CN108755321A - Subgrade construction protective device - Google Patents

Subgrade construction protective device Download PDF

Info

Publication number
CN108755321A
CN108755321A CN201810631098.9A CN201810631098A CN108755321A CN 108755321 A CN108755321 A CN 108755321A CN 201810631098 A CN201810631098 A CN 201810631098A CN 108755321 A CN108755321 A CN 108755321A
Authority
CN
China
Prior art keywords
module
memory module
subgrade
construction
data memory
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810631098.9A
Other languages
Chinese (zh)
Other versions
CN108755321B (en
Inventor
田振刚
李亚伟
张东兴
李会迎
董海鹏
刘炜
孙睿
武涛
王友
王俊艳
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC HIGHWAY MAINTENANCE ENGINEERING TECHNOLOGY Co.,Ltd.
Original Assignee
田振刚
李亚伟
张东兴
李会迎
董海鹏
刘炜
孙睿
武涛
王友
王俊艳
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 田振刚, 李亚伟, 张东兴, 李会迎, 董海鹏, 刘炜, 孙睿, 武涛, 王友, 王俊艳 filed Critical 田振刚
Priority to CN201810631098.9A priority Critical patent/CN108755321B/en
Publication of CN108755321A publication Critical patent/CN108755321A/en
Application granted granted Critical
Publication of CN108755321B publication Critical patent/CN108755321B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01CCONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE; MACHINES OR AUXILIARY TOOLS FOR CONSTRUCTION OR REPAIR
    • E01C3/00Foundations for pavings
    • E01C3/04Foundations produced by soil stabilisation
    • GPHYSICS
    • G01MEASURING; TESTING
    • G01DMEASURING NOT SPECIALLY ADAPTED FOR A SPECIFIC VARIABLE; ARRANGEMENTS FOR MEASURING TWO OR MORE VARIABLES NOT COVERED IN A SINGLE OTHER SUBCLASS; TARIFF METERING APPARATUS; MEASURING OR TESTING NOT OTHERWISE PROVIDED FOR
    • G01D21/00Measuring or testing not otherwise provided for
    • G01D21/02Measuring two or more variables by means not covered by a single other subclass

Landscapes

  • Physics & Mathematics (AREA)
  • General Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Road Paving Structures (AREA)

Abstract

The invention discloses a kind of subgrade construction protective devices, including:Master controller comprising primary processor;Data memory module;Detection device, it is connected to data memory module, detection device includes the soil moisture detection module for being connected to data memory module, granule detecting module and earth's surface gradient detection module, solution formulation module, it is connected to primary processor, and solution formulation module is for the protectiving scheme according to the data analysis stored in data memory module and when formulating subgrade construction;Scheme memory module is connected to solution formulation module, the protectiving scheme of the subgrade construction in the case of different ecological is stored in scheme memory module.The present invention detects the ecological data of subgrade construction by establishing a series of detection module, and combines the protectiving scheme of the protectiving scheme information formulation adaptation to local conditions of storage, to improve the stability of subgrade construction protection.

Description

Subgrade construction protective device
Technical field
The present invention relates to subgrade construction protection technology field more particularly to a kind of subgrade construction protective devices.
Background technology
With the development of the times, the rhythm that urban road laying is built also gradually is being accelerated, wherein the construction of roadbed is that road is repaiied The basis built, roadbed refer to requiring the banded structure object as road bed of build according to route allocation and certain technology, It is the basis of railway and highway, roadbed is linear structure object made of being built with soil or building stones.It builds in good geology, water Roadbed under text, weather conditions.Divide from material, roadbed can be divided into dirt road base, stone roadbed, native stone roadbed, the construction of roadbed Protection is essential in journey, is broadly divided into slope protection equipment:Easily there is slope surface by operation of nature destruction for protecting The soil-slope of deformation;Scour protection equipment:For protect flow or wave to roadbed wash away and scour;Bracing reinforcement is set It is standby:For bracing reinforcement roadbed ontology, to ensure its stability, such as retaining wall, branch barricade, pillar;Sand prevention, snow protection facility: For preventing dust storm, snow-driving wind from burying roadbed, such as various fence, shelter-forest, but protective equipment is generally more conventional and existing Protectiving scheme formulation, cannot suit well and require in the case of different ecological, the feasibility of protectiving scheme needs to be investigated, and carries It is necessary for a kind of protective device of suitable protectiving scheme that can be formulated under different ecological environment.
Invention content
It is an object of the invention to solve at least the above, and provide the advantages of at least will be described later.
It is a still further object of the present invention to provide a kind of subgrade construction protective devices, by establishing a series of detection mould Block detect subgrade construction ecological data, and combine storage protectiving scheme information formulate adaptation to local conditions protectiving scheme, with In the protection of subgrade construction.
In order to realize these purposes and other advantages according to the present invention, a kind of subgrade construction protective device is provided, is wrapped It includes:
Master controller comprising primary processor and the main display being connected with the primary processor.
Data memory module, is connected to the primary processor, data memory module information for storing data.
Detection device, is connected to the data memory module, and the detection device includes:
Soil moisture detection module is connected to the data memory module, and the soil moisture detection module is for examining The moisture for surveying soil simultaneously provides the hardness number of soil and the type of subgrade soil, and by the hardness number and the road Base soil types is stored to the data memory module.
Granule detecting module is connected to the data memory module, and the granule detecting module is for detecting institute State the size of the granularity of roadbed filling building stones.
Earth's surface gradient detection module, is connected to the data memory module, and the earth's surface gradient detection module is used In the gradient of detection earth's surface to judge the depth of the padded or lower digging of embankment or cutting design.
Solution formulation module is connected to the primary processor, and the solution formulation module according to the data for depositing Store up the data analysis stored in module and protectiving scheme when formulating subgrade construction.
Scheme memory module is connected to the solution formulation module, different ecological is stored in the scheme memory module In the case of subgrade construction protectiving scheme.
Preferably, further include three-dimensional view virtual module, be connected respectively to the primary processor, solution formulation module And data memory module, the three-dimensional view virtual module are used for empty according to the data information in the data memory module The three-dimensional scenic of subgrade construction is drawn up, and virtually implements the protectiving scheme of formulation in the three-dimensional scenic.
Preferably, further include the side slope protection frame being arranged in roadbed side slope, the side slope protection frame include fixed link and Elastic rod, the fixed link is along the longitudinally spaced arrangement of the roadbed side slope;Longitudinally disposed multiple first mounting holes of fixed link, The elastic rod is horizontally installed on the roadbed side slope, and be adapted to first mounting hole is provided on the elastic rod Two mounting holes, by fixing piece through first mounting hole and the second mounting hole with the company of the fixation fixed link and elastic rod It connects;Part of the elastic rod between the adjacent fixed link raises up along the gradient direction of the roadbed side slope.
Preferably, protection network is set between the fixed link and the elastic rod.
Preferably, further include guard rail, be spliced by multiple railings, the railing includes multiple is arranged on road The perpendicular column of dike both sides is arranged in the perpendicular column bottom end and the horizontal bar vertical with the perpendicular column and setting in the perpendicular column bottom end company The connecting rod being connected between the two perpendicular columns and horizontal bar, the horizontal bar include the first strut of hollow structure and are arranged described The second strut in first strut and positioned at first strut both sides, the perpendicular column is removably connected to the cross The top on column, the horizontal bar are removably connected on the ground.
Preferably, the dismountable connection type in perpendicular column is specially:The middle part setting of first strut runs through institute The first hole of the first strut is stated, the aperture of first hole is adapted to the outer diameter on the perpendicular column;The perpendicular field is in described Second hole of the top setting of horizontal bar through the perpendicular column;The setting positioning parallel with the connecting rod in second hole Third hole is arranged in the both ends of part, the locating piece, and the 4th hole being adapted to the third hole is provided in the connecting rod Hole.
Preferably, further include warning device, the warning device is connected to the guard rail, when the guard rail Gradient be more than 15 degree when, the warning device sends out sound-light alarm.
Preferably, further include construction monitoring module, be connected respectively to the solution formulation module and warning device, institute Construction protection safety of the construction monitoring module for monitoring the subgrade construction scene is stated, the warning device sends out sound-light alarm And the construction monitoring module is transmitted a signal to, the solution formulation module is according to the information of the construction monitoring module transfer Formulate the scheme for repairing the subgrade protection.
The present invention includes at least following advantageous effect:
The present invention builds the soil water content of the different sections of highway of roadbed by the detection of soil moisture detection module to provide The hardness number of relatively accurate soil, and directly give the type of subgrade soil;Roadbed is inspected by random samples by granule detecting module to fill out Build the size of the granularity of building stones;The gradient on the ground of roadbed construction is detected by earth's surface gradient detection module, and will be upper The data information for stating detection is transmitted to the data memory module, and the detection of above-mentioned data is not required to by modularized processing Supernumerary's power is put into again and carries out detection one by one and data record, while passing through the data of modularized processing detection acquisition The possibility for avoiding artificial clerical mistake ensure that the accuracy of data storage, be stored with and not go the same way in the scheme memory module A variety of different protectiving schemes under the conditions of base soil property, different soil moisture, different weathers, different ground line gradients etc., The solution formulation module is according to being detected and stored to the data information of the synthesis in the data memory module in conjunction with the side Different protection solution formulations in case memory module go out the protectiving scheme of adaptation to local conditions, it is contemplated that the factor of every aspect, data It is referred to convenient for solution formulation module analysis after synthesis, to formulate different protectiving schemes according to the different sections of highway of roadbed construction, with Play more effective protection effect.
Part is illustrated to embody by further advantage, target and the feature of the present invention by following, and part will also be by this The research and practice of invention and be understood by the person skilled in the art.
Description of the drawings
Fig. 1 is the structure diagram of subgrade construction protective device of the present invention;
Fig. 2 is the structural schematic diagram of heretofore described side slope protection frame;
Fig. 3 is the structural schematic diagram of heretofore described railing.
Specific implementation mode
Present invention will be described in further detail below with reference to the accompanying drawings, to enable those skilled in the art with reference to specification text Word can be implemented according to this.
It should be appreciated that such as " having ", "comprising" and " comprising " term used herein are not precluded one or more The presence or addition of a other elements or combinations thereof.
As shown in Figure 1, the present invention provides a kind of subgrade construction protective device, including:
Master controller comprising primary processor and the main display being connected with the primary processor.
Data memory module, is connected to the primary processor, data memory module information for storing data.
Detection device, is connected to the data memory module, and the detection device includes:
Soil moisture detection module is connected to the data memory module, and the soil moisture detection module is for examining The moisture for surveying soil simultaneously provides the hardness number of soil and the type of subgrade soil, and by the hardness number and the road Base soil types is stored to the data memory module.
Granule detecting module is connected to the data memory module, and the granule detecting module is for detecting institute State the size of the granularity of roadbed filling building stones.
Earth's surface gradient detection module, is connected to the data memory module, and the earth's surface gradient detection module is used In the gradient of detection earth's surface to judge the depth of the padded or lower digging of embankment or cutting design.
Solution formulation module is connected to the primary processor, and the solution formulation module according to the data for depositing Store up the data analysis stored in module and protectiving scheme when formulating subgrade construction.
Scheme memory module is connected to the solution formulation module, different ecological is stored in the scheme memory module In the case of subgrade construction protectiving scheme.
In the above scheme, the soil water content of the different sections of highway of roadbed is built by the detection of soil moisture detection module To provide the hardness number of relatively accurate soil, and directly give the type of subgrade soil;It is inspected by random samples by granule detecting module The size of the granularity of roadbed filling building stones;The gradient on the ground of roadbed construction is detected by earth's surface gradient detection module, And the data information of above-mentioned detection is transmitted to the data memory module, the detections of above-mentioned data by modularization at Reason need not put into supernumerary's power and carry out detection one by one and data record, while be adopted by modularized processing detection again The data of collection avoid the possibility of artificial clerical mistake, ensure that the accuracy of data storage, are stored in the scheme memory module It is a variety of different anti-under the conditions ofs different roadbed soil property, different soil moisture, different weathers, different ground line gradients etc. Shield scheme, the solution formulation module are combined according to the data information being detected and stored to the synthesis in the data memory module Different protection solution formulations in the scheme memory module go out the protectiving schemes of adaptation to local conditions, it is contemplated that every aspect because Element refers to after aggregation of data convenient for solution formulation module analysis, to formulate different protection according to the different sections of highway of roadbed construction Scheme, to play more effective protection effect.
In one preferred embodiment, further includes three-dimensional view virtual module, be connected respectively to the primary processor, scheme system Cover half block and data memory module, the three-dimensional view virtual module are used for according to the data in the data memory module Information fictionalizes the three-dimensional scenic of subgrade construction, and virtually implements the protectiving scheme of formulation in the three-dimensional scenic.
In the above scheme, the three-dimensional view virtual module can be empty according to the data stored in the data memory module The three-dimensional scenic for drawing up subgrade construction demonstrates the protectiving scheme made in virtual three-dimensional scenic, including in protectiving scheme The installation for some devices that may include and the position being specifically arranged, by demonstrating answering for protectiving scheme in virtual scene With, convenient for improving the efficiency of protectiving scheme application implementation in reality scene, while be also to the protectiving scheme of formulation one A verification, to ensure that protectiving scheme is practical.
Further include the side slope protection frame 100 being arranged in roadbed side slope, the side slope protection frame 100 in one preferred embodiment Including fixed link 101 and elastic rod 102, the fixed link 101 is along the longitudinally spaced arrangement of the roadbed side slope;The fixed link 101 longitudinally disposed multiple first mounting holes, the elastic rod 102 are horizontally installed on the roadbed side slope, the elastic rod 102 On be provided with the second mounting hole 103 being adapted to first mounting hole, by fixing piece through first mounting hole and the Two mounting holes 103 are with the connection of the fixation fixed link 101 and elastic rod 102;The elastic rod 102 is located at the adjacent fixation Part between bar 101 raises up along the gradient direction of the roadbed side slope.
In the above scheme, as shown in Fig. 2, by the way that side slope protection frame 100 is arranged on the roadbed side slope, for anti- The soil layer sliding of safe edge slope, is arranged using the fixed link 101 along the roadbed side slope lateral separation, the elastic rod 102 is along institute Roadbed side slope is stated by transversely arranged under upper, and is fixed in the fixed link 101 by fixing piece, the fixing piece is to include 4 holders and the fixing bolt in the middle part of the fixing piece, the fixing bolt is through first mounting hole, the second mounting hole 103 and soil layer, with the fixation elastic rod 102 and fixed link 101, four holders are adapted to the fixed link 101 respectively With the crossover node of the elastic rod 102, and it is wrapped on the outside of the crossover node, to increase the stability at crossover node, The shape of elastic rod 102 between the adjacent fixed link 101 raises up along the roadbed side slope, is conducive to the liquid such as rainwater It glides, to reduce the dynamics that rain drop erosion is;The fixed link 101 and the combined crosswise of the elastic rod 102 are fixed on side slope On soil layer, effectively cure side slope soil layer, prevent from sliding, and construction is fixed conveniently.
In one preferred embodiment, protection network 104 is set between the fixed link 101 and the elastic rod 102.
In the above scheme, protection network 104 is set between the fixed link 101 and the elastic rod 102, passes through protection network 104 void density effectively reduces flying upward for roadbed side slope sandy soil, while the solidification of side slope soil layer plays a significant role.
In one preferred embodiment, further includes guard rail 200, be spliced by multiple railings 201, the railing 201 Including it is multiple be arranged embankment both sides perpendicular column 202, be arranged in 202 bottom end of perpendicular column and the cross vertical with the perpendicular column 202 Column 203 and it is arranged and is connected to the connecting rod 204 between the two perpendicular columns 202 and horizontal bar 203 in 202 bottom end of perpendicular column, The horizontal bar 203 includes the first strut 205 of hollow structure and is arranged in first strut 205 and is located at described first Second strut 206 of 205 both sides of bar, the perpendicular column 202 is removably connected to the top of the horizontal bar 203, described Horizontal bar 203 is removably connected on the ground.
In the above scheme, it as shown in figure 3, forming the protection to construction area using guard rail 200, is formed simultaneously and satisfies the need The protection of base, multiple railings 201 splice and combine the guard rail 200 to be formed to roadbed construction protection, and the perpendicular column 202 is set It sets in the both sides of the roadbed and is connected and fixed on horizontal bar 203 on the ground, the horizontal bar 203 and the perpendicular column 202 are removable The connection type unloaded, and stored with installation and dismounting, the setting of second strut 206 is protected by increasing lateral contact area The stability that card railing 201 is contacted with ground, second strut 206 can be stored to first strut 205, also extended First strut 205 adjusts the length that the second strut 206 stretches out on demand, by the connecting rod 204 by perpendicular column 202 adjacent two-by-two It is connected with the crosspoint of horizontal bar 203, it is whole to form a protection.
In one preferred embodiment, 202 dismountable connection type of the perpendicular column is specially:In first strut 205 Portion's setting runs through the first hole 207 of first strut 205, and the aperture of first hole 207 is outer with the perpendicular column 202 Diameter is adapted to;The perpendicular column 202 is located at second hole 208 of the top setting through the perpendicular column 202 of the horizontal bar 203;It is described The setting locating piece parallel with the connecting rod 204 in second hole 208, the both ends setting third hole 209 of the locating piece, The 4th hole 210 being adapted to the third hole 209 is provided in the connecting rod 204.
In the above scheme, the perpendicular column 202 is when to roadbed embankment protection, the perpendicular column 202 substantially with the cross bar Vertical with ground, the perpendicular column 202 is plugged in by way of grafting in first hole 207, is passing through the locating piece Through second hole 208, and by the third hole 209 and 210 overlapping position of the 4th hole be arranged bolt or other Fixed pin is connected perpendicular column 202, horizontal bar 203 and connecting rod 204 with the position of the fixation 202 opposite horizontal bar 203 of perpendicular column Together, the connection type on the perpendicular column 202 and horizontal bar 203 is simply laborsaving, can also be by the perpendicular column convenient for improving installation effectiveness 202 are set as rotatable mode with the connection type of the horizontal bar 203, and card slot, the card slot are opened up on the horizontal bar 203 Interior that sphere that is rotatable and being adapted to the card slot is arranged, sphere top opens up the groove being adapted to the outer diameter on the perpendicular column 202, Need carry out roadbed side slope when, perpendicular column 202 is turned to it is parallel with roadbed side slope, with formed to roadbed side slope it is interim prevent Shield.
Further include warning device in one preferred embodiment, the warning device is connected to the guard rail 200, works as institute When stating the gradient of guard rail 200 more than 15 degree, the warning device sends out sound-light alarm.
In the above scheme, the case where warning device is used to warn construction personnel, and subgrade construction protects, works as protective fence Bar 200 is tilted more than 15 degree under ecological resistance, or the inclination number of degrees of early warning, guard rail are specified according to practice of construction scene 200 protection stability has constituted a threat to, and by the timely construction personnel simultaneously of the sound-light alarm of warning device, is further prevented Shield scheme.
Further include construction monitoring module in one preferred embodiment, is connected respectively to the solution formulation module and alarm Device, the construction monitoring module are used to monitor the construction protection safety at the subgrade construction scene, and the warning device is sent out Sound-light alarm simultaneously transmits a signal to the construction monitoring module, and the solution formulation module is passed according to the construction monitoring module Defeated information formulates the scheme for repairing the subgrade protection.
In the above scheme, the construction monitoring module is after the signal for receiving warning device transmission, it can be seen that protection The approximate location of early warning, construction monitoring module are transmitting information to solution formulation module, are repaiied by the formulation of solution formulation module The further protectiving scheme that multiple protection is implemented, to improve the efficiency of the construction of prevention work of construction site.
Although the embodiments of the present invention have been disclosed as above, but its is not only in the description and the implementation listed With it can be fully applied to various fields suitable for the present invention, for those skilled in the art, can be easily Realize other modification, therefore without departing from the general concept defined in the claims and the equivalent scope, the present invention is simultaneously unlimited In specific details and legend shown and described herein.

Claims (8)

1. a kind of subgrade construction protective device, wherein including:
Master controller comprising primary processor and the main display being connected with the primary processor;
Data memory module, is connected to the primary processor, data memory module information for storing data;
Detection device, is connected to the data memory module, and the detection device includes:
Soil moisture detection module is connected to the data memory module, and the soil moisture detection module is for detecting soil The moisture of earth simultaneously provides the hardness number of soil and the type of subgrade soil, and by the hardness number and the subgrade soils Earth type is stored to the data memory module;
Granule detecting module is connected to the data memory module, and the granule detecting module is for detecting the road Base fills the size of the granularity of building stones;And
Earth's surface gradient detection module is connected to the data memory module, and the earth's surface gradient detection module is for examining The gradient of geodetic table is to judge the depth of the padded or lower digging of embankment or cutting design;
Solution formulation module, is connected to the primary processor, and the solution formulation module is used to store mould according to the data The data analysis that stores in block and protectiving scheme when formulating subgrade construction;And
Scheme memory module is connected to the solution formulation module, different ecological situation is stored in the scheme memory module Under subgrade construction protectiving scheme.
2. subgrade construction protective device as described in claim 1, wherein further include three-dimensional view virtual module, be separately connected To the primary processor, solution formulation module and data memory module, the three-dimensional view virtual module is used for according to the number The three-dimensional scenic of subgrade construction is fictionalized according to the data information in memory module, and is virtually implemented in the three-dimensional scenic The protectiving scheme formulated.
3. subgrade construction protective device as described in claim 1, wherein further include the side slope protection frame being arranged in roadbed side slope, The side slope protection frame includes fixed link and elastic rod, and the fixed link is along the longitudinally spaced arrangement of the roadbed side slope;It is described solid Longitudinally disposed multiple first mounting holes of fixed pole, the elastic rod are horizontally installed on the roadbed side slope, are set on the elastic rod It is equipped with the second mounting hole being adapted to first mounting hole, first mounting hole and the second mounting hole are run through by fixing piece With the connection of the fixation fixed link and elastic rod;Part of the elastic rod between the adjacent fixed link is along the road The gradient direction of base side slope raises up.
4. subgrade construction protective device as claimed in claim 3, wherein protection is arranged between the fixed link and the elastic rod Net.
5. subgrade construction protective device as described in claim 1, wherein further include guard rail, spliced by multiple railings and At, the railing include it is multiple be arranged embankment both sides perpendicular column, be arranged in the perpendicular column bottom end and vertical with the perpendicular column Horizontal bar and it is arranged and is connected to the connecting rod between the two perpendicular columns and horizontal bar in the perpendicular column bottom end, during the horizontal bar includes First strut of hollow structure and the second strut for being arranged in first strut and being located at first strut both sides, it is described perpendicular Column is removably connected to the top of the horizontal bar, and the horizontal bar is removably connected on the ground.
6. subgrade construction protective device as claimed in claim 5, wherein the perpendicular dismountable connection type in column is specially:Institute State first hole of the middle part setting through first strut of the first strut, the aperture of first hole and the perpendicular column Outer diameter is adapted to;The perpendicular field is in the setting of the top of the horizontal bar through second hole on the perpendicular column;In second hole The locating piece parallel with the connecting rod is set, and the both ends of the locating piece are arranged third hole, are provided in the connecting rod The 4th hole being adapted to the third hole.
7. subgrade construction protective device as claimed in claim 5, wherein further include warning device, the warning device is connected to The guard rail, when the gradient of the guard rail is more than 15 degree, the warning device sends out sound-light alarm.
8. subgrade construction protective device as claimed in claim 7, wherein further include construction monitoring module, be connected respectively to institute Solution formulation module and warning device are stated, the construction monitoring module is used to monitor the construction protection peace at the subgrade construction scene Entirely, the warning device sends out sound-light alarm and transmits a signal to the construction monitoring module, the solution formulation module root The scheme for repairing the subgrade protection is formulated according to the information of the construction monitoring module transfer.
CN201810631098.9A 2018-06-19 2018-06-19 Subgrade construction protective device Active CN108755321B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810631098.9A CN108755321B (en) 2018-06-19 2018-06-19 Subgrade construction protective device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810631098.9A CN108755321B (en) 2018-06-19 2018-06-19 Subgrade construction protective device

Publications (2)

Publication Number Publication Date
CN108755321A true CN108755321A (en) 2018-11-06
CN108755321B CN108755321B (en) 2019-10-15

Family

ID=63978770

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810631098.9A Active CN108755321B (en) 2018-06-19 2018-06-19 Subgrade construction protective device

Country Status (1)

Country Link
CN (1) CN108755321B (en)

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5707171A (en) * 1995-09-26 1998-01-13 Zaleski; Peter L. Electrically conductive paving mixture and pavement system
US5983165A (en) * 1997-06-04 1999-11-09 Minnich/ Maginnis Mfg. Co., Inc. Accelerometer-based monitoring of concrete consolidation
CN101373132A (en) * 2008-09-24 2009-02-25 北京交通大学 Apparatus and method for remotely measuring subgrade settlement by laser
CN103000001A (en) * 2012-11-30 2013-03-27 北京佳讯飞鸿电气股份有限公司 Landslide monitoring system for railway disaster prevention
CN103235845A (en) * 2012-12-18 2013-08-07 交通运输部科学研究院 Water and soil erosion monitoring method for highway construction
CN104674819A (en) * 2015-01-28 2015-06-03 东北大学 Informatized construction method of high expressway slope
CN206376266U (en) * 2017-01-17 2017-08-04 河南省交科公路勘察设计有限公司 A kind of highway subgrade landslide-proofing device with auto-alarm function

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5707171A (en) * 1995-09-26 1998-01-13 Zaleski; Peter L. Electrically conductive paving mixture and pavement system
US5983165A (en) * 1997-06-04 1999-11-09 Minnich/ Maginnis Mfg. Co., Inc. Accelerometer-based monitoring of concrete consolidation
CN101373132A (en) * 2008-09-24 2009-02-25 北京交通大学 Apparatus and method for remotely measuring subgrade settlement by laser
CN103000001A (en) * 2012-11-30 2013-03-27 北京佳讯飞鸿电气股份有限公司 Landslide monitoring system for railway disaster prevention
CN103235845A (en) * 2012-12-18 2013-08-07 交通运输部科学研究院 Water and soil erosion monitoring method for highway construction
CN104674819A (en) * 2015-01-28 2015-06-03 东北大学 Informatized construction method of high expressway slope
CN206376266U (en) * 2017-01-17 2017-08-04 河南省交科公路勘察设计有限公司 A kind of highway subgrade landslide-proofing device with auto-alarm function

Also Published As

Publication number Publication date
CN108755321B (en) 2019-10-15

Similar Documents

Publication Publication Date Title
Peckover et al. Treatment and maintenance of rock slopes on transportation routes
Ledezma et al. Effects of ground failure on bridges, roads, and railroads
Youd et al. Liquefaction and secondary ground failure
Kong Risk assessment of slopes
Pappalardo et al. Rockfall hazard and risk assessment: the promontory of the pre-Hellenic Village Castelmola Case, North-Eastern Sicily (Italy)
Green et al. Geotechnical reconnaissance of the 2010 Darfield (New Zealand) earthquake
Vogel et al. Rockfall protection as an integral task
CN108755321B (en) Subgrade construction protective device
CN205959364U (en) Mountain landslide disaster monitoring device
CN206707411U (en) A kind of road foundation ditch safety device
CN210917409U (en) Can dismantle stake-net combined type side slope protector of retrieving
CN106056852A (en) Landslide disaster monitoring equipment
Hanson et al. Westerton: a Roman watchtower on the Gask frontier
Mathews et al. Snow creep: its engineering problems and some techniques and results of its investigation
Kim et al. Maintenance of Hazardous Steep Slopes on National Park Trails
Morton et al. A Debris Avalanche at Forest Falls, San Bernardino County, California, July 11, 1999
Phipps Engineering geological constraints for highways schemes in Ireland: N6 Kinnegad to Athlone dual carriageway case study
Brodhead The Effects of Off-road Vehicles on Coastal Dune Vegetation in the Province Lands, Cape Cod National Seashore, Massachusetts
Meehan Damage to transportation systems
CN206090408U (en) Improve protection level's two crossbeam combined type guard bar of road bed section
JP2002088720A (en) Impact force buffer body against falling stone or the like and work method therefor
Rachoy et al. Anthropogenic caused mass movements and their impact on railway lines in Austria
Chopra Landslides and other mass movements along raods in sikkim and north bengal.
TR RAILROAD ACCIDENT REPORT
Dima et al. Intervention solutions on landslides in road areas. Case study

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190620

Address after: 056000 Unit 09, Unit 1, Building No. 43, Shuguang Street, Congtai District, Handan City, Hebei Province

Applicant after: Tian Zhengang

Applicant after: Li Yawei

Address before: 056000 Unit 09, Unit 1, Building No. 43, Shuguang Street, Congtai District, Handan City, Hebei Province

Applicant before: Tian Zhengang

Applicant before: Wang Junyan

Applicant before: Li Yawei

Applicant before: Zhang Dongxing

Applicant before: Li Huiying

Applicant before: Dong Haipeng

Applicant before: Liu Wei

Applicant before: Sun Rui

Applicant before: Wu Tao

Applicant before: Wang You

GR01 Patent grant
GR01 Patent grant
TA01 Transfer of patent application right
TA01 Transfer of patent application right

Effective date of registration: 20190920

Address after: 325000 No. 268 College West Road, Lucheng District, Zhejiang, Wenzhou

Applicant after: Ji Xu Hui

Address before: 056000 unit 1, 2 building, 43 Shuguang street, Cong Tai District, Handan, Hebei 09

Applicant before: Tian Zhen Gang

Applicant before: Li Ya Wei

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201016

Address after: Room 201-1, building 3, No. 266, Zhenxing Road, Yuyue Town, Deqing County, Huzhou City, Zhejiang Province

Patentee after: Huzhou Taiyi Intelligent Technology Co.,Ltd.

Address before: 325000 No. 268 College West Road, Lucheng District, Zhejiang, Wenzhou

Patentee before: Ji Xuhui

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20201124

Address after: 313201 new town Canadian village, Deqing County, Huzhou City, Zhejiang Province

Patentee after: Deqing Haijie Packaging Co.,Ltd.

Address before: Room 201-1, building 3, No. 266, Zhenxing Road, Yuyue Town, Deqing County, Huzhou City, Zhejiang Province

Patentee before: Huzhou Taiyi Intelligent Technology Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210425

Address after: 100089 Beijing Haidian District Linglong Road 9 West hospital 8 Building 7 floor 1 unit 608

Patentee after: CCCC HIGHWAY MAINTENANCE ENGINEERING TECHNOLOGY Co.,Ltd.

Address before: 313201 new town Canadian village, Deqing County, Huzhou City, Zhejiang Province

Patentee before: Deqing Haijie Packaging Co.,Ltd.