CN108729733A - A kind of permafrost region transmission tower intelligence repair system - Google Patents

A kind of permafrost region transmission tower intelligence repair system Download PDF

Info

Publication number
CN108729733A
CN108729733A CN201810738266.4A CN201810738266A CN108729733A CN 108729733 A CN108729733 A CN 108729733A CN 201810738266 A CN201810738266 A CN 201810738266A CN 108729733 A CN108729733 A CN 108729733A
Authority
CN
China
Prior art keywords
anchoring
correcting machine
automatic correcting
transmission pole
automatic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810738266.4A
Other languages
Chinese (zh)
Other versions
CN108729733B (en
Inventor
徐湘田
刘伟
范彩霞
王永涛
华树广
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Inner Mongolia University
Original Assignee
Inner Mongolia University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Inner Mongolia University filed Critical Inner Mongolia University
Priority to CN201810738266.4A priority Critical patent/CN108729733B/en
Publication of CN108729733A publication Critical patent/CN108729733A/en
Application granted granted Critical
Publication of CN108729733B publication Critical patent/CN108729733B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2284Means for adjusting the orientation of the post or pole
    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04HBUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES; SWIMMING OR SPLASH BATHS OR POOLS; MASTS; FENCING; TENTS OR CANOPIES, IN GENERAL
    • E04H12/00Towers; Masts or poles; Chimney stacks; Water-towers; Methods of erecting such structures
    • E04H12/22Sockets or holders for poles or posts
    • E04H12/2207Sockets or holders for poles or posts not used
    • E04H12/2215Sockets or holders for poles or posts not used driven into the ground

Abstract

The present invention designs power grid electric pole and is laid with field, specially a kind of permafrost region transmission tower intelligence repair system;Transmission pole fractures caused by solving the problems, such as seasonal frozen soil region when unfreezing causes the deformation of foundation soil otherness excessive;Including:Transmission pole, it leaks outside in being equipped with solar panel on surface layer on transmission pole, the transmission pole bottom end being placed in Seasonal analysis is fixed with hollow cavity and counterweight room, hollow chamber is used for fixed in position intelligence spirit level, intelligent spirit level is connect with external intellect controller by conducting wire, simultaneously in Seasonal analysis, it is embedded that there are three automatic correcting machine systems, each automatic correcting machine system is connect by parallel way with intellect controller, it is respectively equipped with correction reinforcing bar, the other end for reinforcing bar of rectifying a deviation is fixedly connected on transmission pole;It has the beneficial effect that:By using triangle intelligent balance system so that in seasonal frozen soil region, inbuilt transmission pole is eliminated freeze thawing and influenced, and keeps the stability of transmission pole.

Description

A kind of permafrost region transmission tower intelligence repair system
Technical field
The present invention designs power grid electric pole and is laid with field, specially a kind of permafrost region transmission tower intelligence repair system.
Background technology
The power engineering people's livelihood engineering one of important as China, plays very important work during national development With.Power Transmission is the important link contacted between power plant and residential electricity consumption.Current power Transmission is mainly with cable conveying It is main, including seabed cable, underground cables and earth's surface shaft tower cable etc..In the conveying of shaft tower cable, the stability of tower structure with And the stability of column foot is most important for the safety of power Transmission.Tower structure passes through armored concrete cylindricality shaft tower and steel The modes such as frame is hinged have obtained preferable solution.
The stability of pole and tower foundation is restricted, including height with the extension of transmission line of electricity by various complex geological conditions The building of mountain Canyon Area pole and tower foundation, the building of permafrost region pole and tower foundation, pole and tower foundation builds in desert.Wherein permafrost region The problem of pole and tower foundation encounters in building is more, after seasonal frozen soil region pole and tower foundation is built, due to freezing-thawing repeated action Cause pole and tower foundation deformation serious, causes top transmission of electricity concrete wire pole wide-angle tilt occur, or even topple over.To China northeast The transmission of electricity safety in area, Xinjiang and Structure Dynamics In The Qinghai-tibet Region constitutes a serious threat.Current season permafrost region, transmission pole is mainly with straight Based on connecing in embedment soil layer, only make some simple processing, frost zone layer thickness is deep commonly greater than the buried depth of line bar in addition Degree, what Frozen-thawed cycled effect generated is affected.
There are mainly two types for the treatment of measures used at present:1. by the way that two transmission poles are taken at top at an angle It connects, the form that bottom is opened at an angle is buried in the earth influence to eliminate unfreezing to line bar;2. single line bar embedment After in soil, concrete pier base is set in transmission pole bottom or the mound of certain altitude is set to eliminate unfreezing pair in earth's surface The influence of transmission pole stability.Wherein, it opens be buried in the earth at an angle by overlap joint, bottom at the top of two transmission poles Method to eliminate freeze thawing influence mitigates freeze thawing influence by changing transmission pole structure type, but since both threads bar buries In Seasonal analysis, the seasonal freezing-thawing action can cause both threads bar overall deformation, and then whole system is caused to tilt very To toppling over;In addition, easily there is transmission pole when being deformed between two transmission poles when otherness is larger under the influence of unfreezing Breakage phenomenon, the harm bigger of generation.
And it is another by eliminating freeze thawing shadow in single transmission pole earth's surface mound or setting line bar root concrete pier base Loud method, for mound due to being located at Seasonal analysis top, it is strong that directly effect and the indirectly-acting of freeze thawing influence the heap soil body It spends, after strength deterioration, line bar stability can be affected by.The method of concrete pier base is arranged due to entire in transmission pole bottom Structure is located in Seasonal analysis, and frozen soil layer is freezing and under ablation procedure repeated action, is being also easy to produce whole large deformation, and temperature The fluctuation of degree causes temperature in concrete structure body to become larger with the surrounding frozen soil layer temperature difference opposite sex, causes concrete structure Aggravate with the mutual heat exchange of surrounding soil, accelerates the destruction process of concrete structure, influence the stability of later stage transmission pole.
Invention content
The present invention provides a kind of automatic repair systems of permafrost region shaft tower, solve seasonal frozen soil region since unfreezing is drawn Rise the deformation of foundation soil otherness it is excessive when caused transmission pole fracture problem;Seasonal frozen soil region Frozen-thawed cycled is solved simultaneously to make It is integral inclined or the problems such as topple over lower caused transmission pole.By using triangle intelligent balance system so that in seasonality The inbuilt transmission pole of permafrost region, which eliminates freeze thawing, to be influenced, and the stability of transmission pole is kept.
To achieve the above object, the technical solution adopted by the present invention is specific as follows:
A kind of automatic repair system of permafrost region shaft tower, including:Transmission pole 1, it is below that transmission pole 1 is embedded in earth's surface 2 in advance In Seasonal analysis 20, it is characterised in that:The leakage on transmission pole 1 on surface layer 2 in being equipped with solar panel 3,1 bottom end of transmission pole being placed in Seasonal analysis 2 is fixed with hollow cavity 4 and counterweight room 5, and hollow chamber is pacified for fixed Intelligent spirit level 6 is set, intelligent spirit level 6 is connect with external intellect controller 7 by conducting wire, while in frost zone In layer 20, centered on transmission pole 1, it is automatic to be embedded with the anchoring of the first anchoring automatic correcting machine system 8, second in three-legged structure Rectification machine system 9 and third anchoring automatic correcting machine system 10, first the 8, second anchoring of anchoring automatic correcting machine system are entangled automatically Inclined machine system 9 and third anchoring automatic correcting machine system 10 are connect by parallel way with intellect controller 7, the first anchoring Automatic correcting machine system 8, second anchors and is equipped with correction in automatic correcting machine system 9 and third anchoring automatic correcting machine system 10 The other end of reinforcing bar 11, correction reinforcing bar 11 is fixedly connected on transmission pole 1.
The solar panel 3 by power cord be intellect controller 7, first anchor automatic correcting machine system 8, Second anchoring automatic correcting machine system 9 and third anchoring automatic correcting machine system 10 provide electric power.
The first anchoring automatic correcting machine system 8, second anchors automatic correcting machine system 9 and third anchors automatic deviation correction 10 structure of machine system is identical, by 15 groups of warehouse in deviation-rectifying system 12, anchoring adjustment frame 13, adapter 14 and intelligent steering system At anchoring adjustment frame 12 is installed on 12 bottom of warehouse in deviation-rectifying system, and intelligent steering system 15 is by adapter 14 and correction 12 top connection of warehouse in system.
Correction reinforcing bar selection system 16 and automatic correcting machine control system 18 are installed in the deviation-rectifying system in warehouse 12, Correction reinforcing bar selection system 16 with equipped with reinforcing bar intelligent recognition device 17 corresponding correction reinforcing bar is identified, automatic correcting machine Intelligence computation balancer 19 is equipped in control system 18.
Leading block 20 is installed in the adapter 14 and deviation-rectifying system between warehouse 12.
The anchoring adjustment frame 13 is embedded in permafrost 22.
Beneficial effects of the present invention are:1, this system can be passed through by providing a kind of automatic repair system of transmission pole The triangle stability principle of inside setting is adjusted in time after being tilted to shaft tower, allows shaft tower that can realize autobalance, really The safety and stability of transmission pole is protected.
2, this system can effectively solve to occur after seasonal frozen soil region transmission pole is influenced due to frozen soil layer unfreezing It tilts and topples over, and realize the automatic business processing of constitutional balance adjustment.
Description of the drawings
Fig. 1 is schematic structural view of the invention;
Fig. 2 is triangle balance regulation system schematic diagram;
Fig. 3 is anchoring adjustment system installation structure schematic diagram;
As shown in the figure:Transmission pole 1, earth's surface 2, solar panel 3, hollow cavity 4, counterweight room 5, intelligent spirit level 6, Intellect controller 7, first anchors automatic correcting machine system 8, second and anchors automatic correcting machine system 9, third anchoring automatically Rectification machine system 10, correction reinforcing bar 11, deviation-rectifying system inside warehouse 12, anchoring adjustment frame 13, adapter 14, intelligent steering system 15, correction reinforcing bar selection system 16, reinforcing bar intelligent recognition device 17, automatic correcting machine control system 18, intelligence computation balancer 19, Leading block 20, Seasonal analysis 21, permafrost 22.
Specific implementation mode
Below in conjunction with the accompanying drawings and pass through specific embodiment further instruction technical scheme of the present invention:
Embodiment 1
In Fig. 1, intelligent spirit level 6 is mainly to intelligent its principle that converts of line bar gradient progress in figure:Spirit level inclines After tiltedly, spirit level air entrapment position will change, and bottom laser displacement tracker will be inclined to line bar according to tracking result The angle of shifting converts, and according to y=ax+b, a and b is design factor in formula, and y is angle of inclination, and x is spirit level offset, Intelligent spirit level can calculate the angle of inclination of line bar accordingly.After conversion is transferred data to by intellect controller 7 One anchoring automatic correcting machine system 8, second anchors automatic correcting machine system 9 and third anchoring automatic correcting machine system 10.First Anchoring automatic correcting machine system 8, second anchors automatic correcting machine system 9, third anchoring automatic correcting machine system 10 is rectified a deviation, It is rectified a deviation using triangular system, deviating correcting principle is:After line bar run-off the straight, bottom triangle equilibrium system intermediate cam What the part side of shape was subject to, which widen, sharply increases, and the pulling force on part side then strongly reduces, and Atria side is then located when starting In equilibrium state, respectively possess the value of thrust of oneself, dynamic balance correction carried out according to each automatic correcting machine system of force balance principle, And the angle calculated in intelligent level instrument meter is mutually authenticated, and reaches complete line bar correction.The moment controls with intelligent acquisition in correction Device 7 is kept in communication, until 6 data of intelligent spirit level restore normal.Arm's length standard value:Two base angle of triangle is equal.When balance quilt Start to start entire repair system after breaking.Solar panel 3 mainly gives each automatic correcting machine system and intelligent acquisition control Device 7 processed provides power supply, built-in radio transmission antenna in intellect controller 7, even if adjustment information is transmitted to indoor calculating Machine terminal, the information that engineering staff can be obtained by terminal differentiates the operation situation of transmission pole, while knowing intelligence The operating status of deviation-rectifying system can solve in time after failure.High-density concrete, totality are filled in bottom weight room 5 Weight is more than line bar weight.In intelligent Correction System work, bottom can keep rotating and slide, and then can be to avoid power transmission line 1 adjustment amplitude of bar is excessive and generates breakage phenomenon.
First anchoring automatic correcting machine system 8, second anchors automatic correcting machine system 9, third anchoring automatic correcting machine system The structure of system 10 is identical, as shown in figure 3, by warehouse in deviation-rectifying system 12, anchoring adjustment frame 13, adapter 14 and automated steering System 15 forms.Each anchoring automatic correcting machine system is anchored entirely through bottom anchor adjustment frame 13 and permafrost 22, is kept away Exempt from itself generation position in rectification machine work to move, influences transmission pole rectifying effect.Installation in warehouse 12 in deviation-rectifying system Have a correction reinforcing bar selection system 16 and automatic correcting machine control system 18, correction reinforcing bar selection system 16 with equipped with reinforcing bar intelligence Corresponding correction reinforcing bar is identified in identifier 17, and intelligence computation balancer 19 is equipped in automatic correcting machine control system 18. Top intelligent steering system 15 can need appropriate rotation, cooperation rectification machine to carry out rectification work according to adjustment.Automatic correcting machine control The transmission pole tilt data that the intelligent spirit level 6 that system 18 processed mainly receives to transmit from intellect controller 7 acquires.Intelligence Energy spirit level 6 mainly acquires each side value of thrust F of line bar inclination angle value and bottom triangle system acquisition, according to above-mentioned Data carry out correction operation.By the identification to data, be converted into specific correction amount, at the same determine specific correction sequence and It determines correction reinforcing bar, and sends data to intelligence computation balancer 19, by data after the calculating analysis of intelligence computation balancer 19 Continue to be transmitted to reinforcing bar intelligent recognition device 17, which determines the specific correction reinforcing bar between adjacent triangle, then repair Real-time data transmission to intellect controller 7 is identified by data line during correction for system starts, correction System stops after work, keeps equilibrium state.
Concrete operation step is:1. transmission pole disturbs once being acted on by frozen soil Frozen-thawed cycled in Seasonal analysis And after generating inclination, intelligent repair system starts.Intelligent spirit level is by the data transmissions such as the angle of inclination of acquisition to intelligent acquisition In controller.
2. after intellect controller analysis, each automatic correcting machine system is sent data to, the system is to data analysis The concrete order rectified a deviation in correction amount and specific balance system is determined afterwards, then starts rectification work.
3. in rectification work, each automatic correcting machine system time is kept in communication with intelligent acquisition control system, until correction Work terminates.During being somebody's turn to do, data are sent to power department terminal by intellect controller by Wireless Transmitter, It is checked for engineer's analysis.
4. after rectification work, which keeps Equilibrium.Three triangle moment keep Equilibrium and phase Have a good balance between mutually, line bar bottom weight ensure that the bottom degree of freedom in line bar adjustment, but due to weight compared with It is big again will not line bar topple over.
It is obvious to a person skilled in the art that invention is not limited to the details of the above exemplary embodiments, Er Qie In the case of without departing substantially from spirit or essential attributes of the invention, the present invention can be realized in other specific forms.Therefore, no matter From the point of view of which point, the present embodiments are to be considered as illustrative and not restrictive, and the scope of the present invention is by appended power Profit requires rather than above description limits, it is intended that all by what is fallen within the meaning and scope of the equivalent requirements of the claims Variation is included within the present invention.Any reference signs in the claims should not be construed as limiting the involved claims.
In addition, it should be understood that although this specification is described in terms of embodiments, but not each embodiment is only wrapped Containing an independent technical solution, this description of the specification is merely for the sake of clarity, and those skilled in the art should It considers the specification as a whole, the technical solutions in the various embodiments may also be suitably combined, forms those skilled in the art The other embodiment being appreciated that.

Claims (6)

1. a kind of automatic repair system of permafrost region shaft tower, including:Transmission pole, transmission pole are embedded in earth's surface seasonality below in advance In frozen soil layer, it is characterised in that:The leakage is placed in seasonality in being equipped with solar panel on surface layer on transmission pole Transmission pole bottom end in frozen soil layer is fixed with hollow cavity and counterweight room, and hollow chamber is used for fixed in position intelligence spirit level, intelligence Energy spirit level is connect with external intellect controller by conducting wire, while in Seasonal analysis, being with transmission pole Center is embedded with the first anchoring automatic correcting machine system, the second anchoring automatic correcting machine system and third in three-legged structure and anchors Automatic correcting machine system, the first anchoring automatic correcting machine system, the second anchoring automatic correcting machine system and third anchoring are entangled automatically Inclined machine system is connect by parallel way with intellect controller, and the first anchoring automatic correcting machine system, the second anchoring are automatic It is equipped with correction reinforcing bar in rectification machine system and third anchoring automatic correcting machine system, the other end for reinforcing bar of rectifying a deviation is fixedly connected on On transmission pole.
2. a kind of automatic repair system of permafrost region shaft tower according to claim 1, it is characterised in that:The solar cell Plate by power cord be intellect controller, the first anchoring automatic correcting machine system, the second anchoring automatic correcting machine system and Third anchors automatic correcting machine system and provides electric power.
3. a kind of automatic repair system of permafrost region shaft tower according to claim 1, it is characterised in that:First anchoring is certainly Dynamic rectification machine system, the second anchoring automatic correcting machine system are identical with third anchoring automatic correcting machine system structure, are by correction Warehouse, anchoring adjustment frame, adapter and intelligent steering system composition, anchoring adjustment frame are installed on warehouse bottom in deviation-rectifying system in system Portion, intelligent steering system at the top of adapter and warehouse in deviation-rectifying system by connecting.
4. a kind of automatic repair system of permafrost region shaft tower according to claim 3, it is characterised in that:In the deviation-rectifying system Correction reinforcing bar selection system and automatic correcting machine control system is installed in warehouse, correction reinforcing bar selection system with equipped with reinforcing bar Corresponding correction reinforcing bar is identified in intelligent recognition device, and intelligence computation balancer is equipped in automatic correcting machine control system.
5. a kind of automatic repair system of permafrost region shaft tower according to claim 3, it is characterised in that:The adapter with entangle Leading block is installed between warehouse in inclined system.
6. a kind of automatic repair system of permafrost region shaft tower according to claim 3, it is characterised in that:The anchoring adjustment frame It is embedded in permafrost.
CN201810738266.4A 2018-07-06 2018-07-06 Intelligent repairing system for transmission tower in frozen soil area Active CN108729733B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810738266.4A CN108729733B (en) 2018-07-06 2018-07-06 Intelligent repairing system for transmission tower in frozen soil area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810738266.4A CN108729733B (en) 2018-07-06 2018-07-06 Intelligent repairing system for transmission tower in frozen soil area

Publications (2)

Publication Number Publication Date
CN108729733A true CN108729733A (en) 2018-11-02
CN108729733B CN108729733B (en) 2023-11-14

Family

ID=63925848

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810738266.4A Active CN108729733B (en) 2018-07-06 2018-07-06 Intelligent repairing system for transmission tower in frozen soil area

Country Status (1)

Country Link
CN (1) CN108729733B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016393A (en) * 2021-08-26 2022-02-08 中国科学院西北生态环境资源研究院 Pier retention system

Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3579936A (en) * 1968-05-29 1971-05-25 Gustav Mattias Andersson Pole base providing adjustability for angular axial alignment of the pole
KR101019734B1 (en) * 2009-12-29 2011-03-08 (주)한국에스코 Apparatus for adjusting post position and direction of iron tower
CN103437385A (en) * 2013-08-21 2013-12-11 国家电网公司 Transmission iron tower tilt rectification method
CN103696614A (en) * 2013-12-01 2014-04-02 国家电网公司 Power transmission line tower inclination detection and correction system
CN203668981U (en) * 2013-12-01 2014-06-25 国家电网公司 Power transmission line iron tower inclination detecting and lifting system in geological subsidence area
CN105484557A (en) * 2015-12-29 2016-04-13 国家电网公司 Restoration device for inclined telegraph pole
CN208918393U (en) * 2018-07-06 2019-05-31 内蒙古大学 A kind of permafrost region transmission tower intelligence repair system

Patent Citations (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US3579936A (en) * 1968-05-29 1971-05-25 Gustav Mattias Andersson Pole base providing adjustability for angular axial alignment of the pole
KR101019734B1 (en) * 2009-12-29 2011-03-08 (주)한국에스코 Apparatus for adjusting post position and direction of iron tower
CN103437385A (en) * 2013-08-21 2013-12-11 国家电网公司 Transmission iron tower tilt rectification method
CN103696614A (en) * 2013-12-01 2014-04-02 国家电网公司 Power transmission line tower inclination detection and correction system
CN203668981U (en) * 2013-12-01 2014-06-25 国家电网公司 Power transmission line iron tower inclination detecting and lifting system in geological subsidence area
CN105484557A (en) * 2015-12-29 2016-04-13 国家电网公司 Restoration device for inclined telegraph pole
CN208918393U (en) * 2018-07-06 2019-05-31 内蒙古大学 A kind of permafrost region transmission tower intelligence repair system

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114016393A (en) * 2021-08-26 2022-02-08 中国科学院西北生态环境资源研究院 Pier retention system
CN114016393B (en) * 2021-08-26 2023-08-22 中国科学院西北生态环境资源研究院 Pier retention system

Also Published As

Publication number Publication date
CN108729733B (en) 2023-11-14

Similar Documents

Publication Publication Date Title
US20220074160A1 (en) Pile-cylinder-truss composite offshore wind turbine foundation and construction process thereof
CN104695964B (en) Subway shield tunnel freeze entering method
CN104343455B (en) Long-distance curved jacking pipe and pipe roof construction technique
CN108716404B (en) Device for preventing and controlling tunnel freeze injury in seasonal frozen soil region and installation method
CN103851257A (en) Paired cable duct bank laying-based support pipe construction process
CN104632234A (en) Rectangular pipe jacking construction method for multi-pipe-spacing cross section
CN208918393U (en) A kind of permafrost region transmission tower intelligence repair system
US20140115987A1 (en) Wind farm and method for installing a wind farm
CN105604086B (en) Fan foundation structure
CN105780806A (en) Offshore wind turbine foundation for long-leg jacket of drilling piles and construction method of offshore wind turbine foundation
CN108677995B (en) Offshore wind turbine single pile foundation with suction caisson and tensioning mooring system
CN108729733A (en) A kind of permafrost region transmission tower intelligence repair system
CN113073672A (en) Offshore wind turbine composite skirt type foundation structure with active control system and construction method
Lange et al. Offshore Wind Farm Bockstigen–Installation and Operation Experience
CN108222058A (en) A kind of bucket foundation and its construction method with adjustable anti-buckling device
CN108487281A (en) A kind of quick sinking construction device of the forced open caisson of piled anchor
CN205777813U (en) Be suitable to the electric power pylon of mountain terrain
CN215211133U (en) Offshore wind turbine composite skirt type foundation structure with active control system
CN111962910A (en) Building underpinning foundation rotating displacement rectification method
CN215211130U (en) Pre-tensioned pile anchor combined foundation for shallow covering layer seabed
CN206310081U (en) For the cable anti-fall device on the anti-ponding basis of mountain region photovoltaic DC-to-AC converter
CN205399469U (en) Wind turbine foundation structure
CN112942306A (en) Freezing method for large foundation pit
CN113309093A (en) Vibration induction thermal expansion anchoring force micro-adjustment anchor rod structure and application method
CN102767190A (en) Tower foundation and method for manufacturing same

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant