CN108731647A - A kind of truss installa-tion docking measurement method - Google Patents

A kind of truss installa-tion docking measurement method Download PDF

Info

Publication number
CN108731647A
CN108731647A CN201810207916.2A CN201810207916A CN108731647A CN 108731647 A CN108731647 A CN 108731647A CN 201810207916 A CN201810207916 A CN 201810207916A CN 108731647 A CN108731647 A CN 108731647A
Authority
CN
China
Prior art keywords
truss
main couple
measurement method
installa
tion
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN201810207916.2A
Other languages
Chinese (zh)
Inventor
厉广永
庞江涛
崔会金
焦立中
刘金鹏
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Permanent Gang Gou Co Ltd In Jiangsu
Original Assignee
Permanent Gang Gou Co Ltd In Jiangsu
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Permanent Gang Gou Co Ltd In Jiangsu filed Critical Permanent Gang Gou Co Ltd In Jiangsu
Priority to CN201810207916.2A priority Critical patent/CN108731647A/en
Publication of CN108731647A publication Critical patent/CN108731647A/en
Pending legal-status Critical Current

Links

Classifications

    • GPHYSICS
    • G01MEASURING; TESTING
    • G01CMEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
    • G01C15/00Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00

Landscapes

  • Physics & Mathematics (AREA)
  • Engineering & Computer Science (AREA)
  • General Physics & Mathematics (AREA)
  • Radar, Positioning & Navigation (AREA)
  • Remote Sensing (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of truss installa-tions to dock measurement method, including step:According to engineering design requirements, moulding bed is positioned and has set up, and marked around the moulding bed;Truss position is positioned according to engineering design requirements, selectes main couple, and feature measurement is carried out to the main couple;Adjust the main couple docking splice point and axis interface point to predeterminated position, and complete the splicing between truss;Repeated measurement and adjustment are carried out to entire spliced truss, until adjusting truss to best design position;The present invention, by carrying out the measurement of necessary data to truss, ensures that truss can be attached to accurate location according to engineering design requirements, can effectively promote the quality of engineering completion in truss installa-tion docking operation.

Description

A kind of truss installa-tion docking measurement method
Technical field
The present invention relates to steel-structure installation measurement fields more particularly to a kind of truss installa-tion to dock measurement method.
Background technology
Truss is structure made of one kind is articulated and connected at both ends each other by rod piece, is made of straight-bar general with three The plane or space structure of corner shaped elements, truss member are primarily subjected to axial tension or pressure, so as to make full use of material Intensity saves material when span is larger than solid web girder, mitigates dead weight and increases rigidity;In some Larger Engineering Projects, Most common is usually steel truss, and steel truss is compared with the girder steel of steel flanged beam, its main feature is that replacing the edge of a wing with chord member and with abdomen Bar replaces web, and is interconnected web member and chord member by gusset plate weld seam or other connections at each node;Sometimes Can without gusset plate and directly by each rod piece mutually welding in this way, plane girder integrally by it is curved when moment of flexure show as upper and lower string The axial compression and tension of bar, shearing then show as the axial compression or tension of each web member.
Invention content
It is an object of the invention to for the technical problems in the prior art, provide a kind of truss installa-tion docking measurement Method, specific technical solution are as follows:
A kind of truss installa-tion docking measurement method, includes the following steps:
According to engineering design requirements, moulding bed is positioned and has set up, and marked around the moulding bed;
Truss position is positioned according to engineering design requirements, selectes main couple, and feature measurement is carried out to the main couple;
Adjust the main couple docking splice point and axis interface point to predeterminated position, and complete the splicing between truss;
Repeated measurement and adjustment are carried out to entire spliced truss, until adjusting truss to best design position.
Further improvement of the present invention further includes step:Each nozzle of the truss is measured, to ensure nozzle Position meets design requirement.
Further improvement of the present invention further includes step:The verticality for measuring the main couple ensures that the main couple hangs down Directly in ground.
Further improvement of the present invention, the positioning of the truss include that truss winds up positioning and lower edge positioning.
Further improvement of the present invention is mounted on position at engineering design absolute altitude or less 300mm when the moulding bed positions.
In embodiments of the present invention, the position of moulding bed is oriented come and according to reality according to drawing of engineering design first It is required that setting up moulding bed to optimal design position, mark of correlation is carried out in its surrounding;Then the position of truss is oriented, and finds out master Truss carries out some characteristic measurements to main couple, in order to preferably splice truss, coordinates necessary measuring instrument to purlin Frame measures, and necessary measurement is repeated, compares and adjust work, ensures truss in the accurate position of engineering design requirements It sets;Truss installa-tion provided by the invention docking measurement method can effectively promote the quality of engineering, be conducive to successive projects into Row and implementation, provide a safe and reliable construction environment.
Description of the drawings
Fig. 1 is the flow diagram of the method for the invention.
Specific implementation mode
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described.Obviously, described embodiment is only A part of the embodiment of the present invention gives presently preferred embodiments of the present invention instead of all the embodiments in attached drawing.The present invention can To realize in many different forms, however it is not limited to embodiment described herein, on the contrary, provide the mesh of these embodiments Be to make the disclosure of the present invention more thorough and comprehensive.Based on the embodiments of the present invention, the common skill in this field The every other embodiment that art personnel are obtained without creative efforts belongs to the model that the present invention protects It encloses.
Refering to fig. 1, in embodiments of the present invention, a kind of method that truss installa-tion docking measures, the method packet are provided Include step:A, according to engineering design requirements, moulding bed is positioned and has set up, and marked around the moulding bed;B, according to work Journey design requirement positions truss position, selectes main couple, and carry out feature measurement to the main couple;C, the main couple is adjusted Docking splice point and axis interface point to predeterminated position, and complete the splicing between truss and to entire spliced truss Repeated measurement and adjustment are carried out, until adjusting truss to best design position.
Preferably, in embodiments of the present invention, position at engineering design absolute altitude or less 300mm is mounted on when the moulding bed positioning It sets.
More specifically, in embodiment, during being measured to truss, with the use of surveys such as theodolite, spirit levels Amount tool fulfils assignment;Preferably, it in being positioned to main couple, is realized by theodolite using mirror method is rushed.
In embodiment, further include being measured to each nozzle of truss when carrying out specification requirement measurement to truss, To ensure that nozzle position meets design requirement;And the verticality of the main couple is measured, ensure the main couple vertical bottom face Setting.
In embodiments of the present invention, the positioning of truss include truss wind up positioning and lower edge positioning, by using total powerstation Method in the truss control point setting-out to moulding bed bearing of lower edge bottom surface is realized.
In embodiments of the present invention, the position of moulding bed is oriented come and according to reality according to drawing of engineering design first It is required that setting up moulding bed to optimal design position, mark of correlation is carried out in its surrounding;Then the position of truss is oriented, and finds out master Truss carries out some characteristic measurements to main couple, in order to preferably splice truss, coordinates necessary measuring instrument to purlin Frame measures, and necessary measurement is repeated, compares and adjust work, ensures truss in the accurate position of engineering design requirements It sets;Truss installa-tion provided by the invention docking measurement method can effectively promote the quality of engineering, be conducive to successive projects into Row and implementation, provide a safe and reliable construction environment.
The foregoing is merely a prefered embodiment of the invention, the scope of the claims of the present invention is not intended to limit, although with reference to aforementioned reality Applying example, invention is explained in detail, still can be to aforementioned each tool for those skilled in the art comes Technical solution recorded in body embodiment is modified, or carries out equivalence replacement to which part technical characteristic.Every profit The equivalent structure made of description of the invention and accompanying drawing content is directly or indirectly used in other related technical areas, Similarly within scope of patent protection of the present invention.

Claims (5)

1. a kind of truss installa-tion docks measurement method, which is characterized in that include the following steps:
According to engineering design requirements, moulding bed is positioned and has set up, and marked around the moulding bed;
Truss position is positioned according to engineering design requirements, selectes main couple, and feature measurement is carried out to the main couple;
Adjust the main couple docking splice point and axis interface point to predeterminated position, and complete the splicing between truss;
Repeated measurement and adjustment are carried out to entire spliced truss, until adjusting truss to best design position.
2. a kind of truss installa-tion according to claim 1 docks measurement method, which is characterized in that further include step:To institute The each nozzle for stating truss measures, to ensure that nozzle position meets design requirement.
3. a kind of truss installa-tion according to claim 1 docks measurement method, which is characterized in that further include step:It measures The verticality of the main couple ensures the main couple perpendicular to ground.
4. a kind of truss installa-tion according to claim 1 docks measurement method, which is characterized in that the positioning packet of the truss Include truss wind up positioning and lower edge positioning.
5. a kind of truss installa-tion according to claim 1 docks measurement method, which is characterized in that pacify when the moulding bed positioning The position at 300mm below engineering design absolute altitude.
CN201810207916.2A 2018-03-14 2018-03-14 A kind of truss installa-tion docking measurement method Pending CN108731647A (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810207916.2A CN108731647A (en) 2018-03-14 2018-03-14 A kind of truss installa-tion docking measurement method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810207916.2A CN108731647A (en) 2018-03-14 2018-03-14 A kind of truss installa-tion docking measurement method

Publications (1)

Publication Number Publication Date
CN108731647A true CN108731647A (en) 2018-11-02

Family

ID=63940485

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810207916.2A Pending CN108731647A (en) 2018-03-14 2018-03-14 A kind of truss installa-tion docking measurement method

Country Status (1)

Country Link
CN (1) CN108731647A (en)

Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101629456A (en) * 2009-08-18 2010-01-20 北京城建精工钢结构工程有限公司 Three-dimensional steel truss assembling support frame shaped like a Chinese character qie and construction method for assembling steel truss
CN101691797A (en) * 2009-09-14 2010-04-07 江苏沪宁钢机股份有限公司 Method for manufacturing roofing truss
CN102277825A (en) * 2011-05-23 2011-12-14 江苏沪宁钢机股份有限公司 Steel truss bridge and method for fabricating same
CN102839747A (en) * 2012-09-24 2012-12-26 中国建筑第八工程局有限公司 Construction method for steel structure truss of super high-rise special structure
CN103243928A (en) * 2013-05-22 2013-08-14 中国建筑第八工程局有限公司 Bidirectional inclined V-shaped column construction method
CN103821372A (en) * 2014-02-26 2014-05-28 中天建设集团有限公司 Method for installing trusses with different heights

Patent Citations (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101629456A (en) * 2009-08-18 2010-01-20 北京城建精工钢结构工程有限公司 Three-dimensional steel truss assembling support frame shaped like a Chinese character qie and construction method for assembling steel truss
CN101691797A (en) * 2009-09-14 2010-04-07 江苏沪宁钢机股份有限公司 Method for manufacturing roofing truss
CN102277825A (en) * 2011-05-23 2011-12-14 江苏沪宁钢机股份有限公司 Steel truss bridge and method for fabricating same
CN102839747A (en) * 2012-09-24 2012-12-26 中国建筑第八工程局有限公司 Construction method for steel structure truss of super high-rise special structure
CN103243928A (en) * 2013-05-22 2013-08-14 中国建筑第八工程局有限公司 Bidirectional inclined V-shaped column construction method
CN103821372A (en) * 2014-02-26 2014-05-28 中天建设集团有限公司 Method for installing trusses with different heights

Similar Documents

Publication Publication Date Title
CN104060523B (en) A kind of ultra-large type bridge box beam component, jig frame special and its assemble method
CN108914782A (en) A kind of large size open web type highway steel box girder stayed-cable bridge manufacturing method
CN205907604U (en) Steel bridge segmental hoisting counterpoint fixing device
CN106836498A (en) A kind of super-span Stadium roof system steel truss lifting construction engineering method
CN101440667A (en) Installation method of large-span single-layer canopy latticed shell structure
CN101736698B (en) Accurate positioning method for cable-stayed bridge pylon cable guide pipe
CN105019665A (en) Method for mounting long-span structure beam based on total station
CN103821372A (en) Method for installing trusses with different heights
CN104775564B (en) Unsupported installation method for bidirectional tilting great-section box latticed columns
CN101451378A (en) 'Drip shaped' radial monolayer steel pipe reticulated shell block and installation method
CN102733545A (en) Section steel column for high-rise building section steel concrete combination structure, and construction method thereof
CN108678398B (en) Pre-assembly method for steel structure truss of reinforced layer of super high-rise building
CN107905182A (en) Large span gates of segmental shape installation accuracy control method
CN214939323U (en) Suspension arm hoisting matching system for steel box girder of cable-stayed bridge
CN114961282B (en) Single-layer latticed shell structure streamer construction method with middle cylinder column
CN110182303A (en) A kind of total group of method of rudder horn
CN106223623A (en) Steel construction box arched roof truss installation method
CN108842954A (en) Installation and construction method of huge different-section honeycomb beam structure system of wing-shaped roof
CN115059308A (en) Large-span hyperbolic reducing inverted triangular pipe truss assembling method
CN115387221A (en) High pier line type control method for high altitude area
CN117376377A (en) Large-span arch bridge internet of things safety precaution monitoring system
CN105648923A (en) Stay cable saddle positioning device and positioning method thereof
CN108731647A (en) A kind of truss installa-tion docking measurement method
CN106869319A (en) Large span steel truss installation method
CN110241735B (en) Positioning and adjusting device and method for main tower cable guide pipe of cable-stayed bridge

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
RJ01 Rejection of invention patent application after publication

Application publication date: 20181102