CN108716912B - 双轴倾角仪垂直度跟踪测量方法 - Google Patents
双轴倾角仪垂直度跟踪测量方法 Download PDFInfo
- Publication number
- CN108716912B CN108716912B CN201810337626.XA CN201810337626A CN108716912B CN 108716912 B CN108716912 B CN 108716912B CN 201810337626 A CN201810337626 A CN 201810337626A CN 108716912 B CN108716912 B CN 108716912B
- Authority
- CN
- China
- Prior art keywords
- steel pipe
- pipe column
- measuring
- verticality
- perpendicularity
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Active
Links
Images
Classifications
-
- G—PHYSICS
- G01—MEASURING; TESTING
- G01C—MEASURING DISTANCES, LEVELS OR BEARINGS; SURVEYING; NAVIGATION; GYROSCOPIC INSTRUMENTS; PHOTOGRAMMETRY OR VIDEOGRAMMETRY
- G01C15/00—Surveying instruments or accessories not provided for in groups G01C1/00 - G01C13/00
- G01C15/12—Instruments for setting out fixed angles, e.g. right angles
Landscapes
- Physics & Mathematics (AREA)
- Engineering & Computer Science (AREA)
- General Physics & Mathematics (AREA)
- Radar, Positioning & Navigation (AREA)
- Remote Sensing (AREA)
- Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)
Abstract
本发明为双轴倾角仪垂直度跟踪测量方法。包括以下步骤:a)将测量装置安装在固定装置上;b)将固定装置焊接或粘结在钢管柱上;c)通过数据线连接电源和笔记本电脑;d)打开计算软件,调试串口以成功连接传感器;e)通过预装在笔记本电脑中的计算软件,根据工况逐次处理计算倾角传感器的测量数据;f)待钢管柱吊起后处于稳定状态时,设置垂直度初始值;g)待钢管柱下入钻孔内后,测量钢管柱相对初始值的垂直度偏差,待偏差达到设计要求后固定钢管柱,调垂完成;h)混凝土浇筑完成后,完成最后一次垂直度测量;i)取下固定装置与测量装置。本发明可测量钢管柱下入钻孔内后的垂直度,自动化程度较高,并且具有较高测量精度。
Description
技术领域
本发明涉及桩基工程垂直度测量控制领域,尤其涉及一种用于测量一柱一桩垂直度的方法。
背景技术
随着我国城市化进程的加快,各种大型、超大型工程越来越多,对应的超大超深基坑数量也在不断增加,实际施工过程中对桩基的施工质量要求也越来越高。在我国超大超深基坑施工中一柱一桩先插法施工手段应用已越来越广泛。垂直度是影响一柱一桩施工质量的一个重要指标。
为了测量一柱一桩的垂直度,CN 106592654 A给出了一种钢管桩垂直度监测方法,它包括以下步骤:a)将保护钢管与钢管桩连接;b)将保护钢管与钢管桩一起沉入土体,并在保护钢管内安装固定测斜管;c)将测斜仪置入测斜管;d)通过测量测斜管监测钢管桩在打桩或基坑开挖过程中的各分段垂直度或垂直度变化;e)计算钢管桩在打桩完成后的垂直度。这种方案存在几处缺陷,首先成本较高,每根桩均需安装保护钢管、测斜管等;其次,安装困难,测斜管在安装时容易发生扭转,从而不能真实反映桩的垂直度;第三,不能实时监控,只能在钢管桩下入土体后才能监测,不利于在发现钢管桩垂直度超限后及时调整;第四,测量精度不能保证,受测斜管安装精度影响较大,不能保证测量精度。
发明内容
本发明旨在解决现有技术中的缺陷,提供一种双轴倾角仪垂直度跟踪测量方法。本发明的双轴倾角仪垂直度跟踪测量方法实现实时监控,测量精度高,成本低。
本发明双轴倾角仪垂直度跟踪测量方法,它包括以下步骤:
a)将测量装置3即双轴倾角测量仪安装在固定装置上;
b)将固定装置2焊接或粘结在钢管柱上;
c)通过数据线连接电源和笔记本电脑;
d)打开计算软件,调试串口以成功连接传感器;
e) 通过预装在笔记本电脑中的计算软件,根据工况逐次处理计算倾角传感器的测量数据;
f)待钢管柱吊起后处于稳定状态时(实时观测倾角传感器数据,变化幅度较小时),设置垂直度初始值;
g)待钢管柱下入钻孔内后,测量钢管柱相对初始值的垂直度偏差,待偏差达到设计要求后固定钢管柱,调垂完成;
h)混凝土浇筑完成后,完成最后一次垂直度测量;
i)取下固定装置与测量装置。
所述的双轴倾角仪垂直度跟踪测量方法,所述测量装置为双轴倾角测量仪,内置MEMS传感器,外包ABS保护壳,灌胶封装,防水,量程为±15°,测量精度为0.0001rad,长42mm*宽42mm*高29mm,上下两侧有固定夹片,用于固定在特制PVC管上,也可直接粘结在特制槽钢内侧。
所述的双轴倾角仪垂直度跟踪测量方法,所述固定装置共分两种,一种为特制U型钢,上下钻有2个圆孔,用于通过螺丝(螺丝提前通过U型钢圆孔定位,焊接在钢管柱上)固定在钢管柱上,装卸方便,成本较低;一种为特制PVC半管,可用环氧树脂粘结在钢管柱上,管内侧中部设置有一个滑槽,滑槽内一个可自由移动的滑板,滑板中部有一条垂直于滑板截面的插片,插片上开有一个系绳槽和卡槽,将传感器通过夹片固定在卡槽上,测量装置可随滑板一同拔出,用于桩头低于地面以下或水下时回收传感器。
本发明提供双轴倾角仪垂直度跟踪测量方法。本发明安装简便,占用空间小,测量精度高,测量快速、方便,可对一柱一桩进行全过程垂直度监测,且可循环使用,大大降低了测量成本。
附图说明
图1为本发明示意图之一;
图2为本发明示意图之二。
具体实施方式
如图1-2所示,本发明为双轴倾角仪垂直度跟踪测量方法,它包括以下步骤:
a)将测量装置1即双轴倾角测量仪安装在固定装置2上;
b)将固定装置2焊接或粘结在钢管柱1上;
c)通过数据线3连接电源4和笔记本电脑5;
d)打开计算软件,调试串口以成功连接传感器;
e) 通过预装在笔记本电脑5中的计算软件,根据工况逐次处理计算倾角传感器的测量数据;
f)待钢管柱吊起后处于稳定状态时(实时观测倾角传感器数据,变化幅度较小时),设置垂直度初始值;
g)待钢管柱下入钻孔内后,测量钢管柱相对初始值的垂直度偏差,待偏差达到设计要求后固定钢管柱,调垂完成;
h)混凝土浇筑完成后,完成最后一次垂直度测量;
i)取下固定装置与测量装置。
现场操作时可将数据线和拉索盘绕在绕线盘上,以便于操作。
所述的双轴倾角仪垂直度跟踪测量方法,所述电源为充电锂电池,外包有保护外壳,外壳尺寸为长117mm*宽80mm*高60mm,输出电压为12V。
所述的双轴倾角仪垂直度跟踪测量方法,所述计算软件为根据测量传感器配套开发,可设置桩号、桩长,实时显示传感器测量数据,设置初值并显示初值设置时间,计算实时偏差等。
所述固定装置共分两种,一种为U型钢,上下钻有二个圆孔,用于通过螺丝(螺丝提前通过U型钢圆孔定位,焊接在钢管柱上)固定在钢管柱上,装卸方便,成本较低;另一种为PVC半管,可用环氧树脂粘结在钢管柱上,管内侧中部设置有一个滑槽,滑槽内一个可自由移动的滑板,滑板中部有一条垂直于滑板截面的插片,插片上开有一个系绳槽和卡槽,将传感器通过夹片固定在卡槽上,测量装置可随滑板一同拔出,用于桩头低于地面以下或水下时回收传感器。
Claims (4)
1.双轴倾角仪垂直度跟踪测量方法,其特征在于,它包括以下步骤:
a)将测量装置即双轴倾角测量仪安装在固定装置上;
b)将固定装置焊接或粘结在钢管柱上;
c)通过数据线连接电源和笔记本电脑;
d)打开计算软件,调试串口以成功连接传感器;所述计算软件为配套开发的并能实时测量钢管桩的垂直度偏差;
e) 通过预装在笔记本电脑中的计算软件,根据工况逐次处理计算倾角传感器的测量数据;
f)待钢管柱吊起后处于稳定状态时;即观测倾角传感器数据变化幅度较小时,设置垂直度初始值;
g)待钢管柱下入钻孔内后,测量钢管柱相对初始值的垂直度偏差,待偏差达到设计要求后固定钢管柱,调垂完成;
h)混凝土浇筑完成后,完成最后一次垂直度测量;
i)取下固定装置与测量装置。
2.根据权利要求1所述双轴倾角仪垂直度跟踪测量方法,其特征在于,所述双轴倾角测量仪内置MEMS传感器,外包ABS保护壳,灌胶封装,防水,量程为±15°,测量精度为0.0001rad。
3.根据权利要求1所述的双轴倾角仪垂直度跟踪测量方法,其特征在于,所述固定装置为U型钢,通过螺丝和弹簧夹片固定在钢管柱顶部外侧。
4.根据权利要求1所述的双轴倾角仪垂直度跟踪测量方法,其特征在于,所述固定装置为PVC半管,该PVC半管用环氧树脂粘结在钢管柱上,内置滑板,测量装置随滑板一同拔出,用于桩头低于地面以下或水下时回收传感器。
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810337626.XA CN108716912B (zh) | 2018-04-16 | 2018-04-16 | 双轴倾角仪垂直度跟踪测量方法 |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN201810337626.XA CN108716912B (zh) | 2018-04-16 | 2018-04-16 | 双轴倾角仪垂直度跟踪测量方法 |
Publications (2)
Publication Number | Publication Date |
---|---|
CN108716912A CN108716912A (zh) | 2018-10-30 |
CN108716912B true CN108716912B (zh) | 2020-07-28 |
Family
ID=63899030
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN201810337626.XA Active CN108716912B (zh) | 2018-04-16 | 2018-04-16 | 双轴倾角仪垂直度跟踪测量方法 |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN108716912B (zh) |
Families Citing this family (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN110700261A (zh) * | 2019-10-21 | 2020-01-17 | 中交第三航务工程局有限公司 | 一种钢管桩沉桩时的垂直度控制系统 |
Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09195513A (ja) * | 1996-01-17 | 1997-07-29 | Fujita Corp | 垂直度表示方法及び装置 |
JP2001090070A (ja) * | 1999-09-27 | 2001-04-03 | Kumagai Gumi Co Ltd | 柱の構築方法及び鉄骨配置用設備 |
CN200964697Y (zh) * | 2006-10-24 | 2007-10-24 | 郑明雄 | 逆打钢柱垂直定位装置 |
CN101736762A (zh) * | 2008-11-20 | 2010-06-16 | 上海市第二建筑有限公司 | 超深逆作法立柱桩智能调垂方法及装置 |
CN103103995A (zh) * | 2013-03-04 | 2013-05-15 | 温州建设集团有限公司 | 一种预埋格构柱垂直度测量施工方法 |
CN205296874U (zh) * | 2015-12-17 | 2016-06-08 | 深圳市福田建安建设集团有限公司 | 桩柱一体化信息化施工监测定位装置 |
CN106592654A (zh) * | 2016-12-28 | 2017-04-26 | 张继红 | 一种钢管桩垂直度监测方法 |
CN107806112A (zh) * | 2017-12-05 | 2018-03-16 | 杭州江润科技有限公司 | 基坑内支撑逆作钢格构立柱及施工方法 |
-
2018
- 2018-04-16 CN CN201810337626.XA patent/CN108716912B/zh active Active
Patent Citations (8)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
JPH09195513A (ja) * | 1996-01-17 | 1997-07-29 | Fujita Corp | 垂直度表示方法及び装置 |
JP2001090070A (ja) * | 1999-09-27 | 2001-04-03 | Kumagai Gumi Co Ltd | 柱の構築方法及び鉄骨配置用設備 |
CN200964697Y (zh) * | 2006-10-24 | 2007-10-24 | 郑明雄 | 逆打钢柱垂直定位装置 |
CN101736762A (zh) * | 2008-11-20 | 2010-06-16 | 上海市第二建筑有限公司 | 超深逆作法立柱桩智能调垂方法及装置 |
CN103103995A (zh) * | 2013-03-04 | 2013-05-15 | 温州建设集团有限公司 | 一种预埋格构柱垂直度测量施工方法 |
CN205296874U (zh) * | 2015-12-17 | 2016-06-08 | 深圳市福田建安建设集团有限公司 | 桩柱一体化信息化施工监测定位装置 |
CN106592654A (zh) * | 2016-12-28 | 2017-04-26 | 张继红 | 一种钢管桩垂直度监测方法 |
CN107806112A (zh) * | 2017-12-05 | 2018-03-16 | 杭州江润科技有限公司 | 基坑内支撑逆作钢格构立柱及施工方法 |
Also Published As
Publication number | Publication date |
---|---|
CN108716912A (zh) | 2018-10-30 |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN201109914Y (zh) | 一种监测软土地基沉降的装置 | |
CN107543734B (zh) | 一种液压凿岩机性能的测试系统及其测试方法 | |
CN113654522A (zh) | 一种旋挖桩孔垂直度随钻测量方法 | |
CN108716912B (zh) | 双轴倾角仪垂直度跟踪测量方法 | |
CN105675846A (zh) | 潜水位和承压水头协同升降的基坑开挖模型试验装置 | |
CN104931353B (zh) | 煤柱塑性区测试方法和测试装置 | |
CN214747897U (zh) | 一种建筑施工监测系统 | |
CN204346501U (zh) | 用于边坡的深层位移和地下水位集成测量装置 | |
CN111535318B (zh) | 逆作法钢管柱精确安装与调整装置及使用方法 | |
CN114753761B (zh) | 一种工程现场原位测量的数字钻进设备及测量方法 | |
CN209083279U (zh) | 一种用于检验钻孔数据的验孔器 | |
CN208313266U (zh) | 双轴倾角仪垂直度跟踪测量装置 | |
CN112284362A (zh) | 一种深水区钢护筒垂直度的测量装置及垂直度测量方法 | |
CN111779042A (zh) | 一种基坑智慧测量方法及其数据智慧管理系统 | |
CN100342205C (zh) | 测量滑坡滑动面位置与滑动量的方法及其装置 | |
CN114088774B (zh) | 一种锚索、杆灌浆阶段饱满度卡环式检测装置及检测方法 | |
CN213688383U (zh) | 一种管道惯性定位仪测试比对装置 | |
CN205333228U (zh) | 钻孔应力传感器的安装装置 | |
CN2854507Y (zh) | 测量滑坡滑动面位置与滑动量的装置 | |
CN212747814U (zh) | 一种井架地锚坑定位装置 | |
CN202420416U (zh) | 一种隧道监控量测中拱顶沉降点测量装置 | |
CN209941761U (zh) | 一种深基坑地连墙深层水平位移智能监测装置 | |
CN108362779B (zh) | 一种针对水平孔的跨孔声波测试换能器的辅助牵引及保护装置 | |
CN202391405U (zh) | 石油钻井钻压扭矩随钻测量仪器的刻度装置 | |
CN102937436B (zh) | 非定向岩心地面定向法 |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
PB01 | Publication | ||
PB01 | Publication | ||
SE01 | Entry into force of request for substantive examination | ||
SE01 | Entry into force of request for substantive examination | ||
CB02 | Change of applicant information |
Address after: 200092 No. 281, Fuxin Road, Shanghai, Yangpu District Applicant after: Shanghai Tongji Detecting Technology Co., Ltd. Address before: 200092 281 Gaoxin Road, Yangpu District, Shanghai Applicant before: Shanghai Tongji Detecting Technology Co., Ltd. |
|
CB02 | Change of applicant information | ||
GR01 | Patent grant | ||
GR01 | Patent grant |