CN108731647A - A kind of truss installa-tion docking measurement method - Google Patents
A kind of truss installa-tion docking measurement method Download PDFInfo
- Publication number
- CN108731647A CN108731647A CN201810207916.2A CN201810207916A CN108731647A CN 108731647 A CN108731647 A CN 108731647A CN 201810207916 A CN201810207916 A CN 201810207916A CN 108731647 A CN108731647 A CN 108731647A
- Authority
- CN
- China
- Prior art keywords
- truss
- main couple
- measurement method
- installa
- tion
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Conveying And Assembling Of Building Elements In Situ (AREA)
Abstract
The invention discloses a kind of truss installa-tions to dock measurement method, including step:According to engineering design requirements, moulding bed is positioned and has set up, and marked around the moulding bed;Truss position is positioned according to engineering design requirements, selectes main couple, and feature measurement is carried out to the main couple;Adjust the main couple docking splice point and axis interface point to predeterminated position, and complete the splicing between truss;Repeated measurement and adjustment are carried out to entire spliced truss, until adjusting truss to best design position;The present invention, by carrying out the measurement of necessary data to truss, ensures that truss can be attached to accurate location according to engineering design requirements, can effectively promote the quality of engineering completion in truss installa-tion docking operation.
Description
Technical field
The present invention relates to steel-structure installation measurement fields more particularly to a kind of truss installa-tion to dock measurement method.
Background technology
Truss is structure made of one kind is articulated and connected at both ends each other by rod piece, is made of straight-bar general with three
The plane or space structure of corner shaped elements, truss member are primarily subjected to axial tension or pressure, so as to make full use of material
Intensity saves material when span is larger than solid web girder, mitigates dead weight and increases rigidity;In some Larger Engineering Projects,
Most common is usually steel truss, and steel truss is compared with the girder steel of steel flanged beam, its main feature is that replacing the edge of a wing with chord member and with abdomen
Bar replaces web, and is interconnected web member and chord member by gusset plate weld seam or other connections at each node;Sometimes
Can without gusset plate and directly by each rod piece mutually welding in this way, plane girder integrally by it is curved when moment of flexure show as upper and lower string
The axial compression and tension of bar, shearing then show as the axial compression or tension of each web member.
Invention content
It is an object of the invention to for the technical problems in the prior art, provide a kind of truss installa-tion docking measurement
Method, specific technical solution are as follows:
A kind of truss installa-tion docking measurement method, includes the following steps:
According to engineering design requirements, moulding bed is positioned and has set up, and marked around the moulding bed;
Truss position is positioned according to engineering design requirements, selectes main couple, and feature measurement is carried out to the main couple;
Adjust the main couple docking splice point and axis interface point to predeterminated position, and complete the splicing between truss;
Repeated measurement and adjustment are carried out to entire spliced truss, until adjusting truss to best design position.
Further improvement of the present invention further includes step:Each nozzle of the truss is measured, to ensure nozzle
Position meets design requirement.
Further improvement of the present invention further includes step:The verticality for measuring the main couple ensures that the main couple hangs down
Directly in ground.
Further improvement of the present invention, the positioning of the truss include that truss winds up positioning and lower edge positioning.
Further improvement of the present invention is mounted on position at engineering design absolute altitude or less 300mm when the moulding bed positions.
In embodiments of the present invention, the position of moulding bed is oriented come and according to reality according to drawing of engineering design first
It is required that setting up moulding bed to optimal design position, mark of correlation is carried out in its surrounding;Then the position of truss is oriented, and finds out master
Truss carries out some characteristic measurements to main couple, in order to preferably splice truss, coordinates necessary measuring instrument to purlin
Frame measures, and necessary measurement is repeated, compares and adjust work, ensures truss in the accurate position of engineering design requirements
It sets;Truss installa-tion provided by the invention docking measurement method can effectively promote the quality of engineering, be conducive to successive projects into
Row and implementation, provide a safe and reliable construction environment.
Description of the drawings
Fig. 1 is the flow diagram of the method for the invention.
Specific implementation mode
In order to enable those skilled in the art to better understand the solution of the present invention, below in conjunction in the embodiment of the present invention
Attached drawing, technical scheme in the embodiment of the invention is clearly and completely described.Obviously, described embodiment is only
A part of the embodiment of the present invention gives presently preferred embodiments of the present invention instead of all the embodiments in attached drawing.The present invention can
To realize in many different forms, however it is not limited to embodiment described herein, on the contrary, provide the mesh of these embodiments
Be to make the disclosure of the present invention more thorough and comprehensive.Based on the embodiments of the present invention, the common skill in this field
The every other embodiment that art personnel are obtained without creative efforts belongs to the model that the present invention protects
It encloses.
Refering to fig. 1, in embodiments of the present invention, a kind of method that truss installa-tion docking measures, the method packet are provided
Include step:A, according to engineering design requirements, moulding bed is positioned and has set up, and marked around the moulding bed;B, according to work
Journey design requirement positions truss position, selectes main couple, and carry out feature measurement to the main couple;C, the main couple is adjusted
Docking splice point and axis interface point to predeterminated position, and complete the splicing between truss and to entire spliced truss
Repeated measurement and adjustment are carried out, until adjusting truss to best design position.
Preferably, in embodiments of the present invention, position at engineering design absolute altitude or less 300mm is mounted on when the moulding bed positioning
It sets.
More specifically, in embodiment, during being measured to truss, with the use of surveys such as theodolite, spirit levels
Amount tool fulfils assignment;Preferably, it in being positioned to main couple, is realized by theodolite using mirror method is rushed.
In embodiment, further include being measured to each nozzle of truss when carrying out specification requirement measurement to truss,
To ensure that nozzle position meets design requirement;And the verticality of the main couple is measured, ensure the main couple vertical bottom face
Setting.
In embodiments of the present invention, the positioning of truss include truss wind up positioning and lower edge positioning, by using total powerstation
Method in the truss control point setting-out to moulding bed bearing of lower edge bottom surface is realized.
In embodiments of the present invention, the position of moulding bed is oriented come and according to reality according to drawing of engineering design first
It is required that setting up moulding bed to optimal design position, mark of correlation is carried out in its surrounding;Then the position of truss is oriented, and finds out master
Truss carries out some characteristic measurements to main couple, in order to preferably splice truss, coordinates necessary measuring instrument to purlin
Frame measures, and necessary measurement is repeated, compares and adjust work, ensures truss in the accurate position of engineering design requirements
It sets;Truss installa-tion provided by the invention docking measurement method can effectively promote the quality of engineering, be conducive to successive projects into
Row and implementation, provide a safe and reliable construction environment.
The foregoing is merely a prefered embodiment of the invention, the scope of the claims of the present invention is not intended to limit, although with reference to aforementioned reality
Applying example, invention is explained in detail, still can be to aforementioned each tool for those skilled in the art comes
Technical solution recorded in body embodiment is modified, or carries out equivalence replacement to which part technical characteristic.Every profit
The equivalent structure made of description of the invention and accompanying drawing content is directly or indirectly used in other related technical areas,
Similarly within scope of patent protection of the present invention.
Claims (5)
1. a kind of truss installa-tion docks measurement method, which is characterized in that include the following steps:
According to engineering design requirements, moulding bed is positioned and has set up, and marked around the moulding bed;
Truss position is positioned according to engineering design requirements, selectes main couple, and feature measurement is carried out to the main couple;
Adjust the main couple docking splice point and axis interface point to predeterminated position, and complete the splicing between truss;
Repeated measurement and adjustment are carried out to entire spliced truss, until adjusting truss to best design position.
2. a kind of truss installa-tion according to claim 1 docks measurement method, which is characterized in that further include step:To institute
The each nozzle for stating truss measures, to ensure that nozzle position meets design requirement.
3. a kind of truss installa-tion according to claim 1 docks measurement method, which is characterized in that further include step:It measures
The verticality of the main couple ensures the main couple perpendicular to ground.
4. a kind of truss installa-tion according to claim 1 docks measurement method, which is characterized in that the positioning packet of the truss
Include truss wind up positioning and lower edge positioning.
5. a kind of truss installa-tion according to claim 1 docks measurement method, which is characterized in that pacify when the moulding bed positioning
The position at 300mm below engineering design absolute altitude.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810207916.2A CN108731647A (en) | 2018-03-14 | 2018-03-14 | A kind of truss installa-tion docking measurement method |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810207916.2A CN108731647A (en) | 2018-03-14 | 2018-03-14 | A kind of truss installa-tion docking measurement method |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108731647A true CN108731647A (en) | 2018-11-02 |
Family
ID=63940485
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810207916.2A Pending CN108731647A (en) | 2018-03-14 | 2018-03-14 | A kind of truss installa-tion docking measurement method |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108731647A (en) |
Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101629456A (en) * | 2009-08-18 | 2010-01-20 | 北京城建精工钢结构工程有限公司 | Three-dimensional steel truss assembling support frame shaped like a Chinese character qie and construction method for assembling steel truss |
CN101691797A (en) * | 2009-09-14 | 2010-04-07 | 江苏沪宁钢机股份有限公司 | Method for manufacturing roofing truss |
CN102277825A (en) * | 2011-05-23 | 2011-12-14 | 江苏沪宁钢机股份有限公司 | Steel truss bridge and method for fabricating same |
CN102839747A (en) * | 2012-09-24 | 2012-12-26 | 中国建筑第八工程局有限公司 | Construction method for steel structure truss of super high-rise special structure |
CN103243928A (en) * | 2013-05-22 | 2013-08-14 | 中国建筑第八工程局有限公司 | Bidirectional inclined V-shaped column construction method |
CN103821372A (en) * | 2014-02-26 | 2014-05-28 | 中天建设集团有限公司 | Method for installing trusses with different heights |
-
2018
- 2018-03-14 CN CN201810207916.2A patent/CN108731647A/en active Pending
Patent Citations (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN101629456A (en) * | 2009-08-18 | 2010-01-20 | 北京城建精工钢结构工程有限公司 | Three-dimensional steel truss assembling support frame shaped like a Chinese character qie and construction method for assembling steel truss |
CN101691797A (en) * | 2009-09-14 | 2010-04-07 | 江苏沪宁钢机股份有限公司 | Method for manufacturing roofing truss |
CN102277825A (en) * | 2011-05-23 | 2011-12-14 | 江苏沪宁钢机股份有限公司 | Steel truss bridge and method for fabricating same |
CN102839747A (en) * | 2012-09-24 | 2012-12-26 | 中国建筑第八工程局有限公司 | Construction method for steel structure truss of super high-rise special structure |
CN103243928A (en) * | 2013-05-22 | 2013-08-14 | 中国建筑第八工程局有限公司 | Bidirectional inclined V-shaped column construction method |
CN103821372A (en) * | 2014-02-26 | 2014-05-28 | 中天建设集团有限公司 | Method for installing trusses with different heights |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN104060523B (en) | A kind of ultra-large type bridge box beam component, jig frame special and its assemble method | |
CN108914782A (en) | A kind of large size open web type highway steel box girder stayed-cable bridge manufacturing method | |
CN205907604U (en) | Steel bridge segmental hoisting counterpoint fixing device | |
CN106836498A (en) | A kind of super-span Stadium roof system steel truss lifting construction engineering method | |
CN101440667A (en) | Installation method of large-span single-layer canopy latticed shell structure | |
CN101736698B (en) | Accurate positioning method for cable-stayed bridge pylon cable guide pipe | |
CN105019665A (en) | Method for mounting long-span structure beam based on total station | |
CN103821372A (en) | Method for installing trusses with different heights | |
CN104775564B (en) | Unsupported installation method for bidirectional tilting great-section box latticed columns | |
CN101451378A (en) | 'Drip shaped' radial monolayer steel pipe reticulated shell block and installation method | |
CN102733545A (en) | Section steel column for high-rise building section steel concrete combination structure, and construction method thereof | |
CN108678398B (en) | Pre-assembly method for steel structure truss of reinforced layer of super high-rise building | |
CN107905182A (en) | Large span gates of segmental shape installation accuracy control method | |
CN214939323U (en) | Suspension arm hoisting matching system for steel box girder of cable-stayed bridge | |
CN114961282B (en) | Single-layer latticed shell structure streamer construction method with middle cylinder column | |
CN110182303A (en) | A kind of total group of method of rudder horn | |
CN106223623A (en) | Steel construction box arched roof truss installation method | |
CN108842954A (en) | Installation and construction method of huge different-section honeycomb beam structure system of wing-shaped roof | |
CN115059308A (en) | Large-span hyperbolic reducing inverted triangular pipe truss assembling method | |
CN115387221A (en) | High pier line type control method for high altitude area | |
CN117376377A (en) | Large-span arch bridge internet of things safety precaution monitoring system | |
CN105648923A (en) | Stay cable saddle positioning device and positioning method thereof | |
CN108731647A (en) | A kind of truss installa-tion docking measurement method | |
CN106869319A (en) | Large span steel truss installation method | |
CN110241735B (en) | Positioning and adjusting device and method for main tower cable guide pipe of cable-stayed bridge |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181102 |
|
RJ01 | Rejection of invention patent application after publication |