CN107933828A - A kind of expandable Novel fish mine anchor of anchor head and its installation method - Google Patents

A kind of expandable Novel fish mine anchor of anchor head and its installation method Download PDF

Info

Publication number
CN107933828A
CN107933828A CN201710937047.4A CN201710937047A CN107933828A CN 107933828 A CN107933828 A CN 107933828A CN 201710937047 A CN201710937047 A CN 201710937047A CN 107933828 A CN107933828 A CN 107933828A
Authority
CN
China
Prior art keywords
anchor
guide rod
anchor body
conical plate
wirerope
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201710937047.4A
Other languages
Chinese (zh)
Other versions
CN107933828B (en
Inventor
国振
芮圣洁
王立忠
周文杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University ZJU
Original Assignee
Zhejiang University ZJU
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University ZJU filed Critical Zhejiang University ZJU
Priority to CN201710937047.4A priority Critical patent/CN107933828B/en
Publication of CN107933828A publication Critical patent/CN107933828A/en
Application granted granted Critical
Publication of CN107933828B publication Critical patent/CN107933828B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/22Handling or lashing of anchors
    • BPERFORMING OPERATIONS; TRANSPORTING
    • B63SHIPS OR OTHER WATERBORNE VESSELS; RELATED EQUIPMENT
    • B63BSHIPS OR OTHER WATERBORNE VESSELS; EQUIPMENT FOR SHIPPING 
    • B63B21/00Tying-up; Shifting, towing, or pushing equipment; Anchoring
    • B63B21/24Anchors
    • B63B21/26Anchors securing to bed

Landscapes

  • Chemical & Material Sciences (AREA)
  • Engineering & Computer Science (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • Ocean & Marine Engineering (AREA)
  • Piles And Underground Anchors (AREA)

Abstract

The invention discloses a kind of expandable Novel fish mine anchor of anchor head, it mainly includes anchor head, guide rod, anchor body, anchor tail-hood plate, the heaving pile annulus etc. being made of four pieces of conical plates, four pieces of conical plates are hinged with anchor body lower edge in the anchor head, conical plate lower end connects wirerope, wirerope is oriented to the other end by the pulley on anchor body and lies on heaving pile annulus, when anchor body injection to designated depth, it can open conical plate by prestretching guide rod.The present invention improves the forced area of anchor body, and then improve anchor body bearing capacity by opening torpedo anchor anchor head conical plate;Tensioning equipment is relatively simple, is easy to make;It is also relatively simple that stretching process is installed, it is easily operated.

Description

A kind of expandable Novel fish mine anchor of anchor head and its installation method
Technical field
The present invention relates to torpedo anchor and its installation method, the expandable Novel fish mine anchor of more particularly to a kind of anchor head and its peace Dress method.
Background technology
In recent years, more and more floating structures (floating platform and ferryboat, floating trestle, floating wharf etc.) are used for sea Foreign development of resources, the construction of off-lying sea islands and reefs, offshore personnel and goods and materials transport.Floating structure is adapted to sea complicated and changeable Foreign environment and geological conditions, and its mooring location technology is the key that its efficiency gives full play to, and obtains the research of ocean engineering circle and learns The extensive concern of person.Wherein, torpedo anchor foundation (torpedo anchor) is the new anchoring technology of latest development, has installation The features such as simple efficient, cost, anchoring excellent performance, especially overcome traditional anchor foundation heavy dependence operating water depth and peace The shortcomings that installing is standby, it is considered to be most potential new anchoring basis at present.
The installation of torpedo anchor is more fast and simple, after only needing range of lift mud face certain distance in water, discharges anchor body, anchor body Rely in the dead weight injection soil body;But during the military service of anchor body, main play of carrying is conducted oneself with dignity and friction of the soil body to it dependent on anchor body Resistance, bearing capacity can only obtain limited performance, to improve the forced area of anchor body and increase bearing capacity, propose that anchor head can be opened The Novel fish mine anchor opened.
The content of the invention
In view of the above-mentioned deficiencies in the prior art, it is an object of the present invention to provide a kind of expandable Novel fish mine anchor of anchor head and its Installation method.This kind of anchor type inherits the advantage of fish anchor Fast Installation, and makes anchor head by relatively simple structure design Open, increase anchor body forced area, and then improve the bearing capacity of anchor body.
The present invention takes following technical scheme:
A kind of expandable Novel fish mine anchor of anchor head, including anchor body, anchor head, guide rod, anchor tail-hood plate;Four are evenly equipped with anchor Anchor body is divided into four regions by block longitudinal direction side wing, and anchor head is made of four pieces and the above-mentioned corresponding conical plate in four regions Cone, each conical plate upper end are hinged with anchor body lower end, and anchor tail-hood plate is arranged at anchor and holds, and is respectively filled in each region upper and lower side of anchor body Have a pulley, guide rod is vertically provided at anchor body inner space, upper end be pierced by anchor tail-hood plate and on guide rod traversing through end successively Equipped with the first stopper and heaving pile annulus, the first stopper is fixed for limitation guide rod with guide rod and moves downward, in each conical plate Lower part is equipped with wirerope connecting hole, and the lantern ring is provided with the inside of each conical plate, and lower end of the guide rod is inserted into each lantern ring, can limit in a pre-installation The position of conical plate processed, makes it be unlikely to open;A wirerope is respectively provided with four regions of anchor body, upper end lies in heaving pile annulus, The other end lies in wirerope connecting hole after upper lower sheave, and pulley is used to be oriented to for wirerope and power transmission, and the is further fixed on guide rod Two stoppers, continue up for making conical plate be flared to horizontal time limit guide rods just, can avoid the excessive of conical plate Tensioning;Heaving pile hole is provided with guide rod top to be used to connect mooring line, and lifting lug is equipped with anchor tail-hood plate and is used to connect installation steel Cable.
The installation method of the expandable Novel fish mine anchor of anchor head as described above is as follows:
When constructing at the scene, after torpedo anchor distancing mud face is gone out certain altitude with installation wirerope, ensure the verticality of anchor body, Anchor body is discharged, after anchor body injection sea bed certain depth, tensioning mooring line, makes guide rod along moving on central axial, at this time guide rod Least significant end is drawn out to beyond the lantern ring, and restriction effect is lost to conical plate, and the first stopper drives heaving pile annulus to move upwards, steel Cable is tightened upwards, and power is reached bottom along pulley, opens conical plate, and when being flared to horizontal position, the second stopper is just Anchor tail-hood plate is touched, limits the excessive opening of conical plate, installation is complete at this time.
The present invention has the following advantages:
By opening torpedo anchor anchor head conical plate, the forced area of anchor body is improved, and then improve anchor body bearing capacity;
Tensioning equipment is relatively simple, is easy to make;It is also relatively simple that stretching process is installed, it is easily operated.
Brief description of the drawings
Fig. 1 is the structure of the main view of anchor body of the present invention before tensioning;
Fig. 2 is anchor body front section view of the present invention before tensioning;
Fig. 3 is anchor body top view of the present invention before tensioning;
Fig. 4 is anchor body bottom view of the present invention before tensioning;
Fig. 5 is anchor body front view of the present invention after tensioning;
Fig. 6 is anchor body top view of the present invention after tensioning.
In figure:1st, anchor head, 2, conical plate, 3, side wing, 4, the lantern ring, 5, guide rod, 6, anchor body, 7, shaft, 8, wirerope connection Hole, 9, wirerope, 10, pulley, 11, anchor tail-hood plate, 12, heaving pile annulus, the 13, first stopper, 14, cover central hole, 15, second Stopper, 16, heaving pile hole, 17, mooring line, 18, lifting lug.
Embodiment
With reference to Fig. 1-6, anchor head is arranged to four pieces by the expandable Novel fish mine anchor of anchor head of the invention can be around pin rotation Conical plate, when torpedo anchor reaches and specifies depth of penetration, tensioning conical plate makes its opening, increases the forced area of torpedo anchor.Tool Body, its structure is as follows:Torpedo anchor anchor head 1 is cone, and the present invention equals two planes along where crossing side wing 3 of conical plate 2 Four pieces are divided into, every piece of 2 middle inside of conical plate welds a lantern ring 4, and the lantern ring 4 is perpendicular to central symmetry axis, and the lantern ring 4 is before tensioning Entangle centre pilot 5;Four pieces of conical plates 2 are connected with 6 edge of anchor body by shaft 7, and shaft 7 is located in 2 topmost of conical plate At the heart;2 outside top of conical plate sets wirerope connecting hole 8, for connecting wirerope 9 and conical plate 2;6 outside upper and lower side of anchor body Respectively one small-sized pulley 10 of installation, pulley 10 is used to be oriented to for wirerope 9 and power transmission, and for lower pulley 10 close to shaft 7, wheel is changed on top 10 at anchor tail, and top and the bottom pulley 10 and shaft 7 are the same as on a plumb line;Four wireropes 9 go to anchor by pulley 10 Tail-hood plate more than 11, is connected, heaving pile annulus 12 is sleeved on guide rod 5 with a heaving pile annulus 12;Guide rod 5 is located at anchor body symmetry axis Place, guide rod 5 is bar of variable cross-section, thicker the first stopper 13 for guide rod of the guide rod in 12 lower part of heaving pile annulus, for limiting system The position of cable annulus 12, the first stopper of guide rod 13 are justified in the top of anchor tail-hood plate 11,14 bore dia of cover central hole with heaving pile The internal diameter of ring 12 is identical, and for limiting moving downward for guide rod 5,5 middle and upper part position of guide rod sets the second stopper 15, guide rod It is thicker so that the lower part of the second stopper 15 contact anchor tail-hood plate 11, limitation are led when conical plate 2 is flared to horizontal position just The excessive tensioning of the further up and conical plate 2 of bar 5;The top of guide rod 5 sets heaving pile hole 16, is connected with mooring line 17, 5 bottommost of guide rod is inserted into the lantern ring 4 of conical plate 2, limits the position of conical plate 2 when mounted, makes it be unlikely to open;Anchor tail-hood Two lifting lugs 18 of the symmetrical place's welding in the outside of plate 11, wirerope is installed for connecting.
When constructing at the scene, after anchor body distancing mud face is gone out certain altitude with installation wirerope, ensure the verticality of anchor body, release Put anchor body, after anchor body injection sea bed certain depth, tensioning mooring line 17, makes guide rod 5 along moving on central axial, at this time guide rod 5 least significant ends are drawn out to beyond the lantern ring 4, and restriction effect is lost to conical plate 2, and the first stopper 13 drives heaving pile annulus 12 upward Use, wirerope 9 is tightened upwards, and power is reached bottom along pulley 10, opens conical plate 2, when being flared to horizontal position Two stoppers 15 just touch anchor tail-hood plate 11, and the excessive opening of limitation conical plate 2, installation is complete at this time.
The present invention installation procedure be:
1. connection installation wirerope and mooring line;
2. anchor body is lifted to desired depth;
3. release anchor body makes it by dead weight injection sea bed;
4. tensioning mooring line, opens conical plate;
5. complete installation.

Claims (2)

1. a kind of expandable Novel fish mine anchor of anchor head, it is characterised in that including anchor body (6), anchor head (1), guide rod (5), anchor tail Cover board (11);Four pieces of longitudinal side wings (3) are evenly equipped with anchor body (6) anchor body is divided into four regions, anchor head (1) is by four pieces The cone formed with the above-mentioned corresponding conical plate in four regions (2), each conical plate (2) upper end are hinged with anchor body lower end, anchor tail-hood Plate (11) is arranged at anchor body (6) upper end, one pulley (10) is respectively housed in each region upper and lower side of anchor body, guide rod (5) is vertically set Be placed in anchor body inner space, upper end be pierced by anchor tail-hood plate (11) and be equipped with successively on guide rod traversing through end the first stopper (13) and Heaving pile annulus (12), the first stopper (13) is fixed for limitation guide rod with guide rod (5) and moves downward, under each conical plate (2) Portion is equipped with wirerope connecting hole (8), the lantern ring (4) is provided with the inside of each conical plate (2), lower end of the guide rod is inserted into each lantern ring, in anchor Four regions of body are respectively provided with a wirerope (9), and upper end lies in heaving pile annulus (12), and the other end lies in wirerope company after upper lower sheave Hole (8) is connect, the second stopper (15) is further fixed on guide rod (5), for making to limit when conical plate (2) is lucky to be flared to level Guide rod (5) continues up, and heaving pile hole (6) is provided with guide rod top and is used to connect mooring line (17), in anchor tail-hood plate (11) lifting lug (18) is equipped with to be used to connect installation wirerope.
2. the installation method of the expandable Novel fish mine anchor of a kind of anchor head as claimed in claim 1, it is characterised in that method is such as Under:Torpedo anchor is lifted to designated position, torpedo anchor is discharged, makes it after Gravitative Loads are issued to predetermined depth of penetration, tensioning Mooring line opens conical plate, completes installation.
CN201710937047.4A 2017-10-10 2017-10-10 A kind of expandable Novel fish mine anchor of anchor head and its installation method Active CN107933828B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201710937047.4A CN107933828B (en) 2017-10-10 2017-10-10 A kind of expandable Novel fish mine anchor of anchor head and its installation method

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201710937047.4A CN107933828B (en) 2017-10-10 2017-10-10 A kind of expandable Novel fish mine anchor of anchor head and its installation method

Publications (2)

Publication Number Publication Date
CN107933828A true CN107933828A (en) 2018-04-20
CN107933828B CN107933828B (en) 2019-02-05

Family

ID=61936084

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201710937047.4A Active CN107933828B (en) 2017-10-10 2017-10-10 A kind of expandable Novel fish mine anchor of anchor head and its installation method

Country Status (1)

Country Link
CN (1) CN107933828B (en)

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677986A (en) * 2018-05-16 2018-10-19 福州大学 Technology of Deepwater Mooring System body and its construction technology
CN109969342A (en) * 2019-03-27 2019-07-05 浙江大学 A kind of expandable novel slurry filling Screw Anchor in end and its installation method
CN109969341A (en) * 2019-03-27 2019-07-05 浙江大学 A kind of the novel slurry filling Screw Anchor and its installation method of expansible multilayer sidewall
CN112356984A (en) * 2021-01-12 2021-02-12 烟台金能机械有限公司 Ship positioning pile lifting mechanism
CN113928477A (en) * 2021-11-04 2022-01-14 福州大学 Gravity injection type deepwater anchor and construction method
CN113978620A (en) * 2021-11-24 2022-01-28 中国船舶科学研究中心 Rapid deployment anchoring system and use method

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4086865A (en) * 1976-04-23 1978-05-02 John Arnold Statham Mooring system
CN102556285A (en) * 2011-12-23 2012-07-11 浙江海洋学院普陀科学技术学院 Net cage module anchor
CN105644720A (en) * 2016-03-25 2016-06-08 中国石油大学(华东) Improved torpedo anchor
CN205602053U (en) * 2016-05-14 2016-09-28 南京飞龙特种消防设备制造有限公司 Automatic earth anchor is used to decompoed rock coral reef
CN106741643A (en) * 2015-11-23 2017-05-31 巴西石油公司 For sea anchoring ship and the gravity anchor of drilling platforms

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US4086865A (en) * 1976-04-23 1978-05-02 John Arnold Statham Mooring system
CN102556285A (en) * 2011-12-23 2012-07-11 浙江海洋学院普陀科学技术学院 Net cage module anchor
CN106741643A (en) * 2015-11-23 2017-05-31 巴西石油公司 For sea anchoring ship and the gravity anchor of drilling platforms
CN105644720A (en) * 2016-03-25 2016-06-08 中国石油大学(华东) Improved torpedo anchor
CN205602053U (en) * 2016-05-14 2016-09-28 南京飞龙特种消防设备制造有限公司 Automatic earth anchor is used to decompoed rock coral reef

Cited By (10)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN108677986A (en) * 2018-05-16 2018-10-19 福州大学 Technology of Deepwater Mooring System body and its construction technology
WO2019218640A1 (en) * 2018-05-16 2019-11-21 福州大学 Deep-water anchoring body and construction process therefor
CN109969342A (en) * 2019-03-27 2019-07-05 浙江大学 A kind of expandable novel slurry filling Screw Anchor in end and its installation method
CN109969341A (en) * 2019-03-27 2019-07-05 浙江大学 A kind of the novel slurry filling Screw Anchor and its installation method of expansible multilayer sidewall
CN109969341B (en) * 2019-03-27 2020-08-04 浙江大学 Grouting spiral anchor with expandable multilayer side wall and mounting method thereof
WO2020192015A1 (en) * 2019-03-27 2020-10-01 浙江大学 Novel grouting screw anchor capable of opening multiple layers of side walls and mounting method therefor
CN112356984A (en) * 2021-01-12 2021-02-12 烟台金能机械有限公司 Ship positioning pile lifting mechanism
CN113928477A (en) * 2021-11-04 2022-01-14 福州大学 Gravity injection type deepwater anchor and construction method
CN113978620A (en) * 2021-11-24 2022-01-28 中国船舶科学研究中心 Rapid deployment anchoring system and use method
CN113978620B (en) * 2021-11-24 2022-12-27 中国船舶科学研究中心 Rapid deployment anchoring system and use method

Also Published As

Publication number Publication date
CN107933828B (en) 2019-02-05

Similar Documents

Publication Publication Date Title
CN107933828B (en) A kind of expandable Novel fish mine anchor of anchor head and its installation method
CN101857072B (en) Unconditional stability equipped deep-draft floating production platform and offshore installation method thereof
WO2020237965A1 (en) Combined suction anchor reinforced by using grouting screw anchor
CN107933830A (en) The new type of deep-water anchor and its installation method of a kind of expansible multilayer anchor slab
CN107985516A (en) A kind of flank extension type dynamic driving anchor
NO151840B (en) STABILIZED ELEVATOR EQUIPMENT FOR LOWERING, LIFTING AND SUPPORTING A PIPE STRING FROM A DIPWATER PLATFORM
CN112627222B (en) Novel offshore wind power foundation applicable to shallow covering layer and construction method thereof
CN201961509U (en) Unconditional stability equipped deep-draft floating oil production platform
CN106005263A (en) Assembled circumferential stabbing torpedo anchor
CN111364494B (en) Offshore high-pile bearing platform foundation supported by anchor cables and inclined straight piles and construction method thereof
CN205293003U (en) Unrestrained offshore oil drilling platform of anti -wind
CN103195080B (en) Towing method for gravity foundation
CN211690420U (en) Height-adjustable anchoring foundation structure based on bucket foundation
CN106930317A (en) A kind of dismountable many base large bearing capacity suction base apparatuses
CN107135999B (en) Gravity type anchoring foundation assembled by cement boards and construction method thereof
CN209493962U (en) A kind of long-short pile bucket foundation suitable for deep water complex sea area
CN217778903U (en) Suction anchor structure
CN212506362U (en) Offshore high-rise pile cap foundation supported by anchor cables and inclined straight piles
CN113998056B (en) Expansion type ocean oil gas platform anchoring pile tying device
CN201842225U (en) Semi-submersible platform
CN211308897U (en) Rotation type anchoring device based on suction bucket penetrates
CN103993860A (en) Offshore drilling base plate
CN207083863U (en) The gravity type anchoring basis that a kind of cement plate assembles
CN111055969A (en) Power injection anchor with punching semicircular anchor wing and capable of enhancing in-place bearing capacity
CN105908773A (en) Two-stage socketed pile wind turbine foundation for shallow covering stratum foundation of offshore wind plant and construction method

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
GR01 Patent grant