and passes through The concrete for being poured into inside grouting cavity links together the pedestal and column.
At least two pieces of full precast slab units in left and right, the full precast slab unit is provided between two adjacent backbars to exist It is equipped with convergence part, the convergence part and full precast slab unit with adjacent full precast slab unit and the column, backbar joint Central region is relatively low compared to relatively thin and top surface, and the bar splicing of reserved exposed steel bar and adjacent members is equipped at the convergence part, is led to It crosses and left and right two pieces of full precast slab unit, column and backbars links together in convergence part cast-in-place concrete.
The head cover further includes the vertical fence board being arranged in the left and right sides, and the fence board is integrated prefabricated in described complete pre- On making sheet unit.
A kind of construction method on the pavement with head cover, includes the following steps:
A. the prefabricated stand column of the left and right sides is fixedly installed on pedestal;
B. prefabricated backbar is lifted and is set up at the support recess at the top of the column of the left and right sides, the pre- of beam end will be supported Exposed steel bar is stayed to be bound together with the reserved exposed steel bar at the top of column;
C. full precast slab unit is lifted between two adjacent backbars, by the reserved exposed of full precast slab unit end Reinforcing bar is bound together with the reserved exposed steel bar at the top of column and at the top of backbar;
D. precast slab unit pours into a mould concrete thus by institute with backbar and column joint in the support recess and entirely Column, backbar and full precast slab unit is stated to link together.
The column bottom is equipped with the inside grouting cavity communicated with its bottom surface and is connected to inside grouting cavity and stands The grouting channel of column side and plasma discharge channel;In the step A, the reinforcing bar projected upwards is set from pedestal, by prefabricated stand column pair Accurate reinforcing bar outstanding is lifted to pedestal so that the protrusion reinforcing bar is inserted into the inside grouting cavity of column, then passes through the filling Channel is starched toward concrete perfusion in internal grouting cavity until concrete mortar is from the discharge of plasma discharge pipeline, is finally supported with hound Column.
In the step C, at least two pieces of full precast slab units in left and right are lifted between adjacent every two backbars, this is complete Precast slab unit is being equipped with relatively thin lower convergence part with adjacent full precast slab unit and the column, backbar joint, will The bar splicing of the reserved exposed steel bar and adjacent members that are arranged on the convergence part;In the step D, while also in the rank Cast-in-place concrete links together full precast slab unit, column and backbar at socket part.
Before the step A, the metallic supports of support backbar are first used in the installation of the inside top of prefabricated stand column; Before the step B, several metals for the full precast slab unit of support are first installed respectively in the two sides of backbar and are supported Part.
Compared with prior art, the pavement of the invention with head cover and its construction method mainly have the following advantages that:
1. head cover uses full prefabricated panel, above need not cast-in-place concrete again, there is sufficient intensity, without below when construction Scaffold is set up, floor space is small, at low cost, and reduces the processes such as plastering, easy for construction, and the construction time is greatly saved;
2. column is connect using grouting way with pedestal, more firm, when construction, need to only be supported with simple hound, be applied Work is convenient, and safety coefficient is high, and saves construction time and material;
3. backbar is set up at the support recess at the top of column and uses concrete joint filling, this connection structure more steady wherein Gu.
Description of the drawings
Fig. 1 is the sectional view that the pavement of the invention with head cover is moved towards perpendicular to pavement;
Fig. 2 is the structure chart of the column 2;
Fig. 3 is the attachment structure schematic diagram of the column 2 bottom and pedestal 1;
Fig. 4 is the attachment structure schematic diagram at 2 top and backbar 3 of the column;
Fig. 5 is the longitudinal sectional drawing of 3 junction of the full precast slab unit 51, column 2 and backbar;
Fig. 6 is the transverse cross-sectional view of 3 junction of the full precast slab unit 51, column 2 and backbar;
Fig. 7 is the planar structure schematic diagram of pavement section head cover 5.
Specific implementation mode
The embodiment of the present invention is described in further detail below in conjunction with the accompanying drawings.
As shown in Figure 1, the pavement with head cover of the present invention includes:Pedestal 1, column 2, backbar 3 and head cover 5.Its In, the column 2 is fixed on pedestal 1, and the length direction along pavement has more, and point left and right sides by design arranged for interval Setting.The backbar 3 is connected across 2 top of left and right sides column, and the head cover 5 is then fixed on backbar 3 for covering people The top on trade.
The column 2, backbar 3 and head cover 5 use full prefabricated component, the pedestal 1 that cast-in-place structural or prefabricated knot can be used Structure.As shown in figure 3, at position corresponding with column 2, it is equipped with from pedestal 1 and upwardly extends reinforcing bar 62 outstanding.
As shown in Fig. 2, 2 top of the column is integrated prefabricated support recess 21, which is square and court Inside and upper opening, such as Fig. 4,2 top of the column are equipped with across support recess 21 and continue up and extend to the reserved of head cover 5 Exposed steel bar 61, as shown in figure 3,2 bottom of column be embedded with when prefabricated communicated with its bottom surface inside grouting cavity 22 and It is connected to grouting channel 23 and plasma discharge channel 24 of the inside grouting cavity 22 with 2 side of column.The protrusion reinforcing bar 62 of the pedestal 1 Be inserted into inside grouting cavity 22, and in the cavity 22 that be in the milk inside this by grouting channel 23 concrete perfusion to general Pedestal 1 and column 2 are fixed together.This connection type of pedestal 1 and column 2 is more solid and reliable, in grouting cavity Before concrete in 22 reaches enough intensity, each column 2 only needs to be supported with two, three hounds, and construction is very Convenient and floor space is small.
Left and right ends and the top reserved exposed steel bar with outward extension of the backbar 3, such as Fig. 1, Fig. 4, Fig. 6 Shown in Fig. 7, the end of backbar 3 connects with the support recess 21 of column 2, and the reserved exposed steel bar of 3 end of backbar with Mutually binding links together the reserved exposed steel bar at 2 top of column in the support recess 21, by the support recess 21 Interior cast concrete 25 links together column 2 and backbar 3.
As shown in fig. 7, the head cover 5 is mainly spliced by the full precast slab unit of polylith 51, full precast slab unit 51 is not Can be excessive, otherwise no matter transport or lifting are all very inconvenient, and danger coefficient is high, in the present embodiment, two before and after adjacent The two pieces of full precast slab units 51 in left and right are equipped between backbar 3, so, full precast slab unit 51 individually was unlikely to Greatly, convenience in transport and lifting.Certainly, if pavement is wider, can be also set up between every two adjacent backbars 3 three pieces or with On full precast slab unit 51.
The forward and backward end of the full precast slab unit 51 connects with backbar 3 and column 2,51 end of full precast slab unit Portion is additionally provided with reserved exposed steel bar binding of the reserved exposed steel bar respectively with 2 top of 3 top of backbar and column and links together. In addition, full precast slab unit 51 adjacent 51 joint of full precast slab unit with side and with the column 2 and backbar 3 joints are equipped with convergence part 511, as shown in figure 5, the convergence part 511 is relatively thin compared with the central region of full precast slab unit 51 And top surface is relatively low, be equipped at the convergence part 511 reserved exposed steel bar respectively with adjacent column 2, backbar 3 and full prefabricated board The reserved exposed steel bar of unit 51 overlaps.It will the two pieces of full precast slab units in left and right by the cast-in-place concrete 53 at convergence part 511 51, column 2 and backbar 3 link together, cast-in-place concrete 53 and 51 middle region of full precast slab unit on the convergence part 511 The either flush in domain.
As shown in Figure 1, the head cover 5 further includes the vertical fence board 52 being arranged in the left and right sides, 52 one of fence board Change is formed in advance on the full precast slab unit 51.Thus the space of plantation greening can be also formed on the head cover 5.
The construction method on the pavement of the present invention with head cover includes the following steps:
1. first installing pedestal 1, the reinforcing bar 62 projected upwards is set from pedestal 1 in the installed position of column 2;
2. being used for the metallic supports of support backbar 3, such as subscript in the inside top installation of prefabricated stand column 2;In backbar 3 Two sides several metallic supports for the full precast slab unit of support 51, such as T character codes are installed respectively;It can be in advance pre- Pre-buried mounting hole position and installation component in column 2 and backbar 3 processed, facilitate installation metallic supports;
3. prefabricated stand column 2 is aligned in the lifting to pedestal 1 of reinforcing bar 62 outstanding so that the protrusion reinforcing bar 62 is inserted into the interior of column 2 Portion is in the milk in cavity 22, then by the grouting channel 23 toward concrete perfusion in the internal cavity 22 that is in the milk until concrete mortar It is discharged from plasma discharge pipeline 24, installation is complete for column 2, finally uses hound support post 2;
4. prefabricated backbar 3 is lifted and is set up at support recess 21 and the metallic supports at 2 top of left and right sides column, By the reserved exposed steel bar 61 at 2 top of the reserved exposed steel bar of 3 end of backbar and column, binding exists in the support recess 21 Together;
5. according to the width of head cover 5, by two pieces or more of the lifting of full precast slab unit 51 to adjacent every two backbars 3 Between, metallic supports that the end of full precast slab unit 51 connects with column 2 and backbar 3 and installed by 3 side of backbar Support, then exposed steel is reserved at 3 top of the reserved exposed steel bar of 51 end of full precast slab unit and 2 top of column and backbar Muscle is bound together, by the reserved exposed steel bar being arranged on the convergence part 511 of full precast slab unit 51 and adjacent upright posts 2, bearing The reserved exposed steel bar of beam 3 and full precast slab unit 51 overlaps;
6. in the support recess 21, full precast slab unit 51 and backbar 3 and 2 joint of column and the convergence part Concrete is poured into a mould at 511 to which the column 2, backbar 3 and full precast slab unit 51 link together.
Pavement of the invention with head cover very convenient can quickly be built using the above construction method, cast-in-place mixed After solidifying soil reaches sufficient intensity, the metallic supports installed on column 2 and backbar 3 can be removed and be reused to other people In the construction on trade.
The column on pavement of the present invention with head cover and the connection type of pedestal are more solid and reliable than traditional, and column is only It needs to be supported with several hounds, without building complicated truss and scaffold.In addition, the connection between column and backbar More firm, head cover is spliced using full precast slab unit, and there is enough intensity worker is tied up directly above Wire-tie, the operations such as casting concrete, without building truss and scaffold below head cover, and greatly reduce head cover need it is existing The area of pouring concrete.It can be seen that entire pavement need not all build truss and scaffold in entire work progress, and It constructs very simple and convenient, construction cost is not only greatly saved, the construction time is also greatly saved, and structure is more Securely, safety coefficient is high.
The above is presently preferred embodiments of the present invention, is not intended to restrict the invention, all in spirit of that invention and original Modification, equivalent replacement or improvement etc., should be included within the scope of the present invention made by then.

Claims (8)

1. a kind of pavement with head cover, including:Pedestal(1)And the pedestal(1)The left and right sides column being fixedly connected(2), It is connected across left and right sides column(2)The backbar at top(3)And it is fixed on the backbar(3)On head cover(5);Its feature It is:
The column(2), backbar(3)And head cover(5)Using full prefabricated component;The column(2)Top is equipped with support recess (21)With along the support recess(21)Extend upwardly to head cover(5)Reserved exposed steel bar;The backbar(3)End and support Recess(21)Connect, and backbar(3)End and top are equipped with reserved exposed steel bar;The column(2)End and backbar(3) The reserved exposed steel bar of end is connected;The head cover(5)Including the full precast slab unit of polylith(51), the full precast slab unit (51)End and backbar(3)And column(2)Connect and be equipped with reserved exposed steel bar respectively with backbar(3)Top and column (2)The reserved exposed steel bar at top is connected;
By in the support recess(21)Interior and full precast slab unit(51)With backbar(3)And column(2)Joint is existing Pouring concrete is by the column(2), backbar(3)With full precast slab unit(51)It links together.
2. the pavement according to claim 1 with head cover, it is characterised in that:The column(2)Bottom is equipped with and its bottom Be in the milk cavity for the inside that face communicates(22)And it is connected to inside grouting cavity(22)With column(2)The grouting channel of side(23) With plasma discharge channel(24);The pedestal(1)Equipped with extend upwardly to the inside be in the milk cavity(22)Reinforcing bar, and by being poured into Be in the milk cavity for the inside(22)Concrete by the pedestal(1)And column(2)It links together.
3. the pavement according to claim 2 with head cover, it is characterised in that:Two adjacent backbars(3)Between set It is equipped at least two pieces of full precast slab units in left and right(51), the full precast slab unit(51)With adjacent full precast slab unit(51) With the column(2), backbar(3)Joint is equipped with convergence part(511), the convergence part(511)With full precast slab unit(51) Central region compared to relatively thin and top surface it is relatively low, the convergence part(511)Place is equipped with the reinforcing bar of reserved exposed steel bar and adjacent members Overlap joint, by convergence part(511)Cast-in-place concrete will the two pieces of full precast slab units in left and right(51), column(2)And backbar(3) It links together.
4. the pavement according to claim 1,2 or 3 with head cover, it is characterised in that:The head cover(5)It further include setting Vertical fence board in the left and right sides(52), the fence board(52)It is integrated prefabricated in the full precast slab unit(51)On.
5. a kind of construction method on the pavement with head cover as described in claim 1, which is characterized in that include the following steps:
A. by the prefabricated stand column of the left and right sides(2)It is fixedly installed in pedestal(1)On;
B. by prefabricated backbar(3)It lifts and is set up in left and right sides column(2)The support recess at top(21)Place, will support Beam(3)The reserved exposed steel bar and column of end(2)The reserved exposed steel bar binding at top is together;
C. by full precast slab unit(51)It lifts to two adjacent backbars(3)Between, by full precast slab unit(51)End Reserved exposed steel bar and column(2)Top and backbar(3)The reserved exposed steel bar binding at top is together;
D. in the support recess(21)Interior and full precast slab unit(51)With backbar(3)And column(2)It pours into a mould joint Concrete is thus by the column(2), backbar(3)With full precast slab unit(51)It links together.
6. the construction method on the pavement according to claim 5 with head cover, it is characterised in that:The column(2)Bottom Equipped with the inside grouting cavity communicated with its bottom surface(22)And it is connected to inside grouting cavity(22)With column(2)The filling of side Starch channel(23)With plasma discharge channel(24);In the step A, from pedestal(1)The reinforcing bar projected upwards is set, by prefabricated stand column (2)Reinforcing bar outstanding is directed to lift to pedestal(1)On so that the protrusion reinforcing bar is inserted into column(2)Inside be in the milk cavity(22) It is interior, then pass through the grouting channel(23)Toward internal grouting cavity(22)Interior concrete perfusion is until concrete mortar is from discharge pipe Road(24)Hound support post is finally used in discharge(2).
7. the construction method on the pavement according to claim 6 with head cover, it is characterised in that:In the step C, in phase Adjacent every two backbars(3)Between lift at least left and right two pieces of full precast slab units(51), the full precast slab unit(51)? With adjacent full precast slab unit(51)With the column(2), backbar(3)Joint is equipped with relatively thin lower convergence part(511), By the convergence part(511)The reserved exposed steel bar of upper setting and the bar splicing of adjacent members;In the step D, while In the convergence part(511)Locate cast-in-place concrete by full precast slab unit(51), column(2)And backbar(3)It links together.
8. the construction method on the pavement with head cover according to claim 5,6 or 7, it is characterised in that:In the step A Before, first in prefabricated stand column(2)Inside top installation be used for support backbar(3)Metallic supports;The step B it Before, first in backbar(3)Two sides install respectively it is several be used for the full precast slab unit of support(51)Metallic supports.
CN201810767196.5A 2018-07-13 2018-07-13 Pavement with head cover and its construction method Pending CN108755342A (en)

Priority Applications (2)

Application Number Priority Date Filing Date Title
CN201810767196.5A CN108755342A (en) 2018-07-13 2018-07-13 Pavement with head cover and its construction method
SG10201807171SA SG10201807171SA (en) 2018-07-13 2018-08-23 A covered walkway and a construction method thereof

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810767196.5A CN108755342A (en) 2018-07-13 2018-07-13 Pavement with head cover and its construction method

Publications (1)

Publication Number Publication Date
CN108755342A true CN108755342A (en) 2018-11-06

Family

ID=63973632

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810767196.5A Pending CN108755342A (en) 2018-07-13 2018-07-13 Pavement with head cover and its construction method

Country Status (2)

Country Link
CN (1) CN108755342A (en)
SG (1) SG10201807171SA (en)

Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1014818C2 (en) * 2000-03-31 2001-10-04 Hollandsche Betongroep Nv Deck construction for covering e.g. car park or traffic route, has edge reinforcement formed by pre=tensile beams
CN102979026A (en) * 2012-06-11 2013-03-20 有利华建筑预制件有限公司 Sidewalk having top cover and semi-prefabricated building method thereof
KR20140092545A (en) * 2013-01-16 2014-07-24 주식회사 국민씨아이 Cantilever Supporter for Side Walk Bridge Deck, and Installation Structure and Install Method of Side Walk Bridge Deck using such Cantilever Supporter
CN206337643U (en) * 2016-12-20 2017-07-18 有利华建材(惠州)有限公司 Pre-fabricated one
CN206408515U (en) * 2016-12-30 2017-08-15 河南省交通规划设计研究院股份有限公司 Precast pier section assembling structure
CN206721920U (en) * 2017-05-12 2017-12-08 衡阳市金泓建筑装饰设计有限公司 Assembly type pipe gallery
CN107938707A (en) * 2017-11-24 2018-04-20 中国铁路设计集团有限公司 Prefabricated assembled underground subway station top board structure
CN208649839U (en) * 2018-07-13 2019-03-26 有利华建筑预制件(深圳)有限公司 Pavement with top cover

Patent Citations (8)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
NL1014818C2 (en) * 2000-03-31 2001-10-04 Hollandsche Betongroep Nv Deck construction for covering e.g. car park or traffic route, has edge reinforcement formed by pre=tensile beams
CN102979026A (en) * 2012-06-11 2013-03-20 有利华建筑预制件有限公司 Sidewalk having top cover and semi-prefabricated building method thereof
KR20140092545A (en) * 2013-01-16 2014-07-24 주식회사 국민씨아이 Cantilever Supporter for Side Walk Bridge Deck, and Installation Structure and Install Method of Side Walk Bridge Deck using such Cantilever Supporter
CN206337643U (en) * 2016-12-20 2017-07-18 有利华建材(惠州)有限公司 Pre-fabricated one
CN206408515U (en) * 2016-12-30 2017-08-15 河南省交通规划设计研究院股份有限公司 Precast pier section assembling structure
CN206721920U (en) * 2017-05-12 2017-12-08 衡阳市金泓建筑装饰设计有限公司 Assembly type pipe gallery
CN107938707A (en) * 2017-11-24 2018-04-20 中国铁路设计集团有限公司 Prefabricated assembled underground subway station top board structure
CN208649839U (en) * 2018-07-13 2019-03-26 有利华建筑预制件(深圳)有限公司 Pavement with top cover

Also Published As

Publication number Publication date
SG10201807171SA (en) 2020-02-27

Similar Documents

Publication Publication Date Title
JP5047680B2 (en) Construction method of continuous viaduct
CN109577534A (en) Tool-based hanging die assembly type composite floor slab and construction method
CN106088326B (en) Assembling frame rod structure based on 3D printing
CN108265885B (en) Construction method of high-large non-orthogonal large-inclination-angle special-shaped concrete inclined column
CN108374319A (en) A kind of through tied arch bridge structural unit and arch bridge structure and its construction method
CN102561690A (en) Construction method for supporting structures on two sides of post-cast strip by use of brick column
CN107227814A (en) A kind of large cantilever concrete structure section construction method
JP2011157720A (en) Method for constructing railway reinforced concrete rigid-frame structure viaduct
CN206468008U (en) Outer wall of basement one side formwork support system
CN106012851A (en) Synchronous construction method of steel box girder and concrete pier studs
CN109895239A (en) A kind of assembly concrete stair delay platform beam slab and its method of construction
CN208649839U (en) Pavement with top cover
KR100892751B1 (en) Bridge repairng method by upper structure lifting and hinge typeed temporary bridge construction
CN102979026B (en) Sidewalk having top cover and semi-prefabricated building method thereof
EP1561874A1 (en) Connecting device and node for buildings with prefabricated elements
CN206903062U (en) A kind of open tubular column with fore-set
CN108755342A (en) Pavement with head cover and its construction method
CN207003803U (en) The single through hole precast shear wall of high-rise assembled and its assembling structure
CN109853803A (en) Assembled integral floor and fabrication and installation method
CN205382595U (en) Integral shear force wall of steel pipe concrete edge constraint coincide
CN206220537U (en) A kind of assembly type truss frame platform
CN114215333A (en) Rapid construction method for outer cornice of high-rise building
CN113417459A (en) Cantilever structure formwork support system and construction method
KR101056395B1 (en) The water-storage tank of assembly type and method for constructing thereof
KR200163856Y1 (en) Prefabricate arch construction

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
REG Reference to a national code

Ref country code: HK

Ref legal event code: DE

Ref document number: 1261920

Country of ref document: HK