CN108716704A - A kind of heating system - Google Patents

A kind of heating system Download PDF

Info

Publication number
CN108716704A
CN108716704A CN201810414953.0A CN201810414953A CN108716704A CN 108716704 A CN108716704 A CN 108716704A CN 201810414953 A CN201810414953 A CN 201810414953A CN 108716704 A CN108716704 A CN 108716704A
Authority
CN
China
Prior art keywords
heat exchange
circulation
exchange circulation
connect
heat
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN201810414953.0A
Other languages
Chinese (zh)
Other versions
CN108716704B (en
Inventor
刘思水
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Qingdao Qixingyu Energy Management Co ltd
Original Assignee
Qingdao Qixing Energy Management Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Qingdao Qixing Energy Management Co Ltd filed Critical Qingdao Qixing Energy Management Co Ltd
Priority to CN201810414953.0A priority Critical patent/CN108716704B/en
Publication of CN108716704A publication Critical patent/CN108716704A/en
Application granted granted Critical
Publication of CN108716704B publication Critical patent/CN108716704B/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Classifications

    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D3/00Hot-water central heating systems
    • F24D3/18Hot-water central heating systems using heat pumps
    • FMECHANICAL ENGINEERING; LIGHTING; HEATING; WEAPONS; BLASTING
    • F24HEATING; RANGES; VENTILATING
    • F24DDOMESTIC- OR SPACE-HEATING SYSTEMS, e.g. CENTRAL HEATING SYSTEMS; DOMESTIC HOT-WATER SUPPLY SYSTEMS; ELEMENTS OR COMPONENTS THEREFOR
    • F24D19/00Details
    • F24D19/10Arrangement or mounting of control or safety devices
    • F24D19/1006Arrangement or mounting of control or safety devices for water heating systems
    • F24D19/1009Arrangement or mounting of control or safety devices for water heating systems for central heating
    • F24D19/1039Arrangement or mounting of control or safety devices for water heating systems for central heating the system uses a heat pump

Landscapes

  • Engineering & Computer Science (AREA)
  • Physics & Mathematics (AREA)
  • Thermal Sciences (AREA)
  • Chemical & Material Sciences (AREA)
  • Combustion & Propulsion (AREA)
  • Mechanical Engineering (AREA)
  • General Engineering & Computer Science (AREA)
  • Steam Or Hot-Water Central Heating Systems (AREA)

Abstract

The present invention proposes a kind of heating system, including the first heat exchange circulation, the second heat exchange circulation, third heat exchange circulation and the 4th heat exchange circulation, first heat exchange circulation is connect with second heat exchange circulation, second heat exchange circulation is connect with the third heat exchange circulation, and the third heat exchange circulation is connect with the 4th heat exchange circulation;The present invention is by being arranged the first heat exchange circulation, the second heat exchange circulation, third heat exchange circulation and the 4th heat exchange circulation, the circulating-heating of heat is reached, thermal energy is provided using Air-Cooled Heat Pump Unit and high temperature heat pump unit, setting energy storage water tank stores energy simultaneously, the low power consumption phase that can be at night carries out energy storage, the peak times of power consumption on daytime stop energy storage and heat, it solves the problems, such as power wastage, while having saved fund.

Description

A kind of heating system
Technical field
The present invention relates to heating fields, particularly relate to a kind of heating system.
Background technology
With the enhancing of environmental consciousness, original fuel combustion heating is abandoned by more and more heating companies, uses instead energy saving Electric power fever heating, but electric power generate heat existing defects, i.e. daytime is peak of power consumption, but is also required to daytime heat, daytime power supply Consumption electric power is big, efficiency is low, price is high, has both caused the waste of electric power, while causing the waste of fund.
Invention content
The present invention proposes a kind of heating system, is handed over by the way that the first heat exchange circulation, the second heat exchange circulation, third heat is arranged Cycle and the 4th heat exchange circulation are changed, has reached the circulating-heating of heat, while using Air-Cooled Heat Pump Unit and high temperature heat pump machine Group provides thermal energy, setting energy storage water tank stores energy, and the low power consumption phase that can be at night carries out energy storage, the electricity consumption on daytime Peak period stops energy storage and heats, and solves the problems, such as power wastage, while having saved fund.
The technical proposal of the invention is realized in this way:
A kind of heating system, including:First heat exchange circulation, the second heat exchange circulation, third heat exchange circulation and the 4th Heat exchange circulation;
First heat exchange circulation is connect with second heat exchange circulation, second heat exchange circulation and described the Three heat exchange circulations connect, and the third heat exchange circulation is connect with the 4th heat exchange circulation;
Alternatively, first heat exchange circulation is connect with the 4th heat exchange circulation;
Alternatively, second heat exchange circulation is connect with the 4th heat exchange circulation;
Alternatively, first heat exchange circulation is connect with the third heat exchange circulation, the third heat exchange circulation with The 4th heat exchange circulation connection;
Alternatively, second heat exchange circulation is connect with the third heat exchange circulation, the third heat exchange circulation with The 4th heat exchange circulation connection;
Further include water replanishing device and control system, the water replanishing device is warm with the third heat exchange circulation and the 4th simultaneously Exchange cycles connect;
First heat exchange circulation, the second heat exchange circulation, third heat exchange circulation, the 4th heat exchange circulation and moisturizing Device is connect with the control system.
Further, first heat exchange circulation includes Air-Cooled Heat Pump Unit, first circulation pipeline and high temperature heat pump unit, The Air-Cooled Heat Pump Unit is run through in one end of the first circulation pipeline, and the other end of the first circulation pipeline runs through the height Warm pump assembly;
First Air-Cooled Heat Pump Unit and the high temperature heat pump unit are connect with the control system.
Further, second heat exchange circulation includes energy storage water tank, second circulation pipeline and the high temperature heat pump unit, The high temperature heat pump unit is run through in one end of the second circulation pipeline, and the other end of the second circulation pipeline runs through the storage It can water tank.
Further, the third heat exchange circulation includes plate heat exchanger, third circulation line and the energy storage water tank, institute The energy storage water tank is run through in the one end for stating third circulation line, and the other end of the third circulation line runs through the plate-type heat-exchange Device;
The plate heat exchanger is connect with the control system.
Further, the 4th heat exchange circulation includes user's heating circulation pipeline and the plate heat exchanger, the use The plate heat exchanger is run through in one end of family heating circulation pipeline, and the other end and the user of user's heating circulation pipeline heat System connects.
Further, the water replanishing device includes softening water tank, described softening water tank one end and the 4th heat exchange circulation In user's heating circulation pipeline the connection of circuit end, be provided with the 5th water pump assembly, institute on the water outlet of softening water tank It states softening water tank while being connected to the energy storage water tank, the circuit end of the softening water tank and user's heating circulation pipeline connects It is provided with regulated expander on logical pipeline, is provided on the pipeline that the softening water tank is connected to the energy storage water tank full-automatic Demineralizer;
The bottom of the softening water tank is provided with sewer comb, and the softening water tank is connected to the full-automatic demineralizer Pipeline on be communicated with tap water comb.
The regulated expander and full-automatic demineralizer are connect with the control system.
Further, the first circulation pipeline for being provided with the first water pump assembly, first water pump assembly on water end (W.E.) It is connect with the control system.
Further, the second circulation pipeline for being provided with the second water pump assembly, second water pump assembly on water end (W.E.) It is connect with the control system.
Further, the third circulation line for being provided with third water pump assembly, the third water pump assembly on water end (W.E.) It is connect with the control system.
Further, the 4th water pump assembly, the 4th water are provided on the circuit end of user's heating circulation pipeline Pump assembly is connect with the control system.
The present invention is handed over by the way that the first heat exchange circulation, the second heat exchange circulation, third heat exchange circulation and the 4th heat is arranged Cycle is changed, has reached the circulating-heating of heat, while thermal energy, setting storage are provided using Air-Cooled Heat Pump Unit and high temperature heat pump unit Energy water tank stores energy, and the low power consumption phase that can be at night carries out energy storage, and the peak times of power consumption on daytime stop energy storage Capable heating is deposited into, solves the problems, such as power wastage, while having saved fund.
Description of the drawings
In order to more clearly explain the embodiment of the invention or the technical proposal in the existing technology, to embodiment or will show below There is attached drawing needed in technology description to be briefly described, it should be apparent that, the accompanying drawings in the following description is only this Some embodiments of invention, for ordinary skill customer person, without having to pay creative labor, also It can be obtain other attached drawings according to these attached drawings.
Fig. 1 is the overall structure plan view of the heating system in the specific embodiment of the invention;
Fig. 2 is the control system of heating system shown in FIG. 1 and each interstructural connection relationship diagram.
Specific implementation mode
Following will be combined with the drawings in the embodiments of the present invention, and technical solution in the embodiment of the present invention carries out clear, complete Site preparation describes, it is clear that described embodiments are only a part of the embodiments of the present invention, instead of all the embodiments.It is based on Embodiment in the present invention, the every other reality that those having ordinary skill in the art is obtained without creative efforts Example is applied, shall fall within the protection scope of the present invention.
In a specific embodiment of the present invention in 1, Fig. 1~Fig. 2 is seen, a kind of heating system, including:First heat exchange circulation 1, the second heat exchange circulation 2, third heat exchange circulation 3 and the 4th heat exchange circulation 4;
First heat exchange circulation 1 is connect with the second heat exchange circulation 2, the second heat exchange circulation 2 and third heat exchange circulation 3 Connection, third heat exchange circulation 3 are connect with the 4th heat exchange circulation 4;
Further include water replanishing device 5 and control system 6, water replanishing device 5 simultaneously with third heat exchange circulation 3 and the 4th heat exchange 4 connection of cycle;
First heat exchange circulation 1, the second heat exchange circulation 2, third heat exchange circulation 3, the 4th heat exchange circulation 4 and moisturizing Device 5 is connect with control system 6.
In a specific embodiment of the present invention, see Fig. 1~Fig. 2, the first heat exchange circulation 1 include Air-Cooled Heat Pump Unit 11, Air-Cooled Heat Pump Unit 13 is run through in one end of first circulation pipeline 12 and high temperature heat pump unit 13, first circulation pipeline 12, and first follows The other end on endless tube road 12 runs through high temperature heat pump unit 13;
Air-Cooled Heat Pump Unit 11 and high temperature heat pump unit 13 are connect with control system 6.
First circulation pipeline 12 is used to transmit or be delivered directly to downwards the 4th by the heat in Air-Cooled Heat Pump Unit 11 4 direct heating of heat exchange circulation.
In a specific embodiment of the present invention, see Fig. 1~Fig. 2, the second heat exchange circulation 2 include high temperature heat pump unit 21, High temperature heat pump unit 21, second circulation pipe are run through in one end of second circulation pipeline 22 and energy storage water tank 23, second circulation pipeline 22 The other end on road 22 runs through energy storage water tank 23;
Second circulation pipeline 22 is used to transmit or be delivered directly to downwards the 4th by the heat in first circulation pipeline 12 4 direct heating of heat exchange circulation.
In a specific embodiment of the present invention, see that Fig. 1~Fig. 2, third heat exchange circulation 3 include energy storage water tank 31, third Energy storage water tank 31 is run through in one end of circulation line 32 and plate heat exchanger 33, third circulation line 32, third circulation line 32 The other end runs through plate heat exchanger 33;
Plate heat exchanger 33 is connect with control system 6.
In a specific embodiment of the present invention, see that Fig. 1~Fig. 2, the 4th heat exchange circulation 4 include plate heat exchanger 41 and use Plate heat exchanger 41, user's heating circulation pipeline 42 are run through in one end of family heating circulation pipeline 42, user's heating circulation pipeline 42 The other end connect with user's heating system 43.
In a specific embodiment of the present invention, see that Fig. 1~Fig. 2, water replanishing device 5 include softening water tank 52, softening water tank 52 One end is connected to the circuit end of user's heating circulation pipeline 42 in the 4th heat exchange circulation 4, softening water tank 52 while and accumulation of energy Water tank 31 is connected to, and the 5th water pump assembly 53, softening water tank 52 and user's heating circulation are provided on the water outlet of softening water tank 52 It is provided with regulated expander 54, the pipeline that softening water tank 52 is connected to energy storage water tank 31 on the pipeline of the circuit end connection of pipeline 42 On be provided with full-automatic demineralizer 51;
The bottom of softening water tank 52 is provided with sewer comb 521, and softening water tank 52 is connected to full-automatic demineralizer 51 Tap water comb 511 is communicated on pipeline.
Regulated expander 54 and full-automatic demineralizer 51 are connect with control system 6.
In a specific embodiment of the present invention, see Fig. 1~Fig. 2, first circulation pipeline 12 for being provided with first on water end (W.E.) Water pump assembly 121, the first water pump assembly 121 are connect with control system 6.
In a specific embodiment of the present invention, see Fig. 1~Fig. 2, second circulation pipeline 22 for being provided with second on water end (W.E.) Water pump assembly 221, the second water pump assembly 221 are connect with control system 6;
Third circulation line 32 for being provided with third water pump assembly 321 on water end (W.E.), third water pump assembly 321 is with control 6 connection of system;
The 4th water pump assembly 421, the 4th water pump assembly 421 and control are provided on the circuit end of user's heating circulation pipeline 42 System 6 processed connects;
First water pump assembly 121, the second water pump assembly 221, third water pump assembly 321 and the 4th water pump assembly 421 are used In control water cycle.
The operation principle of heating system in the present invention is as follows:
When heating:
(1) Air-Cooled Heat Pump Unit 11 from air extract heat the water temperature in first circulation pipeline 12 is promoted to setting Temperature (such as 30~35 DEG C), then temperature promoted to setting temperature (such as 30~35 DEG C) water through first circulation pipeline 12 flow Return high temperature heat pump unit 13 (21);
(2) 30~35 DEG C of water in first circulation pipeline 12 is heated to higher temperature (such as by high temperature heat pump unit 21 75~80 DEG C), the temperature of 75~80 DEG C of hot water in first circulation pipeline 12 is absorbed by the water in second circulation pipeline 22, and first The water for being sucked away temperature in circulation line 12 again flows into Air-Cooled Heat Pump Unit 11, and is recycled to second circulation pipeline with this Water transport heat in 22, while the flow for siphoning away the heat in first circulation pipeline 12 in second circulation pipeline 22 returns accumulation of energy Heat is simultaneously stored in energy storage water tank 23 (31) by water tank 23 (31);
(3) heat for the water being stored in energy storage water tank 23 (31) is siphoned away by the water in third circulation line 32, and then The water for being sucked away heat in two circulation lines 22 flows into high temperature heat pump unit 13 (21) absorbs heat from new, and is recycled with this Water transport heat into third circulation line 32, while the heat siphoned away in second circulation pipeline 22 in third circulation line 32 The flow of amount returns plate heat exchanger 33 (41);
(4) user's heating circulation pipeline 42 will be passed from the interior draw heat of plate heat exchanger 33 (41) and suitable for the temperature of human body Pass every family.
When cooling:
(1) Air-Cooled Heat Pump Unit 11 works and reduces air themperature, and the normal-temperature water in first circulation pipeline 12 is to cold sky Gas discharges heat, and the water temperature in first circulation pipeline 12 is reduced to a certain set temperature (such as 5~7 DEG C), and then temperature drops Down to 5~7 DEG C of water high temperature heat pump unit 13 (21) is flowed back to through first circulation pipeline 12;
(2) water in first circulation pipeline 12 by high temperature heat pump unit 13 (21) be cooled to a certain set temperature (such as 0~ 1 DEG C), the heat of 0~1 DEG C of cold water in first circulation pipeline 12 is absorbed by the water in second circulation pipeline 22, first circulation pipe The water for being sucked away temperature in road 12 again flows into Air-Cooled Heat Pump Unit 11, and is recycled into second circulation pipeline 22 with this Water transport heat, while the flow for siphoning away the heat in first circulation pipeline 12 in second circulation pipeline 22 returns energy storage water tank 23 (31) and by heat it is stored in energy storage water tank 23 (31);
(3) heat for the water being stored in energy storage water tank 23 (31) is siphoned away by the water in third circulation line 32, and then The water for being sucked away heat in two circulation lines 22 flows into high temperature heat pump unit 13 (21) absorbs heat from new, and is recycled with this Water transport heat into third circulation line 32, while the heat siphoned away in second circulation pipeline 22 in third circulation line 32 The flow of amount returns plate heat exchanger 33 (41);
(4) user's heating circulation pipeline 42 will be passed from the interior draw heat of plate heat exchanger 33 (41) and suitable for the temperature of human body Pass every family.
Note:Wherein heat is divided into thermal energy and cold energy.
Meanwhile first heat exchange circulation 1, the second heat exchange circulation 2 can be individually for the 4th heat exchange circulation 4 and provide heat Directly heat;
Or first heat exchange circulation 1, the second heat exchange circulation 2 can be by thermal energy storages in third heat exchange circulation 3 Energy storage water tank 23 (31) in, then gradually to the 4th heat exchange circulation 4 provide heat heat;
Specifically look at specific embodiment 2,3,4,5.
In a specific embodiment of the present invention 2, see Fig. 1~Fig. 2:
First heat exchange circulation 1 is connect with the 4th heat exchange circulation 4, and the first heat exchange circulation 1 is directly the 4th heat at this time Exchange cycles 4 provide thermal energy;
Remove the second heat exchange circulation 2 and third heat exchange circulation 3 in Fig. 1 at this time.
In a specific embodiment of the present invention 3, see Fig. 1~Fig. 2:
Second heat exchange circulation 2 is connect with the 4th heat exchange circulation 4, and the second heat exchange circulation 2 is directly the 4th heat at this time Exchange cycles 4 provide thermal energy;
Remove the first heat exchange circulation 1 and third heat exchange circulation 3 at this time.
In a specific embodiment of the present invention 4, see Fig. 1~Fig. 2:
First heat exchange circulation 1 is connect with third heat exchange circulation 3, third heat exchange circulation 3 and the 4th heat exchange circulation 4 Connection, at this time in energy storage water tank 23 (31) of the thermal energy storage in the first heat exchange circulation 1 in third heat exchange circulation 3, so Afterwards gradually thermal energy is provided to the 4th heat exchange circulation 4 by energy storage water tank 23 (31);
Remove the second heat exchange circulation 2 at this time.
In a specific embodiment of the present invention 5, see Fig. 1~Fig. 2:
Second heat exchange circulation 2 is connect with third heat exchange circulation 3, third heat exchange circulation 3 and the 4th heat exchange circulation 4 It connects, at this time the second heat exchange circulation 2, the thermal energy storage in the second heat exchange circulation 2 is in third heat exchange circulation 3 at this time In energy storage water tank 23 (31), then gradually thermal energy is provided to the 4th heat exchange circulation 4 by energy storage water tank 23 (31);
Remove the first heat exchange circulation 1 at this time.
The foregoing is merely illustrative of the preferred embodiments of the present invention, is not intended to limit the invention, all essences in the present invention With within principle, any modification, equivalent replacement, improvement and so on should all be included in the protection scope of the present invention god.

Claims (10)

1. a kind of heating system, it is characterised in that:It is followed including the first heat exchange circulation, the second heat exchange circulation, third heat exchange Ring and the 4th heat exchange circulation;
First heat exchange circulation is connect with second heat exchange circulation, second heat exchange circulation and third heat Exchange cycles connect, and the third heat exchange circulation is connect with the 4th heat exchange circulation;
Alternatively, first heat exchange circulation is connect with the 4th heat exchange circulation;
Alternatively, second heat exchange circulation is connect with the 4th heat exchange circulation;
Alternatively, first heat exchange circulation is connect with the third heat exchange circulation, the third heat exchange circulation with it is described 4th heat exchange circulation connects;
Alternatively, second heat exchange circulation is connect with the third heat exchange circulation, the third heat exchange circulation with it is described 4th heat exchange circulation connects;
Further include water replanishing device and control system, the water replanishing device simultaneously with the third heat exchange circulation and the 4th heat exchange It is connected by circulation;
First heat exchange circulation, the second heat exchange circulation, third heat exchange circulation, the 4th heat exchange circulation and water replanishing device It is connect with the control system.
2. heating system as described in claim 1, it is characterised in that:First heat exchange circulation includes air-cooled heat pump machine The Air-Cooled Heat Pump Unit is run through in one end of group, first circulation pipeline and high temperature heat pump unit, the first circulation pipeline, described The other end of first circulation pipeline runs through the high temperature heat pump unit;
First Air-Cooled Heat Pump Unit and the high temperature heat pump unit are connect with the control system.
3. heating system as claimed in claim 2, it is characterised in that:Second heat exchange circulation includes energy storage water tank, The high temperature heat pump unit is run through in one end of two circulation lines and the high temperature heat pump unit, the second circulation pipeline, described The other end of second circulation pipeline runs through the energy storage water tank.
4. heating system as claimed in claim 3, it is characterised in that:The third heat exchange circulation include plate heat exchanger, The energy storage water tank is run through in one end of third circulation line and the energy storage water tank, the third circulation line, and the third is followed The other end on endless tube road runs through the plate heat exchanger;
The plate heat exchanger is connect with the control system.
5. heating system as claimed in claim 4, it is characterised in that:4th heat exchange circulation includes user's heating circulation The plate heat exchanger is run through in one end of pipeline and the plate heat exchanger, user's heating circulation pipeline, and the user supplies The other end of warm circulation line is connect with user's heating system.
6. heating system as claimed in claim 5, it is characterised in that:The water replanishing device includes softening water tank, the softening Water tank one end is connected to the circuit end of user's heating circulation pipeline in the 4th heat exchange circulation, and softening water tank goes out The 5th water pump assembly is provided on water end (W.E.), the softening water tank is connected to the energy storage water tank simultaneously, the softening water tank and institute It states and is provided with regulated expander, the softening water tank and the accumulation of energy on the pipeline of the circuit end connection of user's heating circulation pipeline It is provided with full-automatic demineralizer on the pipeline of water tank connection;
The bottom of the softening water tank is provided with sewer comb, the pipe that the softening water tank is connected to the full-automatic demineralizer Road is communicated with tap water comb.
The regulated expander and full-automatic demineralizer are connect with the control system.
7. heating system as claimed in claim 2, it is characterised in that:The first circulation pipeline for being provided on water end (W.E.) One water pump assembly, first water pump assembly are connect with the control system.
8. heating system as claimed in claim 3, it is characterised in that:The second circulation pipeline for being provided on water end (W.E.) Two water pump assemblies, second water pump assembly are connect with the control system.
9. heating system as claimed in claim 4, it is characterised in that:The third circulation line for being provided on water end (W.E.) Three water pump assemblies, the third water pump assembly are connect with the control system.
10. heating system as claimed in claim 5, it is characterised in that:It is set on the circuit end of user's heating circulation pipeline It is equipped with the 4th water pump assembly, the 4th water pump assembly is connect with the control system.
CN201810414953.0A 2018-05-03 2018-05-03 Heat supply system Active CN108716704B (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN201810414953.0A CN108716704B (en) 2018-05-03 2018-05-03 Heat supply system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN201810414953.0A CN108716704B (en) 2018-05-03 2018-05-03 Heat supply system

Publications (2)

Publication Number Publication Date
CN108716704A true CN108716704A (en) 2018-10-30
CN108716704B CN108716704B (en) 2020-03-13

Family

ID=63899590

Family Applications (1)

Application Number Title Priority Date Filing Date
CN201810414953.0A Active CN108716704B (en) 2018-05-03 2018-05-03 Heat supply system

Country Status (1)

Country Link
CN (1) CN108716704B (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113566451A (en) * 2020-04-29 2021-10-29 约克广州空调冷冻设备有限公司 Heat pump system

Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5727396A (en) * 1995-12-15 1998-03-17 Gas Research Institute Method and apparatus for cooling a prime mover for a gas-engine driven heat pump
CN101101162A (en) * 2007-08-01 2008-01-09 中原工学院 Air-geothermal energy double heat source synchronization composite heat pump device
CN102410665A (en) * 2011-11-22 2012-04-11 北京矿大节能科技有限公司 Waste heat recovery and utilization system for coal mine air compressor
CN103900175A (en) * 2014-03-07 2014-07-02 浙江陆特能源科技有限公司 Energy storage type heat pump system
CN107366946A (en) * 2017-08-10 2017-11-21 郗厚站 Heating system and its application method

Patent Citations (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
US5727396A (en) * 1995-12-15 1998-03-17 Gas Research Institute Method and apparatus for cooling a prime mover for a gas-engine driven heat pump
CN101101162A (en) * 2007-08-01 2008-01-09 中原工学院 Air-geothermal energy double heat source synchronization composite heat pump device
CN102410665A (en) * 2011-11-22 2012-04-11 北京矿大节能科技有限公司 Waste heat recovery and utilization system for coal mine air compressor
CN103900175A (en) * 2014-03-07 2014-07-02 浙江陆特能源科技有限公司 Energy storage type heat pump system
CN107366946A (en) * 2017-08-10 2017-11-21 郗厚站 Heating system and its application method

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113566451A (en) * 2020-04-29 2021-10-29 约克广州空调冷冻设备有限公司 Heat pump system
CN113566451B (en) * 2020-04-29 2022-12-30 约克广州空调冷冻设备有限公司 Heat pump system

Also Published As

Publication number Publication date
CN108716704B (en) 2020-03-13

Similar Documents

Publication Publication Date Title
CN102269442B (en) Heating system utilizing heat pump technology to improve heating capacity of central heating pipe network
CN205299702U (en) Central heating system provides multiple forms of energy to complement each other
CN202145018U (en) Heat supply system for improving heat supply capacity of centralized heat supply tube network by heat pump technology
CN201476169U (en) Bathwater heating device recovering and utilizing waste bathwater heat
CN110081503A (en) The energy-storage system of energy simultaneous air-conditioning
CN108716704A (en) A kind of heating system
CN202216328U (en) Hot water supply system
CN203116135U (en) Solar boiler heat supply system
CN209130970U (en) A kind of joint energy storage heating system
CN208253697U (en) A kind of geothermal heating operating system of accumulation of heat and multistage terminal user's combined heat
CN201037671Y (en) Direct type centralization heat collection individual household heat-storage solar energy water heating system
CN202813884U (en) Solar energy ground source heat combined zero-carbon-emission heating and refrigeration system
CN2879012Y (en) Recycling heating water storage direct-heating electric heater
CN110081494A (en) A kind of heat pump heating device and heating system
RU2132024C1 (en) Method and device for operating heat and water supply system
CN204494587U (en) A kind of constant-temperature hot water feed system reclaiming with waste water residual heat and be incubated
CN108317755A (en) A kind of solar energy high temperature hot water supply system
CN207112994U (en) Storing energy and supplying hot system
CN208907692U (en) A kind of direct HEAT PUMP BASED ON EJECTING PRINCIPLE system of enhanced heat exchange
CN206398977U (en) The hot-water supply device that a kind of earth source heat pump unit is combined with boiler
CN208760500U (en) Caravan and its thermal cycle water circuit system
CN205655525U (en) Solar energy and regional energy supply system of renewable energy of air source coupling
CN202852975U (en) Water heater capable of being used together with a concentrated heating system
CN205669899U (en) Cold heat recovery fresh air conditioner hot-water heating system
CN206724278U (en) A kind of efficient composite thermal source health hot water heating system

Legal Events

Date Code Title Description
PB01 Publication
PB01 Publication
SE01 Entry into force of request for substantive examination
SE01 Entry into force of request for substantive examination
GR01 Patent grant
TR01 Transfer of patent right

Effective date of registration: 20201125

Address after: No.3 Fuquan Road, Wenquan street, Jimo District, Qingdao City, Shandong Province

Patentee after: Zhongcheng Xingyu (Qingdao) new energy technology development Co.,Ltd.

Address before: 266200 No. six the Yellow River road three, Jimo Economic Development Zone, Qingdao, Shandong.

Patentee before: QINGDAO QIXINGYU ENERGY MANAGEMENT Co.,Ltd.

TR01 Transfer of patent right
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210111

Address after: 266200 11th floor, Defu Plaza, Heshan Road, Jimo District, Qingdao, Shandong Province

Patentee after: QINGDAO QIXINGYU ENERGY MANAGEMENT Co.,Ltd.

Address before: 265000 No.3, Fuquan Road, Wenquan street, Jimo District, Qingdao City, Shandong Province

Patentee before: Zhongcheng Xingyu (Qingdao) new energy technology development Co.,Ltd.

PP01 Preservation of patent right
PP01 Preservation of patent right

Effective date of registration: 20210226

Granted publication date: 20200313

PD01 Discharge of preservation of patent

Date of cancellation: 20240226

Granted publication date: 20200313

PD01 Discharge of preservation of patent