CN108728889A - A kind of rotating electroplating hanging device for processing to be electroplated - Google Patents
A kind of rotating electroplating hanging device for processing to be electroplated Download PDFInfo
- Publication number
- CN108728889A CN108728889A CN201810880962.9A CN201810880962A CN108728889A CN 108728889 A CN108728889 A CN 108728889A CN 201810880962 A CN201810880962 A CN 201810880962A CN 108728889 A CN108728889 A CN 108728889A
- Authority
- CN
- China
- Prior art keywords
- fixed
- installs case
- bull stick
- hanging device
- electroplated
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Granted
Links
Classifications
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25D—PROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
- C25D17/00—Constructional parts, or assemblies thereof, of cells for electrolytic coating
- C25D17/06—Suspending or supporting devices for articles to be coated
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25D—PROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
- C25D21/00—Processes for servicing or operating cells for electrolytic coating
- C25D21/04—Removal of gases or vapours ; Gas or pressure control
-
- C—CHEMISTRY; METALLURGY
- C25—ELECTROLYTIC OR ELECTROPHORETIC PROCESSES; APPARATUS THEREFOR
- C25D—PROCESSES FOR THE ELECTROLYTIC OR ELECTROPHORETIC PRODUCTION OF COATINGS; ELECTROFORMING; APPARATUS THEREFOR
- C25D21/00—Processes for servicing or operating cells for electrolytic coating
- C25D21/12—Process control or regulation
Landscapes
- Chemical & Material Sciences (AREA)
- Engineering & Computer Science (AREA)
- Chemical Kinetics & Catalysis (AREA)
- Electrochemistry (AREA)
- Materials Engineering (AREA)
- Metallurgy (AREA)
- Organic Chemistry (AREA)
- Automation & Control Theory (AREA)
- Electroplating Methods And Accessories (AREA)
Abstract
The invention belongs to processing equipment field more particularly to a kind of rotating electroplating hanging device for processing to be electroplated is electroplated.The technical problem to be solved in the present invention is to provide it is a kind of can be switched fast different electric currents and voltage, multiple simultaneously workpiece can be handled, can eliminate bubble for the rotating electroplating hanging device processed be electroplated.A kind of rotating electroplating hanging device for processing to be electroplated includes installs case, motor, first rotating shaft, first gear, second gear, hollow bull stick, the first steel ball, electronic reel, bracing wire, sliding rail, sliding block etc.;First rotating shaft top is sequentially connected with motor output end, and first gear is fixed in first rotating shaft bottom end, and first bearing seat is embedded in installs case bottom;Hollow bull stick is pivotally connected with first bearing seat.The present invention achievees the effect that different electric currents and voltage can be switched fast, multiple simultaneously can handle workpiece, can eliminate bubble.
Description
Technical field
The invention belongs to processing equipment field more particularly to a kind of rotating electroplating hanging device for processing to be electroplated is electroplated.
Background technology
In electroplating process, electroplating system is generally by groove body, electroplating solution, DC power supply, cathode, anode, workpiece, filtering
The compositions such as system, stirring system;Wherein, in order to improve electroplating efficiency and obtain the high quality coating of uniform and delicate, electroplating process
In need mutually move between solution, workpiece;In order to achieve the above object, rotation rack plating is the one kind being commonly used
Mode.
Rotating electroplating head is installed on electroplating bath top, rotating electroplating head can be linked up with by bottom and drive hanger workpiece together
It rotates while can be powered again to workpiece by hook, and workpiece is connected with DC power supply cathode;It is cloudy to connect DC power supply
The workpiece of pole could deposit the upper coat of metal under the action of electric field on surface, and workpiece that the rotation of workpiece makes and solution connect
It touches more uniformly, the concentration polarization of solution reduces, and electric field is more uniform to the effect on each surface of workpiece.
But some workpiece need to obtain the coating of different-thickness, this requires applying different voltage and currents to workpiece,
And existing rotating electroplating hangs over and enough provides electric current and voltage in electroplating process, but switching electric current, the speed of voltage are more slow,
In addition, usually will produce many bubbles among the process of plating, and these bubbles are attached to above material to be electroplated, if
Cannot clear up in time can influence the effect of plating, to reduce the quality of product electroplated product, therefore can there is an urgent need for researching and developing one kind
It is switched fast different electric currents and voltage, multiple simultaneously workpiece can be handled, being processed for being electroplated for bubble can be eliminated
Rotating electroplating hanging device.
Invention content
The present invention is more slow in order to overcome existing rotating electroplating hanging device switching electric current, speed of voltage in electroplating process
Slowly the shortcomings that, can not eliminating bubble, the technical problem to be solved in the present invention is to provide one kind capable of being switched fast different electric currents
With voltage, the rotating electroplating hanging device for processing to be electroplated that multiple simultaneously can be handled workpiece, bubble can be eliminated.
The present invention is reached by technological means in detail below:
It is a kind of for the rotating electroplating hanging device processed be electroplated, include installs case, motor, first rotating shaft, first gear, the
Two gears, hollow bull stick, the first steel ball, electronic reel, bracing wire, sliding rail, sliding block, elastic component, trip rod, the second steel ball,
One bearing block, the first conductive rod, second bearing seat, the first electric wire, electric cabinet, the first fixed block, the second electric wire, third electric wire,
Second conductive rod, through-hole, fixed link, the second fixed block, bolt, spill fixed frame, screw rod, first clamping plate and second clamping plate;Electricity
Machine is fixed in installs case inner top, and first rotating shaft top is sequentially connected with motor output end, and first gear is fixed in first rotating shaft
Bottom end, first bearing seat are embedded in installs case bottom;Hollow bull stick is pivotally connected with first bearing seat, and hollow bull stick runs through first bearing
Seat is affixed with second gear;First gear is engaged with second gear, and the first steel ball is fixed in hollow bull stick, and the first steel ball is located at peace
In vanning, sliding rail, electronic reel are fixed in bottom in installs case;Connecting rod one end is slidably connected by sliding block and sliding rail,
The other end and the second steel ball are affixed;First steel ball is corresponding with the second steel ball, and sliding rail side is connected with stop block, sliding block and restriction
It is connected by elastic component between block, electronic reel is fixed in bottom in installs case;Bracing wire one end is wire-wrapped in electronic reel, separately
One end and sliding block side are affixed;Second bearing seat is fixed in installs case inside portion, the first conductive rod top and second bearing seat pivot
It connects, the first conductive rod is located in hollow bull stick, and for electric cabinet in installs case, the first conductive rod top passes through the first electric wire and electricity
Case electrical connection is controlled, hollow bull stick side is connected with multiple fixed links;Second electric wire is wire-wrapped in the first conductive rod, and the second electric wire with
First conductive rod is electrically connected;Hollow bull stick side is equipped with multiple through-holes, and through-hole is located above fixed link, and third electric wire is wire-wrapped in solid
Fixed pole;Third electric wire one end is electrically connected through through-hole with the second electric wire, and the other end and the second conductive rod are affixed;Second fixed block is solid
It is connected to bottom end of the fixed link far from hollow bull stick, the second fixed block is equipped with the first threaded hole, passes through at the top of spill fixed frame
Bolt and the first screw hole, spill fixed frame side are equipped with the second threaded hole, and screw rod is bolted in the second threaded hole, the first folder
Plate is fixed in screw rod end, and first clamping plate is located in spill fixed frame, and second clamping plate is fixed in spill by the first fixed block and consolidates
Determine an inside of the frame far from the second threaded hole, first clamping plate is corresponding with second clamping plate, and the first fixed block is equipped with jack, and second leads
Torch coordinates with jack inserting.
Further, which further includes having the first stereoplasm tube, the first air-suction cover, the
Two stereoplasm tubes, the second air-suction cover, exhaust fan, cartridge filter and activated carbon web plate;First stereoplasm tube is fixed in installs case bottom;First
Stereoplasm tube one end is connected to exhaust fan pumping end, and the other end is connected to the first air-suction cover;After second stereoplasm tube is fixed in installs case
Side;Second stereoplasm tube one end is connected to the first stereoplasm tube, and the other end is connected to the second air-suction cover;First air-suction cover, the second air-breathing
Cover is respectively positioned on right over spill fixed frame, and cartridge filter is connected to exhaust fan outlet side, and multiple activated carbon web plates are fixed in cartridge filter
It is interior.
Further, multiple heat emission holes are also uniformly distributed at the top of the installs case.
Further, the installs case side is also connected with the first fixed plate, and it is reserved that first fixed plate is equipped with first
Hole.
Further, both ends are also connected with the second fixed plate at the top of the installs case, and second fixed plate is equipped with second
Reserving hole.
Further, the hollow bull stick inside portion is connected with sealing ring corresponding with lead to the hole site, and third electric wire passes through
Wear sealing ring.
Further, the first clamping plate, second clamping plate outer surface be equipped with non-slip texture.
Further, multiple fixed links are uniformly distributed into several rings along the axial direction of hollow bull stick, uniform per ring
Circular row has multiple fixed links, the fixed link in adjacent ring to be interspersed.
Compared with prior art, the present invention has the advantages that:
The present invention reach can be switched fast different electric currents and voltage, multiple simultaneously workpiece can be handled, can
Eliminate the effect of bubble.
1, workpiece is fixed by first clamping plate, second clamping plate by the present invention so that it is solid that workpiece can be fixed on spill
Determine frame, spill fixed frame is installed on bottom of fixed, so that multiple workpiece can be fixed on the hanger, such as
This, achievees the effect that multiple simultaneously to handle workpiece.
2, electric current and voltage are passed sequentially through the first conductive rod, the first electric wire, the second electric wire, the by the present invention by electric cabinet
Three electric wires, the second conductive rod, the first fixed block, first clamping plate are transported in workpiece so that workpiece can under electric current and voltage into
Row plating work can directly control electric cabinet when needing to switch different electric currents and voltage, and electric cabinet can quickly switch
Electric current and voltage, in this way, achieving the effect that different electric currents and voltage can be switched fast.
3, the present invention passes through drive first gear rotation by motor so that and first gear drives second gear rotation, from
And hollow bull stick can drive workpiece rotary motion so that contact of the workpiece with solution is more uniform, and the concentration polarization of solution subtracts
Small, electric field is more uniform to the effect on each surface of workpiece.
4, bracing wire is packed up either to decontrol bracing wire and packed up or the process of unwrapping wire by the present invention by electronic reel
In, sliding block can move left and right under the action of the elastic member, under the action of bracing wire, i.e., sliding block drives second by connecting rod
Steel ball moves left and right, so that the second steel ball can be on multiple impact to the first steel ball, so that the first steel ball being capable of band
It moves hollow bull stick to tremble, and workpiece is trembled, it is broken to which bubble shake will be generated in workpiece electrokinetic process, it is therefore prevented that these gas
Bubble is attached to above material to be electroplated, can in this way, reaching if cannot clear up the effect that can influence plating in time
The case where eliminating bubble.
Description of the drawings
Fig. 1 is the first main structure diagram of the present invention.
Fig. 2 is the enlarged structure schematic diagram of A in Fig. 1 of the present invention.
Fig. 3 is second of main structure diagram of the present invention.
Fig. 4 is the third main structure diagram of the present invention.
Fig. 5 is the dimensional structure diagram that the hollow bull stick of the present invention is connected with fixed link.
Label in attached drawing be:1- installs cases, 2- motors, 3- first rotating shafts, 4- first gears, 5- second gears, 6- are empty
Heart bull stick, the first steel balls of 7-, the electronic reels of 8-, 9- bracing wires, 10- sliding rails, 11- sliding blocks, 12- elastic components, 13- trip rods, 14-
Second steel ball, 15- first bearing seats, the first conductive rods of 16-, 17- second bearing seats, the first electric wires of 18-, 19- electric cabinets, 20-
First fixed block, the second electric wires of 21-, 22- third electric wires, the second conductive rods of 23-, 24- through-holes, 25- fixed links, 26- second are solid
Determine block, the first threaded holes of 27-, 28- bolts, 29- spill fixed frames, the second threaded holes of 30-, 31- screw rods, 32- first clamping plates,
33- second clamping plates, 34- jacks, the first stereoplasm tubes of 35-, the first air-suction covers of 36-, the second stereoplasm tubes of 37-, the second air-suction covers of 38-,
39- exhaust fans, 40- cartridge filters, 41- activated carbon web plates, 42- heat emission holes, the first fixed plates of 43-, the first reserving holes of 44-, 45-
Second fixed plate, the second reserving holes of 46-, 47- sealing rings, 48- non-slip textures, 49- stop blocks.
Specific implementation mode
The present invention is described further below in conjunction with attached drawing:
Embodiment
A kind of rotating electroplating hanging device for processing to be electroplated includes as shown in Figs. 1-5 2, first turns of installs case 1, motor
Axis 3, first gear 4, second gear 5, hollow bull stick 6, the first steel ball 7, electronic reel 8, bracing wire 9, sliding rail 10, sliding block 11,
Elastic component 12, trip rod 13, the second steel ball 14, first bearing seat 15, the first conductive rod 16, second bearing seat 17, the first electric wire
18, electric cabinet 19, the first fixed block 20, the second electric wire 21, third electric wire 22, the second conductive rod 23, through-hole 24, fixed link 25,
Second fixed block 26, bolt 28, spill fixed frame 29, screw rod 31, first clamping plate 32 and second clamping plate 33;Motor 2 is fixed in peace
It cases 1 inner top, 3 top of first rotating shaft is sequentially connected with 2 output end of motor, and first gear 4 is fixed in 3 bottom end of first rotating shaft,
First bearing seat 15 is embedded in 1 bottom of installs case;Hollow bull stick 6 is pivotally connected with first bearing seat 15, and hollow bull stick 6 runs through first axle
Bearing 15 and second gear 5 are affixed;First gear 4 is engaged with second gear 5, and the first steel ball 7 is fixed in hollow bull stick 6, and first
Steel ball 7 is located in installs case 1, and sliding rail 10, electronic reel 8 are fixed in bottom in installs case 1;Connecting rod one end passes through sliding block
11 are slidably connected with sliding rail 10, and the other end and the second steel ball 14 are affixed;First steel ball 7 is corresponding with the second steel ball 14, sliding rail 10
Side is connected with stop block 49, is connected by elastic component 12 between sliding block 11 and stop block 49, and electronic reel 8 is fixed in installation
Bottom in case 1;9 one end of bracing wire is wire-wrapped in electronic reel 8, and the other end and 11 side of sliding block are affixed;Second bearing seat 17 is affixed
In 1 inside portion of installs case, 16 top of the first conductive rod is pivotally connected with second bearing seat 17, and the first conductive rod 16 is located at hollow bull stick 6
Interior, in installs case 1,16 top of the first conductive rod is electrically connected by the first electric wire 18 with electric cabinet 19 electric cabinet 19, hollow
6 side of bull stick is connected with multiple fixed links 25;Second electric wire 21 is wire-wrapped in the first conductive rod 16, and the second electric wire 21 is led with first
Torch 16 is electrically connected;6 side of hollow bull stick is equipped with multiple through-holes 24, and through-hole 24 is located above fixed link 25, third electric wire 22 around
It is connected to fixed link 25;22 one end of third electric wire is electrically connected through through-hole 24 with the second electric wire 21, the other end and the second conductive rod 23
It is affixed;Second fixed block 26 is fixed in bottom end of the fixed link 25 far from hollow bull stick 6, and the second fixed block 26 is equipped with the first spiral shell
Pit 27,29 top of spill fixed frame are spirally connected by bolt 28 and the first threaded hole 27, and 29 side of spill fixed frame is equipped with second
Threaded hole 30, screw rod 31 are bolted in the second threaded hole 30, and first clamping plate 32 is fixed in 31 end of screw rod, and first clamping plate 32 is located at recessed
In shape fixed frame 29, second clamping plate 33 is fixed in one of spill fixed frame 29 far from the second threaded hole 30 by the first fixed block 20
Inside, first clamping plate 32 is corresponding with second clamping plate 33, and the first fixed block 20 is equipped with jack 34, the second conductive rod 23 and jack 34
Inserting cooperation.
When needing the hanger to carry out plating work to workpiece, rotate spill fixed frame 29 first so that bolt 28 from
First threaded hole 27 screws out, at this point it is possible to put the workpiece between first clamping plate 32, second clamping plate 33, and then rotary screw 31,
So that screw rod 31 drives first clamping plate 32 close to 33 locality of second clamping plate, to first clamping plate 32,33 energy of second clamping plate
Enough clamp workpiece, after clamping, at this point, by 28 the first threaded hole of precession 27 of bolt and spill fixed frame 29 be installed on it is solid
25 bottom of fixed pole repeats above-mentioned work so that multiple workpiece can be fixed on the hanger, can be more simultaneously in this way, reaching
A effect that workpiece is handled.
After workpiece is fixed on the hanger, at this point it is possible to the second conductive rod 23 is inserted into jack 34, in order to the hanger
Plating work, after insertion, the hanger is installed on electroplating bath, after installing, control electric cabinet 19, electric cabinet 19
Electric current, voltage can be transported in the first conductive rod 16 by the first electric wire 18, the second electricity is being transported in by the first conductive rod 16
Line 21, and then the second electric wire 21 is by electric current, voltage conveys and third electric wire 22, to which third electric wire 22 can be by electric current, voltage
It is transported in the second conductive rod 23, then the second conductive rod 23 is defeated by the first fixed block 20, first clamping plate 32 by electric current and voltage
Send on workpiece, i.e., workpiece plating work can be carried out under electric current and voltage can when needing to switch different electric currents and voltage
To directly control electric cabinet 19, electric cabinet 19 can quickly switching electric current and voltage, in this way, difference can be switched fast by reaching
The effect of electric current and voltage.
During electric current, voltage are transported in workpiece, motor 2 starts always, and motor 2 can pass through 3 band of first rotating shaft
Dynamic first gear 4 rotates, and since first gear 4 is engaged with second gear 5, then second gear 5 can follow turning for first gear 4
It moves and rotates, is i.e. second gear 5 can drive hollow bull stick 6, to which hollow bull stick 6 can drive workpiece rotary motion so that
Contact of the workpiece with solution is more uniform, and the concentration polarization of solution reduces, and electric field is more uniform to the effect on each surface of workpiece.
During above-mentioned workpiece rotation, electric current, voltage are transported in workpiece, start electronic reel 8, electronic reel
Bracing wire 9 can be packed up or decontrol bracing wire 9 by 8, when bracing wire 9 is decontroled, sliding block 11 can under the action of elastic component 12 to
First steel ball, 7 direction is slided and sliding block 11 drives the second steel ball 14 to be moved to 7 direction of the first steel ball by connecting rod so that the
Two steel balls 14 can strike on the first steel ball, then be packed up bracing wire 9 by electronic reel 8, then the second steel ball is to far from first
The direction of steel ball is moved, and above-mentioned work is repeated so that the second steel ball 14 can be on multiple impact to the first steel ball, so that the
One steel ball can drive hollow bull stick 6 to tremble, and workpiece is trembled, to generate bubble shake in workpiece electrokinetic process
It is broken, it is therefore prevented that these bubbles are attached to above material to be electroplated, if the feelings for the effect that can influence plating cannot be cleared up in time
Condition, in this way, reaching the case where capable of eliminating bubble.
After plating, the hanger is taken out from electroplating bath, at this point it is possible to which workpiece is taken from spill fixed frame 29
Under, i.e., screw rod 31 is screwed out so that first clamping plate 32, second clamping plate 33 are not clamping workpiece.
Wherein, as shown in figure 3, the rotating electroplating hanging device for being used to be electroplated processing further includes having the first stereoplasm tube 35, first
Air-suction cover 36, the second stereoplasm tube 37, the second air-suction cover 38, exhaust fan 39, cartridge filter 40 and activated carbon web plate 41;First stereoplasm tube
35 are fixed in 1 bottom of installs case;First stereoplasm tube, 35 one end is evacuated end with exhaust fan 39 and is connected to, the other end and the first air-suction cover 36
Connection;Second stereoplasm tube 37 is fixed in 1 rear side of installs case;Second stereoplasm tube, 37 one end is connected to the first stereoplasm tube 35, the other end
It is connected to the second air-suction cover 38;First air-suction cover 36, the second air-suction cover 38 are respectively positioned on right over spill fixed frame 29, cartridge filter 40
It is connected to 39 outlet side of exhaust fan, multiple activated carbon web plates 41 are fixed in cartridge filter 40.
Start exhaust fan 39, exhaust fan 39 is evacuated end can be hard by the first stereoplasm tube 35, the first air-suction cover 36, second
The gas generated in workpiece electroplating process, bubble are shaken the gas for going bankrupt and sucked by matter, the second air-suction cover 38, then by exhaust fan 39
Gas is discharged in cartridge filter 40 by outlet side, at this point, gas can be purified by activated carbon web plate 41, prevents workpiece electroplating process
Generate gas, the gas that bubble shake goes bankrupt pollutes environment.
Wherein, in order to ensure the heat dissipation of motor 2, electric cabinet 19, with reference to shown in Fig. 4,1 top of the installs case is uniformly also divided
It is furnished with multiple heat emission holes 42.
Wherein, for the ease of the side of the hanger and the installation of electroplating bath, with reference to shown in Fig. 4,1 side of the installs case
It is also connected with the first fixed plate 43, first fixed plate 43 is equipped with the first reserving hole 44.
Wherein, for the ease of the top of the hanger and the installation of electroplating bath, with reference to shown in Fig. 4,1 top of the installs case
Both ends are also connected with the second fixed plate 45, and second fixed plate 45 is equipped with the second reserving hole 46.
Wherein, electroplating liquid medicine enters hollow bull stick 6 by through-hole 24 in order to prevent, causes the hanger to be powered abnormal
The case where, with reference to shown in Fig. 4,6 inside portion of hollow bull stick is connected with sealing ring 47 corresponding with 24 position of through-hole, third
Electric wire 22 runs through sealing ring 47.
Wherein, in order to enable first clamping plate 32, second clamping plate 33 are by Workpiece clamping, with reference to shown in Fig. 4, the first clamping plate
32, the outer surface of second clamping plate 33 is equipped with non-slip texture 48.
Wherein, in order to enable the galvanization coating of workpiece can be uniform, referring to Figure 5,25 edge of multiple fixed links
The axial direction for hollow bull stick 6 is uniformly distributed into several rings, and multiple fixed links 25, the fixed link in adjacent ring are shown per ring uniform ring
25 are interspersed.
The control mode of the present invention is controlled by manually starting and turning off the switch, the wiring diagram and power supply of dynamical element
Offer belong to the common knowledge of this field, and the present invention is mainly used to protect mechanical device, so the present invention is no longer detailed
Explain control mode and wiring arrangement.
Although the disclosure is described in detail with reference to illustrative embodiments, but the present disclosure is not limited thereto, and right
In it should be apparent to those skilled in the art that it can be carry out various modifications without departing from the scope of the disclosure and
Change.
Claims (8)
1. a kind of rotating electroplating hanging device for processing to be electroplated, which is characterized in that include installs case (1), motor (2), first
Shaft (3), first gear (4), second gear (5), hollow bull stick (6), the first steel ball (7), electronic reel (8), bracing wire
(9), sliding rail (10), sliding block (11), elastic component (12), trip rod (13), the second steel ball (14), first bearing seat (15), first
Conductive rod (16), second bearing seat (17), the first electric wire (18), electric cabinet (19), the first fixed block (20), the second electric wire
(21), third electric wire (22), the second conductive rod (23), through-hole (24), fixed link (25), the second fixed block (26), bolt (28),
Spill fixed frame (29), screw rod (31), first clamping plate (32) and second clamping plate (33);Motor (2) is fixed in top in installs case (1)
Portion, first rotating shaft (3) top are sequentially connected with motor (2) output end, and first gear (4) is fixed in first rotating shaft (3) bottom end, the
One bearing block (15) is embedded in installs case (1) bottom;Hollow bull stick (6) is pivotally connected with first bearing seat (15), and hollow bull stick (6) passes through
It wears first bearing seat (15) and second gear (5) is affixed;First gear (4) is engaged with second gear (5), and the first steel ball (7) is solid
It is connected to hollow bull stick (6), the first steel ball (7) is located in installs case (1), and sliding rail (10), electronic reel (8) are fixed in installation
Case (1) interior bottom;Connecting rod one end is slidably connected by sliding block (11) and sliding rail (10), and the other end and the second steel ball (14) are solid
It connects;First steel ball (7) is corresponding with the second steel ball (14), and sliding rail (10) side is connected with stop block (49), sliding block (11) and limit
Determine to connect by elastic component (12) between block (49), electronic reel (8) is fixed in installs case (1) interior bottom;Bracing wire (9) one end
It is wire-wrapped in electronic reel (8), the other end and sliding block (11) side are affixed;Second bearing seat (17) is fixed in installs case (1)
Side, the first conductive rod (16) top are pivotally connected with second bearing seat (17), and the first conductive rod (16) is located in hollow bull stick (6),
In installs case (1), the first conductive rod (16) top is electrically connected electric cabinet (19) by the first electric wire (18) and electric cabinet (19)
It connects, hollow bull stick (6) side is connected with multiple fixed links (25);Second electric wire (21) is wire-wrapped in the first conductive rod (16), and
Two electric wires (21) are electrically connected with the first conductive rod (16);Hollow bull stick (6) side is equipped with multiple through-holes (24), and through-hole (24) is located at
Above fixed link (25), third electric wire (22) is wire-wrapped in fixed link (25);Third electric wire (22) one end is through through-hole (24) and the
Two electric wires (21) are electrically connected, and the other end and the second conductive rod (23) are affixed;It is remote that second fixed block (26) is fixed in fixed link (25)
Bottom end from hollow bull stick (6), the second fixed block (26) are equipped with the first threaded hole (27), lead at the top of spill fixed frame (29)
It crosses bolt (28) to be spirally connected with the first threaded hole (27), spill fixed frame (29) side is equipped with the second threaded hole (30), screw rod (31)
It is bolted in the second threaded hole (30), first clamping plate (32) is fixed in screw rod (31) end, and first clamping plate (32) is fixed positioned at spill
In frame (29), second clamping plate (33) is fixed in spill fixed frame (29) far from the second threaded hole (30) by the first fixed block (20)
One inside, first clamping plate (32) is corresponding with second clamping plate (33), the first fixed block (20) be equipped with jack (34), second conduction
Stick (23) coordinates with jack (34) inserting.
2. a kind of rotating electroplating hanging device for processing to be electroplated according to claim 1, which is characterized in that this is used to be electroplated
The rotating electroplating hanging device of processing further includes having the first stereoplasm tube (35), the first air-suction cover (36), the second stereoplasm tube (37), second to inhale
Gas hood (38), exhaust fan (39), cartridge filter (40) and activated carbon web plate (41);First stereoplasm tube (35) is fixed in installs case (1)
Bottom;First stereoplasm tube (35) one end is connected to exhaust fan (39) pumping end, and the other end is connected to the first air-suction cover (36);Second
Stereoplasm tube (37) is fixed on rear side of installs case (1);Second stereoplasm tube (37) one end is connected to the first stereoplasm tube (35), the other end with
Second air-suction cover (38) is connected to;First air-suction cover (36), the second air-suction cover (38) are respectively positioned on right over spill fixed frame (29), mistake
Filter cylinder (40) is connected to exhaust fan (39) outlet side, and multiple activated carbon web plates (41) are fixed in cartridge filter (40).
3. a kind of rotating electroplating hanging device for processing to be electroplated according to claim 2, which is characterized in that the installs case
(1) uniformly multiple heat emission holes (42) are also distributed in top.
4. a kind of rotating electroplating hanging device for processing to be electroplated according to claim 3, which is characterized in that the installs case
(1) side is also connected with the first fixed plate (43), and first fixed plate (43) is equipped with the first reserving hole (44).
5. a kind of rotating electroplating hanging device for processing to be electroplated according to claim 4, which is characterized in that the installs case
(1) top both ends are also connected with the second fixed plate (45), and second fixed plate (45) is equipped with the second reserving hole (46).
6. a kind of rotating electroplating hanging device for processing to be electroplated according to claim 5, which is characterized in that described hollow turn
Bar (6) inside portion is connected with sealing ring (47) corresponding with through-hole (24) position, and third electric wire (22) runs through sealing ring (47).
7. a kind of rotating electroplating hanging device for processing to be electroplated according to claim 6, which is characterized in that first folder
Plate (32), second clamping plate (33) outer surface be equipped with non-slip texture (48).
8. a kind of rotating electroplating hanging device for processing to be electroplated according to claim 7, which is characterized in that described is multiple
Fixed link (25) is uniformly distributed into several rings along the axial direction of hollow bull stick (6), and multiple fixed links (25) are shown per ring uniform ring,
Fixed link (25) in adjacent ring is interspersed.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810880962.9A CN108728889B (en) | 2018-08-04 | 2018-08-04 | A rotatory electroplating hanger for electroplating process |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810880962.9A CN108728889B (en) | 2018-08-04 | 2018-08-04 | A rotatory electroplating hanger for electroplating process |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108728889A true CN108728889A (en) | 2018-11-02 |
CN108728889B CN108728889B (en) | 2020-06-12 |
Family
ID=63942370
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810880962.9A Active CN108728889B (en) | 2018-08-04 | 2018-08-04 | A rotatory electroplating hanger for electroplating process |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108728889B (en) |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158141B (en) * | 2019-07-04 | 2020-06-12 | 盐城工学院 | Rotation type copper bar double-end electroplating device |
CN111519233A (en) * | 2020-04-22 | 2020-08-11 | 太仓市施美电镀有限公司 | Nickel plating production line and electroplating process thereof |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11293490A (en) * | 1998-04-13 | 1999-10-26 | Kaneda Rika Kogyosho:Kk | Plating apparatus for printing roller |
CN102534735A (en) * | 2012-01-13 | 2012-07-04 | 温州天亿节能环保科技有限公司 | Independent control trolley and electroplating equipment |
CN202347068U (en) * | 2011-12-07 | 2012-07-25 | 怡球金属资源再生(中国)股份有限公司 | Online multi-rotor degassing device |
CN202415720U (en) * | 2011-12-15 | 2012-09-05 | 合肥恒力电子装备公司 | Rotating electroplating device |
CN207581978U (en) * | 2017-11-29 | 2018-07-06 | 嵊州市西鲍电泳有限公司 | Metal electrophoresis equipment |
-
2018
- 2018-08-04 CN CN201810880962.9A patent/CN108728889B/en active Active
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH11293490A (en) * | 1998-04-13 | 1999-10-26 | Kaneda Rika Kogyosho:Kk | Plating apparatus for printing roller |
CN202347068U (en) * | 2011-12-07 | 2012-07-25 | 怡球金属资源再生(中国)股份有限公司 | Online multi-rotor degassing device |
CN202415720U (en) * | 2011-12-15 | 2012-09-05 | 合肥恒力电子装备公司 | Rotating electroplating device |
CN102534735A (en) * | 2012-01-13 | 2012-07-04 | 温州天亿节能环保科技有限公司 | Independent control trolley and electroplating equipment |
CN207581978U (en) * | 2017-11-29 | 2018-07-06 | 嵊州市西鲍电泳有限公司 | Metal electrophoresis equipment |
Cited By (2)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110158141B (en) * | 2019-07-04 | 2020-06-12 | 盐城工学院 | Rotation type copper bar double-end electroplating device |
CN111519233A (en) * | 2020-04-22 | 2020-08-11 | 太仓市施美电镀有限公司 | Nickel plating production line and electroplating process thereof |
Also Published As
Publication number | Publication date |
---|---|
CN108728889B (en) | 2020-06-12 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108728889A (en) | A kind of rotating electroplating hanging device for processing to be electroplated | |
JPH0259239B2 (en) | ||
US7850830B2 (en) | Method and apparatus for racking articles for surface treatment | |
CN110788437B (en) | Automatic tin dipping equipment for pins of circuit board | |
WO1999010568A3 (en) | Device and method for evening out the thickness of metal layers on electrical contact points on items that are to be treated | |
CN213447356U (en) | Plated part blanking device based on water electroplating machine | |
CN106937486A (en) | A kind of pcb board surface automatic processing apparatus | |
CN107825219B (en) | Scrap iron removing system | |
CN108043575B (en) | Iron fillings separating element in iron fillings clearance system | |
CN211757048U (en) | Surface cleaning device for electroplating of motor shell | |
CN206962670U (en) | Paint-dipping drying all-in-one is used in a kind of micro-machine processing | |
CN106521611B (en) | Electroplating device with automatic stripping and hanging system | |
CN1958870B (en) | Conduction system applicable to plating equipment | |
CN112663102A (en) | Uniform electroplating device for inner pipe | |
JP3400780B2 (en) | Method and apparatus for performing electrochemical treatment | |
CN112410860A (en) | Neodymium iron boron electroplating device | |
US2404206A (en) | Method of mining native copper | |
CN210748836U (en) | Smokeless barbecue oven | |
CN221166840U (en) | Silver contact silver plating equipment | |
CN211695648U (en) | Heating oven for copper foil | |
CN208246395U (en) | A kind of process equipment of fiberglass reinforced tenacity increased nylon PA6 composite material | |
CN214291775U (en) | Automatic material unloading mechanism of getting of motor shell | |
CN207435211U (en) | A kind of metal plating waste water processing equipment containing heavy metal ion | |
CN208011984U (en) | Workshop ventilation extractor fan in a kind of copper foil process of manufacture | |
CN215295684U (en) | Degreasing and drying device for manufacturing electrolytic copper foil |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
TA01 | Transfer of patent application right |
Effective date of registration: 20200520 Address after: 341000 mezzanine 201, workshop 3, phase I, Co Mo rare metal industrial base, Shuixi Town, Zhanggong District, Ganzhou City, Jiangxi Province Applicant after: Ganzhou Xingtian electroplating Co., Ltd Address before: 510000 Panyu District, Guangzhou, Guangdong, 132 Panyu District East Road, No. 132, East Campus of Zhongshan University Applicant before: Chen Yuncai |
|
TA01 | Transfer of patent application right | ||
GR01 | Patent grant | ||
GR01 | Patent grant |