CN108729668A - A kind of stair template for building construction - Google Patents
A kind of stair template for building construction Download PDFInfo
- Publication number
- CN108729668A CN108729668A CN201810816180.9A CN201810816180A CN108729668A CN 108729668 A CN108729668 A CN 108729668A CN 201810816180 A CN201810816180 A CN 201810816180A CN 108729668 A CN108729668 A CN 108729668A
- Authority
- CN
- China
- Prior art keywords
- stair
- template
- side baffle
- hand apron
- fixed plate
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
- 238000009435 building construction Methods 0.000 title claims abstract description 17
- 229920003023 plastic Polymers 0.000 claims abstract description 21
- 239000004033 plastic Substances 0.000 claims abstract description 21
- 239000002250 absorbent Substances 0.000 claims abstract description 15
- 238000013016 damping Methods 0.000 claims abstract description 9
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 claims description 5
- 238000004026 adhesive bonding Methods 0.000 claims description 3
- 239000004744 fabric Substances 0.000 claims 1
- 230000003670 easy-to-clean Effects 0.000 abstract description 2
- 238000010586 diagram Methods 0.000 description 6
- 238000009434 installation Methods 0.000 description 5
- 238000005516 engineering process Methods 0.000 description 3
- 229910000861 Mg alloy Inorganic materials 0.000 description 2
- 239000000956 alloy Substances 0.000 description 2
- 238000010276 construction Methods 0.000 description 2
- 238000001035 drying Methods 0.000 description 2
- 238000012986 modification Methods 0.000 description 2
- 230000004048 modification Effects 0.000 description 2
- 241001391944 Commicarpus scandens Species 0.000 description 1
- 238000005452 bending Methods 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000015572 biosynthetic process Effects 0.000 description 1
- 238000005213 imbibition Methods 0.000 description 1
- 238000000034 method Methods 0.000 description 1
- 238000000465 moulding Methods 0.000 description 1
- 238000002360 preparation method Methods 0.000 description 1
- 230000003014 reinforcing effect Effects 0.000 description 1
- 230000008439 repair process Effects 0.000 description 1
Classifications
-
- E—FIXED CONSTRUCTIONS
- E04—BUILDING
- E04G—SCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
- E04G13/00—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
- E04G13/06—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall
- E04G13/062—Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills for stairs, steps, cornices, balconies, or other parts corbelled out of the wall for stairs or steps
Landscapes
- Engineering & Computer Science (AREA)
- Architecture (AREA)
- Mechanical Engineering (AREA)
- Civil Engineering (AREA)
- Structural Engineering (AREA)
- Steps, Ramps, And Handrails (AREA)
Abstract
The invention discloses a kind of stair templates for building construction, including stair end template, left side baffle, fixed plate and pour empty slot, the inside of the stair end template is equipped with load-bearing pillar, and damping gum cover is enclosed on the outside of load-bearing pillar, it is provided with water-absorbent plastics plate above the stair end template, the left side baffle is located at the top of stair end template, and it is provided with right-hand apron on rear side of the baffle of left side, it is provided with card slot on the right-hand apron, the fixed plate is mounted on the front position of right-hand apron, and sliding block is provided with above fixed plate, it is provided with sliding slot below the sliding block, clamping block is installed on the outside of the sliding slot.The stair template of the building construction is mounted with water-absorbent plastics plate, and water-absorbent plastics plate is easy to disassemble, and the moisture helped speed up in concrete is reduced, so that the improved efficiency of concrete Cheng Mo, smooth surface is conducive to stair demoulding, and plastic plate is easy to clean, enhances the practicability of the device.
Description
Technical field
The present invention relates to building construction correlative technology fields, specially a kind of stair template for building construction.
Background technology
Stair template is a kind of very important building implement during house is built, and existing stair template is mostly timber
Matter, but since many buildings are often built in the development of present real estate, a cell, slowly built with this Wooden stair template
The working efficiency of construction personnel, existing stair template installation trouble can be seriously reduced, and demoulds inconvenience, it is often necessary to be worked
Personnel carry out the finishing in later stage, are unfavorable for the development of house construction.
In view of the above-mentioned problems, carrying out innovative design on the basis of original stair template device.
Invention content
The purpose of the present invention is to provide a kind of stair templates for building construction, to solve to carry in above-mentioned background technology
The existing stair template installation trouble haveing, and demould inconvenience, it is often necessary to staff carries out the finishing in later stage, is unfavorable for
The problem of development that house is built.
To achieve the above object, the present invention provides the following technical solutions:A kind of stair template for building construction, including
Stair end template, left side baffle, fixed plate and empty slot is poured, the inside of the stair end template is equipped with load-bearing pillar, and load-bearing
It is enclosed with damping gum cover on the outside of column, water-absorbent plastics plate, left side baffle position are provided with above the stair end template
In the top of stair end template, and it is provided with right-hand apron on rear side of the baffle of left side, card slot, institute are provided on the right-hand apron
It states fixed plate and is mounted on the front position of right-hand apron, and be provided with sliding block above fixed plate, the lower section setting of the sliding block
There is sliding slot, clamping block, the top for pouring empty slot and being located at stair end template, the anti-overflow gear are installed on the outside of the sliding slot
Plate is mounted on the top of left side baffle.
Preferably, the load-bearing pillar is embedded in the inner cavity of stair end template, and load-bearing pillar setting haves three layers, and 3 layers are held
Rectangular cross-distribution between weight column.
Preferably, the inner surface of the left side baffle, right-hand apron and fixed plate is attached with water-absorbent plastics plate, and inhales
Water-based plastic plate is that gluing is connect, and is inhaled with the connection type of stair end template, left side baffle, right-hand apron and fixed plate
The surface of water-based plastic plate is in smooth structure.
Preferably, the card slot is arranged on left side baffle and right-hand apron, and center of the card slot about stair end template
Line is in front and back symmetrical.
Preferably, the fixed plate is made up of with left side baffle and right-hand apron clamping block and is connected together, and fixed
The length of plate is equal to the gap length between left side baffle and right-hand apron.
Preferably, the Anti-overflow guard is an integral structure with left side baffle and right-hand apron, and vertical section of Anti-overflow guard
The contour structures in face are in aduncate arcuate structure.
Compared with prior art, the beneficial effects of the invention are as follows:This is used for the stair template of building construction,
(1) device is provided with card slot and clamping block so that the fixed plate of the device is easy for installation, greatly reduces stair
The installation difficulty of template has saved the disassembly and assembly time of the device, accelerates the working efficiency of staff, facilitates and promotes the device
Convenience;
(2) it is mounted with that load-bearing pillar and damping gum cover, load-bearing pillar are magnesium alloy material, is not increasing the installation weight seriously
In the case of so that the bearing capacity of the device is reinforced, and the service life of the device, while subtracting between load-bearing pillar are effectively extended
Shake gum cover avoids the contact between load-bearing pillar from shaking, and is influenced at mould on inner concrete to reduce;
(3) it is mounted with water-absorbent plastics plate, water-absorbent plastics plate is easy to disassemble, and the moisture helped speed up in concrete subtracts
It is few so that the improved efficiency of concrete Cheng Mo, smooth surface is conducive to stair demoulding, and plastic plate is easy to clean, enhances
The practicability of the device.
Description of the drawings
Fig. 1 is dimensional structure diagram of the present invention;
Fig. 2 is load-bearing pillar structural schematic diagram of the present invention;
Fig. 3 is right-hand apron structural schematic diagram of the present invention;
Fig. 4 is fixed plate structure schematic diagram of the present invention;
Fig. 5 is stair end template internal structure schematic diagram of the present invention;
Fig. 6 is Anti-overflow guard dimensional structure diagram of the present invention.
In figure:1, stair end template;2, load-bearing pillar;3, damping gum cover;4, water-absorbent plastics plate;5, left side baffle;6, right
Side shield;7, card slot;8, fixed plate;9, sliding block;10, sliding slot;11, clamping block;12, empty slot is poured;13, Anti-overflow guard.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete
Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on
Embodiment in the present invention, it is obtained by those of ordinary skill in the art without making creative efforts every other
Embodiment shall fall within the protection scope of the present invention.
- 6 are please referred to Fig.1, the present invention provides a kind of technical solution:A kind of stair template for building construction, including building
Terraced end template 1, load-bearing pillar 2, damping gum cover 3, water-absorbent plastics plate 4, left side baffle 5, right-hand apron 6, card slot 7, fixed plate 8,
Sliding block 9, clamping block 11, pours empty slot 12 and Anti-overflow guard 13 at sliding slot 10, and the inside of stair end template 1 is equipped with load-bearing pillar 2,
And the outside of load-bearing pillar 2 is enclosed with damping gum cover 3, the top of stair end template 1 is provided with water-absorbent plastics plate 4, left side baffle 5
Rear side positioned at the top of stair end template 1, and left side baffle 5 is provided with right-hand apron 6, and card slot is provided on right-hand apron 6
7, fixed plate 8 is mounted on the front position of right-hand apron 6, and the top of fixed plate 8 is provided with sliding block 9, the lower section setting of sliding block 9
There are sliding slot 10, the outside of sliding slot 10 that clamping block 11 is installed, pours the top that empty slot 12 is located at stair end template 1, Anti-overflow guard
13 are mounted on the top of left side baffle 5.
Load-bearing pillar 2 is embedded in the inner cavity of stair end template 1, and the setting of load-bearing pillar 2 haves three layers, and 3 layers of load-bearing pillar 2 it
Between rectangular cross-distribution, load-bearing pillar 2 is magnesium alloy material, and light weight, and bending not easy to break effectively enhances the dress
The bearing set reduces spoilage.
The inner surface of left side baffle 5, right-hand apron 6 and fixed plate 8 is attached with water-absorbent plastics plate 4, and water imbibition is moulded
Flitch 4 is that gluing is connect, and is inhaled with the connection type of stair end template 1, left side baffle 5, right-hand apron 6 and fixed plate 8
The surface of water-based plastic plate 4 is in smooth structure, conveniently stripped, while accelerating the rate of drying of concrete, improves staff
Working efficiency.
Before card slot 7 is arranged on left side baffle 5 and right-hand apron 6, and card slot 7 is in about the center line of stair end template 1
It is symmetrical afterwards, facilitate mounting plate 8, enhances the convenience of the device.
Fixed plate 8 is made up of with left side baffle 5 and right-hand apron 6 clamping block 11 and is connected together, and the length of fixed plate 8
Degree is equal to the gap length between left side baffle 5 and right-hand apron 6, conveniently makes fixed plate 8 and left side baffle 5 and right-hand apron 6
Between be seamlessly connected, promote the aesthetics of concrete formation.
Anti-overflow guard 13 is an integral structure with left side baffle 5 and right-hand apron 6, and 13 longitudinal section of Anti-overflow guard is outer
Shape structure is in aduncate arcuate structure, prevents concrete spill and leakage, reduces the frequency that staff repairs stair.
Operation principle:When being used for the stair template of building construction using this, staff first checks for the device each zero
Whether part is intact, in the case where each part does not damage, reuses and installs the device, according to Fig. 1, first, user
Stair end template 1 is supported using existing support column and is built, stair end template 1 is with left side baffle 5 and right-hand apron 6
Fixed plate 8 is sticked between left side baffle 5 and right-hand apron 6, according to fig. 3 shown in-Fig. 4, then is led to by integral structure, staff
It crosses sliding slot 10 and pushes out sliding block 9, sliding block 9 is connect with clamping block 11, and 11 stress of clamping block injects in card slot 7, with this to fixation
Plate 8 is fixed, and after fixing, staff pours into concrete from pouring empty slot 12, and after filling up, staff utilizes work
Tool strikes off the horizontal plane of concrete, and later with same method, staff installs fixed plate 8 successively, and is pouring
Carry out pouring filling in empty slot 12, according to Fig.6, Anti-overflow guard 13 prevents concrete spill and leakage, according to fig. 2 with shown in Fig. 5, building
Load-bearing pillar 2 and damping gum cover 3 inside terraced end template 1 play the role of reinforcing load-bearing and damping, wait concrete completely dry
After molding, staff removes support column, is demoulded to stair, and water-absorbent plastics plate 4 accelerates the drying efficiency of concrete,
Conveniently stripped simultaneously, the content not being described in detail in this specification belongs to existing skill well known to professional and technical personnel in the field
Art.
It although an embodiment of the present invention has been shown and described, for the ordinary skill in the art, can be with
Understanding without departing from the principles and spirit of the present invention can carry out these embodiments a variety of variations, modification, replace
And modification, the scope of the present invention is defined by the appended.
Claims (6)
1. a kind of stair template for building construction, including stair end template (1), left side baffle (5), fixed plate (8) and pour
Build empty slot (12), it is characterised in that:The inside of the stair end template (1) is equipped with load-bearing pillar (2), and load-bearing pillar (2) is outer
Side is enclosed with damping gum cover (3), and water-absorbent plastics plate (4), the left side baffle are provided with above the stair end template (1)
(5) it is located at the top of stair end template (1), and is provided with right-hand apron (6), the right-hand apron on rear side of left side baffle (5)
(6) card slot (7) is provided on, the fixed plate (8) is mounted on the front position of right-hand apron (6), and the top of fixed plate (8)
It is provided with sliding block (9), sliding slot (10) is provided with below the sliding block (9), clamping block is installed on the outside of the sliding slot (10)
(11), the top for pouring empty slot (12) and being located at stair end template (1), the Anti-overflow guard (13) are mounted on left side baffle
(5) top.
2. a kind of stair template for building construction according to claim 1, it is characterised in that:The load-bearing pillar (2)
It is embedded in the inner cavity of stair end template (1), and load-bearing pillar (2) setting haves three layers, and is at right angles handed between 3 layers of load-bearing pillar (2)
Fork distribution.
3. a kind of stair template for building construction according to claim 1, it is characterised in that:The left side baffle
(5), right-hand apron (6) and the inner surface of fixed plate (8) are attached with water-absorbent plastics plate (4), and water-absorbent plastics plate (4) with
Stair end template (1), left side baffle (5), right-hand apron (6) and the connection type of fixed plate (8) are that gluing connects, and inhales
The surface of water-based plastic plate (4) is in smooth structure.
4. a kind of stair template for building construction according to claim 1, it is characterised in that:The card slot (7) sets
It sets on left side baffle (5) and right-hand apron (6), and card slot (7) symmetrically divides about the center line of stair end template (1) in front and back
Cloth.
5. a kind of stair template for building construction according to claim 1, it is characterised in that:The fixed plate (8)
It is made up of and is connected together with left side baffle (5) and right-hand apron (6) clamping block (11), and the length of fixed plate (8) is equal to
Gap length between left side baffle (5) and right-hand apron (6).
6. a kind of stair template for building construction according to claim 1, it is characterised in that:The Anti-overflow guard
(13) it is an integral structure with left side baffle (5) and right-hand apron (6), and the contour structures of Anti-overflow guard (13) longitudinal section are in
Aduncate arcuate structure.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810816180.9A CN108729668A (en) | 2018-07-24 | 2018-07-24 | A kind of stair template for building construction |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810816180.9A CN108729668A (en) | 2018-07-24 | 2018-07-24 | A kind of stair template for building construction |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108729668A true CN108729668A (en) | 2018-11-02 |
Family
ID=63927367
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810816180.9A Pending CN108729668A (en) | 2018-07-24 | 2018-07-24 | A kind of stair template for building construction |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108729668A (en) |
Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08312090A (en) * | 1995-05-12 | 1996-11-26 | Fujita Corp | Construction method of concrete stair with stepped form left, and stepped form |
JPH1181660A (en) * | 1997-09-11 | 1999-03-26 | Shimizu Corp | Form construction method for staircase |
CN2421363Y (en) * | 2000-05-09 | 2001-02-28 | 许愧枫 | Shuttering for reinforcing concrete strength |
CN104878924A (en) * | 2015-05-29 | 2015-09-02 | 成都市第二建筑工程公司 | Stair step concrete pouring-molded template and stair cast-in-situ construction method |
CN205688798U (en) * | 2016-06-23 | 2016-11-16 | 青岛海川建设集团有限公司 | A kind of anti-fall pressure stair template supporting construction |
CN207434278U (en) * | 2017-07-31 | 2018-06-01 | 广州麟祥环保科技有限公司 | A kind of tamper-proof outdoor garbage bin |
CN208668945U (en) * | 2018-07-24 | 2019-03-29 | 黄丽明 | A kind of stair template for building construction |
-
2018
- 2018-07-24 CN CN201810816180.9A patent/CN108729668A/en active Pending
Patent Citations (7)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH08312090A (en) * | 1995-05-12 | 1996-11-26 | Fujita Corp | Construction method of concrete stair with stepped form left, and stepped form |
JPH1181660A (en) * | 1997-09-11 | 1999-03-26 | Shimizu Corp | Form construction method for staircase |
CN2421363Y (en) * | 2000-05-09 | 2001-02-28 | 许愧枫 | Shuttering for reinforcing concrete strength |
CN104878924A (en) * | 2015-05-29 | 2015-09-02 | 成都市第二建筑工程公司 | Stair step concrete pouring-molded template and stair cast-in-situ construction method |
CN205688798U (en) * | 2016-06-23 | 2016-11-16 | 青岛海川建设集团有限公司 | A kind of anti-fall pressure stair template supporting construction |
CN207434278U (en) * | 2017-07-31 | 2018-06-01 | 广州麟祥环保科技有限公司 | A kind of tamper-proof outdoor garbage bin |
CN208668945U (en) * | 2018-07-24 | 2019-03-29 | 黄丽明 | A kind of stair template for building construction |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209207732U (en) | Precast concrete overlaps board mold | |
CN103774561B (en) | The job execution of speedway prefabricated small box girder frock method streamlined | |
CN208668945U (en) | A kind of stair template for building construction | |
CN201730325U (en) | Formwork for concrete column | |
CN108729668A (en) | A kind of stair template for building construction | |
CN210659256U (en) | Vertical stair mold for prefabricated building | |
CN207003823U (en) | A kind of new prefabricated side bar | |
CN204221941U (en) | A kind of combined type sycon cable duct mould | |
CN212295645U (en) | Aluminum alloy template with tongue-and-groove structure | |
CN209425737U (en) | A kind of precast wall body molding die | |
CN211137559U (en) | Building cement pouring fabricated model | |
CN208618264U (en) | A kind of Lightweight high-strength composite material railroad bridge bridge floor bracket | |
CN113232134A (en) | Adjustable floor slab die for assembly type building | |
CN210436344U (en) | Processing device for prefabricated stairs | |
CN203438363U (en) | Large-aperture assembly type reinforced concrete culvert shaping steel template | |
CN2605299Y (en) | Concrete box-girder permanent internal core construction form | |
CN216240672U (en) | Formula of sinking slip casting mouth plugging device | |
CN206467999U (en) | A kind of construction formwork for placing | |
CN205421711U (en) | Permanent beam mold board of arrangement of reinforcement formula pin joint, concrete structure component | |
CN219993106U (en) | Reverse drawing template for post-pouring strip structural plate | |
CN216340938U (en) | Outer window tongue-and-groove steel mould | |
CN218802972U (en) | Prefabricated wall body three-layer composite mold and accurate mode locking device | |
CN214195552U (en) | Combined core mould | |
CN105984036A (en) | Bubble control technique for producing PC (polycarbonate) boards with modular molds | |
CN208917969U (en) | A kind of monoblock type combined steel formwork |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
WD01 | Invention patent application deemed withdrawn after publication | ||
WD01 | Invention patent application deemed withdrawn after publication |
Application publication date: 20181102 |