CN108725701A - A kind of separable torpedo anchor of anchor body - Google Patents
A kind of separable torpedo anchor of anchor body Download PDFInfo
- Publication number
- CN108725701A CN108725701A CN201810699735.6A CN201810699735A CN108725701A CN 108725701 A CN108725701 A CN 108725701A CN 201810699735 A CN201810699735 A CN 201810699735A CN 108725701 A CN108725701 A CN 108725701A
- Authority
- CN
- China
- Prior art keywords
- anchor
- anchor body
- sleeve
- empennage
- torpedo
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Pending
Links
Classifications
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/24—Anchors
- B63B21/26—Anchors securing to bed
-
- B—PERFORMING OPERATIONS; TRANSPORTING
- B63—SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
- B63B—SHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING
- B63B21/00—Tying-up; Shifting, towing, or pushing equipment; Anchoring
- B63B21/24—Anchors
- B63B21/26—Anchors securing to bed
- B63B2021/265—Anchors securing to bed by gravity embedment, e.g. by dropping a pile-type anchor from a certain height
Abstract
The invention discloses a kind of separable torpedo anchors of anchor body, including the empennage being separated from each other and anchor body, several empennages are symmetrically welded on the outside of sleeve, and the outer diameter of anchor body is less than the internal diameter of sleeve, the upper end of anchor body is equipped with end, and the outer diameter of end is more than the outer diameter of sleeve;The inner hollow of anchor body, middle vacancy are packed into filler, and the anchor head of the lower end setting cone-shaped of anchor body, mooring mast is arranged in the upper end of anchor body;After anchor body is inserted in the sleeve with empennage, injection sea bed, subsequently again removes anchor body together, and injection sleeve with empennage in sea bed forms anchoring basis.Using conducting oneself with dignity, larger anchor body can form anchoring basis the sleeve with empennage in the larger sea bed of the sleeve depth of penetration with empennage, is retained in sea bed, can be used for the use of mooring net cage, anchor body is repeatable to be utilized, and construction cost is relatively low.
Description
Technical field
The present invention relates to the anchoring technical field of seawater cage, specifically a kind of separable torpedo anchor of anchor body.
Background technology
Torpedo anchor is one kind of dynamic driving anchor, is generally about 15m, is weighed 130 tons.The shape of anchor itself similar to torpedo,
Therefore torpedo anchor of gaining the name.Anchor body generally has 4 tail fins.Torpedo anchor anchor figure is for example cylindric, inner hollow, can be with filling high density degree
Material such as concrete, old metal etc. maintain its stability to increase dead weight and reduce anchor center of gravity, the tapered shape in lower end, just
In injection seabed soil, as shown in Figure 1.
Torpedo anchor is quickly and expediently installed, and when installation need not be by any external force, it is only necessary to from the sufficiently high position in seabed
By its vertical release, it is set to fall by its own gravity, and when colliding seabed, by huge inertia force caused by high acceleration
Through sea bed to certain depth.Usual release altitude can reach the final impact velocity of 17m/s when away from seabed 30m, and injection is deep
Degree is about 7m, 30m/s or more can be reached in 150m, depth of penetration is about 20m.Its bearing capacity is about the 3~5 of itself dry weight
Times.The scope of application of torpedo anchor is very wide, simple in structure, reusable, manufacturing cost is low, install convenient and with very high
Vertically pulling-resistant bearing capacity can meet the mooring needs of all kinds of offshore platforms well.
Existing torpedo anchor is mainly used for the oil and natural gas facility of mooring depth water float, thus its quality and volume compared with
Greatly.If torpedo anchor is used for the anchoring of seawater cage, quality and volume seem excessive, and cost is also relatively excessively high, it is difficult to promote
With.The area of China's mariculture at present is concentrated mainly in the shallow gulf within 15 m isobaths, and more than the marine site of the 20 m depth of waters
Utilization rate is still less than 1%, therefore, greatly develops the deep-water net cage culture of the 20 m depth of waters or more, is to solve China's food supply guarantee
One of new way.But existing torpedo anchor is commonly used in the marine sites of hundreds of meters of the even upper km depth of water, if for 20 m of mooring ~
The net cage of the 50m depth of waters, it is clear that should not directly copy mechanically, certain improvement need to be carried out.
Invention content the object of the invention is exactly to provide a kind of separable fish of anchor body to make up the defect of prior art
Mine anchor, empennage can be separated from each other with axle body, after the larger dead weight injection sea bed of anchor body, anchor body can be removed, are retained in
Empennage in sea bed forms anchoring basis, is used for mooring net cage.
In order to achieve the above object, the technical solution adopted in the present invention is:
A kind of separable torpedo anchor of anchor body, it is characterised in that:Including anchor body, anchor body axial direction one end is connected with end, outside end
Diameter is more than anchor body outer diameter, and the anchor body axial direction other end is connected with anchor head, is equipped with centre bore in anchor body, centre hole axis is extended to one end
Aperture is formed in end, is radially equipped with mooring mast in aperture, is further included sleeve, sleeve is coaxially placed on anchor, is limited by end
One end of position sleeve corresponding direction, sleeve axial length are less than anchor body axial length, multiple empennages are connected on the outside of sleeve.
The separable torpedo anchor of a kind of anchor body, it is characterised in that:Each empennage is multiple each parallel to sleeve axial direction
Empennage is evenly distributed on the outside of sleeve, and the side that each empennage corresponds to anchor head direction is separately formed to be skewed, one of them
The side that empennage corresponds to end direction is equipped with mooring hole.
The separable torpedo anchor of a kind of anchor body, it is characterised in that:Described sleeve one end is limited by end, sleeve
The other end sets inclined edge of a knife shape.
The separable torpedo anchor of a kind of anchor body, it is characterised in that:The centre hole axis of anchor body is extended to the other end
In anchor body filler is filled in anchor head position, centre bore.
The present invention designs a kind of Novel fish mine anchor, it is made to meet the anchoring needs of 20 m ~ 50m depth of water net cages, and quality is opposite
Smaller, installation cost is relatively low, but the depth of injection sea bed need to be met the requirements.
Compared with prior art, advantages of the present invention is:
1, the inner hollow of anchor body, middle vacancy are packed into filler, and highdensity material such as concrete, old metal can be selected in filler
Deng, i.e., using conduct oneself with dignity larger anchor body can in the larger sea bed of the sleeve depth of penetration with empennage, then the lifting of anchor body, move
It removes, is retained in sea bed the sleeve with empennage and forms anchoring basis, used for mooring net cage.
2, the carried torpedo anchor of this technology anchor chain mooring on from the mooring hole on anchor body center line empennage relatively far away from,
Make torpedo anchor by eccentric load, torpedo anchor is transported by itself and the more complicated friction of soil body generation after eccentric load with opposite
It is dynamic, it is not easy to be pulled straight out, the load of bigger can be born;And the volume of the sleeve with empennage and quality are relatively small, cost
Relatively low, surface area is larger, and larger frictional force can occur with the soil body, can provide larger mooring forces.
3, reusable as working anchor body, therefore the construction cost for sharing each anchoring basis is relatively low.
Description of the drawings
Fig. 1 is traditional torpedo anchor three dimensional structure diagram.
Fig. 2 is carried torpedo anchor vertical view by the present invention.
Fig. 3 is put forward torpedo anchor three dimensional structure diagram by the present invention.
Fig. 4 for the carried torpedo anchor of the present invention anchor body three dimensional structure diagram.
Fig. 5 is that empennage is welded in three dimensional structure diagram on the outside of sleeve.
Fig. 6 for the carried torpedo anchor of the present invention sectional view.
Fig. 7 is carried the preceding hanging schematic diagram above sea bed of torpedo anchor construction by the present invention.
Fig. 8 is carried torpedo anchor by anchor body dead weight injection sea bed schematic diagram by the present invention.
Fig. 9 liftings remove the anchoring basic schematic of anchor behind.
The possible working state schematic representation in Figure 10 anchorings basis.
The torpedo anchor three dimensional structure diagram of four empennages is arranged in Figure 11.
Reference sign:1, empennage;2, mooring mast;3, end;4, anchor body;5, anchor head;6, sleeve;7, mooring hole;8,
Filler;9, anchor chain;10, cable wire;A, sea bed face.
Specific implementation mode
Present invention will be further explained below with reference to the attached drawings and examples.
As shown in Fig. 2-Figure 11, a kind of separable torpedo anchor of anchor body, including anchor body 4, the axial one end of anchor body 4 are connected with end
First 3,3 outer diameter of end is more than 4 outer diameter of anchor body, and the axial other end of anchor body 4 is connected with anchor head 5, centre bore, center are equipped in anchor body 4
Hole axial direction one end extends to and forms aperture in end 3, and mooring mast 2 is radially equipped in aperture, further includes sleeve 6, and sleeve 6 is coaxial
It is placed on anchor body 4, by one end of 3 spacing collar of end, 6 corresponding direction, 6 axial length of sleeve is less than 4 axial length of anchor body, set
6 outside of cylinder is connected with multiple empennages 1.
Each empennage 1 is axial each parallel to sleeve 6, and multiple empennages 1 are evenly distributed on 6 outside of sleeve, and each empennage 1 corresponds to
It is separately formed to be skewed in the side in 5 direction of anchor head, the side that one of empennage corresponds to 3 direction of end is equipped with mooring hole
7。
6 one end of sleeve is limited by end 3, and 6 other end of sleeve sets inclined edge of a knife shape.
The centre hole axis of anchor body 4 extends to close 5 position of anchor head in anchor body 4 to the other end, and filling is filled in centre bore
Object 8.
As shown in Fig. 2 ~ Fig. 6, the present invention includes the empennage 1 being separated from each other and anchor body 4;Several empennages 1 symmetrically weld
In the outside of sleeve 6;The outer diameter of anchor body 4 is less than the internal diameter of sleeve 6, and the upper end of anchor body 4 is equipped with end 3, and the outer diameter of end 3 is more than
The outer diameter of sleeve 6;The inner hollow of anchor body 4, middle vacancy are packed into filler 8, the anchor head 5 of the lower end setting cone-shaped of anchor body 4, anchor
Mooring mast 2 is arranged in the upper end of body 4;After anchor body 4 is inserted in the sleeve 6 with empennage 1, injection sea bed, subsequently again moves anchor body 4 together
It removes, injection sleeve 6 with empennage 1 in sea bed forms anchoring basis.
The nouns of locality such as above-mentioned " outside " referred to, " lower end " are postures when being constructed based on carried torpedo anchor to determine.
Carried torpedo anchor is suspended to above sea bed when construction, and is in plummet state, as shown in Figure 7.Under this posture, to determine each side
Position word is specifically directed towards, and the noun of locality that other places are carried in specification also is estimated to obtain by this posture.Above-mentioned orientation or position
It is orientation based on ... shown in the drawings or position relationship to set relationship, is merely for convenience of describing and simplifying description, rather than indicates
It either implies that signified device or component must have a particular orientation, construct and operate, therefore should not be understood as to this hair
Bright limitation.
Fig. 2 ~ Fig. 3 gives the configuration picture of carried torpedo anchor.As it can be seen that carried torpedo anchor is in symmetry status.
The lower part of empennage 1 is oblique, and mooring hole 7, one end and 7 phase of mooring hole of anchor chain 9 are arranged on one of empennage 1
Even.Empennage 1 is symmetrically welded on the outside of sleeve 6, as shown in Figure 5.The inclined edge of a knife shape in lower part of sleeve 6, convenient for injection sea
Bed reduces the resistance with seabed soil.
The structural schematic diagram of anchor body 4 is as shown in figure 4, empennage 1 is welded on the structural schematic diagram on sleeve 6 as shown in figure 5, institute
The sectional view for carrying torpedo anchor is as shown in Figure 6.As it can be seen that sleeve 6 is sleeved on anchor body 4, sleeve 6 is substantially separated from each other with anchor body 4
, the sleeve 6 with empennage 1 can be pressed into sea bed together by the end 3 on 4 top of anchor body.The length of sleeve 6 is less than the length of anchor body 4
Degree.In general, the length of anchor body 4 should be greater than 1.5 times of 6 length of sleeve.
The inner hollow of anchor body 4, middle vacancy are packed into filler 8, filler 8 can be selected highdensity material such as concrete,
Old metal etc. maintains the stability during torpedo anchor injection sea bed to increase the dead weight of torpedo anchor and reduce torpedo anchor center of gravity
With verticality.
The relatively straightforward substantive characteristics for illustrating carried torpedo anchor of sectional view shown in fig. 6:Empennage 1 is welded on sleeve 6
On, and sleeve 6 is sleeved on anchor body 4, sleeve 6 is substantially separated from each other with anchor body 4, and the upper end of sleeve 6 is by the end 3 of diameter bigger
Limitation, therefore sleeve 6 can be pressed into sea bed by anchor body 4.
The effect of anchor body 4 is:By its larger dead weight, the sleeve 6 with empennage 1 is pressed into sea bed.Sleeve with empennage 1
The 6 anchoring bases as subsequently used, each empennage 1 uniformly, is symmetrically distributed in the surrounding of sleeve 6,9 mooring of anchor chain from set
On mooring hole 7 on the empennage 1 of 6 center lines of cylinder relatively far away from, basis of anchoring under the action of anchor chain pulling force can catch certain
Seabed soil, and rub with seabed soil, to form larger mooring forces.
In order to ensure the anchor body 4 after injection sea bed can be extracted out effectively from sleeve 6, it can smear and lubricate in 4 outer wall of anchor body
Agent, lubricating oil, to reduce mutual friction.
The construction method of carried torpedo anchor is as follows:One end mooring of anchor chain 9 on the mooring hole 7 on empennage 1, construction is used
Cable wire 10 tie up on the mooring mast 2 of 4 tail portion of anchor body;Make the end 3 of sleeve 6 and anchor body using follow-up disengageable ancillary measure
Between be temporarily closely connected, so that it is guaranteed that sleeve 6 is not fallen off when vertical lifting anchor body 4;Lifting by crane torpedo anchor based on cable wire 10 makes
It is suspended vertically at sea bed predetermined distance thereabove, and the certain length of decentralization anchor chain 9 makes at it relaxed state and to torpedo anchor
Quickly sinking influences to be preferably minimized, as shown in Figure 7;Then cable wire 10 is discharged, torpedo anchor is made quickly to sink simultaneously under Gravitative Loads
Injection sea bed, as shown in Figure 8;Cable wire 10 is then pulled up, anchor body 4 is made to be extracted out from sleeve 6, the sleeve 6 with empennage 1 is retained in sea
In bed, that is, complete the construction operation of carried torpedo anchor.Anchor body 4 anchors basic state as shown in figure 9, anchoring basis exists after removing
Possible posture is as shown in Figure 10 under the action of follow-up anchor chain pulling force.
Fig. 2 ~ Figure 10 gives a kind of the case where three empennages.In fact it is also an option that the empennage of other quantity, such as schemes
11 give a kind of four tail structure schematic diagrames.
Advantages of the present invention is as follows:The inner hollow of anchor body, middle vacancy are packed into filler, and filler can be selected highdensity
Material such as concrete, old metal etc., i.e., can be the larger sea bed of the sleeve depth of penetration with empennage using the larger anchor body of dead weight
In, then the lifting of anchor body, removal, it is retained in sea bed the sleeve with empennage and forms anchoring basis, can be used for mooring net cage
It uses;Anchor chain mooring on from the mooring hole on anchor body center line empennage relatively far away from, is made fish by the carried torpedo anchor of this technology
Mine anchor is by eccentric load, and by itself and the soil body after eccentric load more complicated friction and relative motion are occurred for torpedo anchor, no
It is easy to be pulled straight out, the load of bigger can be born;And the volume of the sleeve with empennage is relatively small with quality, cost is relatively low,
Its surface area is larger, and larger frictional force can occur with the soil body, can provide larger mooring forces;Working anchor body is repeatable to be made
With, therefore the construction cost for sharing each anchoring basis is relatively low.
The length of traditional torpedo anchor is generally more than 10 m, and weight is more than 100 tons.If be used for mooring net cage, it is clear that quality with
Volume is excessive, and the cost is relatively high, it is difficult to promote the use of.Moreover the load that the load that net cage is subject to usually is subject to than ocean platform
It is much smaller, therefore the torpedo anchor of mooring net cage should not directly apply mechanically the torpedo anchor of traditional mooring ocean platform.This technology is to traditional fish
Mine anchor has carried out certain improvement, has not only considered torpedo anchor injection sea bed and has needed enough dead weights, but also has taken into account anchoring basis
Volume should not be too large with dead weight, the unsuitable excessively high actual demand of cost, it is proposed that the anchor body for conducting oneself with dignity larger and the sleeve with wing plate
The mentality of designing that can be separated from each other so that torpedo anchor can meet the mooring needs of 20 m ~ 50m depth of water net cages, and have quality phase
The advantage relatively low to smaller, installation cost.
The case where partial shape and part connection type of empennage and anchor body are shown only in attached drawing, according to carried thinking,
Shape, quantity, sleeve and the anchor body that empennage can be changed are connected with each other mode, and the anchor body for forming other correlation types is separable
Torpedo anchor belongs to the equivalent modifications and change of this technology, and details are not described herein again.
The attached figures are only used for illustrative purposes and cannot be understood as limitating the patent;It is attached in order to more preferably illustrate the present embodiment
Scheme certain components to have omission, zoom in or out, does not represent the size of actual product;To those skilled in the art,
The omitting of some known structures and their instructions in the attached drawings are understandable;Same or analogous label corresponds to same or similar
Component;The terms describing the positional relationship in the drawings are only for illustration, should not be understood as the limitation to this patent.
The present invention is not limited to above-mentioned specific implementation mode, according to the above, according to the ordinary technical knowledge of this field
And customary means, under the premise of not departing from above-mentioned basic fundamental thought of the invention, the present invention can also make other diversified forms
Equivalent modifications, replacement or change, be within the scope of the present invention.
Claims (4)
1. a kind of separable torpedo anchor of anchor body, it is characterised in that:Including anchor body, anchor body axial direction one end is connected with end, end
Outer diameter is more than anchor body outer diameter, and the anchor body axial direction other end is connected with anchor head, centre bore is equipped in anchor body, and centre hole axis extends to one end
Aperture is formed in end, is radially equipped with mooring mast in aperture, is further included sleeve, sleeve is coaxially placed on anchor, by end
One end of spacing collar corresponding direction, sleeve axial length are less than anchor body axial length, multiple empennages are connected on the outside of sleeve.
2. the separable torpedo anchor of a kind of anchor body according to claim 1, it is characterised in that:Each empennage is each parallel to set
Cylinder is axial, and multiple empennages are evenly distributed on the outside of sleeve, and the side that each empennage corresponds to anchor head direction is separately formed to tilt
Shape, the side that one of empennage corresponds to end direction are equipped with mooring hole.
3. the separable torpedo anchor of a kind of anchor body according to claim 1, it is characterised in that:Described sleeve one end is by holding
Head limit, the sleeve other end set inclined edge of a knife shape.
4. the separable torpedo anchor of a kind of anchor body according to claim 1, it is characterised in that:The centre hole axis of anchor body is to another
One end extends in anchor body and is filled with filler in anchor head position, centre bore.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810699735.6A CN108725701A (en) | 2018-06-29 | 2018-06-29 | A kind of separable torpedo anchor of anchor body |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810699735.6A CN108725701A (en) | 2018-06-29 | 2018-06-29 | A kind of separable torpedo anchor of anchor body |
Publications (1)
Publication Number | Publication Date |
---|---|
CN108725701A true CN108725701A (en) | 2018-11-02 |
Family
ID=63925515
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810699735.6A Pending CN108725701A (en) | 2018-06-29 | 2018-06-29 | A kind of separable torpedo anchor of anchor body |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108725701A (en) |
Cited By (4)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110588891A (en) * | 2019-10-12 | 2019-12-20 | 马嘉锋 | Novel ship anchor special for soft soil at river bottom |
CN111017115A (en) * | 2019-11-11 | 2020-04-17 | 合肥学院 | Combined anchoring foundation based on torpedo anchor penetration |
CN111055968A (en) * | 2019-12-05 | 2020-04-24 | 天津大学前沿技术研究院有限公司 | Square anchor wing power penetration anchor capable of enhancing in-place bearing capacity |
WO2021163842A1 (en) * | 2020-02-17 | 2021-08-26 | 大连理工大学 | Combined power anchor having folding anchor shank and method for controlling perpendicularity of the combined power anchor having folding anchor shank during dropping in water |
Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1203166A (en) * | 1997-05-21 | 1998-12-30 | 诺尔斯海德公司 | Device for implementation of anchor into sea bottom |
CN1325352A (en) * | 1998-10-30 | 2001-12-05 | 布鲁帕特有限公司 | Improvements in marine anchors |
US20140053767A1 (en) * | 2011-03-30 | 2014-02-27 | Stevlos B.V. | Anchor assembly |
CN106005262A (en) * | 2016-07-07 | 2016-10-12 | 天津大学 | Torpedo anchor with ring spines |
CN106005263A (en) * | 2016-07-07 | 2016-10-12 | 天津大学 | Assembled circumferential stabbing torpedo anchor |
-
2018
- 2018-06-29 CN CN201810699735.6A patent/CN108725701A/en active Pending
Patent Citations (5)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN1203166A (en) * | 1997-05-21 | 1998-12-30 | 诺尔斯海德公司 | Device for implementation of anchor into sea bottom |
CN1325352A (en) * | 1998-10-30 | 2001-12-05 | 布鲁帕特有限公司 | Improvements in marine anchors |
US20140053767A1 (en) * | 2011-03-30 | 2014-02-27 | Stevlos B.V. | Anchor assembly |
CN106005262A (en) * | 2016-07-07 | 2016-10-12 | 天津大学 | Torpedo anchor with ring spines |
CN106005263A (en) * | 2016-07-07 | 2016-10-12 | 天津大学 | Assembled circumferential stabbing torpedo anchor |
Cited By (6)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110588891A (en) * | 2019-10-12 | 2019-12-20 | 马嘉锋 | Novel ship anchor special for soft soil at river bottom |
CN111017115A (en) * | 2019-11-11 | 2020-04-17 | 合肥学院 | Combined anchoring foundation based on torpedo anchor penetration |
CN111055968A (en) * | 2019-12-05 | 2020-04-24 | 天津大学前沿技术研究院有限公司 | Square anchor wing power penetration anchor capable of enhancing in-place bearing capacity |
WO2021163842A1 (en) * | 2020-02-17 | 2021-08-26 | 大连理工大学 | Combined power anchor having folding anchor shank and method for controlling perpendicularity of the combined power anchor having folding anchor shank during dropping in water |
AU2020323950B2 (en) * | 2020-02-17 | 2022-01-06 | Dalian University Of Technology | Hybrid dynamically installed anchor with a folding shank and control method for keep anchor verticality during free fall in water |
US11827314B2 (en) | 2020-02-17 | 2023-11-28 | Dalian University Of Technology | Hybrid dynamically installed anchor with a folding shank and control method for keep anchor verticality during free fall in water |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN108725701A (en) | A kind of separable torpedo anchor of anchor body | |
CN103806462B (en) | Power transmission circuit soil layer steel strand prestress expands anchor pole basis, the end | |
CN205365991U (en) | Cable arrangement structure of hybrid spar platform | |
CN109418184A (en) | Far-reaching sea aquaculture net cage | |
Sarkar et al. | Study on a new method for installing a monopile and a fully integrated offshore wind turbine structure | |
CN103648900A (en) | An anchor assembly | |
CN205546995U (en) | Three fens firm systems of anchor style deep sea box with a net | |
CN212267765U (en) | Torpedo anchor with additional anchor body and additional anchor body capable of being unfolded and turned outwards | |
CN108925480A (en) | A kind of torpedo anchor and its construction method with weight body | |
CN107933828A (en) | A kind of expandable Novel fish mine anchor of anchor head and its installation method | |
CN108860472B (en) | Torpedo anchor formed by sectional connection | |
CN111994207A (en) | Torpedo anchor with additional anchor body and additional anchor body capable of being unfolded and turned outwards | |
CN106428447A (en) | Ultra-large type multi-floating-body semi-submersible floating platform | |
CN105961224A (en) | Assembled-type cement pier anchoring system for net cage fixation | |
CN108860471A (en) | A kind of tensile torpedo anchor of empennage | |
CN208739908U (en) | A kind of torpedo anchor with weight body | |
CN108860475B (en) | Torpedo anchor capable of spraying bubbles around anchor body during installation | |
CN209096953U (en) | A kind of anchoring basis equipped with rotation empennage | |
CN209142333U (en) | A kind of anchoring basis based on no empennage torpedo anchor injection construction | |
CN2679028Y (en) | Underwater tie platform | |
CN205409135U (en) | Pin -connected panel cement pier anchor system for fixed cage | |
CN111017115B (en) | Combined anchoring foundation based on torpedo anchor penetration | |
CN108860470B (en) | Anchoring foundation based on tailless-wing-fish-and-thunder anchor penetration construction | |
CN209096951U (en) | A kind of tensile torpedo anchor of empennage | |
CN201627557U (en) | Fishing tool of wireless drilling inclinometer |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
RJ01 | Rejection of invention patent application after publication | ||
RJ01 | Rejection of invention patent application after publication |
Application publication date: 20181102 |