CN101736762A - 超深逆作法立柱桩智能调垂方法及装置 - Google Patents

超深逆作法立柱桩智能调垂方法及装置 Download PDF

Info

Publication number
CN101736762A
CN101736762A CN200810203075A CN200810203075A CN101736762A CN 101736762 A CN101736762 A CN 101736762A CN 200810203075 A CN200810203075 A CN 200810203075A CN 200810203075 A CN200810203075 A CN 200810203075A CN 101736762 A CN101736762 A CN 101736762A
Authority
CN
China
Prior art keywords
verticality
stand column
detachable
deviational survey
column pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Pending
Application number
CN200810203075A
Other languages
English (en)
Inventor
邓文龙
闵卫国
吴献
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai No2 Building Co Ltd
Original Assignee
Shanghai No2 Building Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai No2 Building Co Ltd filed Critical Shanghai No2 Building Co Ltd
Priority to CN200810203075A priority Critical patent/CN101736762A/zh
Publication of CN101736762A publication Critical patent/CN101736762A/zh
Pending legal-status Critical Current

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

本发明提供一种超深逆作法立柱桩智能调垂方法及装置,对超深逆作法立柱桩进行智能调垂,使超深地下空间逆作法施工在立柱桩智能调垂更为准确方便。本发明提出的超深逆作法立柱桩智能调垂装置,包含可拆卸测斜装置,其与所述立柱轴心对接;顶部固定装置,其将所述可拆卸测斜装置固定;连杆调节扩张器,其作用于所述立柱外壁以调整所述立柱的垂直度;传感器,其设置于所述可拆卸测斜装置以感测所述可拆卸测斜装置的垂直度,并发出垂直度感测信息;高精度垂直度检测电脑装置,其用于接收所述传感器发出的垂直度感测信息,并依据所述垂直度感测信息启动所述连杆调节扩张器调整所述立柱的垂直度。

Description

超深逆作法立柱桩智能调垂方法及装置
技术领域
本发明是有关于一种立柱桩调垂方法及装置,且特别是有关于一种超深逆作法立柱桩智能调垂方法及装置。
背景技术
逆作法是一项近几年发展起来新兴的基坑支护技术。它是施工高层建筑多层地下室和其他多层地下结构的有效方法。
逆作法施工工艺中的中间支排柱是逆作法施工过程中替代工程结构柱的一种临时性结构杆件,其主要支撑已完成主体结构和施工荷载的作用。地下结构施工竣工后,支排柱一般外包混凝土,作为地下室永久结构受力立柱。因此,支排柱定位和垂直度必须严格控制其精度,以便满足设计要求。一般规定支排柱轴线偏差控制在20mm内,垂直度控制1/300内,否则在承载时会增加柱的附加弯矩,并且给支排柱外包混凝土施工带来困难,故必须有专门的设备对其进行定位和调垂。
500千伏静安(世博)输变电工程的地下结构规模庞大,基坑开挖深度35.25米为世界罕见。如此大规模的超深基坑采用逆作法施工,过去逆作法施工技术中采用的立柱桩调垂技术已不能适用本工程的超深立柱桩的调垂,必须发明一种超深逆作法立柱桩智能调垂装置来保证深逆作法立柱桩施工的施工精度。
发明内容
为了达到上述目的,本发明提供一种超深逆作法立柱桩智能调垂方法及装置,对超深逆作法立柱桩进行智能调垂,使超深地下空间逆作法施工在立柱桩智能调垂更为准确方便。
本发明提出的超深逆作法立柱桩智能调垂方法,包括将可拆卸测斜装置与所述立柱轴心对接;使用顶部固定装置将所述可拆卸测斜装置固定;使用连杆调节扩张器抵接于所述立柱外壁以调整所述立柱的垂直度;将可发出垂直度感测信息的传感器设置于所述可拆卸测斜装置以感测所述可拆卸测斜装置的垂直度;使用高精度垂直度检测电脑装置接收所述传感器发出的垂直度感测信息,并依据所述垂直度感测信息启动所述连杆调节扩张器调整所述立柱的垂直度。
本发明提出的超深逆作法立柱桩智能调垂装置,包含可拆卸测斜装置,其与所述立柱轴心对接;顶部固定装置,其将所述可拆卸测斜装置固定;连杆调节扩张器,其作用于所述立柱外壁以调整所述立柱的垂直度;传感器,其设置于所述可拆卸测斜装置以感测所述可拆卸测斜装置的垂直度,并发出垂直度感测信息;高精度垂直度检测电脑装置,其用于接收所述传感器发出的垂直度感测信息,并依据所述垂直度感测信息启动所述连杆调节扩张器调整所述立柱的垂直度。
本发明提供的超深逆作法立柱桩智能调垂方法及装置,对超深逆作法立柱桩进行智能调垂,有利于提高超深地下空间逆作法施工中对立柱桩智能调垂的调整精度。
为让本发明的上述特征和优点能更明显易懂,下文特举较佳实施例,并配合附图,作详细说明如下。
附图说明
图1所示为本发明提出的超深逆作法立柱桩智能调垂装置的结构示意图。
具体实施方式
为了更了解本发明的技术内容,特举具体实施例并配合所附图式说明如下。
图1所示为本发明提出的超深逆作法立柱桩智能调垂装置的结构示意图。如图1所示,本发明提出的超深逆作法立柱桩智能调垂装置的实施例包括以下结构。
可拆卸工具式钢管104作为测斜装置与超深钢立柱106轴心对接。顶部固定装置将可拆卸工具式钢管104在地面固定在设计位置。本发明实施例中,该顶部固定装置由定位套105和设置于定位套105下面起支撑作用的液压支撑装置107组成。作为本领域通常技术,该定位套105可为圆弧板拼装而成的钢抱箍,相邻圆弧板之间设置法兰连接。连杆调节扩张器103与立柱106外壁相抵接,以调整所述立柱的垂直度。传感器101设置于可拆卸工具式钢管104的外壁上用于感测可拆卸工具式钢管104的垂直度,并发出垂直度感测信息。相应的,作为本领域通常技术,传感器101也可以设置于可拆卸工具式钢管104的内部。高精度垂直度检测电脑装置102接收传感器101发出的垂直度感测信息,并依据该垂直度感测信息启动连杆调节扩张器103调整立柱106的垂直度。
本发明提出的超深逆作法立柱桩智能调垂方法的实施例包以下步骤。
可拆卸工具式钢管104作为测斜装置与超深钢立柱106轴心对接。当超深钢立柱106吊放至孔底设计标高后,顶部固定装置将可拆卸工具式钢管104在地面固定在设计位置,本发明实施例中,该顶部固定装置由定位套105和设置于定位套105下面起支撑作用的液压支撑装置107组成。作为本领域通常技术,该定位套105可为圆弧板拼装而成的钢抱箍,相邻圆弧板之间设置法兰连接。连杆调节扩张器103与立柱106外壁相抵接,以调整所述立柱的垂直度。传感器101设置于可拆卸工具式钢管104的外壁上用于感测可拆卸工具式钢管104的垂直度,并发出垂直度感测信息。相应的,作为本领域通常技术,传感器101也可以设置于可拆卸工具式钢管104的内部。高精度垂直度检测电脑装置102接收传感器101发出的垂直度感测信息,并依据该垂直度感测信息启动连杆调节扩张器103调整立柱106的垂直度。
连杆调节扩张器103调整超深钢立柱106位置后,传感器101感测到垂直度感测信息并将该信息传送给高精度垂直度检测电脑装置102,如信息显示的垂直度满足设计要求,则用连杆调节扩张器103固定超深钢立柱106。
用连杆调节扩张器103固定超深钢立柱106后,浇筑钢管桩水下砼108,拆除连杆调节扩张器103、可拆卸工具式钢管104和顶部固定装置。
虽然本发明已以较佳实施例揭露如上,然其并非用以限定本发明,任何所属技术领域中具有通常知识者,在不脱离本发明的精神和范围内,当可作些许的更动与润饰,因此本发明的保护范围当视权利要求书所界定者为准。

Claims (12)

1.一种超深逆作法立柱桩智能调垂方法,其特征在于,
将可拆卸测斜装置与所述立柱轴心对接;
使用顶部固定装置将所述可拆卸测斜装置固定;
使用连杆调节扩张器抵接于所述立柱外壁以调整所述立柱的垂直度;
将可发出垂直度感测信息的传感器设置于所述可拆卸测斜装置以感测所述可拆卸测斜装置的垂直度;
使用高精度垂直度检测电脑装置接收所述传感器发出的垂直度感测信息,并依据所述垂直度感测信息启动所述连杆调节扩张器调整所述立柱的垂直度。
2.根据权利要求1所述的超深逆作法立柱桩智能调垂方法,其特征在于,所述可拆卸测斜装置为可拆卸工具式钢管。
3.根据权利要求1所述的超深逆作法立柱桩智能调垂方法,其特征在于,所述顶部固定装置为具有液压支撑装置的定位套。
4.根据权利要求3所述的超深逆作法立柱桩智能调垂方法,其特征在于,所述的定位套为圆弧板拼装而成的钢抱箍,相邻圆弧板之间设置法兰连接。
5.根据权利要求1所述的超深逆作法立柱桩智能调垂方法,其特征在于,所述传感器设置于所述可拆卸测斜装置的内部。
6.根据权利要求1所述的超深逆作法立柱桩智能调垂方法,其特征在于,所述传感器设置于所述可拆卸测斜装置的外壁。
7.一种超深逆作法立柱桩智能调垂装置,其特征在于,包含
可拆卸测斜装置,其与所述立柱轴心对接;
顶部固定装置,其将所述可拆卸测斜装置固定;
连杆调节扩张器,其作用于所述立柱外壁以调整所述立柱的垂直度;
传感器,其设置于所述可拆卸测斜装置以感测所述可拆卸测斜装置的垂直度,并发出垂直度感测信息;
高精度垂直度检测电脑装置,其用于接收所述传感器发出的垂直度感测信息,并依据所述垂直度感测信息启动所述连杆调节扩张器调整所述立柱的垂直度。
8.根据权利要求7所述的超深逆作法立柱桩智能调垂装置,其特征在于,所述可拆卸测斜装置为可拆卸工具式钢管。
9.根据权利要求7所述的超深逆作法立柱桩智能调垂装置,其特征在于,所述顶部固定装置为具有液压支撑装置的定位套。
10.根据权利要求9所述的超深逆作法立柱桩智能调垂装置,其特征在于,所述的定位套为圆弧板拼装而成的钢抱箍,相邻圆弧板之间设置法兰连接。
11.根据权利要求7所述的超深逆作法立柱桩智能调垂装置,其特征在于,所述传感器设置于所述可拆卸测斜装置的内部。
12.根据权利要求7所述的超深逆作法立柱桩智能调垂装置,其特征在于,所述传感器设置于所述可拆卸测斜装置的外壁。
CN200810203075A 2008-11-20 2008-11-20 超深逆作法立柱桩智能调垂方法及装置 Pending CN101736762A (zh)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN200810203075A CN101736762A (zh) 2008-11-20 2008-11-20 超深逆作法立柱桩智能调垂方法及装置

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN200810203075A CN101736762A (zh) 2008-11-20 2008-11-20 超深逆作法立柱桩智能调垂方法及装置

Publications (1)

Publication Number Publication Date
CN101736762A true CN101736762A (zh) 2010-06-16

Family

ID=42460748

Family Applications (1)

Application Number Title Priority Date Filing Date
CN200810203075A Pending CN101736762A (zh) 2008-11-20 2008-11-20 超深逆作法立柱桩智能调垂方法及装置

Country Status (1)

Country Link
CN (1) CN101736762A (zh)

Cited By (11)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102023005A (zh) * 2010-10-29 2011-04-20 浙江宝业建设集团有限公司 支撑柱实时调垂系统及其调垂方法
CN102561390A (zh) * 2010-12-17 2012-07-11 上海市电力公司 逆作法工艺在地下变电站结构施工中的应用
CN103993597A (zh) * 2014-05-23 2014-08-20 上海森信建设工程有限公司 一种高精度垂直立柱桩建造方法
CN104196248A (zh) * 2014-07-22 2014-12-10 安徽省建筑科学研究设计院 逆作法后插钢管柱垂直定位装置及其施工方法
CN104358262A (zh) * 2014-09-29 2015-02-18 中国建筑第八工程局有限公司 一种可拆卸工具式深基坑内支撑引柱及施工方法
CN107254890A (zh) * 2017-07-03 2017-10-17 浙江省建筑设计研究院 一种用于预制方桩截断纠倾的限位装置
CN108149723A (zh) * 2017-12-20 2018-06-12 上海建工集团股份有限公司 一种用于逆作法超低位钢管桩的调垂装置及其纠正方法
CN108716912A (zh) * 2018-04-16 2018-10-30 上海同济检测技术有限公司 双轴倾角仪垂直度跟踪测量方法
CN109487822A (zh) * 2018-12-05 2019-03-19 昆明捷程桩工有限责任公司 逆作法施工钢管柱安装调整方法及控制装置
CN109914825A (zh) * 2019-03-28 2019-06-21 昆明捷程桩工有限责任公司 逆作法钢管柱的可回收垂直度调整器
CN113202085A (zh) * 2021-05-24 2021-08-03 中铁上海设计院集团有限公司 一种用于软土区的预制桩施工方法

Cited By (16)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN102023005B (zh) * 2010-10-29 2012-10-17 浙江宝业建设集团有限公司 支撑柱实时调垂系统及其调垂方法
CN102023005A (zh) * 2010-10-29 2011-04-20 浙江宝业建设集团有限公司 支撑柱实时调垂系统及其调垂方法
CN102561390A (zh) * 2010-12-17 2012-07-11 上海市电力公司 逆作法工艺在地下变电站结构施工中的应用
CN102561390B (zh) * 2010-12-17 2016-01-27 上海市电力公司 逆作法工艺在地下变电站结构施工中的应用
CN103993597B (zh) * 2014-05-23 2015-12-09 上海森信建设工程有限公司 一种高精度垂直立柱桩建造方法
CN103993597A (zh) * 2014-05-23 2014-08-20 上海森信建设工程有限公司 一种高精度垂直立柱桩建造方法
CN104196248B (zh) * 2014-07-22 2016-03-02 安徽省建筑科学研究设计院 逆作法后插钢管柱垂直定位装置及其施工方法
CN104196248A (zh) * 2014-07-22 2014-12-10 安徽省建筑科学研究设计院 逆作法后插钢管柱垂直定位装置及其施工方法
CN104358262A (zh) * 2014-09-29 2015-02-18 中国建筑第八工程局有限公司 一种可拆卸工具式深基坑内支撑引柱及施工方法
CN107254890A (zh) * 2017-07-03 2017-10-17 浙江省建筑设计研究院 一种用于预制方桩截断纠倾的限位装置
CN108149723A (zh) * 2017-12-20 2018-06-12 上海建工集团股份有限公司 一种用于逆作法超低位钢管桩的调垂装置及其纠正方法
CN108716912A (zh) * 2018-04-16 2018-10-30 上海同济检测技术有限公司 双轴倾角仪垂直度跟踪测量方法
CN108716912B (zh) * 2018-04-16 2020-07-28 上海同济检测技术有限公司 双轴倾角仪垂直度跟踪测量方法
CN109487822A (zh) * 2018-12-05 2019-03-19 昆明捷程桩工有限责任公司 逆作法施工钢管柱安装调整方法及控制装置
CN109914825A (zh) * 2019-03-28 2019-06-21 昆明捷程桩工有限责任公司 逆作法钢管柱的可回收垂直度调整器
CN113202085A (zh) * 2021-05-24 2021-08-03 中铁上海设计院集团有限公司 一种用于软土区的预制桩施工方法

Similar Documents

Publication Publication Date Title
CN101736762A (zh) 超深逆作法立柱桩智能调垂方法及装置
CN101824919B (zh) 钢管柱在富水软弱地层中深孔水下的安装定位方法
CN110219326B (zh) 逆作法一柱一桩水下调垂施工工艺
WO2019128155A1 (zh) 沉井施工结构及其施工方法
CN109487822B (zh) 逆作法施工钢管柱安装调整方法及控制装置
CN108571425B (zh) 一种海上风力发电机组桩基承台基础及其施工方法
CN210238595U (zh) 逆作法一柱一桩水下调垂施工装置
CN102493471A (zh) 结构地脚锚栓悬空安装施工工艺方法
CN1884725A (zh) 地下建筑钢管柱定位调垂装置
CN208604645U (zh) 一种竖向圆柱管孔任意点中心测量装置
CN101851915B (zh) 测力管桩
CN103953052A (zh) 一种洞桩法钢管柱施工方法
CN109372015A (zh) 逆作法钢管柱与钢筋笼活动式连接装置
CN114277803B (zh) 逆作法钢管结构柱后插法定位施工方法
CN201738301U (zh) 测力管桩
JP2014137329A (ja) 建入れ部材の建入れ誤差の測定システム、建入れ部材の建入れ誤差の測定方法、及び逆打ち支柱の建入れ方法
CN102587386A (zh) 地下室逆作法钢管柱hpe液压施工方法
CN103061454A (zh) 一种钢管混凝土柱在地下深孔内的安装定位方法
CN209368877U (zh) 逆作法钢管柱与钢筋笼活动式连接装置
CN107063178B (zh) 一种安装位移传感器的混凝土水准标石及其高程观测与计算方法
CN206523151U (zh) 基坑测量辅助装置
CN2915952Y (zh) 地下建筑钢管柱定位调垂装置
CN206593659U (zh) 一种用于全球卫星导航定位系统的基准站
CN211851153U (zh) 一种组合钢柱式gps观测墩
CN206279566U (zh) 逆作法一柱一桩双联置换式全过程测量系统

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C10 Entry into substantive examination
SE01 Entry into force of request for substantive examination
C02 Deemed withdrawal of patent application after publication (patent law 2001)
WD01 Invention patent application deemed withdrawn after publication

Open date: 20100616