CN108729666A - A kind of combined type bearing constructed for skyscraper or bridge tower - Google Patents

A kind of combined type bearing constructed for skyscraper or bridge tower Download PDF

Info

Publication number
CN108729666A
CN108729666A CN201810918334.5A CN201810918334A CN108729666A CN 108729666 A CN108729666 A CN 108729666A CN 201810918334 A CN201810918334 A CN 201810918334A CN 108729666 A CN108729666 A CN 108729666A
Authority
CN
China
Prior art keywords
bearing
plate
skyscraper
bridge tower
combined type
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810918334.5A
Other languages
Chinese (zh)
Other versions
CN108729666B (en
Inventor
王辉
王开强
陈波
刘晓升
朱磊磊
周勇
曹振杰
杨辉
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Third Engineering Bureau Co Ltd
Original Assignee
China Construction Third Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Third Engineering Bureau Co Ltd filed Critical China Construction Third Engineering Bureau Co Ltd
Priority to CN201810918334.5A priority Critical patent/CN108729666B/en
Publication of CN108729666A publication Critical patent/CN108729666A/en
Application granted granted Critical
Publication of CN108729666B publication Critical patent/CN108729666B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • EFIXED CONSTRUCTIONS
    • E04BUILDING
    • E04GSCAFFOLDING; FORMS; SHUTTERING; BUILDING IMPLEMENTS OR AIDS, OR THEIR USE; HANDLING BUILDING MATERIALS ON THE SITE; REPAIRING, BREAKING-UP OR OTHER WORK ON EXISTING BUILDINGS
    • E04G13/00Falsework, forms, or shutterings for particular parts of buildings, e.g. stairs, steps, cornices, balconies foundations, sills
    • EFIXED CONSTRUCTIONS
    • E01CONSTRUCTION OF ROADS, RAILWAYS, OR BRIDGES
    • E01DCONSTRUCTION OF BRIDGES, ELEVATED ROADWAYS OR VIADUCTS; ASSEMBLY OF BRIDGES
    • E01D21/00Methods or apparatus specially adapted for erecting or assembling bridges

Landscapes

  • Engineering & Computer Science (AREA)
  • Architecture (AREA)
  • Civil Engineering (AREA)
  • Structural Engineering (AREA)
  • Mechanical Engineering (AREA)
  • Bridges Or Land Bridges (AREA)
  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The invention discloses a kind of combined type bearings constructed for skyscraper or bridge tower, mounted on the corner of skyscraper or bridge tower, the device includes the first bearing member and the second bearing member, two bearing members include force bearing plate, the first side plate and the second side plate, the force bearing plate is mounted on wall, first side plate is vertically mounted on the side of the force bearing plate and is connect with large form, second side plate is vertically mounted on the other side of the force bearing plate, connects to form the angle mould consistent with corner configurations by respective second side plate between two bearing members.The supporting point position of the present invention avoids the positions such as moulding, prestressing force, but is disposed close to king-post diagonal position, has the advantages that single fulcrum bearing capacity is big, supporting-point quantity is few, repairing point in construction surface pre embedded bolt hole is few, can greatly improve construction efficiency.

Description

A kind of combined type bearing constructed for skyscraper or bridge tower
Technical field
The invention belongs to technical field of building construction, are related to a kind of mould bases constructed for high-rise building, superelevation bridge tower System, and in particular to a kind of combined type has the bearing of angle mould and track function.
Background technology
In bridge tower construction, bridge tower has the characteristics that lines on surface is diverse, according to traditional bridge tower construction mould bases system System, because mould bases fulcrum is arranged in mostly in the middle part of metope, that there are single fulcrum bearing capacities is small, stencil design is complicated, live tears down and reconstruct difficulty The problems such as big is spent, and for king-post corner arcwall face, conventional mould constructional difficulties, forming face low precision.
Invention content
The purpose of the present invention is to provide the bearing that a kind of combined type has angle mould and track function, its supporting points The positions such as moulding, prestressing force are avoided in position, but are disposed close to king-post diagonal position, are arranged and are changed according to ornamental strip Design other templates, template may be implemented and quickly torn down and reconstructed on frame body, have single fulcrum bearing capacity is big, supporting-point quantity is few, The few advantage of construction surface pre embedded bolt hole repairing point, can greatly improve construction efficiency.
The technical solution adopted by the present invention to solve the technical problems is:
A kind of combined type bearing constructed for skyscraper or bridge tower, is mounted on the corner of skyscraper or bridge tower, The device includes the first bearing member and the second bearing member, and two bearing members include force bearing plate, the first side plate and the second side plate, institute Force bearing plate is stated on wall, first side plate is vertically mounted on the side of the force bearing plate and is connect with large form, institute The other side that the second side plate is vertically mounted on the force bearing plate is stated, passes through respective second side plate connection shape between two bearing members At the angle mould consistent with corner configurations.
According to the above technical scheme, multiple gussets are arranged at intervals between first side plate and force bearing plate.
According to the above technical scheme, it is attached by several bolts between the second side plate of two bearing members.
According to the above technical scheme, several positioning pins are provided between the second side plate of two bearing members.
According to the above technical scheme, be respectively arranged with top plate and bottom plate at the top and bottom of the force bearing plate, the top plate and Screw hole is offered on bottom plate.
According to the above technical scheme, the force bearing plate is equipped at least two pre-buried screws, the pre-buried spiral shell on the first bearing member Hole and the position of the pre-buried screw on the second bearing member are staggered up and down, make the pre-buried screw on the first bearing member and the second bearing member On pre-buried screw between minimum centers-distance be more than outer diameter with the pre embedded bolt of pre-buried screw phase configuration.
According to the above technical scheme, corner pawl case is provided on the force bearing plate, the corner pawl case is used equipped with several In hanging quitting for supported material body.
According to the above technical scheme, the force bearing plate is equipped with the anti-side chute board for being slidably connected with supported material body.
According to the above technical scheme, first bearing member and the second bearing member are both designed as L-type, and two L-type bearing members are spelled Dress up the arc angle mould with curved corner phase configuration.
According to the above technical scheme, which further includes external corner pull rod, the external corner pull rod be mounted on corner both sides wall On large form be fixedly connected.
The beneficial effect comprise that:The present invention by be arranged two bearing members, and by its concrete structure into Row design, makes it be assembled into and corner configurations(Arc surface or right-angle surface)Consistent angle mould overcomes traditional construction die plate corners The shortcomings that arc surface constructional difficulties, the angle mould and large form quickly link into an integrated entity collective effect, can will will support point design In king-post diagonal position, such large form can be designed according to moulding and prestress change, which has single The advantage that a fulcrum bearing capacity is big, supporting-point quantity is few, repairing point in construction surface pre embedded bolt hole is few can greatly improve construction effect Rate.
Description of the drawings
Present invention will be further explained below with reference to the attached drawings and examples, in attached drawing:
Fig. 1 is the structural schematic diagram of the embodiment of the present invention;
Fig. 2 is the floor plan that the embodiment of the present invention is applied to king-post;
Fig. 3 is the floor map of installation of the embodiment of the present invention on the corner;
Fig. 4 is the scheme of installation of the embodiment of the present invention and pre embedded bolt;
Fig. 5 is the application schematic diagram one of the embodiment of the present invention;
Fig. 6 is the application schematic diagram two of the embodiment of the present invention.
In figure:1- king-posts, the first bearing members of 2-, 2.1- force bearing plates, the first side plates of 2.2-, the second side plates of 2.3-, 2.4- muscle Plate, 2.5- bolts, 2.6- positioning pins, 2.7- top plates, 2.8- bottom plates, the corners 2.9- pawl case, 2.10- quit, 2.11- anti-side slideways Plate, 2.12- axis pins, 2.13- pre-buried screws, the second bearing members of 3-, 4- pre embedded bolts, 4.1- screw bodies, 4.2- bearing bolts, 4.3- self-locking gaskets, 5- external corner pull rods, 6- large forms, 7- back cords.
Specific implementation mode
In order to make the purpose , technical scheme and advantage of the present invention be clearer, with reference to the accompanying drawings and embodiments, right The present invention is further elaborated.It should be appreciated that described herein, specific examples are only used to explain the present invention, not For limiting the present invention.
As shown in Figure 1-Figure 3, a kind of combined type bearing constructed for skyscraper or bridge tower, builds mounted on high level It builds or bridge tower(King-post 1)Corner, the device include the first bearing member 2 and the second bearing member 3, the structure of two bearing members it is big Cause it is identical, include force bearing plate 2.1, the first side plate 2.2 and the second side plate 2.3, force bearing plate 2.1 be mounted on wall on, the first side Plate 2.2 is vertically mounted on the side of force bearing plate 2.1 and is connect with large form, and the second side plate 2.3 is vertically mounted on force bearing plate 2.1 The other side connects to form the angle mould consistent with corner configurations between two bearing members by respective second side plate.The present embodiment In, the component of two bearing members is made of steel plate.
In a preferred embodiment of the invention, as shown in Figure 1, being arranged at intervals between the first side plate 2.2 and force bearing plate 2.1 Multiple gussets 2.4 improve the stability of device.
In a preferred embodiment of the invention, as shown in Figure 1, passing through several spiral shells between the second side plate of two bearing members Bolt 2.5 is attached, and fast quick-detach may be implemented using bolt, in order to recycle.
In a preferred embodiment of the invention, as shown in Figure 1, being provided with several between the second side plate of two bearing members Positioning pin 2.6, it is ensured that assembled cambered surface precision realizes quickly positioning.
In a preferred embodiment of the invention, as shown in Figure 1, being respectively arranged with top plate 2.7 at the top and bottom of force bearing plate With bottom plate 2.8, screw hole is offered on top plate 2.7 and bottom plate 2.8, is docked up and down for bearing member, meets multilayer circulation construction It needs.
In a preferred embodiment of the invention, as shown in Figure 1, force bearing plate is equipped at least two pre-buried screws 2.13, the The position of pre-buried screw and the pre-buried screw on the second bearing member on one bearing member is staggered up and down, makes pre- on the first bearing member The minimum centers-distance between the pre-buried screw on screw hole and the second bearing member is buried more than the pre embedded bolt 4 with pre-buried screw phase configuration Outer diameter, interfered to avoid the pre embedded bolt on two bearing members.
As shown in figure 4, two bearing members are fixed on by pre embedded bolt on wall, pre embedded bolt bears to shear and draw Power, pre embedded bolt can have enough to meet the need bolt using " full taking-out type ", be divided into screw body 4.1, bearing bolt 4.2 and self-locking gasket 4.3 Three parts.
In a preferred embodiment of the invention, as shown in Figure 1, being provided with corner pawl case 2.9 on force bearing plate(Corner pawl case weldering It is connected on the second side plate), what corner pawl case was equipped with that several are used to hang supported material body quits 2.10, corner pawl case upper edge Short transverse is equipped with several pin holes, quit between the pawl case of corner by the axis pin 2.12 that is arranged in one of pin hole into Row is located by connecting, and the corner pawl case quit by the way that band is arranged can bear external load.
In a preferred embodiment of the invention, as shown in Figure 1, force bearing plate is equipped with for being slidably connected with supported material body Anti-side chute board 2.11, make supported material body that can be slided along anti-side chute board, and prevent it from toppling.
In a preferred embodiment of the invention, as shown in Figure 1, the first bearing member and the second bearing member are both designed as L-type, two A L-type bearing member is assembled into the arc angle mould with curved corner phase configuration, to adapt to curved corner.
In a preferred embodiment of the invention, as shown in Figure 5, Figure 6, which further includes external corner pull rod 5, external corner pull rod with Large form on the wall of corner both sides is fixedly connected, swollen mould when preventing concreting.
The construction method of the present invention, including:
Step 1, as shown in figure 5, the present invention only does angle mould use, is mounted on wall at initially construction concrete non-bearing segment On body load side and forming face, bearing member pre-buried screw is blocked with blind plate, the back cord 7 of installation surrounding large form 6, large form 6 is pressed Firmly the first side plate of the first bearing member or the second bearing member, while concreting is prevented to drawing using external corner pull rod 5 in corner When swollen mould, assembling reinforcement after-pouring concrete;
Step 2, construct concrete load segment when, as shown in fig. 6, lifting second group of device and first group of device pass through top plate It is docked up and down with bottom plate, pre embedded bolt 4 is installed and surrounding large form 6, the back cord 7 of large form 6 push down the first bearing member or second First side plate of bearing member, while the swollen mould when corner prevents concreting using external corner pull rod 5 to drawing, are poured after assembling reinforcement Build concrete;
Step 3, after concrete strength reaches requirement, by supported material body(Bearing support)It is supported on quitting for two bearing members On, and remove first group of device and continue up the recycling of construction load segment;
Step 4 after removing supported material body, removes second group of device, and move to next quasi- construction load segment;
Step 5, repeat step 2 to four, until concrete walls body construction is completed.
The present invention also serves as template while having load effect, is the key member that frame load is transferred to wall, 2 groups of devices up and down are set generally on a standard segment.
It should be understood that for those of ordinary skills, it can be modified or changed according to the above description, And all these modifications and variations should all belong to the protection domain of appended claims of the present invention.

Claims (10)

1. a kind of combined type bearing constructed for skyscraper or bridge tower, is mounted on the corner of skyscraper or bridge tower Place, which is characterized in that the device includes the first bearing member and the second bearing member, and two bearing members include force bearing plate, the first side Plate and the second side plate, the force bearing plate be mounted on wall on, first side plate be vertically mounted on the side of the force bearing plate and It is connect with large form, second side plate is vertically mounted on the other side of the force bearing plate, by respective between two bearing members The second side plate connect to form the angle mould consistent with corner configurations.
2. the combined type bearing according to claim 1 constructed for skyscraper or bridge tower, which is characterized in that institute It states and is arranged at intervals with multiple gussets between the first side plate and force bearing plate.
3. the combined type bearing according to claim 1 constructed for skyscraper or bridge tower, which is characterized in that two It is attached by several bolts between second side plate of a bearing member.
4. the combined type bearing according to claim 3 constructed for skyscraper or bridge tower, which is characterized in that two It is provided with several positioning pins between second side plate of a bearing member.
5. the combined type bearing according to claim 1 constructed for skyscraper or bridge tower, which is characterized in that institute It states and is respectively arranged with top plate and bottom plate at the top and bottom of force bearing plate, screw hole is offered on the top plate and bottom plate.
6. the combined type bearing according to claim 1 constructed for skyscraper or bridge tower, which is characterized in that institute It states force bearing plate and is equipped at least two pre-buried screws, the pre-buried screw on the first bearing member and the pre-buried screw on the second bearing member Position up and down be staggered, make the minimum center between the pre-buried screw in the pre-buried screw and the second bearing member on the first bearing member Away from the outer diameter more than the pre embedded bolt with pre-buried screw phase configuration.
7. the combined type bearing according to claim 1 constructed for skyscraper or bridge tower, which is characterized in that institute It states and is provided with corner pawl case on force bearing plate, the corner pawl case is equipped with several for hanging quitting for supported material body.
8. the combined type bearing according to claim 1 constructed for skyscraper or bridge tower, which is characterized in that institute Force bearing plate is stated equipped with the anti-side chute board for being slidably connected with supported material body.
9. the combined type bearing according to claim 1 constructed for skyscraper or bridge tower, which is characterized in that institute It states the first bearing member and the second bearing member is both designed as L-type, two L-type bearing members are assembled into the arc with curved corner phase configuration Angle mould.
10. the combined type bearing according to claim 1 constructed for skyscraper or bridge tower, which is characterized in that The device further includes external corner pull rod, and the external corner pull rod is fixedly connected with the large form on the wall of corner both sides.
CN201810918334.5A 2018-08-13 2018-08-13 Combined bearing device for high-rise building or bridge tower construction Active CN108729666B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810918334.5A CN108729666B (en) 2018-08-13 2018-08-13 Combined bearing device for high-rise building or bridge tower construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810918334.5A CN108729666B (en) 2018-08-13 2018-08-13 Combined bearing device for high-rise building or bridge tower construction

Publications (2)

Publication Number Publication Date
CN108729666A true CN108729666A (en) 2018-11-02
CN108729666B CN108729666B (en) 2023-07-18

Family

ID=63942743

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810918334.5A Active CN108729666B (en) 2018-08-13 2018-08-13 Combined bearing device for high-rise building or bridge tower construction

Country Status (1)

Country Link
CN (1) CN108729666B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942784A (en) * 2021-02-01 2021-06-11 浙江城建建设集团有限公司 Corner conversion device and corner bearing support setting method

Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3339739A1 (en) * 1983-11-03 1985-05-15 Klaus 2000 Hamburg Köhler Formwork for civil engineering parts, in particular cable junction boxes
JP2002105913A (en) * 2000-07-26 2002-04-10 Daido Kizai Kogyo Kk Form structure and pressing member used therefor and form set.up method
US20020195536A1 (en) * 1999-11-23 2002-12-26 Safway Formwork Systems, Llc Conversion corner chamfer for form work
CN101481944A (en) * 2009-01-06 2009-07-15 四川公路桥梁建设集团有限公司 Method for installing reinforcing steel bars in high pier and tower rollover construction and movable support thereof
CN103132691A (en) * 2013-02-25 2013-06-05 江苏省苏中建设集团股份有限公司 Large steel formwork corner reinforcing device
CN204298742U (en) * 2014-12-01 2015-04-29 中铁上海工程局集团有限公司 For the supporting and protection structure of Bridge High-pier construction
CN204386161U (en) * 2015-01-12 2015-06-10 重庆工商职业学院 Building concrete framework capital mortar leakage prevention mould
CN105862602A (en) * 2016-05-26 2016-08-17 大荣建设集团有限公司 Turnover formwork system of hollow inclined concrete pylon and construction method thereof
CN105887685A (en) * 2016-04-18 2016-08-24 中铁港航局集团有限公司 Railway high pier body template and scaffold integrated turnover formwork segmental construction method
CN206174469U (en) * 2016-09-29 2017-05-17 中建三局集团有限公司 Attach to L type load device of wall body suitable for skyscraper construction
CN206581597U (en) * 2017-03-17 2017-10-24 山东新活新材料科技有限公司 A kind of piping lane abnormal shape corner structure aluminum alloy mould plate
CN107386629A (en) * 2017-09-11 2017-11-24 广东铝遊家科技有限公司 Build aluminum alloy mould plate combining structure
CN206815190U (en) * 2017-05-22 2017-12-29 贵州省公路工程集团有限公司 Carry the bridge square pier construction formwork of corbel type support safety fence operation platform
CN208950301U (en) * 2018-08-13 2019-06-07 中建三局集团有限公司 A kind of combined type bearing constructed for skyscraper or bridge tower

Patent Citations (14)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
DE3339739A1 (en) * 1983-11-03 1985-05-15 Klaus 2000 Hamburg Köhler Formwork for civil engineering parts, in particular cable junction boxes
US20020195536A1 (en) * 1999-11-23 2002-12-26 Safway Formwork Systems, Llc Conversion corner chamfer for form work
JP2002105913A (en) * 2000-07-26 2002-04-10 Daido Kizai Kogyo Kk Form structure and pressing member used therefor and form set.up method
CN101481944A (en) * 2009-01-06 2009-07-15 四川公路桥梁建设集团有限公司 Method for installing reinforcing steel bars in high pier and tower rollover construction and movable support thereof
CN103132691A (en) * 2013-02-25 2013-06-05 江苏省苏中建设集团股份有限公司 Large steel formwork corner reinforcing device
CN204298742U (en) * 2014-12-01 2015-04-29 中铁上海工程局集团有限公司 For the supporting and protection structure of Bridge High-pier construction
CN204386161U (en) * 2015-01-12 2015-06-10 重庆工商职业学院 Building concrete framework capital mortar leakage prevention mould
CN105887685A (en) * 2016-04-18 2016-08-24 中铁港航局集团有限公司 Railway high pier body template and scaffold integrated turnover formwork segmental construction method
CN105862602A (en) * 2016-05-26 2016-08-17 大荣建设集团有限公司 Turnover formwork system of hollow inclined concrete pylon and construction method thereof
CN206174469U (en) * 2016-09-29 2017-05-17 中建三局集团有限公司 Attach to L type load device of wall body suitable for skyscraper construction
CN206581597U (en) * 2017-03-17 2017-10-24 山东新活新材料科技有限公司 A kind of piping lane abnormal shape corner structure aluminum alloy mould plate
CN206815190U (en) * 2017-05-22 2017-12-29 贵州省公路工程集团有限公司 Carry the bridge square pier construction formwork of corbel type support safety fence operation platform
CN107386629A (en) * 2017-09-11 2017-11-24 广东铝遊家科技有限公司 Build aluminum alloy mould plate combining structure
CN208950301U (en) * 2018-08-13 2019-06-07 中建三局集团有限公司 A kind of combined type bearing constructed for skyscraper or bridge tower

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112942784A (en) * 2021-02-01 2021-06-11 浙江城建建设集团有限公司 Corner conversion device and corner bearing support setting method

Also Published As

Publication number Publication date
CN108729666B (en) 2023-07-18

Similar Documents

Publication Publication Date Title
CN104847156A (en) Unit-assembly type communication tower
CN207761278U (en) A kind of mortar leakage prevention building template assembly
CN206581148U (en) A kind of Cast-in-situ Beam is without Temporary Piers support
CN108729666A (en) A kind of combined type bearing constructed for skyscraper or bridge tower
CN208950301U (en) A kind of combined type bearing constructed for skyscraper or bridge tower
CN110273432B (en) Extension construction method for main structure of existing subway station
CN204645799U (en) A kind of unit-combination type communication tower
CN110924426A (en) Bottom-expanding cup-mouth type connecting structure and method for reinforced concrete column and foundation
CN206570922U (en) Assembled integral armored concrete grid type framework
CN206571156U (en) Detached column formwork erection and concrete placing installation
CN203640161U (en) Building vertical column system
CN203684275U (en) Simple support for cantilever type retaining wall
CN109322483B (en) Reinforcing and supporting structure of shear wall external formwork
CN206438762U (en) A kind of corrosion resistant aluminum alloy mould plate for building
CN202787309U (en) Transformer foundation
CN206289971U (en) Framed bent core and wall placing installation
CN207392226U (en) A kind of rim of a cup formula basis of herringbone column's substation framework
CN205999968U (en) A kind of novel rainwater water storage module
CN205742251U (en) Single-pipe tower pedestal
CN215926719U (en) Reinforcing structure of aluminum alloy template reverse ridge hanging die
CN206753055U (en) A kind of building structure template supporting structure and its component
CN220468873U (en) Support changing structure for inner support detachment
CN203334289U (en) Tool type connecting piece for foundation pit supporting steel support and enclosure wall
CN211974310U (en) Detachable laying platform for bottom end of internal mold of long and narrow deformation joint
CN216643731U (en) BIM building power equipment wall hanging device

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant